France Electricity Demand and Generation Mix
France demand was 58,105 MW in the hour starting 12 Nov 2026, 14:00 CET (UTC+01:00). Nuclear was the largest source in the hour starting 12 Nov 2026, 14:00 CET (UTC+01:00), at 76% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- France is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 12 Nov 2026, 14:00 CET (UTC+01:00), demand in France was 58,105 MW, against a day-ahead forecast of 57,138 MW.
- Nuclear supplied 76.1% of France's generation in the hour starting 12 Nov 2026, 14:00 CET (UTC+01:00).
- The day-ahead price in France averaged EUR 197.25/MWh for delivery on 2026-11-13 (13 November 2026).
- Installed generating capacity in France was 164 GW in 2026, as reported to ENTSO-E.
- Demand in France totalled 428 TWh in 2024.
- Nuclear supplied 70.4% of France's generation in 2024.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 12 Nov 2026, 14:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00:00Z.
Generation by Source
Latest hour with generation by source: 12 Nov 2026, 14:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Nuclear | 42,913 MW | 76.1% |
| Gas | 5,290 MW | 9.4% |
| Solar | 3,755 MW | 6.7% |
| Hydro | 3,688 MW | 6.5% |
| Other | 400 MW | 0.7% |
| Bioenergy | 275 MW | 0.5% |
| Oil | 37 MW | 0.1% |
| Storage | -1,014 MW | charging |
| Total from these sources | 56,357 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00:00Z.
Day-Ahead Price
Delivery day 2026-11-13 (13 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for France and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-13.
Last 30 Days, Hourly
Times in UTCShow the data table (687 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-14T23:00Z | 40,573 MW |
| 2026-10-15T00:00Z | 38,525 MW |
| 2026-10-15T01:00Z | 36,543 MW |
| 2026-10-15T02:00Z | 36,023 MW |
| 2026-10-15T03:00Z | 37,525 MW |
| 2026-10-15T04:00Z | 41,795 MW |
| 2026-10-15T05:00Z | 46,428 MW |
| 2026-10-15T06:00Z | 48,399 MW |
| 2026-10-15T07:00Z | 48,995 MW |
| 2026-10-15T08:00Z | 49,163 MW |
| 2026-10-15T09:00Z | 49,598 MW |
| 2026-10-15T10:00Z | 49,455 MW |
| 2026-10-15T11:00Z | 48,045 MW |
| 2026-10-15T12:00Z | 48,287 MW |
| 2026-10-15T13:00Z | 47,501 MW |
| 2026-10-15T14:00Z | 46,137 MW |
| 2026-10-15T15:00Z | 45,786 MW |
| 2026-10-15T16:00Z | 47,821 MW |
| 2026-10-15T17:00Z | 50,422 MW |
| 2026-10-15T18:00Z | 47,847 MW |
| 2026-10-15T19:00Z | 44,580 MW |
| 2026-10-15T20:00Z | 44,433 MW |
| 2026-10-15T21:00Z | 43,845 MW |
| 2026-10-15T22:00Z | 41,711 MW |
| 2026-10-15T23:00Z | 39,975 MW |
| 2026-10-16T00:00Z | 37,696 MW |
| 2026-10-16T01:00Z | 35,751 MW |
| 2026-10-16T02:00Z | 35,348 MW |
| 2026-10-16T03:00Z | 36,943 MW |
| 2026-10-16T04:00Z | 40,784 MW |
| 2026-10-16T05:00Z | 45,589 MW |
| 2026-10-16T06:00Z | 47,691 MW |
| 2026-10-16T07:00Z | 48,162 MW |
| 2026-10-16T08:00Z | 48,277 MW |
| 2026-10-16T09:00Z | 48,625 MW |
| 2026-10-16T10:00Z | 49,094 MW |
| 2026-10-16T11:00Z | 47,519 MW |
| 2026-10-16T12:00Z | 47,820 MW |
| 2026-10-16T13:00Z | 46,746 MW |
| 2026-10-16T14:00Z | 44,909 MW |
| 2026-10-16T15:00Z | 45,237 MW |
| 2026-10-16T16:00Z | 47,053 MW |
| 2026-10-16T17:00Z | 49,075 MW |
| 2026-10-16T18:00Z | 46,629 MW |
| 2026-10-16T19:00Z | 43,855 MW |
| 2026-10-16T20:00Z | 44,094 MW |
| 2026-10-16T21:00Z | 43,483 MW |
| 2026-10-16T22:00Z | 41,359 MW |
| 2026-10-16T23:00Z | 39,573 MW |
| 2026-10-17T00:00Z | 37,164 MW |
| 2026-10-17T01:00Z | 35,005 MW |
| 2026-10-17T02:00Z | 34,118 MW |
| 2026-10-17T03:00Z | 34,636 MW |
| 2026-10-17T04:00Z | 35,963 MW |
| 2026-10-17T05:00Z | 37,610 MW |
| 2026-10-17T06:00Z | 39,671 MW |
| 2026-10-17T07:00Z | 41,669 MW |
| 2026-10-17T08:00Z | 42,802 MW |
| 2026-10-17T09:00Z | 44,055 MW |
| 2026-10-17T10:00Z | 45,479 MW |
| 2026-10-17T11:00Z | 43,975 MW |
| 2026-10-17T12:00Z | 43,752 MW |
| 2026-10-17T13:00Z | 42,607 MW |
| 2026-10-17T14:00Z | 40,858 MW |
| 2026-10-17T15:00Z | 41,026 MW |
| 2026-10-17T16:00Z | 42,985 MW |
| 2026-10-17T17:00Z | 45,613 MW |
| 2026-10-17T18:00Z | 43,925 MW |
| 2026-10-17T19:00Z | 41,959 MW |
| 2026-10-17T20:00Z | 42,543 MW |
| 2026-10-17T21:00Z | 42,694 MW |
| 2026-10-17T22:00Z | 40,721 MW |
| 2026-10-17T23:00Z | 39,181 MW |
| 2026-10-18T00:00Z | 37,212 MW |
| 2026-10-18T01:00Z | 35,290 MW |
| 2026-10-18T02:00Z | 34,280 MW |
| 2026-10-18T03:00Z | 34,570 MW |
| 2026-10-18T04:00Z | 35,774 MW |
| 2026-10-18T05:00Z | 36,948 MW |
| 2026-10-18T06:00Z | 38,424 MW |
| 2026-10-18T07:00Z | 40,699 MW |
| 2026-10-18T08:00Z | 42,886 MW |
| 2026-10-18T09:00Z | 44,706 MW |
| 2026-10-18T10:00Z | 46,541 MW |
| 2026-10-18T11:00Z | 44,581 MW |
| 2026-10-18T12:00Z | 43,509 MW |
| 2026-10-18T13:00Z | 42,407 MW |
| 2026-10-18T14:00Z | 41,047 MW |
| 2026-10-18T15:00Z | 41,414 MW |
| 2026-10-18T16:00Z | 44,567 MW |
| 2026-10-18T17:00Z | 48,323 MW |
| 2026-10-18T18:00Z | 46,623 MW |
| 2026-10-18T19:00Z | 44,758 MW |
| 2026-10-18T20:00Z | 45,054 MW |
| 2026-10-18T21:00Z | 44,738 MW |
| 2026-10-18T22:00Z | 43,119 MW |
| 2026-10-18T23:00Z | 41,564 MW |
| 2026-10-19T00:00Z | 39,339 MW |
| 2026-10-19T01:00Z | 37,471 MW |
| 2026-10-19T02:00Z | 37,450 MW |
| 2026-10-19T03:00Z | 39,675 MW |
| 2026-10-19T04:00Z | 43,917 MW |
| 2026-10-19T05:00Z | 48,688 MW |
| 2026-10-19T06:00Z | 52,255 MW |
| 2026-10-19T07:00Z | 53,916 MW |
| 2026-10-19T08:00Z | 54,615 MW |
| 2026-10-19T09:00Z | 55,133 MW |
| 2026-10-19T10:00Z | 55,707 MW |
| 2026-10-19T11:00Z | 54,009 MW |
| 2026-10-19T12:00Z | 54,407 MW |
| 2026-10-19T13:00Z | 52,615 MW |
| 2026-10-19T14:00Z | 50,537 MW |
| 2026-10-19T15:00Z | 50,089 MW |
| 2026-10-19T16:00Z | 52,978 MW |
| 2026-10-19T17:00Z | 56,219 MW |
| 2026-10-19T18:00Z | 53,092 MW |
| 2026-10-19T19:00Z | 49,364 MW |
| 2026-10-19T20:00Z | 48,906 MW |
| 2026-10-19T21:00Z | 48,248 MW |
| 2026-10-19T22:00Z | 45,975 MW |
| 2026-10-19T23:00Z | 44,128 MW |
| 2026-10-20T00:00Z | 41,976 MW |
| 2026-10-20T01:00Z | 39,630 MW |
| 2026-10-20T02:00Z | 39,091 MW |
| 2026-10-20T03:00Z | 40,809 MW |
| 2026-10-20T04:00Z | 44,781 MW |
| 2026-10-20T05:00Z | 49,326 MW |
| 2026-10-20T06:00Z | 52,634 MW |
| 2026-10-20T07:00Z | 54,339 MW |
| 2026-10-20T08:00Z | 54,656 MW |
| 2026-10-20T09:00Z | 55,324 MW |
| 2026-10-20T10:00Z | 55,476 MW |
| 2026-10-20T11:00Z | 53,991 MW |
| 2026-10-20T12:00Z | 53,732 MW |
| 2026-10-20T13:00Z | 52,105 MW |
| 2026-10-20T14:00Z | 50,276 MW |
| 2026-10-20T15:00Z | 50,118 MW |
| 2026-10-20T16:00Z | 53,042 MW |
| 2026-10-20T17:00Z | 55,776 MW |
| 2026-10-20T18:00Z | 52,734 MW |
| 2026-10-20T19:00Z | 49,100 MW |
| 2026-10-20T20:00Z | 48,889 MW |
| 2026-10-20T21:00Z | 48,008 MW |
| 2026-10-20T22:00Z | 46,061 MW |
| 2026-10-20T23:00Z | 44,457 MW |
| 2026-10-21T00:00Z | 42,414 MW |
| 2026-10-21T01:00Z | 40,514 MW |
| 2026-10-21T02:00Z | 40,040 MW |
| 2026-10-21T03:00Z | 41,770 MW |
| 2026-10-21T04:00Z | 46,062 MW |
| 2026-10-21T05:00Z | 50,157 MW |
| 2026-10-21T06:00Z | 52,932 MW |
| 2026-10-21T07:00Z | 54,253 MW |
| 2026-10-21T08:00Z | 54,978 MW |
| 2026-10-21T09:00Z | 55,912 MW |
| 2026-10-21T10:00Z | 56,044 MW |
| 2026-10-21T11:00Z | 55,027 MW |
| 2026-10-21T12:00Z | 54,543 MW |
| 2026-10-21T13:00Z | 53,015 MW |
| 2026-10-21T14:00Z | 51,499 MW |
| 2026-10-21T15:00Z | 50,599 MW |
| 2026-10-21T16:00Z | 53,144 MW |
| 2026-10-21T17:00Z | 57,199 MW |
| 2026-10-21T18:00Z | 54,107 MW |
| 2026-10-21T19:00Z | 51,024 MW |
| 2026-10-21T20:00Z | 50,973 MW |
| 2026-10-21T21:00Z | 50,218 MW |
| 2026-10-21T22:00Z | 48,148 MW |
| 2026-10-21T23:00Z | 46,284 MW |
| 2026-10-22T00:00Z | 44,370 MW |
| 2026-10-22T01:00Z | 42,258 MW |
| 2026-10-22T02:00Z | 41,848 MW |
| 2026-10-22T03:00Z | 43,827 MW |
| 2026-10-22T04:00Z | 47,834 MW |
| 2026-10-22T05:00Z | 52,226 MW |
| 2026-10-22T06:00Z | 55,173 MW |
| 2026-10-22T07:00Z | 55,697 MW |
| 2026-10-22T08:00Z | 55,722 MW |
| 2026-10-22T09:00Z | 55,883 MW |
| 2026-10-22T10:00Z | 55,716 MW |
| 2026-10-22T11:00Z | 54,259 MW |
| 2026-10-22T12:00Z | 54,120 MW |
| 2026-10-22T13:00Z | 52,332 MW |
| 2026-10-22T14:00Z | 50,028 MW |
| 2026-10-22T15:00Z | 49,227 MW |
| 2026-10-22T16:00Z | 52,600 MW |
| 2026-10-22T17:00Z | 55,928 MW |
| 2026-10-22T18:00Z | 52,923 MW |
| 2026-10-22T19:00Z | 49,782 MW |
| 2026-10-22T20:00Z | 49,730 MW |
| 2026-10-22T21:00Z | 49,093 MW |
| 2026-10-22T22:00Z | 47,140 MW |
| 2026-10-22T23:00Z | 45,663 MW |
| 2026-10-23T00:00Z | 43,775 MW |
| 2026-10-23T01:00Z | 41,632 MW |
| 2026-10-23T02:00Z | 41,202 MW |
| 2026-10-23T03:00Z | 42,654 MW |
| 2026-10-23T04:00Z | 46,359 MW |
| 2026-10-23T05:00Z | 50,461 MW |
| 2026-10-23T06:00Z | 53,561 MW |
| 2026-10-23T07:00Z | 55,009 MW |
| 2026-10-23T08:00Z | 56,507 MW |
| 2026-10-23T09:00Z | 57,657 MW |
| 2026-10-23T10:00Z | 57,645 MW |
| 2026-10-23T11:00Z | 56,427 MW |
| 2026-10-23T12:00Z | 56,132 MW |
| 2026-10-23T13:00Z | 54,714 MW |
| 2026-10-23T14:00Z | 52,310 MW |
| 2026-10-23T15:00Z | 51,841 MW |
| 2026-10-23T16:00Z | 53,972 MW |
| 2026-10-23T17:00Z | 56,547 MW |
| 2026-10-23T18:00Z | 54,229 MW |
| 2026-10-23T19:00Z | 51,290 MW |
| 2026-10-23T20:00Z | 51,403 MW |
| 2026-10-23T21:00Z | 51,052 MW |
| 2026-10-23T22:00Z | 48,790 MW |
| 2026-10-23T23:00Z | 46,978 MW |
| 2026-10-24T00:00Z | 44,634 MW |
| 2026-10-24T01:00Z | 42,024 MW |
| 2026-10-24T02:00Z | 40,980 MW |
| 2026-10-24T03:00Z | 41,085 MW |
| 2026-10-24T04:00Z | 42,573 MW |
| 2026-10-24T05:00Z | 44,480 MW |
| 2026-10-24T06:00Z | 46,177 MW |
| 2026-10-24T07:00Z | 48,317 MW |
| 2026-10-24T08:00Z | 49,601 MW |
| 2026-10-24T09:00Z | 50,571 MW |
| 2026-10-24T10:00Z | 51,890 MW |
| 2026-10-24T11:00Z | 50,516 MW |
| 2026-10-24T12:00Z | 50,273 MW |
| 2026-10-24T13:00Z | 48,798 MW |
| 2026-10-24T14:00Z | 48,024 MW |
| 2026-10-24T15:00Z | 48,280 MW |
| 2026-10-24T16:00Z | 50,987 MW |
| 2026-10-24T17:00Z | 53,455 MW |
| 2026-10-24T18:00Z | 51,051 MW |
| 2026-10-24T19:00Z | 48,669 MW |
| 2026-10-24T20:00Z | 49,033 MW |
| 2026-10-24T21:00Z | 48,998 MW |
| 2026-10-24T22:00Z | 46,758 MW |
| 2026-10-24T23:00Z | 44,300 MW |
| 2026-10-25T00:00Z | 41,588 MW |
| 2026-10-25T01:00Z | 39,412 MW |
| 2026-10-25T02:00Z | 37,630 MW |
| 2026-10-25T03:00Z | 37,026 MW |
| 2026-10-25T04:00Z | 37,801 MW |
| 2026-10-25T05:00Z | 39,124 MW |
| 2026-10-25T06:00Z | 40,082 MW |
| 2026-10-25T07:00Z | 42,459 MW |
| 2026-10-25T08:00Z | 45,045 MW |
| 2026-10-25T09:00Z | 46,057 MW |
| 2026-10-25T10:00Z | 47,368 MW |
| 2026-10-25T11:00Z | 48,505 MW |
| 2026-10-25T12:00Z | 46,190 MW |
| 2026-10-25T13:00Z | 45,312 MW |
| 2026-10-25T14:00Z | 44,164 MW |
| 2026-10-25T15:00Z | 43,201 MW |
| 2026-10-25T16:00Z | 44,884 MW |
| 2026-10-25T17:00Z | 49,382 MW |
| 2026-10-25T18:00Z | 50,875 MW |
| 2026-10-25T19:00Z | 48,574 MW |
| 2026-10-25T20:00Z | 46,795 MW |
| 2026-10-25T21:00Z | 47,126 MW |
| 2026-10-25T22:00Z | 47,119 MW |
| 2026-10-25T23:00Z | 45,845 MW |
| 2026-10-26T00:00Z | 44,571 MW |
| 2026-10-26T01:00Z | 41,884 MW |
| 2026-10-26T02:00Z | 39,802 MW |
| 2026-10-26T03:00Z | 40,014 MW |
| 2026-10-26T04:00Z | 42,573 MW |
| 2026-10-26T05:00Z | 47,124 MW |
