North America Electricity Flows Map

Between 13 October 2026 and 11 November 2026 the largest net flow of electricity between two US grid operators was 2.11 TWh, from SRP into AZPS. The Lower 48 states imported a net 2.07 TWh from Canada. The map shows the net flow on the 45 largest of 159 borders between balancing authorities, summed over 30 complete days: a wider line is a larger net flow and the arrowhead points to the operator that received it. These are EIA interchange figures for that window, not live readings.

Skip the map and go to the tables

The map draws the 45 largest of 159 borders by net flow over the 30 days 13 October to 11 November 2026, from 230 GWh (thinnest) to 2.11 TWh (widest). The arrowhead points to the operator that received the net flow. Node positions are approximate, and lines join those points: they are not cable routes.

Select a border on the map, or a row in the table, to see its detail. The tables below list every border.

Every Border, Net Flow and Direction

30 days, 13 October to 11 November 2026
Every Border, Net Flow and Direction, 13 October to 11 November 2026. Select a column heading to sort.
Border Net direction Net flow Average net power First operator's report (first to second) Second operator's report (first to second)
AZPS and SRP SRP to AZPS 2.11 TWh 2,925 MW -2.17 TWh -2.04 TWh
MISO and TVA MISO to TVA 1.47 TWh 2,039 MW +1.46 TWh +1.47 TWh
BPA and PSEI BPA to PSEI 1.35 TWh 1,880 MW +1.17 TWh +1.54 TWh
MISO and PJM PJM to MISO 1.24 TWh 1,727 MW -1.62 TWh -868 GWh
NYISO and PJM PJM to NYISO 1.15 TWh 1,603 MW -1.27 TWh -1.03 TWh
SCEG and SOCO SOCO to SCEG 903 GWh 1,255 MW -887 GWh -920 GWh
BPA and PGE BPA to PGE 876 GWh 1,216 MW +603 GWh +1.15 TWh
CPLE and PJM CPLE to PJM 859 GWh 1,193 MW +865 GWh +854 GWh
SC and SCEG SCEG to SC 829 GWh 1,152 MW -835 GWh -824 GWh
AZPS and CAISO AZPS to CAISO 811 GWh 1,127 MW +702 GWh +920 GWh
IPCO and PACE PACE to IPCO 799 GWh 1,109 MW -799 GWh -798 GWh
PJM and TVA TVA to PJM 742 GWh 1,031 MW -637 GWh -847 GWh
CAISO and NEVP NEVP to CAISO 723 GWh 1,004 MW -706 GWh -739 GWh
MHEB and MISO MHEB to MISO 707 GWh 982 MW not reported +707 GWh
LDWP and WALC WALC to LDWP 701 GWh 974 MW -728 GWh -674 GWh
BPA and NWMT NWMT to BPA 663 GWh 920 MW -663 GWh -662 GWh
CAISO and SRP SRP to CAISO 612 GWh 850 MW -605 GWh -620 GWh
BCHA and BPA BCHA to BPA 612 GWh 849 MW not reported +612 GWh
CPLE and DUK DUK to CPLE 597 GWh 830 MW -597 GWh -597 GWh
FPL and SEC SEC to FPL 533 GWh 740 MW -543 GWh -523 GWh
FPC and FPL FPL to FPC 526 GWh 731 MW -526 GWh -526 GWh
LDWP and NEVP LDWP to NEVP 506 GWh 703 MW +516 GWh +495 GWh
AECI and MISO AECI to MISO 477 GWh 662 MW +477 GWh +476 GWh
FPL and JEA FPL to JEA 434 GWh 603 MW +427 GWh +441 GWh
IESO and MISO IESO to MISO 379 GWh 527 MW not reported +379 GWh
SC and SOCO SOCO to SC 373 GWh 517 MW -367 GWh -378 GWh
BPA and GRID GRID to BPA 368 GWh 511 MW -368 GWh -368 GWh
AZPS and WALC AZPS to WALC 367 GWh 510 MW +380 GWh +354 GWh
IPCO and PACW IPCO to PACW 363 GWh 505 MW +363 GWh +363 GWh
AVRN and PACW AVRN to PACW 349 GWh 484 MW +349 GWh +349 GWh
