Hungary Electricity Demand and Generation Mix
Hungary demand was 6,268 MW in the hour starting 12 Nov 2026, 13:00 CET (UTC+01:00). Gas was the largest source in the hour starting 11 Nov 2026, 13:00 CET (UTC+01:00), at 44% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Hungary is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 12 Nov 2026, 13:00 CET (UTC+01:00), demand in Hungary was 6,268 MW, against a day-ahead forecast of 6,034 MW.
- Gas supplied 44.3% of Hungary's generation in the hour starting 11 Nov 2026, 13:00 CET (UTC+01:00).
- The day-ahead price in Hungary averaged EUR 200.40/MWh for delivery on 2026-11-13 (13 November 2026).
- Installed generating capacity in Hungary was 16.9 GW in 2026, as reported to ENTSO-E.
- Demand in Hungary totalled 43.2 TWh in 2025.
- Nuclear supplied 45.3% of Hungary's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 12 Nov 2026, 13:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T12:00:00Z.
Generation by Source
Latest hour with generation by source: 11 Nov 2026, 13:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Gas | 1,917 MW | 44.3% |
| Nuclear | 1,461 MW | 33.8% |
| Solar | 316 MW | 7.3% |
| Coal | 300 MW | 6.9% |
| Bioenergy | 198 MW | 4.6% |
| Other | 99 MW | 2.3% |
| Other renewables | 23 MW | 0.5% |
| Hydro | 9 MW | 0.2% |
| Geothermal | 0 MW | 0.0% |
| Total from these sources | 4,324 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11T12:00:00Z.
Day-Ahead Price
Delivery day 2026-11-13 (13 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Hungary and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-13.
Last 30 Days, Hourly
Times in UTCShow the data table (687 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-14T23:00Z | 4,603 MW |
| 2026-10-15T00:00Z | 4,420 MW |
| 2026-10-15T01:00Z | 4,409 MW |
| 2026-10-15T02:00Z | 4,494 MW |
| 2026-10-15T03:00Z | 4,728 MW |
| 2026-10-15T04:00Z | 5,413 MW |
| 2026-10-15T05:00Z | 5,714 MW |
| 2026-10-15T06:00Z | 5,649 MW |
| 2026-10-15T07:00Z | 5,472 MW |
| 2026-10-15T08:00Z | 5,313 MW |
| 2026-10-15T09:00Z | 5,158 MW |
| 2026-10-15T10:00Z | 5,169 MW |
| 2026-10-15T11:00Z | 5,183 MW |
| 2026-10-15T12:00Z | 5,155 MW |
| 2026-10-15T13:00Z | 5,359 MW |
| 2026-10-15T14:00Z | 5,582 MW |
| 2026-10-15T15:00Z | 5,852 MW |
| 2026-10-15T16:00Z | 6,111 MW |
| 2026-10-15T17:00Z | 6,168 MW |
| 2026-10-15T18:00Z | 5,938 MW |
| 2026-10-15T19:00Z | 5,530 MW |
| 2026-10-15T20:00Z | 5,310 MW |
| 2026-10-15T21:00Z | 5,142 MW |
| 2026-10-15T22:00Z | 4,879 MW |
| 2026-10-15T23:00Z | 4,607 MW |