| 2026-10-26T06:00Z | 50,728 MW |
| 2026-10-26T07:00Z | 53,536 MW |
| 2026-10-26T08:00Z | 54,681 MW |
| 2026-10-26T09:00Z | 54,698 MW |
| 2026-10-26T10:00Z | 54,905 MW |
| 2026-10-26T11:00Z | 55,892 MW |
| 2026-10-26T12:00Z | 54,725 MW |
| 2026-10-26T13:00Z | 54,805 MW |
| 2026-10-26T14:00Z | 53,368 MW |
| 2026-10-26T15:00Z | 51,817 MW |
| 2026-10-26T16:00Z | 52,356 MW |
| 2026-10-26T17:00Z | 56,382 MW |
| 2026-10-26T18:00Z | 56,894 MW |
| 2026-10-26T19:00Z | 52,987 MW |
| 2026-10-26T20:00Z | 49,713 MW |
| 2026-10-26T21:00Z | 49,506 MW |
| 2026-10-26T22:00Z | 48,929 MW |
| 2026-10-26T23:00Z | 46,739 MW |
| 2026-10-27T00:00Z | 45,101 MW |
| 2026-10-27T01:00Z | 42,923 MW |
| 2026-10-27T02:00Z | 41,118 MW |
| 2026-10-27T03:00Z | 40,624 MW |
| 2026-10-27T04:00Z | 42,250 MW |
| 2026-10-27T05:00Z | 46,490 MW |
| 2026-10-27T06:00Z | 49,912 MW |
| 2026-10-27T07:00Z | 51,677 MW |
| 2026-10-27T08:00Z | 51,893 MW |
| 2026-10-27T09:00Z | 51,435 MW |
| 2026-10-27T10:00Z | 51,803 MW |
| 2026-10-27T11:00Z | 52,854 MW |
| 2026-10-27T12:00Z | 51,656 MW |
| 2026-10-27T13:00Z | 51,784 MW |
| 2026-10-27T14:00Z | 50,695 MW |
| 2026-10-27T15:00Z | 49,701 MW |
| 2026-10-27T16:00Z | 50,185 MW |
| 2026-10-27T17:00Z | 54,314 MW |
| 2026-10-27T18:00Z | 54,985 MW |
| 2026-10-27T19:00Z | 51,361 MW |
| 2026-10-27T20:00Z | 48,449 MW |
| 2026-10-27T21:00Z | 48,468 MW |
| 2026-10-27T22:00Z | 48,113 MW |
| 2026-10-27T23:00Z | 46,129 MW |
| 2026-10-28T00:00Z | 44,584 MW |
| 2026-10-28T01:00Z | 42,568 MW |
| 2026-10-28T02:00Z | 40,660 MW |
| 2026-10-28T03:00Z | 40,668 MW |
| 2026-10-28T04:00Z | 43,037 MW |
| 2026-10-28T05:00Z | 47,438 MW |
| 2026-10-28T06:00Z | 51,333 MW |
| 2026-10-28T07:00Z | 53,549 MW |
| 2026-10-28T08:00Z | 53,728 MW |
| 2026-10-28T09:00Z | 53,706 MW |
| 2026-10-28T10:00Z | 53,443 MW |
| 2026-10-28T11:00Z | 53,807 MW |
| 2026-10-28T12:00Z | 52,161 MW |
| 2026-10-28T13:00Z | 51,899 MW |
| 2026-10-28T14:00Z | 50,707 MW |
| 2026-10-28T15:00Z | 49,945 MW |
| 2026-10-28T16:00Z | 51,160 MW |
| 2026-10-28T17:00Z | 55,648 MW |
| 2026-10-28T18:00Z | 56,535 MW |
| 2026-10-28T19:00Z | 53,099 MW |
| 2026-10-28T20:00Z | 50,189 MW |
| 2026-10-28T21:00Z | 50,394 MW |
| 2026-10-28T22:00Z | 50,101 MW |
| 2026-10-28T23:00Z | 48,425 MW |
| 2026-10-29T00:00Z | 46,853 MW |
| 2026-10-29T01:00Z | 44,758 MW |
| 2026-10-29T02:00Z | 42,811 MW |
| 2026-10-29T03:00Z | 42,746 MW |
| 2026-10-29T04:00Z | 44,869 MW |
| 2026-10-29T05:00Z | 49,380 MW |
| 2026-10-29T06:00Z | 53,010 MW |
| 2026-10-29T07:00Z | 55,299 MW |
| 2026-10-29T08:00Z | 55,007 MW |
| 2026-10-29T09:00Z | 54,568 MW |
| 2026-10-29T10:00Z | 54,110 MW |
| 2026-10-29T11:00Z | 54,058 MW |
| 2026-10-29T12:00Z | 52,228 MW |
| 2026-10-29T13:00Z | 52,278 MW |
| 2026-10-29T14:00Z | 51,241 MW |
| 2026-10-29T15:00Z | 50,246 MW |
| 2026-10-29T16:00Z | 51,991 MW |
| 2026-10-29T17:00Z | 56,197 MW |
| 2026-10-29T18:00Z | 56,780 MW |
| 2026-10-29T19:00Z | 53,460 MW |
| 2026-10-29T20:00Z | 50,538 MW |
| 2026-10-29T21:00Z | 50,943 MW |
| 2026-10-29T22:00Z | 50,643 MW |
| 2026-10-29T23:00Z | 49,134 MW |
| 2026-10-30T00:00Z | 47,769 MW |
| 2026-10-30T01:00Z | 45,664 MW |
| 2026-10-30T02:00Z | 44,005 MW |
| 2026-10-30T03:00Z | 44,052 MW |
| 2026-10-30T04:00Z | 46,320 MW |
| 2026-10-30T05:00Z | 50,413 MW |
| 2026-10-30T06:00Z | 53,792 MW |
| 2026-10-30T07:00Z | 56,032 MW |
| 2026-10-30T08:00Z | 55,864 MW |
| 2026-10-30T09:00Z | 55,059 MW |
| 2026-10-30T10:00Z | 54,510 MW |
| 2026-10-30T11:00Z | 54,399 MW |
| 2026-10-30T12:00Z | 52,523 MW |
| 2026-10-30T13:00Z | 52,319 MW |
| 2026-10-30T14:00Z | 51,039 MW |
| 2026-10-30T15:00Z | 49,828 MW |
| 2026-10-30T16:00Z | 51,056 MW |
| 2026-10-30T17:00Z | 54,749 MW |
| 2026-10-30T18:00Z | 55,353 MW |
| 2026-10-30T19:00Z | 52,324 MW |
| 2026-10-30T20:00Z | 49,861 MW |
| 2026-10-30T21:00Z | 50,569 MW |
| 2026-10-30T22:00Z | 50,352 MW |
| 2026-10-30T23:00Z | 48,636 MW |
| 2026-10-31T00:00Z | 46,928 MW |
| 2026-10-31T01:00Z | 44,721 MW |
| 2026-10-31T02:00Z | 42,370 MW |
| 2026-10-31T03:00Z | 41,680 MW |
| 2026-10-31T04:00Z | 42,584 MW |
| 2026-10-31T05:00Z | 44,546 MW |
| 2026-10-31T06:00Z | 46,113 MW |
| 2026-10-31T07:00Z | 47,744 MW |
| 2026-10-31T08:00Z | 49,108 MW |
| 2026-10-31T09:00Z | 49,209 MW |
| 2026-10-31T10:00Z | 49,242 MW |
| 2026-10-31T11:00Z | 50,236 MW |
| 2026-10-31T12:00Z | 48,568 MW |
| 2026-10-31T13:00Z | 48,067 MW |
| 2026-10-31T14:00Z | 46,926 MW |
| 2026-10-31T15:00Z | 45,630 MW |
| 2026-10-31T16:00Z | 46,677 MW |
| 2026-10-31T17:00Z | 50,160 MW |
| 2026-10-31T18:00Z | 51,074 MW |
| 2026-10-31T19:00Z | 49,048 MW |
| 2026-10-31T20:00Z | 47,293 MW |
| 2026-10-31T21:00Z | 48,303 MW |
| 2026-10-31T22:00Z | 48,920 MW |
| 2026-10-31T23:00Z | 47,806 MW |
| 2026-11-01T00:00Z | 46,162 MW |
| 2026-11-01T01:00Z | 43,995 MW |
| 2026-11-01T02:00Z | 41,851 MW |
| 2026-11-01T03:00Z | 41,305 MW |
| 2026-11-01T04:00Z | 41,881 MW |
| 2026-11-01T05:00Z | 43,200 MW |
| 2026-11-01T06:00Z | 44,086 MW |
| 2026-11-01T07:00Z | 45,695 MW |
| 2026-11-01T08:00Z | 47,123 MW |
| 2026-11-01T09:00Z | 48,063 MW |
| 2026-11-01T10:00Z | 48,894 MW |
| 2026-11-01T11:00Z | 50,088 MW |
| 2026-11-01T12:00Z | 47,447 MW |
| 2026-11-01T13:00Z | 46,801 MW |
| 2026-11-01T14:00Z | 46,049 MW |
| 2026-11-01T15:00Z | 45,509 MW |
| 2026-11-01T16:00Z | 47,287 MW |
| 2026-11-01T17:00Z | 52,409 MW |
| 2026-11-01T18:00Z | 53,887 MW |
| 2026-11-01T19:00Z | 51,445 MW |
| 2026-11-01T20:00Z | 49,489 MW |
| 2026-11-01T21:00Z | 49,957 MW |
| 2026-11-01T22:00Z | 49,675 MW |
| 2026-11-01T23:00Z | 48,365 MW |
| 2026-11-02T00:00Z | 47,182 MW |
| 2026-11-02T01:00Z | 45,441 MW |
| 2026-11-02T02:00Z | 43,651 MW |
| 2026-11-02T03:00Z | 43,855 MW |
| 2026-11-02T04:00Z | 46,506 MW |
| 2026-11-02T05:00Z | 51,988 MW |
| 2026-11-02T06:00Z | 56,683 MW |
| 2026-11-02T07:00Z | 58,516 MW |
| 2026-11-02T08:00Z | 58,440 MW |
| 2026-11-02T09:00Z | 57,941 MW |
| 2026-11-02T10:00Z | 57,670 MW |
| 2026-11-02T11:00Z | 57,842 MW |
| 2026-11-02T12:00Z | 56,835 MW |
| 2026-11-02T13:00Z | 57,050 MW |
| 2026-11-02T14:00Z | 56,388 MW |
| 2026-11-02T15:00Z | 55,618 MW |
| 2026-11-02T16:00Z | 56,936 MW |
| 2026-11-02T17:00Z | 61,447 MW |
| 2026-11-02T18:00Z | 61,856 MW |
| 2026-11-02T19:00Z | 58,130 MW |
| 2026-11-02T20:00Z | 54,801 MW |
| 2026-11-02T21:00Z | 54,467 MW |
| 2026-11-02T22:00Z | 53,752 MW |
| 2026-11-02T23:00Z | 51,841 MW |
| 2026-11-03T00:00Z | 50,179 MW |
| 2026-11-03T01:00Z | 48,285 MW |
| 2026-11-03T02:00Z | 46,190 MW |
| 2026-11-03T03:00Z | 45,918 MW |
| 2026-11-03T04:00Z | 48,591 MW |
| 2026-11-03T05:00Z | 53,783 MW |
| 2026-11-03T06:00Z | 58,354 MW |
| 2026-11-03T07:00Z | 60,496 MW |
| 2026-11-03T08:00Z | 60,772 MW |
| 2026-11-03T09:00Z | 60,656 MW |
| 2026-11-03T10:00Z | 60,785 MW |
| 2026-11-03T11:00Z | 60,999 MW |
| 2026-11-03T12:00Z | 59,618 MW |
| 2026-11-03T13:00Z | 60,063 MW |
| 2026-11-03T14:00Z | 58,790 MW |
| 2026-11-03T15:00Z | 57,852 MW |
| 2026-11-03T16:00Z | 59,501 MW |
| 2026-11-03T17:00Z | 63,752 MW |
| 2026-11-03T18:00Z | 64,355 MW |
| 2026-11-03T19:00Z | 60,725 MW |
| 2026-11-03T20:00Z | 57,439 MW |
| 2026-11-03T21:00Z | 57,383 MW |
| 2026-11-03T22:00Z | 56,592 MW |
| 2026-11-03T23:00Z | 54,474 MW |
| 2026-11-04T00:00Z | 52,899 MW |
| 2026-11-04T01:00Z | 50,890 MW |
| 2026-11-04T02:00Z | 48,715 MW |
| 2026-11-04T03:00Z | 48,565 MW |
| 2026-11-04T04:00Z | 51,116 MW |
| 2026-11-04T05:00Z | 55,944 MW |
| 2026-11-04T06:00Z | 60,227 MW |
| 2026-11-04T07:00Z | 63,423 MW |
| 2026-11-04T08:00Z | 64,323 MW |
| 2026-11-04T09:00Z | 64,175 MW |
| 2026-11-04T10:00Z | 63,683 MW |
| 2026-11-04T11:00Z | 64,187 MW |
| 2026-11-04T12:00Z | 62,975 MW |
| 2026-11-04T13:00Z | 62,588 MW |
| 2026-11-04T14:00Z | 61,213 MW |
| 2026-11-04T15:00Z | 60,321 MW |
| 2026-11-04T16:00Z | 61,590 MW |
| 2026-11-04T17:00Z | 65,879 MW |
| 2026-11-04T18:00Z | 66,143 MW |
| 2026-11-04T19:00Z | 62,228 MW |
| 2026-11-04T20:00Z | 58,794 MW |
| 2026-11-04T21:00Z | 58,319 MW |
| 2026-11-04T22:00Z | 57,626 MW |
| 2026-11-04T23:00Z | 55,808 MW |
| 2026-11-05T00:00Z | 54,242 MW |
| 2026-11-05T01:00Z | 52,099 MW |
| 2026-11-05T02:00Z | 49,813 MW |
| 2026-11-05T03:00Z | 49,574 MW |
| 2026-11-05T04:00Z | 52,109 MW |
| 2026-11-05T05:00Z | 56,801 MW |
| 2026-11-05T06:00Z | 61,037 MW |
| 2026-11-05T07:00Z | 63,676 MW |
| 2026-11-05T08:00Z | 64,314 MW |
| 2026-11-05T09:00Z | 63,159 MW |
| 2026-11-05T10:00Z | 62,311 MW |
| 2026-11-05T11:00Z | 62,135 MW |
| 2026-11-05T12:00Z | 60,379 MW |
| 2026-11-05T13:00Z | 60,542 MW |
| 2026-11-05T14:00Z | 58,975 MW |
| 2026-11-05T15:00Z | 57,384 MW |
| 2026-11-05T16:00Z | 59,153 MW |
| 2026-11-05T17:00Z | 63,736 MW |
| 2026-11-05T18:00Z | 64,171 MW |
| 2026-11-05T19:00Z | 60,206 MW |
| 2026-11-05T20:00Z | 56,858 MW |
| 2026-11-05T21:00Z | 57,034 MW |
| 2026-11-05T22:00Z | 56,705 MW |
| 2026-11-05T23:00Z | 55,199 MW |
| 2026-11-06T00:00Z | 53,554 MW |
| 2026-11-06T01:00Z | 51,402 MW |
| 2026-11-06T02:00Z | 49,430 MW |
| 2026-11-06T03:00Z | 49,243 MW |
| 2026-11-06T04:00Z | 51,687 MW |
| 2026-11-06T05:00Z | 56,718 MW |
| 2026-11-06T06:00Z | 61,365 MW |
| 2026-11-06T07:00Z | 63,786 MW |
| 2026-11-06T08:00Z | 64,327 MW |
| 2026-11-06T09:00Z | 63,443 MW |
| 2026-11-06T10:00Z | 62,879 MW |
| 2026-11-06T11:00Z | 62,719 MW |
| 2026-11-06T12:00Z | 60,349 MW |
| 2026-11-06T13:00Z | 59,790 MW |
| 2026-11-06T14:00Z | 58,012 MW |
| 2026-11-06T15:00Z | 55,958 MW |
| 2026-11-06T16:00Z | 57,760 MW |
| 2026-11-06T17:00Z | 61,548 MW |
| 2026-11-06T18:00Z | 61,979 MW |
| 2026-11-06T19:00Z | 59,013 MW |
| 2026-11-06T20:00Z | 56,383 MW |
| 2026-11-06T21:00Z | 57,199 MW |
| 2026-11-06T22:00Z | 56,823 MW |
| 2026-11-06T23:00Z | 55,064 MW |
| 2026-11-07T00:00Z | 53,620 MW |
| 2026-11-07T01:00Z | 51,169 MW |
| 2026-11-07T02:00Z | 48,615 MW |
| 2026-11-07T03:00Z | 47,883 MW |
| 2026-11-07T04:00Z | 48,651 MW |
| 2026-11-07T05:00Z | 50,691 MW |
| 2026-11-07T06:00Z | 52,585 MW |
| 2026-11-07T07:00Z | 54,837 MW |
| 2026-11-07T08:00Z | 56,311 MW |
| 2026-11-07T09:00Z | 56,579 MW |
| 2026-11-07T10:00Z | 56,292 MW |
| 2026-11-07T11:00Z | 57,210 MW |
| 2026-11-07T12:00Z | 54,987 MW |
| 2026-11-07T13:00Z | 54,127 MW |
| 2026-11-07T14:00Z | 52,878 MW |
| 2026-11-07T15:00Z | 51,541 MW |
| 2026-11-07T16:00Z | 53,218 MW |
| 2026-11-07T17:00Z | 56,785 MW |
| 2026-11-07T18:00Z | 57,310 MW |
| 2026-11-07T19:00Z | 54,864 MW |
| 2026-11-07T20:00Z | 52,902 MW |
| 2026-11-07T21:00Z | 53,863 MW |
| 2026-11-07T22:00Z | 54,112 MW |
| 2026-11-07T23:00Z | 52,877 MW |
| 2026-11-08T00:00Z | 51,461 MW |
| 2026-11-08T01:00Z | 49,306 MW |
| 2026-11-08T02:00Z | 46,880 MW |
| 2026-11-08T03:00Z | 45,978 MW |
| 2026-11-08T04:00Z | 46,369 MW |
| 2026-11-08T05:00Z | 47,659 MW |
| 2026-11-08T06:00Z | 48,821 MW |
| 2026-11-08T07:00Z | 50,720 MW |
| 2026-11-08T08:00Z | 52,929 MW |
| 2026-11-08T09:00Z | 54,476 MW |
| 2026-11-08T10:00Z | 55,521 MW |
| 2026-11-08T11:00Z | 56,987 MW |
| 2026-11-08T12:00Z | 54,529 MW |
| 2026-11-08T13:00Z | 53,547 MW |
| 2026-11-08T14:00Z | 52,518 MW |
| 2026-11-08T15:00Z | 51,159 MW |