ISO-NE and NYISO NYISO to ISO-NE 330 GWh 458 MW -331 GWh -329 GWh
AZPS and LDWP AZPS to LDWP 307 GWh 427 MW +333 GWh +282 GWh
FPL and SOCO SOCO to FPL 297 GWh 412 MW -291 GWh -302 GWh
GRID and SRP GRID to SRP 294 GWh 408 MW +294 GWh +293 GWh
LGEE and MISO MISO to LGEE 286 GWh 397 MW -285 GWh -286 GWh
DEAA and SRP DEAA to SRP 281 GWh 391 MW +281 GWh +281 GWh
DUK and SC SC to DUK 281 GWh 390 MW -282 GWh -280 GWh
SRP and WALC SRP to WALC 275 GWh 382 MW +281 GWh +269 GWh
PSCO and SWPW PSCO to SWPW 273 GWh 379 MW +288 GWh +258 GWh
BPA and CHPD CHPD to BPA 266 GWh 369 MW -266 GWh -265 GWh
FPC and SEC SEC to FPC 254 GWh 352 MW -279 GWh -228 GWh
HQT and NYISO HQT to NYISO 253 GWh 352 MW not reported +253 GWh
BPA and TPWR BPA to TPWR 247 GWh 343 MW +247 GWh +247 GWh
BPA and SCL BPA to SCL 242 GWh 336 MW +242 GWh +242 GWh
CAISO and IID IID to CAISO 230 GWh 320 MW -222 GWh -239 GWh
BPA and PACW (not drawn) BPA to PACW 229 GWh 318 MW +229 GWh +229 GWh
CAISO and TIDC (not drawn) CAISO to TIDC 215 GWh 299 MW +209 GWh +222 GWh
LGEE and PJM (not drawn) LGEE to PJM 212 GWh 294 MW +227 GWh +196 GWh
FMPP and FPL (not drawn) FPL to FMPP 210 GWh 291 MW -213 GWh -207 GWh
CPLE and SCEG (not drawn) SCEG to CPLE 202 GWh 281 MW -202 GWh -202 GWh
AVA and BPA (not drawn) BPA to AVA 198 GWh 275 MW -275 GWh -121 GWh
FMPP and FPC (not drawn) FMPP to FPC 194 GWh 270 MW +200 GWh +189 GWh
GRID and WALC (not drawn) GRID to WALC 184 GWh 256 MW +191 GWh +178 GWh
AVRN and BPA (not drawn) AVRN to BPA 184 GWh 256 MW +184 GWh +184 GWh
BANC and TIDC (not drawn) TIDC to BANC 175 GWh 244 MW -168 GWh -183 GWh
LGEE and TVA (not drawn) TVA to LGEE 172 GWh 239 MW -175 GWh -169 GWh
SOCO and TVA (not drawn) TVA to SOCO 159 GWh 221 MW -160 GWh -158 GWh
TEPC and WALC (not drawn) WALC to TEPC 157 GWh 218 MW -162 GWh -152 GWh
FPC and TEC (not drawn) FPC to TEC 150 GWh 208 MW +148 GWh +152 GWh
GRID and PNM (not drawn) GRID to PNM 148 GWh 205 MW +150 GWh +146 GWh
SEPA and SOCO (not drawn) SEPA to SOCO 147 GWh 205 MW +147 GWh +148 GWh
ERCOT and SPP (not drawn) SPP to ERCOT 147 GWh 205 MW -96.7 GWh -198 GWh
AECI and TVA (not drawn) AECI to TVA 143 GWh 198 MW +146 GWh +139 GWh
AECI and SPP (not drawn) SPP to AECI 137 GWh 190 MW -137 GWh -138 GWh
IESO and NYISO (not drawn) IESO to NYISO 135 GWh 188 MW not reported +135 GWh
EPE and PNM (not drawn) PNM to EPE 130 GWh 181 MW -130 GWh -130 GWh
DUK and PJM (not drawn) DUK to PJM 120 GWh 167 MW +139 GWh +102 GWh
NEVP and PACE (not drawn) PACE to NEVP 111 GWh 154 MW -108 GWh -113 GWh
SPA and SPP (not drawn) SPA to SPP 109 GWh 152 MW not reported +109 GWh
CPLE and SC (not drawn) SC to CPLE 109 GWh 151 MW -108 GWh -110 GWh
AZPS and TEPC (not drawn) TEPC to AZPS 107 GWh 148 MW -107 GWh -107 GWh
PSCO and SPP (not drawn) SPP to PSCO 95.5 GWh 133 MW -78.8 GWh -112 GWh
NWMT and SWPW (not drawn) SWPW to NWMT 94.9 GWh 132 MW -94.8 GWh -95.1 GWh
FMPP and TEC (not drawn) TEC to FMPP 91.5 GWh 127 MW -91.4 GWh -91.5 GWh
CAISO and LDWP (not drawn) LDWP to CAISO 91.2 GWh 127 MW -92.9 GWh -89.4 GWh