| 2026-10-16T00:00Z | 4,457 MW |
| 2026-10-16T01:00Z | 4,422 MW |
| 2026-10-16T02:00Z | 4,492 MW |
| 2026-10-16T03:00Z | 4,786 MW |
| 2026-10-16T04:00Z | 5,456 MW |
| 2026-10-16T05:00Z | 5,695 MW |
| 2026-10-16T06:00Z | 5,314 MW |
| 2026-10-16T07:00Z | 4,713 MW |
| 2026-10-16T08:00Z | 4,277 MW |
| 2026-10-16T09:00Z | 4,045 MW |
| 2026-10-16T10:00Z | 4,089 MW |
| 2026-10-16T11:00Z | 4,073 MW |
| 2026-10-16T12:00Z | 4,047 MW |
| 2026-10-16T13:00Z | 4,392 MW |
| 2026-10-16T14:00Z | 4,984 MW |
| 2026-10-16T15:00Z | 5,586 MW |
| 2026-10-16T16:00Z | 5,853 MW |
| 2026-10-16T17:00Z | 5,937 MW |
| 2026-10-16T18:00Z | 5,749 MW |
| 2026-10-16T19:00Z | 5,387 MW |
| 2026-10-16T20:00Z | 5,244 MW |
| 2026-10-16T21:00Z | 5,094 MW |
| 2026-10-16T22:00Z | 4,836 MW |
| 2026-10-16T23:00Z | 4,478 MW |
| 2026-10-17T00:00Z | 4,315 MW |
| 2026-10-17T01:00Z | 4,275 MW |
| 2026-10-17T02:00Z | 4,287 MW |
| 2026-10-17T03:00Z | 4,379 MW |
| 2026-10-17T04:00Z | 4,654 MW |
| 2026-10-17T05:00Z | 4,926 MW |
| 2026-10-17T06:00Z | 4,873 MW |
| 2026-10-17T07:00Z | 4,757 MW |
| 2026-10-17T08:00Z | 4,620 MW |
| 2026-10-17T09:00Z | 4,477 MW |
| 2026-10-17T10:00Z | 4,326 MW |
| 2026-10-17T11:00Z | 4,244 MW |
| 2026-10-17T12:00Z | 4,169 MW |
| 2026-10-17T13:00Z | 4,309 MW |
| 2026-10-17T14:00Z | 4,724 MW |
| 2026-10-17T15:00Z | 5,113 MW |
| 2026-10-17T16:00Z | 5,328 MW |
| 2026-10-17T17:00Z | 5,398 MW |
| 2026-10-17T18:00Z | 5,233 MW |
| 2026-10-17T19:00Z | 4,902 MW |
| 2026-10-17T20:00Z | 4,717 MW |
| 2026-10-17T21:00Z | 4,528 MW |
| 2026-10-17T22:00Z | 4,231 MW |
| 2026-10-17T23:00Z | 4,000 MW |
| 2026-10-18T00:00Z | 3,890 MW |
| 2026-10-18T01:00Z | 3,822 MW |
| 2026-10-18T02:00Z | 3,841 MW |
| 2026-10-18T03:00Z | 3,938 MW |
| 2026-10-18T04:00Z | 4,154 MW |
| 2026-10-18T05:00Z | 4,388 MW |
| 2026-10-18T06:00Z | 4,484 MW |
| 2026-10-18T07:00Z | 4,391 MW |
| 2026-10-18T08:00Z | 4,287 MW |
| 2026-10-18T09:00Z | 4,003 MW |
| 2026-10-18T10:00Z | 3,762 MW |
| 2026-10-18T11:00Z | 3,631 MW |
| 2026-10-18T12:00Z | 3,711 MW |
| 2026-10-18T13:00Z | 3,919 MW |
| 2026-10-18T14:00Z | 4,382 MW |
| 2026-10-18T15:00Z | 4,939 MW |
| 2026-10-18T16:00Z | 5,322 MW |
| 2026-10-18T17:00Z | 5,405 MW |
| 2026-10-18T18:00Z | 5,199 MW |
| 2026-10-18T19:00Z | 4,853 MW |
| 2026-10-18T20:00Z | 4,667 MW |
| 2026-10-18T21:00Z | 4,516 MW |
| 2026-10-18T22:00Z | 4,282 MW |
| 2026-10-18T23:00Z | 4,100 MW |
| 2026-10-19T00:00Z | 4,046 MW |
| 2026-10-19T01:00Z | 4,055 MW |
| 2026-10-19T02:00Z | 4,132 MW |
| 2026-10-19T03:00Z | 4,498 MW |
| 2026-10-19T04:00Z | 5,319 MW |