| 2026-11-08T16:00Z | 53,187 MW |
| 2026-11-08T17:00Z | 57,029 MW |
| 2026-11-08T18:00Z | 58,023 MW |
| 2026-11-08T19:00Z | 55,403 MW |
| 2026-11-08T20:00Z | 52,924 MW |
| 2026-11-08T21:00Z | 52,928 MW |
| 2026-11-08T22:00Z | 52,888 MW |
| 2026-11-08T23:00Z | 51,439 MW |
| 2026-11-09T00:00Z | 49,802 MW |
| 2026-11-09T01:00Z | 47,771 MW |
| 2026-11-09T02:00Z | 45,703 MW |
| 2026-11-09T03:00Z | 45,612 MW |
| 2026-11-09T04:00Z | 48,162 MW |
| 2026-11-09T05:00Z | 53,346 MW |
| 2026-11-09T06:00Z | 58,106 MW |
| 2026-11-09T07:00Z | 60,641 MW |
| 2026-11-09T08:00Z | 61,535 MW |
| 2026-11-09T09:00Z | 61,507 MW |
| 2026-11-09T10:00Z | 61,813 MW |
| 2026-11-09T11:00Z | 62,133 MW |
| 2026-11-09T12:00Z | 60,839 MW |
| 2026-11-09T13:00Z | 60,666 MW |
| 2026-11-09T14:00Z | 59,116 MW |
| 2026-11-09T15:00Z | 57,704 MW |
| 2026-11-09T16:00Z | 58,814 MW |
| 2026-11-09T17:00Z | 61,493 MW |
| 2026-11-09T18:00Z | 61,394 MW |
| 2026-11-09T19:00Z | 57,720 MW |
| 2026-11-09T20:00Z | 54,508 MW |
| 2026-11-09T21:00Z | 53,927 MW |
| 2026-11-09T22:00Z | 53,364 MW |
| 2026-11-09T23:00Z | 51,314 MW |
| 2026-11-10T00:00Z | 49,789 MW |
| 2026-11-10T01:00Z | 47,312 MW |
| 2026-11-10T02:00Z | 45,267 MW |
| 2026-11-10T03:00Z | 44,879 MW |
| 2026-11-10T04:00Z | 46,832 MW |
| 2026-11-10T05:00Z | 51,505 MW |
| 2026-11-10T06:00Z | 55,704 MW |
| 2026-11-10T07:00Z | 57,460 MW |
| 2026-11-10T08:00Z | 58,541 MW |
| 2026-11-10T09:00Z | 58,433 MW |
| 2026-11-10T10:00Z | 58,987 MW |
| 2026-11-10T11:00Z | 60,144 MW |
| 2026-11-10T12:00Z | 58,257 MW |
| 2026-11-10T13:00Z | 57,958 MW |
| 2026-11-10T14:00Z | 56,413 MW |
| 2026-11-10T15:00Z | 54,767 MW |
| 2026-11-10T16:00Z | 54,985 MW |
| 2026-11-10T17:00Z | 57,603 MW |
| 2026-11-10T18:00Z | 57,650 MW |
| 2026-11-10T19:00Z | 54,391 MW |
| 2026-11-10T20:00Z | 51,318 MW |
| 2026-11-10T21:00Z | 51,148 MW |
| 2026-11-10T22:00Z | 50,639 MW |
| 2026-11-10T23:00Z | 48,683 MW |
| 2026-11-11T00:00Z | 47,336 MW |
| 2026-11-11T01:00Z | 44,453 MW |
| 2026-11-11T02:00Z | 41,669 MW |
| 2026-11-11T03:00Z | 40,734 MW |
| 2026-11-11T04:00Z | 41,023 MW |
| 2026-11-11T05:00Z | 42,703 MW |
| 2026-11-11T06:00Z | 43,678 MW |
| 2026-11-11T07:00Z | 45,374 MW |
| 2026-11-11T08:00Z | 47,484 MW |
| 2026-11-11T09:00Z | 49,034 MW |
| 2026-11-11T10:00Z | 50,004 MW |
| 2026-11-11T11:00Z | 52,057 MW |
| 2026-11-11T12:00Z | 50,297 MW |
| 2026-11-11T13:00Z | 49,443 MW |
| 2026-11-11T14:00Z | 48,259 MW |
| 2026-11-11T15:00Z | 46,937 MW |
| 2026-11-11T16:00Z | 48,765 MW |
| 2026-11-11T17:00Z | 52,476 MW |
| 2026-11-11T18:00Z | 53,425 MW |
| 2026-11-11T19:00Z | 50,858 MW |
| 2026-11-11T20:00Z | 48,251 MW |
| 2026-11-11T21:00Z | 48,314 MW |
| 2026-11-11T22:00Z | 48,113 MW |
| 2026-11-11T23:00Z | 46,714 MW |
| 2026-11-12T00:00Z | 45,151 MW |
| 2026-11-12T01:00Z | 43,116 MW |
| 2026-11-12T02:00Z | 41,074 MW |
| 2026-11-12T03:00Z | 40,872 MW |
| 2026-11-12T04:00Z | 43,157 MW |
| 2026-11-12T05:00Z | 48,178 MW |
| 2026-11-12T06:00Z | 52,825 MW |
| 2026-11-12T07:00Z | 55,579 MW |
| 2026-11-12T08:00Z | 57,329 MW |
| 2026-11-12T09:00Z | 57,730 MW |
| 2026-11-12T10:00Z | 58,183 MW |
| 2026-11-12T11:00Z | 59,007 MW |
| 2026-11-12T12:00Z | 57,960 MW |
| 2026-11-12T13:00Z | 58,105 MW |
Show the data table (687 rows)
| Hour starting (UTC) | Nuclear | Wind | Gas | Hydro | Solar |
|---|---|---|---|---|---|
| 2026-10-14T23:00Z | 37,562 MW | 3,044 MW | 2,153 MW | 3,022 MW | 0 MW |
| 2026-10-15T00:00Z | 37,654 MW | 3,206 MW | 1,762 MW | 3,068 MW | 0 MW |
| 2026-10-15T01:00Z | 37,799 MW | 3,336 MW | 1,696 MW | 2,907 MW | 0 MW |
| 2026-10-15T02:00Z | 38,476 MW | 3,187 MW | 1,534 MW | 2,886 MW | 0 MW |
| 2026-10-15T03:00Z | 38,806 MW | 2,999 MW | 2,170 MW | 3,055 MW | 0 MW |
| 2026-10-15T04:00Z | 38,865 MW | 2,890 MW | 4,105 MW | 3,179 MW | 0 MW |
| 2026-10-15T05:00Z | 38,545 MW | 2,818 MW | 4,408 MW | 3,624 MW | 198 MW |
| 2026-10-15T06:00Z | 38,348 MW | 2,911 MW | 4,393 MW | 4,037 MW | 690 MW |
| 2026-10-15T07:00Z | 38,322 MW | 2,954 MW | 4,328 MW | 3,621 MW | 4,043 MW |
| 2026-10-15T08:00Z | 38,317 MW | 2,531 MW | 2,858 MW | 2,927 MW | 9,148 MW |
| 2026-10-15T09:00Z | 38,255 MW | 2,040 MW | 1,349 MW | 2,614 MW | 13,595 MW |
| 2026-10-15T10:00Z | 38,065 MW | 1,714 MW | 1,075 MW | 2,011 MW | 16,370 MW |
| 2026-10-15T11:00Z | 37,977 MW | 1,553 MW | 948 MW | 2,045 MW | 17,883 MW |
| 2026-10-15T12:00Z | 37,895 MW | 1,628 MW | 823 MW | 2,135 MW | 17,672 MW |
| 2026-10-15T13:00Z | 37,822 MW | 1,727 MW | 1,096 MW | 2,442 MW | 15,828 MW |
| 2026-10-15T14:00Z | 37,821 MW | 1,562 MW | 1,512 MW | 2,624 MW | 12,280 MW |
| 2026-10-15T15:00Z | 38,166 MW | 1,340 MW | 3,492 MW | 3,659 MW | 7,107 MW |
| 2026-10-15T16:00Z | 38,476 MW | 1,245 MW | 4,531 MW | 4,684 MW | 2,050 MW |
| 2026-10-15T17:00Z | 38,601 MW | 1,722 MW | 4,658 MW | 5,247 MW | 281 MW |
| 2026-10-15T18:00Z | 38,632 MW | 2,497 MW | 4,691 MW | 4,639 MW | 180 MW |
| 2026-10-15T19:00Z | 38,634 MW | 3,118 MW | 4,693 MW | 3,931 MW | 0 MW |
| 2026-10-15T20:00Z | 38,654 MW | 3,347 MW | 4,717 MW | 3,471 MW | 0 MW |
| 2026-10-15T21:00Z | 38,894 MW | 3,328 MW | 4,470 MW | 3,041 MW | 0 MW |
| 2026-10-15T22:00Z | 39,191 MW | 3,408 MW | 3,570 MW | 2,899 MW | 0 MW |
| 2026-10-15T23:00Z | 39,280 MW | 3,370 MW | 3,231 MW | 2,731 MW | 0 MW |
| 2026-10-16T00:00Z | 39,304 MW | 3,179 MW | 2,862 MW | 2,661 MW | 0 MW |
| 2026-10-16T01:00Z | 39,322 MW | 2,993 MW | 2,786 MW | 2,654 MW | 0 MW |
| 2026-10-16T02:00Z | 39,349 MW | 3,184 MW | 2,767 MW | 2,677 MW | 0 MW |
| 2026-10-16T03:00Z | 39,369 MW | 3,225 MW | 3,403 MW | 2,846 MW | 0 MW |
| 2026-10-16T04:00Z | 39,383 MW | 3,168 MW | 4,336 MW | 3,364 MW | 0 MW |
| 2026-10-16T05:00Z | 39,390 MW | 3,109 MW | 4,681 MW | 3,717 MW | 183 MW |
| 2026-10-16T06:00Z | 39,396 MW | 3,090 MW | 4,728 MW | 4,082 MW | 584 MW |
| 2026-10-16T07:00Z | 38,938 MW | 3,211 MW | 4,680 MW | 3,836 MW | 3,049 MW |
| 2026-10-16T08:00Z | 38,302 MW | 2,871 MW | 4,340 MW | 3,147 MW | 6,663 MW |
| 2026-10-16T09:00Z | 38,333 MW | 2,875 MW | 2,133 MW | 2,510 MW | 9,852 MW |
| 2026-10-16T10:00Z | 38,339 MW | 3,277 MW | 988 MW | 1,803 MW | 11,755 MW |
| 2026-10-16T11:00Z | 38,207 MW | 3,761 MW | 806 MW | 1,644 MW | 12,548 MW |
| 2026-10-16T12:00Z | 38,221 MW | 4,620 MW | 927 MW | 1,730 MW | 12,166 MW |
| 2026-10-16T13:00Z | 38,162 MW | 5,472 MW | 1,010 MW | 1,834 MW | 10,672 MW |
| 2026-10-16T14:00Z | 38,108 MW | 5,667 MW | 1,858 MW | 2,102 MW | 8,028 MW |
| 2026-10-16T15:00Z | 38,171 MW | 6,001 MW | 3,346 MW | 3,538 MW | 4,412 MW |
| 2026-10-16T16:00Z | 38,462 MW | 6,527 MW | 4,151 MW | 3,969 MW | 1,249 MW |
| 2026-10-16T17:00Z | 38,715 MW | 7,305 MW | 4,196 MW | 4,068 MW | 259 MW |
| 2026-10-16T18:00Z | 39,123 MW | 7,899 MW | 4,195 MW | 3,705 MW | 202 MW |
| 2026-10-16T19:00Z | 39,037 MW | 8,334 MW | 3,862 MW | 3,120 MW | 0 MW |
| 2026-10-16T20:00Z | 38,705 MW | 9,215 MW | 3,314 MW | 2,571 MW | 0 MW |
| 2026-10-16T21:00Z | 38,666 MW | 9,115 MW | 2,230 MW | 2,373 MW | 0 MW |
| 2026-10-16T22:00Z | 38,656 MW | 9,403 MW | 1,121 MW | 2,228 MW | 0 MW |
| 2026-10-16T23:00Z | 38,703 MW | 9,553 MW | 328 MW | 1,868 MW | 0 MW |
| 2026-10-17T00:00Z | 38,190 MW | 9,252 MW | 344 MW | 1,646 MW | 0 MW |
| 2026-10-17T01:00Z | 38,036 MW | 8,790 MW | 345 MW | 1,518 MW | 0 MW |
| 2026-10-17T02:00Z | 38,044 MW | 8,610 MW | 342 MW | 1,486 MW | 0 MW |
| 2026-10-17T03:00Z | 38,498 MW | 8,708 MW | 344 MW | 1,539 MW | 0 MW |
| 2026-10-17T04:00Z | 38,645 MW | 8,669 MW | 333 MW | 1,807 MW | 0 MW |
| 2026-10-17T05:00Z | 38,658 MW | 9,011 MW | 341 MW | 1,983 MW | 205 MW |
| 2026-10-17T06:00Z | 38,570 MW | 9,356 MW | 342 MW | 1,927 MW | 527 MW |
| 2026-10-17T07:00Z | 38,259 MW | 9,043 MW | 368 MW | 1,833 MW | 2,608 MW |
| 2026-10-17T08:00Z | 37,519 MW | 8,448 MW | 356 MW | 1,659 MW | 6,034 MW |
| 2026-10-17T09:00Z | 36,254 MW | 9,345 MW | 327 MW | 1,461 MW | 9,075 MW |
| 2026-10-17T10:00Z | 35,025 MW | 10,851 MW | 335 MW | 1,427 MW | 10,724 MW |
| 2026-10-17T11:00Z | 33,826 MW | 11,798 MW | 362 MW | 1,382 MW | 11,214 MW |
| 2026-10-17T12:00Z | 32,925 MW | 12,053 MW | 366 MW | 1,467 MW | 10,728 MW |
| 2026-10-17T13:00Z | 32,409 MW | 12,083 MW | 364 MW | 1,558 MW | 9,239 MW |
| 2026-10-17T14:00Z | 33,466 MW | 11,812 MW | 344 MW | 1,631 MW | 6,982 MW |
| 2026-10-17T15:00Z | 35,951 MW | 11,483 MW | 355 MW | 2,301 MW | 4,150 MW |
| 2026-10-17T16:00Z | 36,781 MW | 10,372 MW | 905 MW | 3,284 MW | 1,328 MW |
| 2026-10-17T17:00Z | 36,905 MW | 9,414 MW | 1,453 MW | 4,562 MW | 267 MW |
| 2026-10-17T18:00Z | 36,915 MW | 10,051 MW | 1,975 MW | 3,700 MW | 194 MW |
| 2026-10-17T19:00Z | 36,879 MW | 10,335 MW | 1,446 MW | 2,507 MW | 0 MW |
| 2026-10-17T20:00Z | 36,759 MW | 10,059 MW | 978 MW | 2,123 MW | 0 MW |
| 2026-10-17T21:00Z | 36,803 MW | 9,631 MW | 1,534 MW | 1,908 MW | 0 MW |
| 2026-10-17T22:00Z | 36,878 MW | 9,334 MW | 1,645 MW | 1,897 MW | 0 MW |
| 2026-10-17T23:00Z | 36,857 MW | 8,489 MW | 1,784 MW | 1,726 MW | 0 MW |
| 2026-10-18T00:00Z | 36,884 MW | 7,939 MW | 1,457 MW | 1,713 MW | 0 MW |
| 2026-10-18T01:00Z | 36,677 MW | 7,608 MW | 1,355 MW | 1,535 MW | 0 MW |
| 2026-10-18T02:00Z | 36,626 MW | 7,059 MW | 1,364 MW | 1,429 MW | 0 MW |
| 2026-10-18T03:00Z | 36,729 MW | 6,854 MW | 1,495 MW | 1,488 MW | 0 MW |
| 2026-10-18T04:00Z | 36,942 MW | 6,598 MW | 1,669 MW | 1,631 MW | 0 MW |
| 2026-10-18T05:00Z | 36,943 MW | 6,326 MW | 1,777 MW | 1,766 MW | 199 MW |
| 2026-10-18T06:00Z | 36,868 MW | 5,678 MW | 2,015 MW | 1,940 MW | 417 MW |
| 2026-10-18T07:00Z | 36,891 MW | 4,756 MW | 2,081 MW | 2,555 MW | 2,381 MW |
| 2026-10-18T08:00Z | 36,842 MW | 3,658 MW | 2,103 MW | 2,947 MW | 5,763 MW |
| 2026-10-18T09:00Z | 36,813 MW | 2,987 MW | 2,089 MW | 2,902 MW | 8,736 MW |
| 2026-10-18T10:00Z | 36,668 MW | 2,890 MW | 1,969 MW | 2,400 MW | 10,459 MW |
| 2026-10-18T11:00Z | 36,607 MW | 3,208 MW | 2,023 MW | 1,884 MW | 10,929 MW |
| 2026-10-18T12:00Z | 36,596 MW | 3,150 MW | 2,212 MW | 1,831 MW | 10,142 MW |
| 2026-10-18T13:00Z | 36,513 MW | 3,403 MW | 2,308 MW | 2,068 MW | 8,750 MW |
| 2026-10-18T14:00Z | 36,574 MW | 3,000 MW | 2,886 MW | 2,764 MW | 6,771 MW |
| 2026-10-18T15:00Z | 36,625 MW | 2,674 MW | 3,882 MW | 3,668 MW | 4,148 MW |
| 2026-10-18T16:00Z | 36,654 MW | 2,435 MW | 4,233 MW | 4,328 MW | 1,314 MW |
| 2026-10-18T17:00Z | 36,690 MW | 1,943 MW | 4,624 MW | 4,754 MW | 232 MW |
| 2026-10-18T18:00Z | 36,699 MW | 2,193 MW | 4,777 MW | 4,536 MW | 176 MW |
| 2026-10-18T19:00Z | 36,709 MW | 2,064 MW | 4,680 MW | 3,927 MW | 0 MW |
| 2026-10-18T20:00Z | 36,718 MW | 1,993 MW | 4,653 MW | 3,707 MW | 0 MW |
| 2026-10-18T21:00Z | 36,741 MW | 1,794 MW | 4,651 MW | 3,127 MW | 0 MW |
| 2026-10-18T22:00Z | 36,647 MW | 1,743 MW | 2,698 MW | 2,576 MW | 0 MW |
| 2026-10-18T23:00Z | 36,633 MW | 1,626 MW | 1,642 MW | 2,303 MW | 0 MW |
| 2026-10-19T00:00Z | 36,862 MW | 1,707 MW | 1,569 MW | 2,249 MW | 0 MW |
| 2026-10-19T01:00Z | 36,987 MW | 1,708 MW | 1,553 MW | 2,200 MW | 0 MW |
| 2026-10-19T02:00Z | 36,967 MW | 1,682 MW | 1,571 MW | 2,197 MW | 0 MW |