LDWP and PACE (not drawn) PACE to LDWP 90.1 GWh 125 MW -91.1 GWh -89.1 GWh
BHBA and SWPW (not drawn) SWPW to BHBA 82.7 GWh 115 MW -84.0 GWh -81.4 GWh
MISO and SOCO (not drawn) MISO to SOCO 75.5 GWh 105 MW +38.7 GWh +112 GWh
BPA and LDWP (not drawn) BPA to LDWP 73.8 GWh 102 MW +73.8 GWh +73.8 GWh
CHPD and PSEI (not drawn) CHPD to PSEI 73.2 GWh 102 MW +73.2 GWh +73.2 GWh
BHBA and SPP (not drawn) SPP to BHBA 69.3 GWh 96 MW -69.3 GWh not reported
BHBA and PACE (not drawn) BHBA to PACE 67.2 GWh 93 MW +66.2 GWh +68.1 GWh
DUK and SOCO (not drawn) DUK to SOCO 66.8 GWh 93 MW +66.7 GWh +66.8 GWh
SC and SEPA (not drawn) SC to SEPA 65.8 GWh 91 MW +64.8 GWh +66.7 GWh
BANC and CAISO (not drawn) CAISO to BANC 65.5 GWh 91 MW -71.0 GWh -59.9 GWh
FPL and TEC (not drawn) TEC to FPL 65.1 GWh 90 MW -64.3 GWh -65.9 GWh
BPA and IPCO (not drawn) IPCO to BPA 64.1 GWh 89 MW -64.1 GWh -64.1 GWh
NEVP and WALC (not drawn) WALC to NEVP 60.8 GWh 84 MW -51.8 GWh -69.8 GWh
PNM and SWPW (not drawn) PNM to SWPW 60.2 GWh 84 MW +60.7 GWh +59.7 GWh
PNM and PSCO (not drawn) PSCO to PNM 57.8 GWh 80 MW -62.5 GWh -53.1 GWh
SWPW and WALC (not drawn) SWPW to WALC 57.5 GWh 80 MW +59.3 GWh +55.7 GWh
BPA and CAISO (not drawn) CAISO to BPA 57.4 GWh 80 MW -67.1 GWh -47.6 GWh
SIKE and SPP (not drawn) SPP to SIKE 57.1 GWh 79 MW -56.8 GWh -57.3 GWh
FPC and TAL (not drawn) TAL to FPC 57.0 GWh 79 MW -56.2 GWh -57.9 GWh
AVA and NWMT (not drawn) NWMT to AVA 56.9 GWh 79 MW -55.0 GWh -58.7 GWh
SOCO and TAL (not drawn) SOCO to TAL 56.4 GWh 78 MW +56.4 GWh +56.4 GWh
DUK and TVA (not drawn) TVA to DUK 54.4 GWh 76 MW -54.5 GWh -54.4 GWh
GCPD and PACW (not drawn) GCPD to PACW 53.0 GWh 74 MW +53.0 GWh +53.0 GWh
SEC and TEC (not drawn) SEC to TEC 52.8 GWh 73 MW +52.0 GWh +53.5 GWh
FPL and HST (not drawn) FPL to HST 52.4 GWh 73 MW +51.6 GWh +53.3 GWh
HQT and ISO-NE (not drawn) ISO-NE to HQT 51.4 GWh 71 MW not reported -51.4 GWh
SIKE and SPA (not drawn) SIKE to SPA 51.2 GWh 71 MW +51.2 GWh not reported
SRP and TEPC (not drawn) TEPC to SRP 51.1 GWh 71 MW -51.1 GWh -51.2 GWh
GWA and NWMT (not drawn) GWA to NWMT 51.1 GWh 71 MW +38.1 GWh +64.1 GWh
CAISO and WALC (not drawn) WALC to CAISO 42.7 GWh 59 MW -44.2 GWh -41.3 GWh
MISO and SPA (not drawn) SPA to MISO 42.1 GWh 58 MW -42.1 GWh not reported
SPC and SPP (not drawn) SPC to SPP 39.3 GWh 55 MW not reported +39.3 GWh
FPC and SOCO (not drawn) FPC to SOCO 39.2 GWh 54 MW +38.8 GWh +39.6 GWh
DUK and SCEG (not drawn) SCEG to DUK 38.0 GWh 53 MW -37.2 GWh -38.7 GWh
DUK and YAD (not drawn) YAD to DUK 37.4 GWh 52 MW -37.3 GWh -37.5 GWh
PSEI and SCL (not drawn) PSEI to SCL 36.4 GWh 51 MW +36.4 GWh +36.4 GWh
AZPS and SWPW (not drawn) SWPW to AZPS 34.7 GWh 48 MW -37.1 GWh -32.4 GWh
BANC and BPA (not drawn) BANC to BPA 34.5 GWh 48 MW +31.1 GWh +38.0 GWh
GCPD and PSEI (not drawn) PSEI to GCPD 34.2 GWh 48 MW -34.2 GWh -34.2 GWh
PNM and TEPC (not drawn) PNM to TEPC 33.9 GWh 47 MW +32.0 GWh +35.9 GWh
PSEI and TPWR (not drawn) TPWR to PSEI 30.8 GWh 43 MW -30.8 GWh -30.8 GWh
PACE and SWPW (not drawn) SWPW to PACE 28.6 GWh 40 MW -27.9 GWh -29.3 GWh