| 2026-10-19T05:00Z | 5,603 MW |
| 2026-10-19T06:00Z | 5,286 MW |
| 2026-10-19T07:00Z | 4,713 MW |
| 2026-10-19T08:00Z | 4,413 MW |
| 2026-10-19T09:00Z | 4,154 MW |
| 2026-10-19T10:00Z | 4,171 MW |
| 2026-10-19T11:00Z | 4,288 MW |
| 2026-10-19T12:00Z | 4,485 MW |
| 2026-10-19T13:00Z | 4,846 MW |
| 2026-10-19T14:00Z | 5,288 MW |
| 2026-10-19T15:00Z | 5,705 MW |
| 2026-10-19T16:00Z | 6,003 MW |
| 2026-10-19T17:00Z | 6,018 MW |
| 2026-10-19T18:00Z | 5,787 MW |
| 2026-10-19T19:00Z | 5,385 MW |
| 2026-10-19T20:00Z | 5,198 MW |
| 2026-10-19T21:00Z | 5,027 MW |
| 2026-10-19T22:00Z | 4,802 MW |
| 2026-10-19T23:00Z | 4,544 MW |
| 2026-10-20T00:00Z | 4,410 MW |
| 2026-10-20T01:00Z | 4,448 MW |
| 2026-10-20T02:00Z | 4,461 MW |
| 2026-10-20T03:00Z | 4,736 MW |
| 2026-10-20T04:00Z | 5,492 MW |
| 2026-10-20T05:00Z | 5,760 MW |
| 2026-10-20T06:00Z | 5,573 MW |
| 2026-10-20T07:00Z | 5,327 MW |
| 2026-10-20T08:00Z | 5,061 MW |
| 2026-10-20T09:00Z | 4,873 MW |
| 2026-10-20T10:00Z | 4,808 MW |
| 2026-10-20T11:00Z | 4,653 MW |
| 2026-10-20T12:00Z | 4,710 MW |
| 2026-10-20T13:00Z | 4,893 MW |
| 2026-10-20T14:00Z | 5,342 MW |
| 2026-10-20T15:00Z | 5,728 MW |
| 2026-10-20T16:00Z | 6,059 MW |
| 2026-10-20T17:00Z | 6,107 MW |
| 2026-10-20T18:00Z | 5,885 MW |
| 2026-10-20T19:00Z | 5,494 MW |
| 2026-10-20T20:00Z | 5,230 MW |
| 2026-10-20T21:00Z | 5,136 MW |
| 2026-10-20T22:00Z | 4,788 MW |
| 2026-10-20T23:00Z | 4,608 MW |
| 2026-10-21T00:00Z | 4,470 MW |
| 2026-10-21T01:00Z | 4,467 MW |
| 2026-10-21T02:00Z | 4,545 MW |
| 2026-10-21T03:00Z | 4,779 MW |
| 2026-10-21T04:00Z | 5,496 MW |
| 2026-10-21T05:00Z | 5,753 MW |
| 2026-10-21T06:00Z | 5,283 MW |
| 2026-10-21T07:00Z | 4,600 MW |
| 2026-10-21T08:00Z | 4,237 MW |
| 2026-10-21T09:00Z | 4,115 MW |
| 2026-10-21T10:00Z | 4,113 MW |
| 2026-10-21T11:00Z | 4,123 MW |
| 2026-10-21T12:00Z | 4,315 MW |
| 2026-10-21T13:00Z | 4,767 MW |
| 2026-10-21T14:00Z | 5,300 MW |
| 2026-10-21T15:00Z | 5,776 MW |
| 2026-10-21T16:00Z | 5,999 MW |
| 2026-10-21T17:00Z | 6,004 MW |
| 2026-10-21T18:00Z | 5,764 MW |
| 2026-10-21T19:00Z | 5,430 MW |
| 2026-10-21T20:00Z | 5,179 MW |
| 2026-10-21T21:00Z | 5,058 MW |
| 2026-10-21T22:00Z | 4,733 MW |
| 2026-10-21T23:00Z | 4,505 MW |
| 2026-10-22T00:00Z | 4,364 MW |
| 2026-10-22T01:00Z | 4,336 MW |
| 2026-10-22T02:00Z | 4,396 MW |
| 2026-10-22T03:00Z | 4,672 MW |
| 2026-10-22T04:00Z | 5,320 MW |
| 2026-10-22T05:00Z | 5,713 MW |
| 2026-10-22T06:00Z | 5,830 MW |
| 2026-10-22T07:00Z | 5,808 MW |
| 2026-10-22T08:00Z | 5,718 MW |
| 2026-10-22T09:00Z | 5,631 MW |