| 2026-10-19T03:00Z | 36,957 MW | 1,697 MW | 2,387 MW | 2,473 MW | 0 MW |
| 2026-10-19T04:00Z | 36,982 MW | 1,848 MW | 4,305 MW | 3,224 MW | 0 MW |
| 2026-10-19T05:00Z | 37,055 MW | 2,117 MW | 4,862 MW | 3,994 MW | 183 MW |
| 2026-10-19T06:00Z | 37,066 MW | 2,534 MW | 5,049 MW | 4,549 MW | 379 MW |
| 2026-10-19T07:00Z | 37,083 MW | 2,712 MW | 5,095 MW | 4,179 MW | 2,147 MW |
| 2026-10-19T08:00Z | 37,087 MW | 2,771 MW | 5,084 MW | 4,349 MW | 4,786 MW |
| 2026-10-19T09:00Z | 37,069 MW | 2,578 MW | 4,737 MW | 3,816 MW | 6,886 MW |
| 2026-10-19T10:00Z | 37,044 MW | 2,384 MW | 4,618 MW | 3,067 MW | 7,907 MW |
| 2026-10-19T11:00Z | 37,024 MW | 2,305 MW | 4,675 MW | 2,706 MW | 7,665 MW |
| 2026-10-19T12:00Z | 37,008 MW | 2,335 MW | 4,540 MW | 2,693 MW | 6,822 MW |
| 2026-10-19T13:00Z | 36,999 MW | 2,717 MW | 4,702 MW | 2,945 MW | 5,595 MW |
| 2026-10-19T14:00Z | 36,998 MW | 3,245 MW | 4,734 MW | 3,442 MW | 3,976 MW |
| 2026-10-19T15:00Z | 36,993 MW | 3,668 MW | 5,011 MW | 4,266 MW | 2,155 MW |
| 2026-10-19T16:00Z | 36,976 MW | 3,726 MW | 5,490 MW | 5,152 MW | 744 MW |
| 2026-10-19T17:00Z | 36,963 MW | 4,181 MW | 5,489 MW | 5,390 MW | 247 MW |
| 2026-10-19T18:00Z | 36,955 MW | 4,727 MW | 5,490 MW | 4,604 MW | 203 MW |
| 2026-10-19T19:00Z | 36,949 MW | 4,862 MW | 5,021 MW | 3,805 MW | 0 MW |
| 2026-10-19T20:00Z | 36,919 MW | 5,232 MW | 4,288 MW | 3,388 MW | 0 MW |
| 2026-10-19T21:00Z | 36,953 MW | 5,629 MW | 2,898 MW | 3,096 MW | 0 MW |
| 2026-10-19T22:00Z | 37,129 MW | 5,749 MW | 2,227 MW | 2,755 MW | 0 MW |
| 2026-10-19T23:00Z | 37,400 MW | 5,588 MW | 1,489 MW | 2,482 MW | 0 MW |
| 2026-10-20T00:00Z | 38,053 MW | 5,907 MW | 1,364 MW | 2,436 MW | 0 MW |
| 2026-10-20T01:00Z | 38,162 MW | 6,481 MW | 912 MW | 2,563 MW | 0 MW |
| 2026-10-20T02:00Z | 38,023 MW | 6,914 MW | 1,253 MW | 2,669 MW | 0 MW |
| 2026-10-20T03:00Z | 38,078 MW | 7,202 MW | 1,445 MW | 2,926 MW | 0 MW |
| 2026-10-20T04:00Z | 38,234 MW | 7,410 MW | 2,592 MW | 3,414 MW | 0 MW |
| 2026-10-20T05:00Z | 38,233 MW | 7,605 MW | 4,140 MW | 4,089 MW | 183 MW |
| 2026-10-20T06:00Z | 38,214 MW | 6,913 MW | 4,260 MW | 4,339 MW | 301 MW |
| 2026-10-20T07:00Z | 38,240 MW | 6,343 MW | 4,207 MW | 4,079 MW | 1,405 MW |
| 2026-10-20T08:00Z | 38,244 MW | 5,676 MW | 3,703 MW | 3,851 MW | 3,296 MW |
| 2026-10-20T09:00Z | 38,243 MW | 5,180 MW | 3,595 MW | 3,560 MW | 5,149 MW |
| 2026-10-20T10:00Z | 38,159 MW | 5,062 MW | 3,043 MW | 3,150 MW | 6,527 MW |
| 2026-10-20T11:00Z | 38,149 MW | 5,210 MW | 2,689 MW | 2,948 MW | 7,382 MW |
| 2026-10-20T12:00Z | 38,129 MW | 6,014 MW | 2,641 MW | 2,884 MW | 7,353 MW |
| 2026-10-20T13:00Z | 38,196 MW | 6,252 MW | 2,424 MW | 2,844 MW | 6,619 MW |
| 2026-10-20T14:00Z | 38,406 MW | 6,218 MW | 2,505 MW | 3,295 MW | 5,061 MW |
| 2026-10-20T15:00Z | 38,287 MW | 6,460 MW | 3,143 MW | 4,026 MW | 3,187 MW |
| 2026-10-20T16:00Z | 38,258 MW | 7,121 MW | 3,332 MW | 4,763 MW | 1,133 MW |
| 2026-10-20T17:00Z | 37,976 MW | 7,338 MW | 3,297 MW | 5,305 MW | 255 MW |
| 2026-10-20T18:00Z | 38,123 MW | 7,520 MW | 3,307 MW | 4,766 MW | 206 MW |
| 2026-10-20T19:00Z | 37,696 MW | 7,813 MW | 2,900 MW | 4,195 MW | 0 MW |
| 2026-10-20T20:00Z | 37,706 MW | 8,560 MW | 2,234 MW | 3,810 MW | 0 MW |
| 2026-10-20T21:00Z | 37,654 MW | 9,135 MW | 1,184 MW | 3,572 MW | 0 MW |
| 2026-10-20T22:00Z | 38,208 MW | 9,678 MW | 642 MW | 3,679 MW | 0 MW |
| 2026-10-20T23:00Z | 38,354 MW | 9,897 MW | 282 MW | 3,557 MW | 0 MW |
| 2026-10-21T00:00Z | 38,344 MW | 9,926 MW | 286 MW | 3,410 MW | 0 MW |
| 2026-10-21T01:00Z | 37,552 MW | 10,366 MW | 284 MW | 3,354 MW | 0 MW |
| 2026-10-21T02:00Z | 37,277 MW | 10,465 MW | 320 MW | 3,413 MW | 0 MW |
| 2026-10-21T03:00Z | 37,297 MW | 11,080 MW | 335 MW | 3,665 MW | 0 MW |
| 2026-10-21T04:00Z | 37,259 MW | 12,267 MW | 1,092 MW | 3,805 MW | 0 MW |
| 2026-10-21T05:00Z | 37,269 MW | 13,616 MW | 2,118 MW | 4,181 MW | 229 MW |
| 2026-10-21T06:00Z | 37,251 MW | 14,361 MW | 2,093 MW | 4,727 MW | 387 MW |
| 2026-10-21T07:00Z | 37,266 MW | 14,378 MW | 2,307 MW | 5,064 MW | 1,823 MW |
| 2026-10-21T08:00Z | 37,224 MW | 14,462 MW | 1,980 MW | 4,539 MW | 4,535 MW |
| 2026-10-21T09:00Z | 37,109 MW | 15,152 MW | 1,474 MW | 4,000 MW | 7,536 MW |
| 2026-10-21T10:00Z | 37,070 MW | 15,441 MW | 720 MW | 3,615 MW | 9,759 MW |
| 2026-10-21T11:00Z | 35,964 MW | 14,979 MW | 757 MW | 3,330 MW | 10,907 MW |
| 2026-10-21T12:00Z | 35,400 MW | 15,057 MW | 763 MW | 3,281 MW | 10,978 MW |
| 2026-10-21T13:00Z | 34,666 MW | 15,778 MW | 669 MW | 3,000 MW | 10,090 MW |
| 2026-10-21T14:00Z | 35,087 MW | 16,216 MW | 323 MW | 3,035 MW | 8,277 MW |
| 2026-10-21T15:00Z | 36,603 MW | 15,850 MW | 415 MW | 3,349 MW | 4,823 MW |
| 2026-10-21T16:00Z | 38,087 MW | 14,914 MW | 1,656 MW | 4,882 MW | 1,294 MW |
| 2026-10-21T17:00Z | 38,287 MW | 14,374 MW | 2,359 MW | 5,394 MW | 266 MW |
| 2026-10-21T18:00Z | 38,321 MW | 13,457 MW | 2,402 MW | 4,905 MW | 195 MW |
| 2026-10-21T19:00Z | 38,322 MW | 13,487 MW | 2,333 MW | 4,627 MW | 0 MW |
| 2026-10-21T20:00Z | 38,339 MW | 12,862 MW | 1,717 MW | 4,467 MW | 0 MW |
| 2026-10-21T21:00Z | 38,388 MW | 12,739 MW | 1,000 MW | 4,119 MW | 0 MW |
| 2026-10-21T22:00Z | 38,365 MW | 12,470 MW | 336 MW | 3,512 MW | 0 MW |
| 2026-10-21T23:00Z | 38,343 MW | 12,084 MW | 220 MW | 3,295 MW | 0 MW |
| 2026-10-22T00:00Z | 38,290 MW | 12,243 MW | 226 MW | 3,295 MW | 0 MW |
| 2026-10-22T01:00Z | 38,316 MW | 12,514 MW | 276 MW | 3,264 MW | 0 MW |
| 2026-10-22T02:00Z | 38,266 MW | 13,270 MW | 289 MW | 3,031 MW | 0 MW |
| 2026-10-22T03:00Z | 38,267 MW | 14,141 MW | 288 MW | 3,055 MW | 0 MW |
| 2026-10-22T04:00Z | 38,342 MW | 14,730 MW | 288 MW | 3,567 MW | 0 MW |
| 2026-10-22T05:00Z | 38,408 MW | 15,219 MW | 285 MW | 3,906 MW | 219 MW |
| 2026-10-22T06:00Z | 38,415 MW | 15,032 MW | 286 MW | 3,962 MW | 420 MW |
| 2026-10-22T07:00Z | 38,421 MW | 14,211 MW | 281 MW | 3,903 MW | 2,461 MW |
| 2026-10-22T08:00Z | 38,285 MW | 13,232 MW | 288 MW | 3,684 MW | 5,816 MW |
| 2026-10-22T09:00Z | 38,100 MW | 12,614 MW | 282 MW | 3,168 MW | 8,626 MW |
| 2026-10-22T10:00Z | 36,869 MW | 12,277 MW | 268 MW | 3,059 MW | 10,178 MW |
| 2026-10-22T11:00Z | 35,992 MW | 12,008 MW | 287 MW | 3,016 MW | 10,808 MW |
| 2026-10-22T12:00Z | 35,728 MW | 11,685 MW | 288 MW | 2,994 MW | 10,309 MW |
| 2026-10-22T13:00Z | 35,833 MW | 11,334 MW | 336 MW | 2,819 MW | 8,858 MW |
| 2026-10-22T14:00Z | 36,054 MW | 10,218 MW | 799 MW | 2,938 MW | 6,199 MW |
| 2026-10-22T15:00Z | 36,833 MW | 8,938 MW | 2,372 MW | 4,070 MW | 2,997 MW |
| 2026-10-22T16:00Z | 37,823 MW | 8,822 MW | 3,640 MW | 5,167 MW | 795 MW |
| 2026-10-22T17:00Z | 38,740 MW | 10,725 MW | 3,678 MW | 5,721 MW | 205 MW |
| 2026-10-22T18:00Z | 39,059 MW | 12,598 MW | 3,466 MW | 5,104 MW | 189 MW |
| 2026-10-22T19:00Z | 39,119 MW | 14,078 MW | 3,233 MW | 4,439 MW | 0 MW |
| 2026-10-22T20:00Z | 39,106 MW | 14,918 MW | 1,582 MW | 4,035 MW | 0 MW |
| 2026-10-22T21:00Z | 39,086 MW | 15,374 MW | 718 MW | 3,826 MW | 0 MW |
| 2026-10-22T22:00Z | 39,055 MW | 15,768 MW | 424 MW | 4,133 MW | 0 MW |
| 2026-10-22T23:00Z | 39,017 MW | 16,097 MW | 295 MW | 3,269 MW | 0 MW |
| 2026-10-23T00:00Z | 38,855 MW | 16,574 MW | 294 MW | 2,776 MW | 0 MW |
| 2026-10-23T01:00Z | 38,291 MW | 16,988 MW | 292 MW | 2,290 MW | 0 MW |
| 2026-10-23T02:00Z | 38,446 MW | 16,924 MW | 285 MW | 2,229 MW | 0 MW |
| 2026-10-23T03:00Z | 39,067 MW | 17,099 MW | 296 MW | 2,481 MW | 0 MW |
| 2026-10-23T04:00Z | 39,325 MW | 16,967 MW | 502 MW | 2,888 MW | 0 MW |
| 2026-10-23T05:00Z | 39,405 MW | 17,131 MW | 1,217 MW | 3,994 MW | 188 MW |
| 2026-10-23T06:00Z | 39,419 MW | 17,412 MW | 2,072 MW | 4,966 MW | 345 MW |
| 2026-10-23T07:00Z | 39,395 MW | 17,378 MW | 2,122 MW | 4,261 MW | 1,690 MW |
| 2026-10-23T08:00Z | 39,347 MW | 17,098 MW | 2,067 MW | 3,911 MW | 4,226 MW |
| 2026-10-23T09:00Z | 39,169 MW | 17,396 MW | 1,811 MW | 3,111 MW | 6,845 MW |
| 2026-10-23T10:00Z | 38,963 MW | 17,296 MW | 1,638 MW | 3,044 MW | 8,703 MW |
| 2026-10-23T11:00Z | 39,145 MW | 16,902 MW | 1,563 MW | 2,525 MW | 10,109 MW |
| 2026-10-23T12:00Z | 39,125 MW | 17,190 MW | 1,485 MW | 2,391 MW | 10,521 MW |
| 2026-10-23T13:00Z | 38,846 MW | 17,764 MW | 1,604 MW | 2,278 MW | 9,576 MW |
| 2026-10-23T14:00Z | 38,684 MW | 17,580 MW | 1,721 MW | 2,301 MW | 7,054 MW |
| 2026-10-23T15:00Z | 38,819 MW | 18,172 MW | 1,681 MW | 2,757 MW | 3,832 MW |
| 2026-10-23T16:00Z | 39,050 MW | 18,417 MW | 1,543 MW | 3,958 MW | 1,025 MW |
| 2026-10-23T17:00Z | 39,113 MW | 18,487 MW | 1,497 MW | 4,242 MW | 225 MW |
| 2026-10-23T18:00Z | 39,036 MW | 18,111 MW | 1,485 MW | 3,896 MW | 205 MW |
| 2026-10-23T19:00Z | 38,978 MW | 17,655 MW | 1,169 MW | 3,622 MW | 0 MW |
| 2026-10-23T20:00Z | 37,826 MW | 17,330 MW | 1,126 MW | 3,630 MW | 0 MW |
| 2026-10-23T21:00Z | 36,495 MW | 17,280 MW | 1,114 MW | 3,288 MW | 0 MW |
| 2026-10-23T22:00Z | 35,970 MW | 17,070 MW | 762 MW | 3,361 MW | 0 MW |
| 2026-10-23T23:00Z | 35,801 MW | 16,531 MW | 723 MW | 2,993 MW | 0 MW |
| 2026-10-24T00:00Z | 35,786 MW | 16,096 MW | 701 MW | 2,619 MW | 0 MW |
| 2026-10-24T01:00Z | 35,733 MW | 15,509 MW | 674 MW | 2,376 MW | 0 MW |
| 2026-10-24T02:00Z | 35,337 MW | 14,573 MW | 687 MW | 2,363 MW | 0 MW |
| 2026-10-24T03:00Z | 35,237 MW | 13,185 MW | 713 MW | 2,381 MW | 0 MW |
| 2026-10-24T04:00Z | 35,330 MW | 11,880 MW | 697 MW | 2,562 MW | 0 MW |
| 2026-10-24T05:00Z | 35,437 MW | 11,503 MW | 697 MW | 2,713 MW | 230 MW |
| 2026-10-24T06:00Z | 33,814 MW | 10,755 MW | 696 MW | 2,809 MW | 340 MW |
| 2026-10-24T07:00Z | 33,572 MW | 9,877 MW | 708 MW | 2,856 MW | 1,740 MW |
| 2026-10-24T08:00Z | 34,144 MW | 9,903 MW | 695 MW | 2,580 MW | 4,134 MW |
| 2026-10-24T09:00Z | 34,487 MW | 10,271 MW | 683 MW | 2,400 MW | 6,412 MW |
| 2026-10-24T10:00Z | 33,971 MW | 11,540 MW | 678 MW | 2,286 MW | 7,710 MW |
| 2026-10-24T11:00Z | 33,311 MW | 12,498 MW | 702 MW | 2,105 MW | 7,909 MW |
| 2026-10-24T12:00Z | 33,070 MW | 13,468 MW | 691 MW | 2,183 MW | 7,206 MW |
| 2026-10-24T13:00Z | 33,350 MW | 14,292 MW | 694 MW | 2,245 MW | 5,710 MW |
| 2026-10-24T14:00Z | 34,323 MW | 15,546 MW | 688 MW | 2,433 MW | 3,892 MW |
| 2026-10-24T15:00Z | 34,865 MW | 16,457 MW | 690 MW | 2,831 MW | 1,855 MW |
| 2026-10-24T16:00Z | 34,951 MW | 17,274 MW | 701 MW | 3,344 MW | 564 MW |
| 2026-10-24T17:00Z | 35,050 MW | 18,096 MW | 722 MW | 3,561 MW | 208 MW |
| 2026-10-24T18:00Z | 35,120 MW | 18,563 MW | 694 MW | 3,224 MW | 190 MW |
| 2026-10-24T19:00Z | 34,987 MW | 18,854 MW | 694 MW | 3,108 MW | 0 MW |
| 2026-10-24T20:00Z | 34,856 MW | 18,907 MW | 677 MW | 3,389 MW | 0 MW |
| 2026-10-24T21:00Z | 34,036 MW | 18,979 MW | 672 MW | 3,075 MW | 0 MW |
| 2026-10-24T22:00Z | 31,485 MW | 19,015 MW | 708 MW | 2,947 MW | 0 MW |
| 2026-10-24T23:00Z | 30,247 MW | 19,014 MW | 692 MW | 2,777 MW | 0 MW |
| 2026-10-25T00:00Z | 30,249 MW | 18,941 MW | 692 MW | 2,653 MW | 0 MW |
| 2026-10-25T01:00Z | 29,757 MW | 19,070 MW | 677 MW | 2,361 MW | 0 MW |
| 2026-10-25T02:00Z | 27,550 MW | 18,992 MW | 689 MW | 2,370 MW | 0 MW |
| 2026-10-25T03:00Z | 26,734 MW | 18,687 MW | 702 MW | 2,770 MW | 0 MW |