PACW and PGE (not drawn) PACW to PGE 25.9 GWh 36 MW +25.9 GWh +25.9 GWh
CPLW and PJM (not drawn) CPLW to PJM 25.0 GWh 35 MW +31.9 GWh +18.0 GWh
MISO and SIKE (not drawn) SIKE to MISO 23.7 GWh 33 MW -24.5 GWh -23.0 GWh
BPA and DOPD (not drawn) DOPD to BPA 20.4 GWh 28 MW -22.0 GWh -18.9 GWh
AECI and SPA (not drawn) SPA to AECI 19.6 GWh 27 MW -19.6 GWh not reported
AZPS and PACE (not drawn) PACE to AZPS 18.1 GWh 25 MW -18.1 GWh -18.1 GWh
DUK and SEPA (not drawn) DUK to SEPA 16.3 GWh 23 MW +16.1 GWh +16.5 GWh
MISO and SPP (not drawn) SPP to MISO 16.0 GWh 22 MW -20.8 GWh -11.2 GWh
AZPS and PNM (not drawn) PNM to AZPS (reports disagree) 15.7 GWh 22 MW +4.37 GWh -35.8 GWh
CAISO and CEN (not drawn) CAISO to CEN 13.9 GWh 19 MW +13.9 GWh not reported
ISO-NE and NBSO (not drawn) ISO-NE to NBSO 13.8 GWh 19 MW +13.8 GWh not reported
IPCO and NEVP (not drawn) IPCO to NEVP (reports disagree) 13.5 GWh 19 MW -41.0 GWh +68.0 GWh
JEA and SEC (not drawn) SEC to JEA 13.2 GWh 18 MW -14.1 GWh -12.2 GWh
BPA and GCPD (not drawn) GCPD to BPA 13.0 GWh 18 MW -13.8 GWh -12.3 GWh
FPC and GVL (not drawn) FPC to GVL 12.5 GWh 17 MW +13.7 GWh +11.2 GWh
PACE and SRP (not drawn) SRP to PACE 12.3 GWh 17 MW -11.7 GWh -12.8 GWh
AVA and CHPD (not drawn) CHPD to AVA 12.1 GWh 17 MW -11.9 GWh -12.3 GWh
AZPS and IID (not drawn) AZPS to IID 10.6 GWh 15 MW +10.5 GWh +10.6 GWh
AVA and GCPD (not drawn) AVA to GCPD 9.89 GWh 14 MW +9.73 GWh +10.0 GWh
CPLW and TVA (not drawn) TVA to CPLW 9.82 GWh 14 MW -9.85 GWh -9.79 GWh
CPLW and DUK (not drawn) DUK to CPLW 9.66 GWh 13 MW -9.66 GWh -9.66 GWh
CHPD and DOPD (not drawn) DOPD to CHPD 9.63 GWh 13 MW -9.63 GWh -9.63 GWh
CEN and ERCOT (not drawn) ERCOT to CEN 9.00 GWh 13 MW not reported -9.00 GWh
SPP and WAUW (not drawn) SPP to WAUW 8.98 GWh 12 MW +8.98 GWh not reported
IID and WALC (not drawn) IID to WALC 8.09 GWh 11 MW +8.84 GWh +7.35 GWh
IPCO and NWMT (not drawn) NWMT to IPCO 7.65 GWh 11 MW -7.65 GWh -7.65 GWh
AVA and IPCO (not drawn) IPCO to AVA 7.53 GWh 10 MW -7.53 GWh -7.53 GWh
NWMT and PACE (not drawn) NWMT to PACE 5.09 GWh 7 MW +5.08 GWh +5.09 GWh
AVA and PACW (not drawn) AVA to PACW 4.90 GWh 7 MW +4.87 GWh +4.93 GWh
CPLE and YAD (not drawn) YAD to CPLE 3.73 GWh 5 MW -3.73 GWh -3.73 GWh
SCEG and SEPA (not drawn) SCEG to SEPA 3.39 GWh 5 MW +3.14 GWh +3.63 GWh
AECI and SIKE (not drawn) SIKE to AECI 3.09 GWh 4 MW -1.14 GWh -5.05 GWh
EPE and TEPC (not drawn) TEPC to EPE 2.01 GWh 3 MW -59 MWh -3.97 GWh
FMPP and JEA (not drawn) JEA to FMPP 1.86 GWh 3 MW -1.87 GWh -1.86 GWh
CAISO and PACW (not drawn) PACW to CAISO 1.06 GWh 1 MW -1.01 GWh -1.11 GWh
FPL and GVL (not drawn) FPL to GVL (reports disagree) 744 MWh 1 MW +2.81 GWh -1.32 GWh
BPA and NEVP (not drawn) BPA to NEVP (reports disagree) 455 MWh 1 MW +1.13 GWh -217 MWh
AESO and NWMT (not drawn) No net flow 0 MWh 0 MW not reported 0 MWh
EPE and SPP (not drawn) No net flow 0 MWh 0 MW 0 MWh 0 MWh
NWMT and WAUW (not drawn) No net flow 0 MWh 0 MW 0 MWh not reported
NWMT and WWA (not drawn) No net flow 0 MWh 0 MW 0 MWh not reported
PNM and SPP (not drawn) No net flow 0 MWh 0 MW 0 MWh 0 MWh

Interchange between each pair of balancing authorities, summed over 30 complete days (13 October to 11 November 2026). Net is the average of the two operators' reports; average net power is the net divided by the 720 hours in the window. Each report is signed from the first operator's side: positive means energy left the first named operator for the second. "First operator" follows the order of the border name. A border with only one report is a Canadian or Mexican operator, or a US operator that does not report the other side.

Between EIA Regions

30 days, 13 October to 11 November 2026
Between EIA Regions, 13 October to 11 November 2026. Select a column heading to sort.
Border Net direction Net flow Average net power First operator's report (first to second) Second operator's report (first to second)
California and Southwest Southwest to California 2.48 TWh 3,441 MW -2.58 TWh -2.37 TWh
Midwest and Tennessee Midwest to Tennessee 1.44 TWh 1,998 MW +1.43 TWh +1.44 TWh
Mid-Atlantic and New York Mid-Atlantic to New York 1.15 TWh 1,603 MW +1.03 TWh +1.27 TWh
Carolinas and Southeast Southeast to Carolinas 1.12 TWh 1,561 MW -1.10 TWh -1.14 TWh
Canada and Midwest Canada to Midwest 1.09 TWh 1,509 MW not reported +1.09 TWh
Mid-Atlantic and Midwest Mid-Atlantic to Midwest 1.03 TWh 1,433 MW +671 GWh +1.39 TWh
Carolinas and Mid-Atlantic Carolinas to Mid-Atlantic 1.00 TWh 1,395 MW +1.04 TWh +974 GWh
Mid-Atlantic and Tennessee Tennessee to Mid-Atlantic 742 GWh 1,031 MW -637 GWh -847 GWh
Northwest and Southwest Northwest to Southwest 653 GWh 907 MW +659 GWh +648 GWh
Canada and Northwest Canada to Northwest 613 GWh 851 MW not reported +613 GWh
Canada and New York Canada to New York 389 GWh 540 MW not reported +389 GWh
New England and New York New York to New England 330 GWh 458 MW -331 GWh -329 GWh
Florida and Southeast Southeast to Florida 314 GWh 436 MW -309 GWh -319 GWh
California and Northwest Northwest to California 286 GWh 397 MW -277 GWh -295 GWh
Central and Midwest Central to Midwest 221 GWh 308 MW +218 GWh +225 GWh
Southeast and Tennessee Tennessee to Southeast 159 GWh 221 MW -160 GWh -158 GWh
Central and Texas Central to Texas 147 GWh 205 MW +198 GWh +96.7 GWh
Central and Northwest Central to Northwest 135 GWh 187 MW +121 GWh +148 GWh
Midwest and Southeast Midwest to Southeast 75.5 GWh 105 MW +38.7 GWh +112 GWh
Canada and New England New England to Canada 65.2 GWh 91 MW not reported -65.2 GWh
Carolinas and Tennessee Tennessee to Carolinas 64.3 GWh 89 MW -64.3 GWh -64.2 GWh
Canada and Central Canada to Central 39.3 GWh 55 MW not reported +39.3 GWh
California and Mexico California to Mexico 13.9 GWh 19 MW +13.9 GWh not reported
Texas and Mexico Texas to Mexico 9.00 GWh 13 MW +9.00 GWh not reported
Central and Southwest No net flow 0 MWh 0 MW 0 MWh 0 MWh

The same interchange grouped into the EIA regions, 13 October to 11 November 2026, with the Canada and Mexico aggregates EIA publishes. Regions are larger than balancing authorities and their borders are not drawn on the map.