| 2026-10-25T04:00Z | 27,310 MW | 18,253 MW | 704 MW | 2,809 MW | 0 MW |
| 2026-10-25T05:00Z | 28,492 MW | 17,695 MW | 663 MW | 2,821 MW | 184 MW |
| 2026-10-25T06:00Z | 29,587 MW | 17,172 MW | 676 MW | 2,915 MW | 272 MW |
| 2026-10-25T07:00Z | 30,389 MW | 16,843 MW | 691 MW | 3,031 MW | 1,528 MW |
| 2026-10-25T08:00Z | 30,077 MW | 16,819 MW | 699 MW | 2,574 MW | 3,759 MW |
| 2026-10-25T09:00Z | 29,789 MW | 16,739 MW | 696 MW | 2,461 MW | 5,960 MW |
| 2026-10-25T10:00Z | 29,821 MW | 17,339 MW | 681 MW | 2,366 MW | 7,359 MW |
| 2026-10-25T11:00Z | 29,560 MW | 17,502 MW | 693 MW | 2,265 MW | 8,271 MW |
| 2026-10-25T12:00Z | 29,521 MW | 17,489 MW | 691 MW | 2,317 MW | 8,245 MW |
| 2026-10-25T13:00Z | 30,264 MW | 17,208 MW | 681 MW | 2,361 MW | 7,599 MW |
| 2026-10-25T14:00Z | 30,513 MW | 16,726 MW | 739 MW | 2,400 MW | 5,850 MW |
| 2026-10-25T15:00Z | 31,353 MW | 15,918 MW | 731 MW | 2,649 MW | 3,257 MW |
| 2026-10-25T16:00Z | 32,633 MW | 14,248 MW | 726 MW | 3,090 MW | 857 MW |
| 2026-10-25T17:00Z | 32,994 MW | 12,586 MW | 751 MW | 3,571 MW | 207 MW |
| 2026-10-25T18:00Z | 33,344 MW | 11,605 MW | 743 MW | 3,800 MW | 0 MW |
| 2026-10-25T19:00Z | 33,957 MW | 11,163 MW | 726 MW | 3,733 MW | 0 MW |
| 2026-10-25T20:00Z | 34,042 MW | 10,507 MW | 742 MW | 3,468 MW | 0 MW |
| 2026-10-25T21:00Z | 33,957 MW | 9,217 MW | 756 MW | 3,570 MW | 0 MW |
| 2026-10-25T22:00Z | 34,171 MW | 8,836 MW | 749 MW | 3,369 MW | 0 MW |
| 2026-10-25T23:00Z | 34,896 MW | 9,140 MW | 694 MW | 3,433 MW | 0 MW |
| 2026-10-26T00:00Z | 35,319 MW | 8,721 MW | 717 MW | 3,296 MW | 0 MW |
| 2026-10-26T01:00Z | 34,979 MW | 8,464 MW | 717 MW | 3,159 MW | 0 MW |
| 2026-10-26T02:00Z | 34,828 MW | 8,295 MW | 705 MW | 3,277 MW | 0 MW |
| 2026-10-26T03:00Z | 35,266 MW | 7,869 MW | 723 MW | 3,306 MW | 0 MW |
| 2026-10-26T04:00Z | 35,501 MW | 7,887 MW | 748 MW | 3,525 MW | 0 MW |
| 2026-10-26T05:00Z | 35,606 MW | 7,783 MW | 840 MW | 4,248 MW | 0 MW |
| 2026-10-26T06:00Z | 35,815 MW | 8,013 MW | 1,129 MW | 5,085 MW | 353 MW |
| 2026-10-26T07:00Z | 35,957 MW | 8,357 MW | 1,304 MW | 5,114 MW | 1,985 MW |
| 2026-10-26T08:00Z | 36,289 MW | 8,339 MW | 1,279 MW | 4,761 MW | 5,261 MW |
| 2026-10-26T09:00Z | 37,049 MW | 8,017 MW | 1,025 MW | 4,121 MW | 7,783 MW |
| 2026-10-26T10:00Z | 37,303 MW | 8,053 MW | 730 MW | 3,916 MW | 8,995 MW |
| 2026-10-26T11:00Z | 37,491 MW | 8,921 MW | 706 MW | 4,353 MW | 9,184 MW |
| 2026-10-26T12:00Z | 37,551 MW | 9,444 MW | 718 MW | 3,952 MW | 8,713 MW |
| 2026-10-26T13:00Z | 37,520 MW | 9,676 MW | 765 MW | 4,303 MW | 7,459 MW |
| 2026-10-26T14:00Z | 37,529 MW | 9,840 MW | 924 MW | 4,747 MW | 5,594 MW |
| 2026-10-26T15:00Z | 37,493 MW | 10,048 MW | 1,461 MW | 5,625 MW | 3,149 MW |
| 2026-10-26T16:00Z | 37,789 MW | 9,967 MW | 1,687 MW | 6,425 MW | 850 MW |
| 2026-10-26T17:00Z | 38,408 MW | 9,810 MW | 1,598 MW | 6,271 MW | 205 MW |
| 2026-10-26T18:00Z | 38,744 MW | 9,777 MW | 1,586 MW | 5,774 MW | 183 MW |
| 2026-10-26T19:00Z | 38,756 MW | 9,540 MW | 1,810 MW | 5,010 MW | 0 MW |
| 2026-10-26T20:00Z | 38,701 MW | 9,463 MW | 1,326 MW | 4,455 MW | 0 MW |
| 2026-10-26T21:00Z | 38,605 MW | 9,507 MW | 1,159 MW | 4,186 MW | 0 MW |
| 2026-10-26T22:00Z | 38,186 MW | 9,607 MW | 1,108 MW | 4,049 MW | 0 MW |
| 2026-10-26T23:00Z | 38,025 MW | 9,399 MW | 1,213 MW | 3,887 MW | 0 MW |
| 2026-10-27T00:00Z | 37,095 MW | 9,473 MW | 1,353 MW | 3,697 MW | 0 MW |
| 2026-10-27T01:00Z | 37,151 MW | 9,799 MW | 1,465 MW | 3,628 MW | 0 MW |
| 2026-10-27T02:00Z | 37,158 MW | 10,193 MW | 1,763 MW | 3,262 MW | 0 MW |
| 2026-10-27T03:00Z | 37,177 MW | 10,243 MW | 1,833 MW | 2,734 MW | 0 MW |
| 2026-10-27T04:00Z | 37,039 MW | 9,987 MW | 1,914 MW | 2,847 MW | 0 MW |
| 2026-10-27T05:00Z | 37,020 MW | 10,092 MW | 1,946 MW | 3,587 MW | 0 MW |
| 2026-10-27T06:00Z | 37,194 MW | 10,776 MW | 2,094 MW | 3,948 MW | 339 MW |
| 2026-10-27T07:00Z | 37,308 MW | 10,474 MW | 1,956 MW | 3,899 MW | 2,397 MW |
| 2026-10-27T08:00Z | 37,288 MW | 9,253 MW | 1,676 MW | 3,371 MW | 6,543 MW |
| 2026-10-27T09:00Z | 37,269 MW | 8,197 MW | 1,228 MW | 3,015 MW | 10,414 MW |
| 2026-10-27T10:00Z | 37,270 MW | 7,667 MW | 1,190 MW | 2,896 MW | 12,560 MW |
| 2026-10-27T11:00Z | 37,202 MW | 7,881 MW | 1,220 MW | 2,807 MW | 13,202 MW |
| 2026-10-27T12:00Z | 37,176 MW | 7,492 MW | 1,571 MW | 2,872 MW | 12,129 MW |
| 2026-10-27T13:00Z | 37,236 MW | 7,030 MW | 1,894 MW | 2,925 MW | 9,822 MW |
| 2026-10-27T14:00Z | 37,300 MW | 6,648 MW | 2,633 MW | 3,338 MW | 6,755 MW |
| 2026-10-27T15:00Z | 37,338 MW | 6,466 MW | 3,537 MW | 4,393 MW | 3,293 MW |
| 2026-10-27T16:00Z | 37,413 MW | 5,682 MW | 4,600 MW | 4,933 MW | 785 MW |
| 2026-10-27T17:00Z | 37,452 MW | 5,354 MW | 4,793 MW | 6,023 MW | 218 MW |
| 2026-10-27T18:00Z | 37,500 MW | 6,022 MW | 4,821 MW | 6,129 MW | 204 MW |
| 2026-10-27T19:00Z | 37,538 MW | 6,278 MW | 4,802 MW | 5,534 MW | 0 MW |
| 2026-10-27T20:00Z | 37,572 MW | 6,210 MW | 4,750 MW | 4,602 MW | 0 MW |
| 2026-10-27T21:00Z | 37,624 MW | 6,003 MW | 4,791 MW | 4,195 MW | 0 MW |
| 2026-10-27T22:00Z | 37,730 MW | 5,374 MW | 4,755 MW | 3,769 MW | 0 MW |
| 2026-10-27T23:00Z | 37,829 MW | 5,042 MW | 3,849 MW | 3,048 MW | 0 MW |
| 2026-10-28T00:00Z | 37,948 MW | 4,777 MW | 3,464 MW | 2,809 MW | 0 MW |
| 2026-10-28T01:00Z | 38,237 MW | 4,466 MW | 2,802 MW | 2,591 MW | 0 MW |
| 2026-10-28T02:00Z | 39,069 MW | 3,904 MW | 2,831 MW | 2,517 MW | 0 MW |
| 2026-10-28T03:00Z | 39,488 MW | 3,500 MW | 2,950 MW | 2,615 MW | 0 MW |
| 2026-10-28T04:00Z | 40,163 MW | 3,177 MW | 3,357 MW | 2,602 MW | 0 MW |
| 2026-10-28T05:00Z | 40,855 MW | 2,808 MW | 4,393 MW | 3,690 MW | 0 MW |
| 2026-10-28T06:00Z | 41,390 MW | 2,508 MW | 4,874 MW | 4,352 MW | 311 MW |
| 2026-10-28T07:00Z | 41,619 MW | 2,308 MW | 4,810 MW | 4,414 MW | 2,497 MW |
| 2026-10-28T08:00Z | 41,823 MW | 2,276 MW | 3,754 MW | 4,009 MW | 7,081 MW |
| 2026-10-28T09:00Z | 41,784 MW | 1,745 MW | 2,099 MW | 3,308 MW | 11,431 MW |
| 2026-10-28T10:00Z | 41,653 MW | 1,621 MW | 1,403 MW | 2,912 MW | 14,141 MW |
| 2026-10-28T11:00Z | 41,499 MW | 1,786 MW | 1,335 MW | 2,813 MW | 15,792 MW |
| 2026-10-28T12:00Z | 41,026 MW | 1,855 MW | 1,362 MW | 2,798 MW | 15,278 MW |
| 2026-10-28T13:00Z | 41,036 MW | 1,930 MW | 2,081 MW | 3,003 MW | 13,259 MW |
| 2026-10-28T14:00Z | 40,830 MW | 1,970 MW | 3,847 MW | 3,227 MW | 9,775 MW |
| 2026-10-28T15:00Z | 41,577 MW | 1,887 MW | 4,649 MW | 4,117 MW | 4,906 MW |
| 2026-10-28T16:00Z | 41,473 MW | 1,934 MW | 5,037 MW | 5,689 MW | 1,052 MW |
| 2026-10-28T17:00Z | 41,553 MW | 2,191 MW | 5,231 MW | 6,476 MW | 270 MW |
| 2026-10-28T18:00Z | 41,609 MW | 2,419 MW | 5,161 MW | 6,128 MW | 246 MW |
| 2026-10-28T19:00Z | 41,666 MW | 2,714 MW | 5,175 MW | 5,140 MW | 0 MW |
| 2026-10-28T20:00Z | 41,724 MW | 2,808 MW | 5,195 MW | 4,511 MW | 0 MW |
| 2026-10-28T21:00Z | 41,788 MW | 2,881 MW | 5,145 MW | 3,813 MW | 0 MW |
| 2026-10-28T22:00Z | 41,819 MW | 2,988 MW | 4,857 MW | 3,371 MW | 0 MW |
| 2026-10-28T23:00Z | 41,845 MW | 3,121 MW | 4,736 MW | 2,813 MW | 0 MW |
| 2026-10-29T00:00Z | 41,864 MW | 3,489 MW | 4,633 MW | 2,569 MW | 0 MW |
| 2026-10-29T01:00Z | 41,871 MW | 3,547 MW | 4,551 MW | 2,534 MW | 0 MW |
| 2026-10-29T02:00Z | 41,945 MW | 3,762 MW | 4,452 MW | 2,465 MW | 0 MW |
| 2026-10-29T03:00Z | 42,458 MW | 3,955 MW | 4,521 MW | 2,342 MW | 0 MW |
| 2026-10-29T04:00Z | 42,648 MW | 3,978 MW | 4,170 MW | 2,486 MW | 0 MW |
| 2026-10-29T05:00Z | 42,665 MW | 4,048 MW | 4,545 MW | 3,626 MW | 0 MW |
| 2026-10-29T06:00Z | 42,648 MW | 4,191 MW | 4,512 MW | 4,379 MW | 311 MW |
| 2026-10-29T07:00Z | 42,602 MW | 4,033 MW | 4,536 MW | 4,322 MW | 2,416 MW |
| 2026-10-29T08:00Z | 42,649 MW | 3,192 MW | 4,420 MW | 3,915 MW | 5,943 MW |
| 2026-10-29T09:00Z | 42,683 MW | 2,315 MW | 4,305 MW | 3,304 MW | 9,838 MW |
| 2026-10-29T10:00Z | 42,661 MW | 1,854 MW | 3,205 MW | 2,483 MW | 12,333 MW |
| 2026-10-29T11:00Z | 42,628 MW | 2,183 MW | 2,659 MW | 2,434 MW | 13,339 MW |
| 2026-10-29T12:00Z | 42,586 MW | 2,761 MW | 2,730 MW | 2,335 MW | 13,213 MW |
| 2026-10-29T13:00Z | 42,549 MW | 3,168 MW | 2,670 MW | 2,513 MW | 11,255 MW |
| 2026-10-29T14:00Z | 42,530 MW | 3,554 MW | 4,032 MW | 3,014 MW | 7,838 MW |
| 2026-10-29T15:00Z | 42,538 MW | 3,555 MW | 4,536 MW | 4,007 MW | 3,615 MW |
| 2026-10-29T16:00Z | 42,612 MW | 4,019 MW | 4,478 MW | 5,175 MW | 764 MW |
| 2026-10-29T17:00Z | 42,636 MW | 5,069 MW | 4,791 MW | 6,358 MW | 200 MW |
| 2026-10-29T18:00Z | 42,632 MW | 6,302 MW | 5,143 MW | 6,128 MW | 191 MW |
| 2026-10-29T19:00Z | 42,634 MW | 7,218 MW | 4,848 MW | 5,002 MW | 0 MW |
| 2026-10-29T20:00Z | 42,671 MW | 7,584 MW | 4,701 MW | 4,090 MW | 0 MW |
| 2026-10-29T21:00Z | 42,712 MW | 7,427 MW | 4,823 MW | 3,335 MW | 0 MW |
| 2026-10-29T22:00Z | 42,731 MW | 6,785 MW | 4,742 MW | 3,141 MW | 0 MW |
| 2026-10-29T23:00Z | 42,756 MW | 6,433 MW | 4,755 MW | 3,143 MW | 0 MW |
| 2026-10-30T00:00Z | 42,771 MW | 6,290 MW | 4,884 MW | 2,825 MW | 0 MW |
| 2026-10-30T01:00Z | 42,768 MW | 6,302 MW | 4,848 MW | 2,446 MW | 0 MW |
| 2026-10-30T02:00Z | 42,779 MW | 6,326 MW | 4,418 MW | 2,204 MW | 0 MW |
| 2026-10-30T03:00Z | 42,771 MW | 6,187 MW | 4,604 MW | 2,242 MW | 0 MW |
| 2026-10-30T04:00Z | 42,799 MW | 6,024 MW | 4,796 MW | 2,246 MW | 0 MW |
| 2026-10-30T05:00Z | 42,804 MW | 5,842 MW | 4,833 MW | 3,218 MW | 0 MW |
| 2026-10-30T06:00Z | 42,798 MW | 6,238 MW | 4,942 MW | 4,351 MW | 293 MW |
| 2026-10-30T07:00Z | 42,805 MW | 6,196 MW | 4,940 MW | 4,535 MW | 2,568 MW |
| 2026-10-30T08:00Z | 42,797 MW | 4,862 MW | 4,802 MW | 3,829 MW | 7,322 MW |
| 2026-10-30T09:00Z | 42,755 MW | 3,726 MW | 3,952 MW | 2,949 MW | 12,033 MW |
| 2026-10-30T10:00Z | 42,673 MW | 3,358 MW | 2,868 MW | 2,376 MW | 14,889 MW |
| 2026-10-30T11:00Z | 42,637 MW | 3,092 MW | 1,823 MW | 2,107 MW | 16,108 MW |
| 2026-10-30T12:00Z | 42,608 MW | 3,268 MW | 1,311 MW | 1,842 MW | 15,699 MW |
| 2026-10-30T13:00Z | 42,536 MW | 3,656 MW | 1,673 MW | 1,929 MW | 13,665 MW |
| 2026-10-30T14:00Z | 42,513 MW | 3,980 MW | 2,802 MW | 2,354 MW | 9,888 MW |
| 2026-10-30T15:00Z | 42,539 MW | 4,298 MW | 4,490 MW | 3,200 MW | 4,699 MW |
| 2026-10-30T16:00Z | 42,507 MW | 5,234 MW | 4,829 MW | 4,445 MW | 940 MW |
| 2026-10-30T17:00Z | 42,530 MW | 6,963 MW | 4,992 MW | 5,532 MW | 195 MW |
| 2026-10-30T18:00Z | 42,558 MW | 8,574 MW | 4,816 MW | 5,623 MW | 190 MW |
| 2026-10-30T19:00Z | 42,590 MW | 8,630 MW | 3,851 MW | 4,760 MW | 0 MW |
| 2026-10-30T20:00Z | 42,602 MW | 8,220 MW | 4,373 MW | 3,665 MW | 0 MW |
| 2026-10-30T21:00Z | 42,616 MW | 7,261 MW | 4,752 MW | 3,159 MW | 0 MW |
| 2026-10-30T22:00Z | 42,637 MW | 6,341 MW | 4,596 MW | 2,947 MW | 0 MW |
| 2026-10-30T23:00Z | 42,584 MW | 6,200 MW | 4,377 MW | 2,559 MW | 0 MW |
| 2026-10-31T00:00Z | 42,455 MW | 6,196 MW | 3,830 MW | 2,192 MW | 0 MW |
| 2026-10-31T01:00Z | 42,607 MW | 6,100 MW | 3,357 MW | 2,108 MW | 0 MW |
| 2026-10-31T02:00Z | 42,717 MW | 5,971 MW | 3,224 MW | 2,117 MW | 0 MW |
| 2026-10-31T03:00Z | 42,761 MW | 6,202 MW | 3,185 MW | 1,963 MW | 0 MW |