Net Position of Each Operator

30 days, 13 October to 11 November 2026
Exports, imports and net position of each operator, 13 October to 11 November 2026. Select a column heading to sort.
Operator Exports Imports Net (exports minus imports) Reporting
Alberta Electric System Operator 0 MWh 0 MWh 0 MWh Neighbours only
Alcoa Power Generating, Inc. - Yadkin Division 41.2 GWh 0 MWh +41.2 GWh Own report and neighbours
Arizona Public Service Company 1.50 TWh 2.28 TWh -785 GWh Own report and neighbours
Arlington Valley, LLC 281 GWh 0 MWh +281 GWh Own report and neighbours
Associated Electric Cooperative, Inc. 619 GWh 160 GWh +459 GWh Own report and neighbours
Avangrid Renewables, LLC 532 GWh 0 MWh +532 GWh Own report and neighbours
Avista Corporation 14.8 GWh 274 GWh -260 GWh Own report and neighbours
Balancing Authority of Northern California 34.5 GWh 241 GWh -206 GWh Own report and neighbours
Black Hills Energy 67.2 GWh 152 GWh -84.8 GWh Own report and neighbours
Bonneville Power Administration 3.22 TWh 2.28 TWh +939 GWh Own report and neighbours
British Columbia Hydro and Power Authority 612 GWh 0 MWh +612 GWh Neighbours only
California Independent System Operator 352 GWh 2.51 TWh -2.16 TWh Own report and neighbours
Centro Nacional de Control de Energia 0 MWh 22.9 GWh -22.9 GWh Neighbours only
City of Homestead 0 MWh 52.4 GWh -52.4 GWh Own report and neighbours
City of Tacoma, Department of Public Utilities, Light Division 30.8 GWh 247 GWh -216 GWh Own report and neighbours
City of Tallahassee 57.0 GWh 56.4 GWh +614 MWh Own report and neighbours
Dominion Energy South Carolina, Inc. 1.07 TWh 903 GWh +169 GWh Own report and neighbours
Duke Energy Carolinas 810 GWh 411 GWh +400 GWh Own report and neighbours
Duke Energy Florida, Inc. 202 GWh 1.03 TWh -830 GWh Own report and neighbours
Duke Energy Progress East 859 GWh 912 GWh -53.0 GWh Own report and neighbours
Duke Energy Progress West 25.0 GWh 19.5 GWh +5.48 GWh Own report and neighbours
El Paso Electric Company 0 MWh 132 GWh -132 GWh Own report and neighbours
Electric Reliability Council of Texas, Inc. 9.00 GWh 147 GWh -138 GWh Own report and neighbours
Florida Municipal Power Pool 194 GWh 303 GWh -109 GWh Own report and neighbours
Florida Power & Light Co. 1.22 TWh 895 GWh +328 GWh Own report and neighbours
Gainesville Regional Utilities 0 MWh 13.2 GWh -13.2 GWh Own report and neighbours
Gridforce Energy Management, LLC 993 GWh 0 MWh +993 GWh Own report and neighbours
Hydro-Quebec TransEnergie 253 GWh 51.4 GWh +202 GWh Neighbours only
Idaho Power Company 449 GWh 806 GWh -358 GWh Own report and neighbours
Imperial Irrigation District 239 GWh 10.6 GWh +228 GWh Own report and neighbours
ISO New England 65.2 GWh 330 GWh -265 GWh Own report and neighbours
JEA 1.86 GWh 447 GWh -445 GWh Own report and neighbours
Los Angeles Department of Water and Power 597 GWh 1.17 TWh -575 GWh Own report and neighbours
Louisville Gas and Electric Company and Kentucky Utilities Company 212 GWh 458 GWh -246 GWh Own report and neighbours