| 2026-10-31T04:00Z | 42,775 MW | 6,216 MW | 3,126 MW | 2,246 MW | 0 MW |
| 2026-10-31T05:00Z | 42,782 MW | 6,075 MW | 3,295 MW | 2,751 MW | 0 MW |
| 2026-10-31T06:00Z | 42,745 MW | 6,039 MW | 3,306 MW | 3,449 MW | 263 MW |
| 2026-10-31T07:00Z | 42,484 MW | 5,857 MW | 3,146 MW | 3,376 MW | 2,335 MW |
| 2026-10-31T08:00Z | 42,671 MW | 4,744 MW | 2,509 MW | 2,741 MW | 6,719 MW |
| 2026-10-31T09:00Z | 42,756 MW | 3,621 MW | 1,422 MW | 2,441 MW | 11,095 MW |
| 2026-10-31T10:00Z | 42,596 MW | 3,400 MW | 986 MW | 2,206 MW | 13,885 MW |
| 2026-10-31T11:00Z | 42,582 MW | 2,961 MW | 1,138 MW | 2,000 MW | 15,329 MW |
| 2026-10-31T12:00Z | 42,450 MW | 2,841 MW | 977 MW | 2,009 MW | 15,101 MW |
| 2026-10-31T13:00Z | 42,460 MW | 2,965 MW | 1,081 MW | 2,109 MW | 13,385 MW |
| 2026-10-31T14:00Z | 42,546 MW | 3,235 MW | 1,523 MW | 2,399 MW | 9,742 MW |
| 2026-10-31T15:00Z | 42,526 MW | 3,718 MW | 3,138 MW | 2,817 MW | 4,569 MW |
| 2026-10-31T16:00Z | 42,625 MW | 4,733 MW | 4,122 MW | 4,108 MW | 897 MW |
| 2026-10-31T17:00Z | 42,667 MW | 6,237 MW | 4,316 MW | 4,789 MW | 190 MW |
| 2026-10-31T18:00Z | 42,715 MW | 7,161 MW | 4,367 MW | 4,717 MW | 187 MW |
| 2026-10-31T19:00Z | 42,749 MW | 7,322 MW | 4,640 MW | 4,293 MW | 0 MW |
| 2026-10-31T20:00Z | 42,737 MW | 7,128 MW | 4,696 MW | 3,248 MW | 0 MW |
| 2026-10-31T21:00Z | 42,681 MW | 6,644 MW | 4,750 MW | 2,962 MW | 0 MW |
| 2026-10-31T22:00Z | 42,729 MW | 6,165 MW | 4,866 MW | 2,918 MW | 0 MW |
| 2026-10-31T23:00Z | 42,728 MW | 5,436 MW | 4,585 MW | 2,569 MW | 0 MW |
| 2026-11-01T00:00Z | 42,690 MW | 4,994 MW | 3,983 MW | 2,381 MW | 0 MW |
| 2026-11-01T01:00Z | 41,970 MW | 4,925 MW | 2,943 MW | 2,368 MW | 0 MW |
| 2026-11-01T02:00Z | 41,694 MW | 5,335 MW | 2,720 MW | 2,420 MW | 0 MW |
| 2026-11-01T03:00Z | 41,339 MW | 5,748 MW | 2,769 MW | 2,426 MW | 0 MW |
| 2026-11-01T04:00Z | 41,378 MW | 6,286 MW | 2,604 MW | 2,541 MW | 0 MW |
| 2026-11-01T05:00Z | 41,474 MW | 6,692 MW | 2,827 MW | 2,782 MW | 0 MW |
| 2026-11-01T06:00Z | 41,641 MW | 7,009 MW | 2,800 MW | 2,921 MW | 291 MW |
| 2026-11-01T07:00Z | 41,962 MW | 6,855 MW | 2,403 MW | 2,913 MW | 2,208 MW |
| 2026-11-01T08:00Z | 42,247 MW | 5,598 MW | 1,850 MW | 2,628 MW | 6,189 MW |
| 2026-11-01T09:00Z | 42,212 MW | 4,550 MW | 1,617 MW | 2,277 MW | 10,233 MW |
| 2026-11-01T10:00Z | 41,843 MW | 4,583 MW | 1,735 MW | 1,888 MW | 13,085 MW |
| 2026-11-01T11:00Z | 41,657 MW | 4,882 MW | 1,690 MW | 1,710 MW | 14,223 MW |
| 2026-11-01T12:00Z | 39,680 MW | 5,358 MW | 1,806 MW | 1,649 MW | 14,296 MW |
| 2026-11-01T13:00Z | 39,967 MW | 5,325 MW | 1,787 MW | 1,615 MW | 12,897 MW |
| 2026-11-01T14:00Z | 40,483 MW | 5,179 MW | 2,037 MW | 2,122 MW | 9,494 MW |
| 2026-11-01T15:00Z | 41,697 MW | 5,205 MW | 3,106 MW | 2,554 MW | 4,507 MW |
| 2026-11-01T16:00Z | 41,969 MW | 5,514 MW | 4,943 MW | 3,481 MW | 905 MW |
| 2026-11-01T17:00Z | 42,041 MW | 6,782 MW | 5,224 MW | 4,171 MW | 228 MW |
| 2026-11-01T18:00Z | 42,387 MW | 7,629 MW | 5,195 MW | 4,123 MW | 202 MW |
| 2026-11-01T19:00Z | 42,309 MW | 7,969 MW | 5,106 MW | 3,430 MW | 0 MW |
| 2026-11-01T20:00Z | 41,858 MW | 7,630 MW | 4,580 MW | 2,724 MW | 0 MW |
| 2026-11-01T21:00Z | 41,843 MW | 7,044 MW | 4,986 MW | 2,532 MW | 0 MW |
| 2026-11-01T22:00Z | 41,863 MW | 6,552 MW | 4,830 MW | 2,605 MW | 0 MW |
| 2026-11-01T23:00Z | 41,880 MW | 6,098 MW | 4,503 MW | 2,246 MW | 0 MW |
| 2026-11-02T00:00Z | 41,902 MW | 5,614 MW | 4,354 MW | 1,829 MW | 0 MW |
| 2026-11-02T01:00Z | 41,925 MW | 5,316 MW | 4,218 MW | 1,845 MW | 0 MW |
| 2026-11-02T02:00Z | 41,941 MW | 5,058 MW | 4,138 MW | 1,796 MW | 0 MW |
| 2026-11-02T03:00Z | 41,945 MW | 4,709 MW | 4,130 MW | 1,795 MW | 0 MW |
| 2026-11-02T04:00Z | 41,956 MW | 4,848 MW | 4,436 MW | 2,118 MW | 0 MW |
| 2026-11-02T05:00Z | 41,962 MW | 5,187 MW | 5,522 MW | 3,021 MW | 0 MW |
| 2026-11-02T06:00Z | 41,933 MW | 5,739 MW | 6,017 MW | 3,803 MW | 267 MW |
| 2026-11-02T07:00Z | 41,575 MW | 6,017 MW | 5,653 MW | 3,774 MW | 2,226 MW |
| 2026-11-02T08:00Z | 41,081 MW | 5,287 MW | 5,272 MW | 3,547 MW | 6,440 MW |
| 2026-11-02T09:00Z | 41,835 MW | 4,811 MW | 5,354 MW | 2,836 MW | 10,583 MW |
| 2026-11-02T10:00Z | 41,807 MW | 5,385 MW | 3,730 MW | 2,293 MW | 13,207 MW |
| 2026-11-02T11:00Z | 41,809 MW | 7,047 MW | 3,058 MW | 1,862 MW | 14,408 MW |
| 2026-11-02T12:00Z | 41,620 MW | 8,127 MW | 2,916 MW | 1,750 MW | 13,745 MW |
| 2026-11-02T13:00Z | 41,291 MW | 9,170 MW | 2,862 MW | 1,938 MW | 11,603 MW |
| 2026-11-02T14:00Z | 41,152 MW | 10,026 MW | 3,613 MW | 2,317 MW | 8,100 MW |
| 2026-11-02T15:00Z | 41,235 MW | 10,082 MW | 5,189 MW | 3,305 MW | 3,745 MW |
| 2026-11-02T16:00Z | 41,286 MW | 9,893 MW | 5,922 MW | 4,664 MW | 753 MW |
| 2026-11-02T17:00Z | 41,294 MW | 10,247 MW | 5,997 MW | 6,433 MW | 217 MW |
| 2026-11-02T18:00Z | 41,294 MW | 10,969 MW | 5,988 MW | 6,251 MW | 219 MW |
| 2026-11-02T19:00Z | 41,296 MW | 10,972 MW | 6,019 MW | 4,609 MW | 0 MW |
| 2026-11-02T20:00Z | 41,299 MW | 10,575 MW | 5,889 MW | 3,461 MW | 0 MW |
| 2026-11-02T21:00Z | 40,630 MW | 10,139 MW | 5,924 MW | 3,059 MW | 0 MW |
| 2026-11-02T22:00Z | 40,581 MW | 9,650 MW | 5,253 MW | 2,808 MW | 0 MW |
| 2026-11-02T23:00Z | 41,198 MW | 9,354 MW | 5,206 MW | 2,269 MW | 0 MW |
| 2026-11-03T00:00Z | 41,342 MW | 9,079 MW | 5,161 MW | 1,967 MW | 0 MW |
| 2026-11-03T01:00Z | 41,352 MW | 8,965 MW | 5,359 MW | 1,953 MW | 0 MW |
| 2026-11-03T02:00Z | 41,368 MW | 8,531 MW | 5,214 MW | 1,912 MW | 0 MW |
| 2026-11-03T03:00Z | 41,379 MW | 8,766 MW | 4,912 MW | 1,832 MW | 0 MW |
| 2026-11-03T04:00Z | 41,395 MW | 8,986 MW | 5,111 MW | 2,129 MW | 0 MW |
| 2026-11-03T05:00Z | 41,398 MW | 8,972 MW | 5,593 MW | 3,361 MW | 0 MW |
| 2026-11-03T06:00Z | 41,382 MW | 9,287 MW | 6,007 MW | 4,951 MW | 257 MW |
| 2026-11-03T07:00Z | 41,384 MW | 9,788 MW | 6,009 MW | 5,141 MW | 2,011 MW |
| 2026-11-03T08:00Z | 41,385 MW | 9,906 MW | 5,971 MW | 4,451 MW | 5,633 MW |
| 2026-11-03T09:00Z | 41,374 MW | 10,163 MW | 5,926 MW | 3,856 MW | 9,006 MW |
| 2026-11-03T10:00Z | 41,380 MW | 10,931 MW | 5,736 MW | 2,612 MW | 10,426 MW |
| 2026-11-03T11:00Z | 41,369 MW | 11,487 MW | 5,355 MW | 2,494 MW | 10,335 MW |
| 2026-11-03T12:00Z | 41,363 MW | 11,566 MW | 5,377 MW | 2,349 MW | 9,070 MW |
| 2026-11-03T13:00Z | 41,352 MW | 11,806 MW | 5,699 MW | 2,624 MW | 7,467 MW |
| 2026-11-03T14:00Z | 41,357 MW | 12,061 MW | 6,199 MW | 2,908 MW | 4,787 MW |
| 2026-11-03T15:00Z | 41,361 MW | 11,905 MW | 6,348 MW | 3,353 MW | 2,134 MW |
| 2026-11-03T16:00Z | 41,375 MW | 12,124 MW | 6,266 MW | 4,520 MW | 528 MW |
| 2026-11-03T17:00Z | 41,375 MW | 12,713 MW | 6,390 MW | 5,446 MW | 192 MW |
| 2026-11-03T18:00Z | 41,376 MW | 12,496 MW | 6,388 MW | 5,045 MW | 187 MW |
| 2026-11-03T19:00Z | 41,384 MW | 11,924 MW | 6,378 MW | 4,477 MW | 0 MW |
| 2026-11-03T20:00Z | 41,389 MW | 11,720 MW | 6,331 MW | 3,632 MW | 0 MW |
| 2026-11-03T21:00Z | 41,393 MW | 11,149 MW | 6,152 MW | 3,092 MW | 0 MW |
| 2026-11-03T22:00Z | 41,402 MW | 10,557 MW | 6,107 MW | 2,773 MW | 0 MW |
| 2026-11-03T23:00Z | 41,407 MW | 10,297 MW | 5,187 MW | 2,459 MW | 0 MW |
| 2026-11-04T00:00Z | 41,406 MW | 10,106 MW | 4,835 MW | 2,003 MW | 0 MW |
| 2026-11-04T01:00Z | 41,409 MW | 10,011 MW | 4,914 MW | 1,934 MW | 0 MW |
| 2026-11-04T02:00Z | 40,987 MW | 9,919 MW | 4,750 MW | 1,932 MW | 0 MW |
| 2026-11-04T03:00Z | 41,258 MW | 9,637 MW | 4,757 MW | 1,910 MW | 0 MW |
| 2026-11-04T04:00Z | 41,437 MW | 9,671 MW | 4,836 MW | 2,034 MW | 0 MW |
| 2026-11-04T05:00Z | 41,442 MW | 9,786 MW | 5,948 MW | 3,252 MW | 0 MW |
| 2026-11-04T06:00Z | 41,442 MW | 9,775 MW | 6,412 MW | 4,211 MW | 225 MW |
| 2026-11-04T07:00Z | 41,427 MW | 9,689 MW | 6,442 MW | 4,329 MW | 1,281 MW |
| 2026-11-04T08:00Z | 41,416 MW | 9,302 MW | 6,353 MW | 4,530 MW | 3,450 MW |
| 2026-11-04T09:00Z | 41,377 MW | 9,305 MW | 6,327 MW | 3,791 MW | 6,046 MW |
| 2026-11-04T10:00Z | 41,320 MW | 8,952 MW | 6,349 MW | 2,989 MW | 8,213 MW |
| 2026-11-04T11:00Z | 41,382 MW | 8,066 MW | 6,352 MW | 2,827 MW | 9,223 MW |
| 2026-11-04T12:00Z | 41,358 MW | 7,337 MW | 6,200 MW | 3,046 MW | 8,287 MW |
| 2026-11-04T13:00Z | 41,323 MW | 6,816 MW | 6,262 MW | 3,933 MW | 6,539 MW |
| 2026-11-04T14:00Z | 41,028 MW | 6,631 MW | 6,363 MW | 4,338 MW | 4,434 MW |
| 2026-11-04T15:00Z | 41,220 MW | 7,022 MW | 6,401 MW | 4,862 MW | 2,013 MW |
| 2026-11-04T16:00Z | 41,320 MW | 7,388 MW | 6,458 MW | 5,609 MW | 523 MW |
| 2026-11-04T17:00Z | 41,366 MW | 7,813 MW | 6,507 MW | 5,975 MW | 188 MW |
| 2026-11-04T18:00Z | 41,373 MW | 7,804 MW | 6,517 MW | 5,789 MW | 189 MW |
| 2026-11-04T19:00Z | 41,374 MW | 7,678 MW | 6,164 MW | 4,723 MW | 0 MW |
| 2026-11-04T20:00Z | 41,367 MW | 7,421 MW | 5,628 MW | 3,217 MW | 0 MW |
| 2026-11-04T21:00Z | 40,487 MW | 6,713 MW | 5,585 MW | 2,916 MW | 0 MW |
| 2026-11-04T22:00Z | 39,886 MW | 6,344 MW | 5,489 MW | 2,974 MW | 0 MW |
| 2026-11-04T23:00Z | 40,017 MW | 6,288 MW | 5,440 MW | 2,913 MW | 0 MW |
| 2026-11-05T00:00Z | 39,704 MW | 6,157 MW | 5,257 MW | 2,366 MW | 0 MW |
| 2026-11-05T01:00Z | 39,570 MW | 6,061 MW | 5,134 MW | 2,250 MW | 0 MW |
| 2026-11-05T02:00Z | 39,702 MW | 6,063 MW | 4,999 MW | 2,106 MW | 0 MW |
| 2026-11-05T03:00Z | 39,831 MW | 6,080 MW | 4,797 MW | 2,161 MW | 0 MW |
| 2026-11-05T04:00Z | 40,046 MW | 5,992 MW | 5,096 MW | 2,505 MW | 0 MW |
| 2026-11-05T05:00Z | 40,390 MW | 5,484 MW | 5,654 MW | 3,385 MW | 0 MW |
| 2026-11-05T06:00Z | 40,776 MW | 5,298 MW | 5,844 MW | 4,903 MW | 228 MW |
| 2026-11-05T07:00Z | 41,123 MW | 5,085 MW | 6,061 MW | 4,814 MW | 1,530 MW |
| 2026-11-05T08:00Z | 40,977 MW | 4,141 MW | 6,084 MW | 3,656 MW | 4,467 MW |
| 2026-11-05T09:00Z | 40,808 MW | 2,963 MW | 6,101 MW | 2,615 MW | 7,524 MW |
| 2026-11-05T10:00Z | 40,483 MW | 2,287 MW | 5,733 MW | 2,426 MW | 9,673 MW |
| 2026-11-05T11:00Z | 40,117 MW | 1,861 MW | 5,708 MW | 2,481 MW | 10,760 MW |
| 2026-11-05T12:00Z | 39,994 MW | 1,658 MW | 5,544 MW | 2,742 MW | 10,528 MW |
| 2026-11-05T13:00Z | 39,980 MW | 1,703 MW | 5,850 MW | 3,077 MW | 9,371 MW |
| 2026-11-05T14:00Z | 40,061 MW | n/a | 6,078 MW | 3,996 MW | 6,546 MW |
| 2026-11-05T15:00Z | 40,343 MW | n/a | 6,512 MW | 5,620 MW | 2,876 MW |
| 2026-11-05T16:00Z | 40,503 MW | n/a | 6,618 MW | 6,814 MW | 589 MW |
| 2026-11-05T17:00Z | 40,489 MW | n/a | 6,680 MW | 7,024 MW | 179 MW |
| 2026-11-05T18:00Z | 40,513 MW | n/a | 6,962 MW | 6,894 MW | 167 MW |
| 2026-11-05T19:00Z | 40,537 MW | n/a | 6,929 MW | 6,586 MW | 0 MW |
| 2026-11-05T20:00Z | 40,761 MW | n/a | 6,759 MW | 5,805 MW | 0 MW |
| 2026-11-05T21:00Z | 42,281 MW | n/a | 6,564 MW | 4,264 MW | 0 MW |
| 2026-11-05T22:00Z | 43,005 MW | n/a | 6,390 MW | 3,396 MW | 0 MW |
| 2026-11-05T23:00Z | 43,307 MW | n/a | 6,456 MW | 2,909 MW | 0 MW |
| 2026-11-06T00:00Z | 43,343 MW | n/a | 6,445 MW | 2,720 MW | 0 MW |
| 2026-11-06T01:00Z | 43,397 MW | n/a | 6,596 MW | 2,571 MW | 0 MW |
| 2026-11-06T02:00Z | 43,380 MW | n/a | 6,611 MW | 2,406 MW | 0 MW |
| 2026-11-06T03:00Z | 43,059 MW | n/a | 6,596 MW | 2,388 MW | 0 MW |
| 2026-11-06T04:00Z | 43,415 MW | n/a | 6,612 MW | 2,899 MW | 0 MW |