Manitoba Hydro 707 GWh 0 MWh +707 GWh Neighbours only
Midcontinent Independent System Operator, Inc. 1.83 TWh 2.89 TWh -1.06 TWh Own report and neighbours
NaturEner Power Watch, LLC 51.1 GWh 0 MWh +51.1 GWh Own report and neighbours
NaturEner Wind Watch, LLC 0 MWh 0 MWh 0 MWh Neighbours only
Nevada Power Company 723 GWh 691 GWh +31.6 GWh Own report and neighbours
New Brunswick System Operator 0 MWh 13.8 GWh -13.8 GWh Neighbours only
New York Independent System Operator 330 GWh 1.54 TWh -1.21 TWh Own report and neighbours
NorthWestern Corporation 732 GWh 146 GWh +586 GWh Own report and neighbours
Ontario IESO 515 GWh 0 MWh +515 GWh Neighbours only
PacifiCorp East 1.02 TWh 113 GWh +904 GWh Own report and neighbours
PacifiCorp West 27.0 GWh 998 GWh -971 GWh Own report and neighbours
PJM Interconnection, LLC 2.40 TWh 1.96 TWh +439 GWh Own report and neighbours
Portland General Electric Company 0 MWh 902 GWh -902 GWh Own report and neighbours
Public Service Company of Colorado 331 GWh 95.5 GWh +235 GWh Own report and neighbours
Public Service Company of New Mexico 240 GWh 206 GWh +34.5 GWh Own report and neighbours
Public Utility District No. 1 of Chelan County 351 GWh 9.63 GWh +341 GWh Own report and neighbours
Public Utility District No. 2 of Grant County, Washington 66.0 GWh 44.1 GWh +21.9 GWh Own report and neighbours
PUD No. 1 of Douglas County 30.1 GWh 0 MWh +30.1 GWh Own report and neighbours
Puget Sound Energy, Inc. 70.6 GWh 1.46 TWh -1.39 TWh Own report and neighbours
Salt River Project Agricultural Improvement and Power District 3.01 TWh 626 GWh +2.38 TWh Own report and neighbours
Saskatchewan Power Corporation 39.3 GWh 0 MWh +39.3 GWh Neighbours only
Seattle City Light 0 MWh 278 GWh -278 GWh Own report and neighbours
Seminole Electric Cooperative 853 GWh 0 MWh +853 GWh Own report and neighbours
Sikeston Board Of Municipal Utilities 78.1 GWh 57.1 GWh +21.0 GWh Own report and neighbours
South Carolina Public Service Authority 456 GWh 1.20 TWh -746 GWh Own report and neighbours
Southeastern Power Administration 147 GWh 85.5 GWh +62.0 GWh Own report and neighbours
Southern Company Services, Inc. - Trans 1.63 TWh 488 GWh +1.14 TWh Own report and neighbours
Southwest Power Pool 531 GWh 148 GWh +383 GWh Own report and neighbours
Southwest Power Pool West Balancing Authority Area 298 GWh 333 GWh -34.8 GWh Own report and neighbours
Southwestern Power Administration 171 GWh 51.2 GWh +120 GWh Neighbours only
Tampa Electric Company 157 GWh 203 GWh -46.0 GWh Own report and neighbours
Tennessee Valley Authority 1.14 TWh 1.61 TWh -473 GWh Own report and neighbours
Tucson Electric Power 160 GWh 191 GWh -30.7 GWh Own report and neighbours
Turlock Irrigation District 175 GWh 215 GWh -39.9 GWh Own report and neighbours
Western Area Power Administration - Desert Southwest Region 961 GWh 892 GWh +69.3 GWh Own report and neighbours
Western Area Power Administration - Upper Great Plains West 0 MWh 8.98 GWh -8.98 GWh Neighbours only