| 2026-11-06T05:00Z | 42,635 MW | n/a | 6,786 MW | 4,883 MW | 0 MW |
| 2026-11-06T06:00Z | 42,227 MW | n/a | 7,171 MW | 6,574 MW | 198 MW |
| 2026-11-06T07:00Z | 42,233 MW | n/a | 7,114 MW | 6,864 MW | 1,305 MW |
| 2026-11-06T08:00Z | 42,224 MW | n/a | 7,066 MW | 6,029 MW | 4,468 MW |
| 2026-11-06T09:00Z | 42,199 MW | n/a | 7,169 MW | 5,022 MW | 7,789 MW |
| 2026-11-06T10:00Z | 42,137 MW | n/a | 7,040 MW | 4,230 MW | 10,087 MW |
| 2026-11-06T11:00Z | 42,139 MW | n/a | 7,019 MW | 3,814 MW | 11,548 MW |
| 2026-11-06T12:00Z | 42,142 MW | n/a | 6,832 MW | 3,833 MW | 11,524 MW |
| 2026-11-06T13:00Z | 42,108 MW | n/a | 6,968 MW | 4,874 MW | 10,286 MW |
| 2026-11-06T14:00Z | 42,089 MW | n/a | 7,008 MW | 6,172 MW | 7,448 MW |
| 2026-11-06T15:00Z | 42,079 MW | n/a | 7,002 MW | 7,067 MW | 3,370 MW |
| 2026-11-06T16:00Z | 42,113 MW | n/a | 7,009 MW | 7,556 MW | 640 MW |
| 2026-11-06T17:00Z | 42,168 MW | n/a | 7,023 MW | 7,730 MW | 180 MW |
| 2026-11-06T18:00Z | 42,192 MW | n/a | 6,982 MW | 7,746 MW | 172 MW |
| 2026-11-06T19:00Z | 42,254 MW | n/a | 6,694 MW | 7,401 MW | 0 MW |
| 2026-11-06T20:00Z | 41,988 MW | n/a | 6,636 MW | 6,800 MW | 0 MW |
| 2026-11-06T21:00Z | 41,100 MW | n/a | 6,626 MW | 5,863 MW | 0 MW |
| 2026-11-06T22:00Z | 39,414 MW | n/a | 6,605 MW | 4,833 MW | 0 MW |
| 2026-11-06T23:00Z | 38,712 MW | n/a | 6,642 MW | 3,996 MW | 0 MW |
| 2026-11-07T00:00Z | 38,584 MW | n/a | 6,596 MW | 2,964 MW | 0 MW |
| 2026-11-07T01:00Z | 38,670 MW | n/a | 6,628 MW | 2,696 MW | 0 MW |
| 2026-11-07T02:00Z | 38,490 MW | n/a | 6,609 MW | 2,606 MW | 0 MW |
| 2026-11-07T03:00Z | 38,541 MW | n/a | 6,661 MW | 2,431 MW | 0 MW |
| 2026-11-07T04:00Z | 38,530 MW | n/a | 6,650 MW | 2,509 MW | 0 MW |
| 2026-11-07T05:00Z | 38,640 MW | n/a | 6,651 MW | 2,876 MW | 0 MW |
| 2026-11-07T06:00Z | 38,663 MW | n/a | 6,648 MW | 3,477 MW | 187 MW |
| 2026-11-07T07:00Z | 38,589 MW | n/a | 6,645 MW | 3,495 MW | 1,422 MW |
| 2026-11-07T08:00Z | 38,703 MW | n/a | 6,632 MW | 3,674 MW | 4,887 MW |
| 2026-11-07T09:00Z | 38,809 MW | n/a | 6,572 MW | 3,054 MW | 8,473 MW |
| 2026-11-07T10:00Z | 38,823 MW | n/a | 6,555 MW | 2,759 MW | 10,854 MW |
| 2026-11-07T11:00Z | 38,836 MW | n/a | 6,577 MW | 2,673 MW | 12,192 MW |
| 2026-11-07T12:00Z | 38,918 MW | n/a | 6,576 MW | 2,565 MW | 11,776 MW |
| 2026-11-07T13:00Z | 38,965 MW | n/a | 6,550 MW | 2,810 MW | 10,035 MW |
| 2026-11-07T14:00Z | 38,993 MW | n/a | 6,567 MW | 4,353 MW | 6,860 MW |
| 2026-11-07T15:00Z | 39,003 MW | n/a | 6,705 MW | 5,931 MW | 2,936 MW |
| 2026-11-07T16:00Z | 39,040 MW | n/a | 6,730 MW | 6,750 MW | 587 MW |
| 2026-11-07T17:00Z | 38,966 MW | n/a | 6,738 MW | 7,011 MW | 182 MW |
| 2026-11-07T18:00Z | 39,024 MW | n/a | 6,747 MW | 6,815 MW | 177 MW |
| 2026-11-07T19:00Z | 39,122 MW | n/a | 6,744 MW | 6,187 MW | 0 MW |
| 2026-11-07T20:00Z | 39,152 MW | n/a | 6,641 MW | 5,638 MW | 0 MW |
| 2026-11-07T21:00Z | 39,117 MW | n/a | 6,299 MW | 5,095 MW | 0 MW |
| 2026-11-07T22:00Z | 39,161 MW | n/a | 6,247 MW | 4,119 MW | 0 MW |
| 2026-11-07T23:00Z | 39,139 MW | n/a | 6,252 MW | 3,281 MW | 0 MW |
| 2026-11-08T00:00Z | 39,136 MW | n/a | 6,266 MW | 2,732 MW | 0 MW |
| 2026-11-08T01:00Z | 39,171 MW | n/a | 6,261 MW | 2,453 MW | 0 MW |
| 2026-11-08T02:00Z | 39,145 MW | n/a | 6,242 MW | 2,227 MW | 0 MW |
| 2026-11-08T03:00Z | 39,159 MW | n/a | 6,243 MW | 2,283 MW | 0 MW |
| 2026-11-08T04:00Z | 39,169 MW | n/a | 6,123 MW | 2,400 MW | 0 MW |
| 2026-11-08T05:00Z | 39,176 MW | n/a | 5,846 MW | 2,704 MW | 0 MW |
| 2026-11-08T06:00Z | 39,176 MW | n/a | 5,843 MW | 2,697 MW | 198 MW |
| 2026-11-08T07:00Z | 39,107 MW | n/a | 5,837 MW | 2,670 MW | 1,197 MW |
| 2026-11-08T08:00Z | 39,135 MW | n/a | 5,801 MW | 2,650 MW | 3,847 MW |
| 2026-11-08T09:00Z | 39,151 MW | n/a | 5,517 MW | 2,841 MW | 6,741 MW |
| 2026-11-08T10:00Z | 39,134 MW | n/a | 5,444 MW | 3,049 MW | 9,017 MW |
| 2026-11-08T11:00Z | 39,113 MW | n/a | 5,308 MW | 2,453 MW | 10,147 MW |
| 2026-11-08T12:00Z | 39,157 MW | n/a | 5,461 MW | 2,428 MW | 9,822 MW |
| 2026-11-08T13:00Z | 39,203 MW | n/a | 5,453 MW | 2,576 MW | 8,225 MW |
| 2026-11-08T14:00Z | 39,444 MW | n/a | 5,342 MW | 3,125 MW | 5,108 MW |
| 2026-11-08T15:00Z | 39,892 MW | n/a | 5,457 MW | 4,419 MW | 1,947 MW |
| 2026-11-08T16:00Z | 39,979 MW | n/a | 5,602 MW | 5,606 MW | 439 MW |
| 2026-11-08T17:00Z | 39,981 MW | n/a | 5,780 MW | 5,803 MW | 203 MW |
| 2026-11-08T18:00Z | 39,993 MW | n/a | 5,956 MW | 6,046 MW | 206 MW |
| 2026-11-08T19:00Z | 40,007 MW | n/a | 6,239 MW | 5,604 MW | 0 MW |
| 2026-11-08T20:00Z | 40,012 MW | n/a | 6,130 MW | 4,616 MW | 0 MW |
| 2026-11-08T21:00Z | 39,999 MW | n/a | 6,180 MW | 3,901 MW | 0 MW |
| 2026-11-08T22:00Z | 40,074 MW | n/a | 6,365 MW | 3,091 MW | 0 MW |
| 2026-11-08T23:00Z | 40,099 MW | n/a | 6,324 MW | 2,859 MW | 0 MW |
| 2026-11-09T00:00Z | 40,130 MW | n/a | 6,047 MW | 2,672 MW | 0 MW |
| 2026-11-09T01:00Z | 40,164 MW | n/a | 5,804 MW | 2,732 MW | 0 MW |
| 2026-11-09T02:00Z | 40,183 MW | n/a | 5,789 MW | 2,699 MW | 0 MW |
| 2026-11-09T03:00Z | 40,200 MW | n/a | 6,111 MW | 2,716 MW | 0 MW |
| 2026-11-09T04:00Z | 40,224 MW | n/a | 6,003 MW | 3,134 MW | 0 MW |
| 2026-11-09T05:00Z | 40,257 MW | n/a | 6,265 MW | 4,225 MW | 0 MW |
| 2026-11-09T06:00Z | 40,283 MW | n/a | 6,829 MW | 5,943 MW | 231 MW |
| 2026-11-09T07:00Z | 40,309 MW | n/a | 6,862 MW | 6,762 MW | 968 MW |
| 2026-11-09T08:00Z | 40,322 MW | n/a | 6,852 MW | 6,748 MW | 3,272 MW |
| 2026-11-09T09:00Z | 40,300 MW | n/a | 6,839 MW | 5,964 MW | 5,778 MW |
| 2026-11-09T10:00Z | 40,258 MW | n/a | 7,014 MW | 5,160 MW | 7,133 MW |
| 2026-11-09T11:00Z | 40,209 MW | n/a | 7,043 MW | 5,378 MW | 7,303 MW |
| 2026-11-09T12:00Z | 40,183 MW | n/a | 7,024 MW | 5,647 MW | 6,509 MW |
| 2026-11-09T13:00Z | 40,170 MW | n/a | 7,011 MW | 5,987 MW | 4,644 MW |
| 2026-11-09T14:00Z | 40,404 MW | n/a | 7,003 MW | 6,878 MW | 2,699 MW |
| 2026-11-09T15:00Z | 40,782 MW | n/a | 6,982 MW | 7,165 MW | 1,259 MW |
| 2026-11-09T16:00Z | 41,147 MW | n/a | 7,014 MW | 7,610 MW | 417 MW |
| 2026-11-09T17:00Z | 41,624 MW | n/a | 7,063 MW | 8,048 MW | 212 MW |
| 2026-11-09T18:00Z | 41,680 MW | n/a | 7,149 MW | 7,948 MW | 210 MW |
| 2026-11-09T19:00Z | 41,691 MW | n/a | 7,125 MW | 7,357 MW | 0 MW |
| 2026-11-09T20:00Z | 41,650 MW | n/a | 7,022 MW | 6,544 MW | 0 MW |
| 2026-11-09T21:00Z | 41,546 MW | n/a | 7,356 MW | 5,567 MW | 0 MW |
| 2026-11-09T22:00Z | 41,545 MW | n/a | 6,885 MW | 4,394 MW | 0 MW |
| 2026-11-09T23:00Z | 41,588 MW | n/a | 6,577 MW | 4,084 MW | 0 MW |
| 2026-11-10T00:00Z | 41,676 MW | n/a | 6,810 MW | 4,107 MW | 0 MW |
| 2026-11-10T01:00Z | 41,850 MW | n/a | 6,828 MW | 3,683 MW | 0 MW |
| 2026-11-10T02:00Z | 41,891 MW | n/a | 6,815 MW | 3,401 MW | 0 MW |
| 2026-11-10T03:00Z | 41,884 MW | n/a | 6,619 MW | 3,396 MW | 0 MW |
| 2026-11-10T04:00Z | 42,073 MW | n/a | 6,734 MW | 3,894 MW | 0 MW |
| 2026-11-10T05:00Z | 42,361 MW | n/a | 6,990 MW | 4,668 MW | 0 MW |
| 2026-11-10T06:00Z | 42,709 MW | n/a | 7,290 MW | 5,643 MW | 190 MW |
| 2026-11-10T07:00Z | 42,123 MW | n/a | 7,298 MW | 6,349 MW | 846 MW |
| 2026-11-10T08:00Z | 41,741 MW | n/a | 7,282 MW | 6,400 MW | 2,826 MW |
| 2026-11-10T09:00Z | 41,646 MW | n/a | 7,239 MW | 6,400 MW | 5,074 MW |
| 2026-11-10T10:00Z | 41,605 MW | n/a | 7,026 MW | 6,200 MW | 6,859 MW |
| 2026-11-10T11:00Z | 41,573 MW | n/a | 6,824 MW | 6,012 MW | 7,799 MW |
| 2026-11-10T12:00Z | 41,536 MW | n/a | 7,049 MW | 5,776 MW | 7,620 MW |
| 2026-11-10T13:00Z | 41,518 MW | n/a | 7,183 MW | 5,879 MW | 6,111 MW |
| 2026-11-10T14:00Z | 41,493 MW | n/a | 7,170 MW | 6,062 MW | 3,792 MW |
| 2026-11-10T15:00Z | 41,493 MW | n/a | 7,110 MW | 6,398 MW | 1,563 MW |
| 2026-11-10T16:00Z | 41,498 MW | n/a | 7,115 MW | 7,271 MW | 395 MW |
| 2026-11-10T17:00Z | 41,486 MW | n/a | 7,150 MW | 7,642 MW | 196 MW |
| 2026-11-10T18:00Z | 41,204 MW | n/a | 7,150 MW | 7,477 MW | 206 MW |
| 2026-11-10T19:00Z | 41,488 MW | n/a | 6,962 MW | 6,107 MW | 0 MW |
| 2026-11-10T20:00Z | 41,529 MW | n/a | 6,846 MW | 5,159 MW | 0 MW |
| 2026-11-10T21:00Z | 41,553 MW | n/a | 6,829 MW | 4,419 MW | 0 MW |
| 2026-11-10T22:00Z | 41,568 MW | n/a | 6,588 MW | 3,784 MW | 0 MW |
| 2026-11-10T23:00Z | 41,580 MW | n/a | 6,495 MW | 3,572 MW | 0 MW |
| 2026-11-11T00:00Z | 41,508 MW | n/a | 6,383 MW | 3,542 MW | 0 MW |
| 2026-11-11T01:00Z | 41,145 MW | n/a | 6,240 MW | 3,639 MW | 0 MW |
| 2026-11-11T02:00Z | 41,306 MW | n/a | 5,739 MW | 3,638 MW | 0 MW |
| 2026-11-11T03:00Z | 41,770 MW | n/a | 5,718 MW | 3,452 MW | 0 MW |
| 2026-11-11T04:00Z | 41,942 MW | n/a | 5,981 MW | 3,351 MW | 0 MW |
| 2026-11-11T05:00Z | 41,978 MW | n/a | 5,918 MW | 3,570 MW | 0 MW |
| 2026-11-11T06:00Z | 42,115 MW | n/a | 6,087 MW | 4,334 MW | 184 MW |
| 2026-11-11T07:00Z | 42,239 MW | n/a | 6,211 MW | 5,278 MW | 775 MW |
| 2026-11-11T08:00Z | 42,204 MW | n/a | 6,359 MW | 5,428 MW | 2,571 MW |
| 2026-11-11T09:00Z | 42,171 MW | n/a | 6,372 MW | 5,231 MW | 4,812 MW |
| 2026-11-11T10:00Z | 41,957 MW | n/a | 6,497 MW | 5,041 MW | 6,545 MW |
| 2026-11-11T11:00Z | 41,099 MW | n/a | 6,238 MW | 5,040 MW | 8,090 MW |
| 2026-11-11T12:00Z | 41,221 MW | n/a | 6,216 MW | 4,710 MW | 8,165 MW |
| 2026-11-11T13:00Z | 42,063 MW | n/a | 5,721 MW | 4,874 MW | 6,900 MW |
| 2026-11-11T14:00Z | 42,080 MW | n/a | 5,948 MW | 5,661 MW | 4,443 MW |
| 2026-11-11T15:00Z | 42,167 MW | n/a | 6,202 MW | 5,698 MW | 1,776 MW |
| 2026-11-11T16:00Z | 42,276 MW | n/a | 6,574 MW | 6,230 MW | 381 MW |
| 2026-11-11T17:00Z | 42,367 MW | n/a | 6,620 MW | 7,211 MW | 187 MW |
| 2026-11-11T18:00Z | 42,545 MW | n/a | 6,830 MW | 7,574 MW | 200 MW |
| 2026-11-11T19:00Z | 42,564 MW | n/a | 6,860 MW | 6,796 MW | 0 MW |
| 2026-11-11T20:00Z | 42,586 MW | n/a | 6,698 MW | 6,051 MW | 0 MW |
| 2026-11-11T21:00Z | 42,611 MW | n/a | 6,487 MW | 5,228 MW | 0 MW |
| 2026-11-11T22:00Z | 42,636 MW | n/a | 6,290 MW | 4,603 MW | 0 MW |
| 2026-11-11T23:00Z | 42,796 MW | n/a | 6,202 MW | 4,175 MW | 0 MW |
| 2026-11-12T00:00Z | 42,901 MW | n/a | 5,444 MW | 4,031 MW | 0 MW |
| 2026-11-12T01:00Z | 42,796 MW | n/a | 4,558 MW | 3,933 MW | 0 MW |
| 2026-11-12T02:00Z | 42,853 MW | n/a | 4,186 MW | 3,752 MW | 0 MW |
| 2026-11-12T03:00Z | 42,868 MW | n/a | 4,028 MW | 3,711 MW | 0 MW |
| 2026-11-12T04:00Z | 42,851 MW | n/a | 4,449 MW | 3,745 MW | 0 MW |
| 2026-11-12T05:00Z | 42,852 MW | n/a | 5,339 MW | 4,326 MW | 0 MW |
| 2026-11-12T06:00Z | 42,858 MW | n/a | 6,035 MW | 4,884 MW | 230 MW |
| 2026-11-12T07:00Z | 42,870 MW | n/a | 6,109 MW | 5,242 MW | 652 MW |
| 2026-11-12T08:00Z | 42,858 MW | n/a | 6,054 MW | 4,836 MW | 1,740 MW |
| 2026-11-12T09:00Z | 42,851 MW | n/a | 6,082 MW | 4,262 MW | 2,830 MW |
| 2026-11-12T10:00Z | 42,845 MW | n/a | 5,747 MW | 4,179 MW | 3,664 MW |
| 2026-11-12T11:00Z | 42,840 MW | n/a | 5,240 MW | 3,966 MW | 4,339 MW |
| 2026-11-12T12:00Z | 42,872 MW | n/a | 5,046 MW | 3,733 MW | 4,390 MW |
| 2026-11-12T13:00Z | 42,913 MW | n/a | 5,290 MW | 3,688 MW | 3,755 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00Z.