Built from the averaged border figures above. A positive net means the operator sent out more than it received across its borders with the operators listed in the window; a negative net means it was a net importer. Interchange with operators not covered by EIA is not counted, and flows within an operator's own area are not counted.

Key Facts

  • EIA balancing authorities reported interchange on 159 borders between 70 operators in the 30 days 13 October to 11 November 2026.
  • The largest net flow in the 30 days to 11 November 2026 was 2.11 TWh from SRP to AZPS, an average of 2,925 MW.
  • Salt River Project Agricultural Improvement and Power District was the largest net exporter in the 30 days to 11 November 2026, at 2.38 TWh.
  • California Independent System Operator was the largest net importer in the 30 days to 11 November 2026, at 2.16 TWh.
  • The Lower 48 states imported a net 2.07 TWh from Canada in the 30 days to 11 November 2026.
  • The Lower 48 states exported a net 22.3 GWh to Mexico in the 30 days to 11 November 2026.
  • Both operators reported 140 of the borders and agreed on the direction of 136 of them in the 30 days to 11 November 2026.

Reading the Map

  • Sign convention. EIA reports interchange from each balancing authority's own side: a positive figure means energy left that operator for its neighbour, a negative figure means it arrived. The map shows the direction of the net flow, from the operator that sent it to the one that received it, and the table gives the signed reports.
  • Two reports, one border. Both operators on a border report it, and their meters rarely match exactly. The net flow on the map and in the tables is the average of the two reports; each report is in the border table. Both operators reported 140 borders and agreed on the direction of 136.
  • Window totals. Each figure is a sum over 30 complete days, 13 October to 11 November 2026. The export holds one total per border, so the map does not show a single day or an hour by hour picture.
  • Net, not gross. Power can cross a border in both directions within the window. The map shows the difference, so a busy border with balanced traffic can look quiet.
  • Balancing authorities. The 59 operators that report interchange to EIA are electric system operators, not states or countries, and vary from ERCOT and PJM to a single city utility. Nodes sit at hand placed approximate centres, and lines join those points: they show which operators are linked, not where lines run.
  • Canada and Mexico. Canadian and Mexican operators are shown as nodes on their side of the border, from the US side's reports only. The Canada and Mexico totals for the Lower 48 come from EIA's own aggregate.
  • Map and tables. To keep the map readable it draws the 45 largest borders. Every border, including the smallest, is in the table, and so is each operator's net position.

Sources: Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Map outlines: Natural Earth. (Public domain) Data as of 11 November 2026 (30 days from 13 October 2026). Hourly and daily interchange (EIA-930), provisional.

Cite this page
APA 7

World Power Monitor. (2026). North America Electricity Flows Map: US Grid Interchange. https://worldpowermonitor.com/us/flows/

Plain text

World Power Monitor. North America Electricity Flows Map: US Grid Interchange. Data as of 2026-11-11. Data from U.S. Energy Information Administration and Natural Earth. https://worldpowermonitor.com/us/flows/

BibTeX
@misc{wpm_us_flows_2026,
  title = {{North America Electricity Flows Map: US Grid Interchange}},
  author = {{World Power Monitor}},
  year = {2026},
  note = {Data as of 2026-11-11. Data from U.S. Energy Information Administration and Natural Earth.},
  url = {https://worldpowermonitor.com/us/flows/}
}

Permalink: https://worldpowermonitor.com/us/flows/

The Copy buttons add today's date as the access date.