Installed Capacity
Annual figure for 2026| Nuclear | |
|---|---|
| Solar | |
| Wind | |
| Hydro | |
| Gas | |
| Storage | |
| Oil | |
| Other | |
| Coal | |
| Bioenergy | |
| Other renewables | |
| Geothermal |
Total installed capacity in France: 164 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Paris time dates, through 2026-11-11Show the data table (400 rows)
| Date (Europe/Paris time) | Demand |
|---|---|
| 2025-10-08 | 1.11 TWh |
| 2025-10-09 | 1.12 TWh |
| 2025-10-10 | 1.11 TWh |
| 2025-10-11 | 999 GWh |
| 2025-10-12 | 956 GWh |
| 2025-10-13 | 1.10 TWh |
| 2025-10-14 | 1.12 TWh |
| 2025-10-15 | 1.13 TWh |
| 2025-10-16 | 1.14 TWh |
| 2025-10-17 | 1.13 TWh |
| 2025-10-18 | 1.03 TWh |
| 2025-10-19 | 1.01 TWh |
| 2025-10-20 | 1.11 TWh |
| 2025-10-21 | 1.13 TWh |
| 2025-10-22 | 1.13 TWh |
| 2025-10-23 | 1.14 TWh |
| 2025-10-24 | 1.18 TWh |
| 2025-10-25 | 1.08 TWh |
| 2025-10-26 | 1.09 TWh |
| 2025-10-27 | 1.21 TWh |
| 2025-10-28 | 1.20 TWh |
| 2025-10-29 | 1.20 TWh |
| 2025-10-30 | 1.19 TWh |
| 2025-10-31 | 1.16 TWh |
| 2025-11-01 | 1.03 TWh |
| 2025-11-02 | 1.03 TWh |
| 2025-11-03 | 1.19 TWh |
| 2025-11-04 | 1.19 TWh |
| 2025-11-05 | 1.19 TWh |
| 2025-11-06 | 1.19 TWh |
| 2025-11-07 | 1.20 TWh |
| 2025-11-08 | 1.12 TWh |
| 2025-11-09 | 1.10 TWh |
| 2025-11-10 | 1.19 TWh |
| 2025-11-11 | 1.12 TWh |
| 2025-11-12 | 1.21 TWh |
| 2025-11-13 | 1.19 TWh |
| 2025-11-14 | 1.16 TWh |
| 2025-11-15 | 1.07 TWh |
| 2025-11-16 | 1.07 TWh |
| 2025-11-17 | 1.27 TWh |
| 2025-11-18 | 1.43 TWh |
| 2025-11-19 | 1.48 TWh |
| 2025-11-20 | 1.56 TWh |
| 2025-11-21 | 1.65 TWh |
| 2025-11-22 | 1.61 TWh |
| 2025-11-23 | 1.50 TWh |
| 2025-11-24 | 1.49 TWh |
| 2025-11-25 | 1.51 TWh |
| 2025-11-26 | 1.58 TWh |
| 2025-11-27 | 1.60 TWh |
| 2025-11-28 | 1.53 TWh |
| 2025-11-29 | 1.35 TWh |
| 2025-11-30 | 1.32 TWh |
| 2025-12-01 | 1.54 TWh |
| 2025-12-02 | 1.52 TWh |
| 2025-12-03 | 1.51 TWh |
| 2025-12-04 | 1.52 TWh |
| 2025-12-05 | 1.55 TWh |
| 2025-12-06 | 1.35 TWh |
| 2025-12-07 | 1.24 TWh |
| 2025-12-08 | 1.31 TWh |
| 2025-12-09 | 1.33 TWh |
| 2025-12-10 | n/a |
| 2025-12-11 | 1.39 TWh |
| 2025-12-12 | 1.36 TWh |
| 2025-12-13 | 1.30 TWh |
| 2025-12-14 | 1.31 TWh |
| 2025-12-15 | 1.43 TWh |
| 2025-12-16 | 1.39 TWh |
| 2025-12-17 | 1.42 TWh |
| 2025-12-18 | 1.39 TWh |
| 2025-12-19 | 1.34 TWh |
| 2025-12-20 | 1.27 TWh |
| 2025-12-21 | 1.22 TWh |
| 2025-12-22 | 1.37 TWh |
| 2025-12-23 | 1.44 TWh |
| 2025-12-24 | 1.48 TWh |
| 2025-12-25 | 1.44 TWh |
| 2025-12-26 | 1.55 TWh |
| 2025-12-27 | 1.53 TWh |
| 2025-12-28 | 1.51 TWh |
| 2025-12-29 | 1.63 TWh |
| 2025-12-30 | 1.64 TWh |
| 2025-12-31 | 1.66 TWh |
| 2026-01-01 | 1.63 TWh |
| 2026-01-02 | 1.67 TWh |
| 2026-01-03 | 1.67 TWh |
| 2026-01-04 | 1.69 TWh |
| 2026-01-05 | 1.93 TWh |
| 2026-01-06 | 1.98 TWh |
| 2026-01-07 | 1.94 TWh |
| 2026-01-08 | 1.75 TWh |
| 2026-01-09 | 1.67 TWh |
| 2026-01-10 | 1.60 TWh |
| 2026-01-11 | 1.59 TWh |
| 2026-01-12 | 1.63 TWh |
| 2026-01-13 | 1.52 TWh |
| 2026-01-14 | 1.47 TWh |
| 2026-01-15 | 1.46 TWh |
| 2026-01-16 | 1.46 TWh |
| 2026-01-17 | 1.36 TWh |
| 2026-01-18 | 1.33 TWh |
| 2026-01-19 | 1.51 TWh |
| 2026-01-20 | 1.54 TWh |
| 2026-01-21 | 1.53 TWh |
| 2026-01-22 | 1.51 TWh |
| 2026-01-23 | 1.55 TWh |
| 2026-01-24 | 1.47 TWh |
| 2026-01-25 | 1.44 TWh |
| 2026-01-26 | 1.59 TWh |
| 2026-01-27 | 1.60 TWh |
| 2026-01-28 | 1.60 TWh |
| 2026-01-29 | 1.63 TWh |
| 2026-01-30 | 1.55 TWh |
| 2026-01-31 | 1.42 TWh |
| 2026-02-01 | 1.35 TWh |
| 2026-02-02 | 1.50 TWh |
| 2026-02-03 | 1.47 TWh |
| 2026-02-04 | 1.50 TWh |
| 2026-02-05 | 1.49 TWh |
| 2026-02-06 | 1.42 TWh |
| 2026-02-07 | 1.32 TWh |
| 2026-02-08 | 1.30 TWh |
| 2026-02-09 | 1.47 TWh |
| 2026-02-10 | 1.45 TWh |
| 2026-02-11 | 1.40 TWh |
| 2026-02-12 | 1.40 TWh |
| 2026-02-13 | 1.45 TWh |
| 2026-02-14 | 1.42 TWh |
| 2026-02-15 | 1.48 TWh |
| 2026-02-16 | 1.51 TWh |
| 2026-02-17 | 1.51 TWh |
| 2026-02-18 | 1.53 TWh |
| 2026-02-19 | 1.51 TWh |
| 2026-02-20 | 1.47 TWh |
| 2026-02-21 | 1.27 TWh |
| 2026-02-22 | 1.20 TWh |
| 2026-02-23 | 1.31 TWh |
| 2026-02-24 | 1.27 TWh |
| 2026-02-25 | 1.26 TWh |
| 2026-02-26 | 1.24 TWh |
| 2026-02-27 | 1.25 TWh |
| 2026-02-28 | 1.18 TWh |
| 2026-03-01 | 1.18 TWh |
| 2026-03-02 | 1.28 TWh |
| 2026-03-03 | 1.27 TWh |
| 2026-03-04 | 1.25 TWh |
| 2026-03-05 | 1.24 TWh |
| 2026-03-06 | 1.25 TWh |
| 2026-03-07 | 1.14 TWh |
| 2026-03-08 | 1.10 TWh |
| 2026-03-09 | 1.22 TWh |
| 2026-03-10 | 1.24 TWh |
| 2026-03-11 | 1.29 TWh |
| 2026-03-12 | 1.30 TWh |
| 2026-03-13 | 1.33 TWh |
| 2026-03-14 | 1.27 TWh |
| 2026-03-15 | 1.26 TWh |
| 2026-03-16 | 1.35 TWh |
| 2026-03-17 | 1.27 TWh |
| 2026-03-18 | 1.24 TWh |
| 2026-03-19 | 1.23 TWh |
| 2026-03-20 | 1.21 TWh |
| 2026-03-21 | 1.11 TWh |
| 2026-03-22 | 1.11 TWh |
| 2026-03-23 | 1.24 TWh |
| 2026-03-24 | 1.23 TWh |
| 2026-03-25 | 1.32 TWh |
| 2026-03-26 | 1.40 TWh |
| 2026-03-27 | 1.40 TWh |
| 2026-03-28 | 1.28 TWh |
| 2026-03-29 | 1.19 TWh |
| 2026-03-30 | 1.34 TWh |
| 2026-03-31 | 1.36 TWh |
| 2026-04-01 | 1.35 TWh |
| 2026-04-02 | 1.33 TWh |
| 2026-04-03 | 1.31 TWh |
| 2026-04-04 | 1.09 TWh |
| 2026-04-05 | 1.01 TWh |
| 2026-04-06 | 1.02 TWh |
| 2026-04-07 | 1.09 TWh |
| 2026-04-08 | 1.08 TWh |
| 2026-04-09 | 1.08 TWh |
| 2026-04-10 | 1.07 TWh |
| 2026-04-11 | 1.01 TWh |
| 2026-04-12 | 1.03 TWh |
| 2026-04-13 | 1.20 TWh |
| 2026-04-14 | 1.19 TWh |
| 2026-04-15 | 1.14 TWh |
| 2026-04-16 | 1.10 TWh |
| 2026-04-17 | 1.07 TWh |
| 2026-04-18 | 955 GWh |
| 2026-04-19 | 919 GWh |
| 2026-04-20 | 1.05 TWh |
| 2026-04-21 | 1.09 TWh |
| 2026-04-22 | 1.10 TWh |
| 2026-04-23 | 1.08 TWh |
| 2026-04-24 | 1.06 TWh |
| 2026-04-25 | 956 GWh |
| 2026-04-26 | 910 GWh |
| 2026-04-27 | 1.03 TWh |
| 2026-04-28 | 1.05 TWh |
| 2026-04-29 | 1.05 TWh |
| 2026-04-30 | 1.04 TWh |
| 2026-05-01 | 879 GWh |
| 2026-05-02 | 904 GWh |
| 2026-05-03 | 896 GWh |
| 2026-05-04 | 1.05 TWh |
| 2026-05-05 | 1.07 TWh |
| 2026-05-06 | 1.09 TWh |
| 2026-05-07 | 1.08 TWh |
| 2026-05-08 | 942 GWh |
| 2026-05-09 | 895 GWh |
| 2026-05-10 | 901 GWh |
| 2026-05-11 | 1.05 TWh |
| 2026-05-12 | 1.06 TWh |
| 2026-05-13 | 1.08 TWh |
| 2026-05-14 | 1.01 TWh |
| 2026-05-15 | 1.06 TWh |
| 2026-05-16 | 1.01 TWh |
| 2026-05-17 | 965 GWh |
| 2026-05-18 | 1.09 TWh |
| 2026-05-19 | 1.10 TWh |
| 2026-05-20 | 1.07 TWh |
| 2026-05-21 | 1.06 TWh |
| 2026-05-22 | 1.04 TWh |
| 2026-05-23 | 925 GWh |
| 2026-05-24 | 873 GWh |
| 2026-05-25 | 936 GWh |
| 2026-05-26 | 1.08 TWh |
| 2026-05-27 | 1.10 TWh |
| 2026-05-28 | 1.11 TWh |
| 2026-05-29 | 1.10 TWh |
| 2026-05-30 | 984 GWh |
| 2026-05-31 | 906 GWh |
| 2026-06-01 | 1.03 TWh |
| 2026-06-02 | 1.06 TWh |
| 2026-06-03 | 1.04 TWh |
| 2026-06-04 | 1.06 TWh |
| 2026-06-05 | 1.02 TWh |
| 2026-06-06 | 918 GWh |
| 2026-06-07 | 873 GWh |
| 2026-06-08 | 1.03 TWh |
| 2026-06-09 | 1.03 TWh |
| 2026-06-10 | 1.04 TWh |
| 2026-06-11 | 1.05 TWh |
| 2026-06-12 | 1.05 TWh |
| 2026-06-13 | 946 GWh |
| 2026-06-14 | 893 GWh |
| 2026-06-15 | 1.05 TWh |
| 2026-06-16 | 1.08 TWh |
| 2026-06-17 | 1.11 TWh |
| 2026-06-18 | 1.15 TWh |
| 2026-06-19 | 1.13 TWh |
| 2026-06-20 | 1.03 TWh |
| 2026-06-21 | 1.01 TWh |
| 2026-06-22 | 1.19 TWh |
| 2026-06-23 | 1.23 TWh |
| 2026-06-24 | 1.25 TWh |
| 2026-06-25 | 1.26 TWh |
| 2026-06-26 | 1.23 TWh |
| 2026-06-27 | 1.10 TWh |
| 2026-06-28 | 1.03 TWh |
| 2026-06-29 | 1.12 TWh |
| 2026-06-30 | 1.14 TWh |
| 2026-07-01 | 1.12 TWh |
| 2026-07-02 | 1.11 TWh |
| 2026-07-03 | 1.12 TWh |
| 2026-07-04 | 1.01 TWh |
| 2026-07-05 | 973 GWh |
| 2026-07-06 | 1.15 TWh |
| 2026-07-07 | 1.17 TWh |
| 2026-07-08 | 1.19 TWh |
| 2026-07-09 | 1.20 TWh |
| 2026-07-10 | 1.20 TWh |
| 2026-07-11 | 1.08 TWh |
| 2026-07-12 | 1.02 TWh |
| 2026-07-13 | 1.12 TWh |
| 2026-07-14 | 1.08 TWh |
| 2026-07-15 | 1.19 TWh |
| 2026-07-16 | 1.19 TWh |
| 2026-07-17 | 1.15 TWh |
| 2026-07-18 | 1.03 TWh |
| 2026-07-19 | 949 GWh |
| 2026-07-20 | 1.08 TWh |
| 2026-07-21 | 1.10 TWh |
| 2026-07-22 | 1.07 TWh |
| 2026-07-23 | 1.08 TWh |
| 2026-07-24 | 1.08 TWh |
| 2026-07-25 | 982 GWh |
| 2026-07-26 | 919 GWh |
| 2026-07-27 | 1.04 TWh |
| 2026-07-28 | 1.09 TWh |
| 2026-07-29 | 1.13 TWh |
| 2026-07-30 | 1.12 TWh |
| 2026-07-31 | 1.09 TWh |
| 2026-08-01 | 973 GWh |
| 2026-08-02 | 943 GWh |
| 2026-08-03 | 1.06 TWh |
| 2026-08-04 | 1.07 TWh |
| 2026-08-05 | 1.06 TWh |
| 2026-08-06 | 1.04 TWh |
| 2026-08-07 | 1.02 TWh |
| 2026-08-08 | 959 GWh |
| 2026-08-09 | 935 GWh |
| 2026-08-10 | 1.02 TWh |
| 2026-08-11 | 1.04 TWh |
| 2026-08-12 | 1.06 TWh |
| 2026-08-13 | 1.09 TWh |
| 2026-08-14 | 1.09 TWh |
| 2026-08-15 | 996 GWh |
| 2026-08-16 | 948 GWh |
| 2026-08-17 | 1.03 TWh |
| 2026-08-18 | 1.05 TWh |
| 2026-08-19 | 1.05 TWh |
| 2026-08-20 | 1.03 TWh |
| 2026-08-21 | 991 GWh |
| 2026-08-22 | 897 GWh |
| 2026-08-23 | 865 GWh |
| 2026-08-24 | 1.02 TWh |
| 2026-08-25 | 1.03 TWh |
| 2026-08-26 | 1.06 TWh |
| 2026-08-27 | 1.08 TWh |
| 2026-08-28 | 1.05 TWh |
| 2026-08-29 | 947 GWh |
| 2026-08-30 | 904 GWh |
| 2026-08-31 | 1.04 TWh |
| 2026-09-01 | 1.05 TWh |
| 2026-09-02 | 1.07 TWh |
| 2026-09-03 | 1.08 TWh |
| 2026-09-04 | 1.10 TWh |
| 2026-09-05 | 977 GWh |
| 2026-09-06 | 946 GWh |
| 2026-09-07 | 1.09 TWh |
| 2026-09-08 | 1.11 TWh |
| 2026-09-09 | 1.06 TWh |
| 2026-09-10 | 1.05 TWh |
| 2026-09-11 | 1.04 TWh |
| 2026-09-12 | 934 GWh |
| 2026-09-13 | 907 GWh |
| 2026-09-14 | 1.05 TWh |
| 2026-09-15 | 1.07 TWh |
| 2026-09-16 | 1.07 TWh |
| 2026-09-17 | 1.05 TWh |
| 2026-09-18 | 1.04 TWh |
| 2026-09-19 | 937 GWh |
| 2026-09-20 | 905 GWh |
| 2026-09-21 | 1.02 TWh |
| 2026-09-22 | 1.04 TWh |
| 2026-09-23 | 1.05 TWh |
| 2026-09-24 | 1.06 TWh |
| 2026-09-25 | 1.05 TWh |
| 2026-09-26 | 938 GWh |
| 2026-09-27 | 900 GWh |
| 2026-09-28 | 1.04 TWh |
| 2026-09-29 | 1.06 TWh |
| 2026-09-30 | 1.07 TWh |
| 2026-10-01 | 1.05 TWh |
| 2026-10-02 | 1.03 TWh |
| 2026-10-03 | 936 GWh |
| 2026-10-04 | 898 GWh |
| 2026-10-05 | 1.03 TWh |
| 2026-10-06 | 1.05 TWh |
| 2026-10-07 | 1.06 TWh |
| 2026-10-08 | 1.06 TWh |
| 2026-10-09 | 1.08 TWh |
| 2026-10-10 | 966 GWh |
| 2026-10-11 | 947 GWh |
| 2026-10-12 | 1.07 TWh |
| 2026-10-13 | 1.08 TWh |
| 2026-10-14 | 1.08 TWh |
| 2026-10-15 | 1.08 TWh |
| 2026-10-16 | 1.06 TWh |
| 2026-10-17 | 981 GWh |
| 2026-10-18 | 994 GWh |
| 2026-10-19 | 1.17 TWh |
| 2026-10-20 | 1.19 TWh |
| 2026-10-21 | 1.21 TWh |
| 2026-10-22 | 1.22 TWh |
| 2026-10-23 | 1.23 TWh |
| 2026-10-24 | 1.15 TWh |
| 2026-10-25 | 1.11 TWh |
| 2026-10-26 | 1.21 TWh |
| 2026-10-27 | 1.17 TWh |
| 2026-10-28 | 1.20 TWh |
| 2026-10-29 | 1.22 TWh |
| 2026-10-30 | 1.23 TWh |
| 2026-10-31 | 1.13 TWh |
| 2026-11-01 | 1.13 TWh |
| 2026-11-02 | 1.30 TWh |
| 2026-11-03 | 1.36 TWh |
| 2026-11-04 | 1.42 TWh |
| 2026-11-05 | 1.40 TWh |
| 2026-11-06 | 1.39 TWh |
| 2026-11-07 | 1.29 TWh |
| 2026-11-08 | 1.25 TWh |
| 2026-11-09 | 1.35 TWh |
| 2026-11-10 | 1.29 TWh |
| 2026-11-11 | 1.14 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11. Daily totals are summed by World Power Monitor from complete Europe/Paris local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 367 TWh | 407 TWh | Nuclear 75.3% | 315 |
| 2025 (partial) | 433 TWh | 486 TWh | Nuclear 76.1% | 364 |
| 2024 | 428 TWh | 510 TWh | Nuclear 70.4% | 366 |
| 2023 | 422 TWh | 452 TWh | Nuclear 70.0% | 365 |
| 2022 | 431 TWh | 401 TWh | Nuclear 69.2% | 365 |
| 2021 | 456 TWh | 498 TWh | Nuclear 72.2% | 365 |
| 2020 | 442 TWh | 478 TWh | Nuclear 70.0% | 366 |
| 2019 (partial) | 464 TWh | 516 TWh | Nuclear 73.0% | 364 |
| 2018 | 463 TWh | 523 TWh | Nuclear 74.5% | 365 |
| 2017 | 469 TWh | 502 TWh | Nuclear 75.3% | 365 |
| 2016 (partial) | 473 TWh | 495 TWh | Nuclear 74.9% | 364 |
| 2015 | 469 TWh | 523 TWh | Nuclear 78.8% | 365 |
A year is partial when ENTSO-E has not published every day; 2024 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Power Flows With Neighbours
Net totals, 2026-10-13 (13 October 2026) to 2026-11-11 (11 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Italy North | France exports | 1.98 TWh |
| Switzerland | France exports | 1.40 TWh |
| Germany and Luxembourg | France exports | 800 GWh |
| Great Britain | France exports | 364 GWh |
| Belgium | France exports | 313 GWh |
| Spain | France exports | 159 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Share and Embed
Figures as of 2026-11-12 (12 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for France, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). France Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/fr/
World Power Monitor. France Electricity Demand and Generation Mix. Data as of 2026-11-12 13:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/fr/
@misc{wpm_zones_fr_2026,
title = {{France Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12 13:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/fr/}
} Permalink: https://worldpowermonitor.com/zones/fr/
The Copy buttons add today's date as the access date.