| 2026-10-22T10:00Z | 5,359 MW |
| 2026-10-22T11:00Z | 5,181 MW |
| 2026-10-22T12:00Z | 5,097 MW |
| 2026-10-22T13:00Z | 5,194 MW |
| 2026-10-22T14:00Z | 5,452 MW |
| 2026-10-22T15:00Z | 5,752 MW |
| 2026-10-22T16:00Z | 5,908 MW |
| 2026-10-22T17:00Z | 5,883 MW |
| 2026-10-22T18:00Z | 5,689 MW |
| 2026-10-22T19:00Z | 5,319 MW |
| 2026-10-22T20:00Z | 5,151 MW |
| 2026-10-22T21:00Z | 5,025 MW |
| 2026-10-22T22:00Z | 4,747 MW |
| 2026-10-22T23:00Z | 4,403 MW |
| 2026-10-23T00:00Z | 4,250 MW |
| 2026-10-23T01:00Z | 4,156 MW |
| 2026-10-23T02:00Z | 4,126 MW |
| 2026-10-23T03:00Z | 4,075 MW |
| 2026-10-23T04:00Z | 4,217 MW |
| 2026-10-23T05:00Z | 4,409 MW |
| 2026-10-23T06:00Z | 4,279 MW |
| 2026-10-23T07:00Z | 3,926 MW |
| 2026-10-23T08:00Z | 3,639 MW |
| 2026-10-23T09:00Z | 3,404 MW |
| 2026-10-23T10:00Z | 3,412 MW |
| 2026-10-23T11:00Z | 3,494 MW |
| 2026-10-23T12:00Z | 3,776 MW |
| 2026-10-23T13:00Z | 4,191 MW |
| 2026-10-23T14:00Z | 4,650 MW |
| 2026-10-23T15:00Z | 4,977 MW |
| 2026-10-23T16:00Z | 5,160 MW |
| 2026-10-23T17:00Z | 5,173 MW |
| 2026-10-23T18:00Z | 5,070 MW |
| 2026-10-23T19:00Z | 4,772 MW |
| 2026-10-23T20:00Z | 4,695 MW |
| 2026-10-23T21:00Z | 4,523 MW |
| 2026-10-23T22:00Z | 4,167 MW |
| 2026-10-23T23:00Z | 3,906 MW |
| 2026-10-24T00:00Z | 3,802 MW |
| 2026-10-24T01:00Z | 3,775 MW |
| 2026-10-24T02:00Z | 3,818 MW |
| 2026-10-24T03:00Z | 3,973 MW |
| 2026-10-24T04:00Z | 4,281 MW |
| 2026-10-24T05:00Z | 4,563 MW |
| 2026-10-24T06:00Z | 4,636 MW |
| 2026-10-24T07:00Z | 4,629 MW |
| 2026-10-24T08:00Z | 4,686 MW |
| 2026-10-24T09:00Z | 4,735 MW |
| 2026-10-24T10:00Z | 4,719 MW |
| 2026-10-24T11:00Z | 4,643 MW |
| 2026-10-24T12:00Z | 4,616 MW |
| 2026-10-24T13:00Z | 4,730 MW |
| 2026-10-24T14:00Z | 5,018 MW |
| 2026-10-24T15:00Z | 5,194 MW |
| 2026-10-24T16:00Z | 5,337 MW |
| 2026-10-24T17:00Z | 5,359 MW |
| 2026-10-24T18:00Z | 5,194 MW |
| 2026-10-24T19:00Z | 4,889 MW |
| 2026-10-24T20:00Z | 4,729 MW |
| 2026-10-24T21:00Z | 4,555 MW |
| 2026-10-24T22:00Z | 4,217 MW |
| 2026-10-24T23:00Z | 3,943 MW |
| 2026-10-25T00:00Z | 3,874 MW |
| 2026-10-25T01:00Z | 3,755 MW |
| 2026-10-25T02:00Z | 3,780 MW |
| 2026-10-25T03:00Z | 3,849 MW |
| 2026-10-25T04:00Z | 4,000 MW |
| 2026-10-25T05:00Z | 4,216 MW |
| 2026-10-25T06:00Z | 4,313 MW |
| 2026-10-25T07:00Z | 4,265 MW |
| 2026-10-25T08:00Z | 3,990 MW |
| 2026-10-25T09:00Z | 3,899 MW |
| 2026-10-25T10:00Z | 3,895 MW |
| 2026-10-25T11:00Z | 4,102 MW |
| 2026-10-25T12:00Z | 4,331 MW |
| 2026-10-25T13:00Z | 4,595 MW |
| 2026-10-25T14:00Z | 4,881 MW |
| 2026-10-25T15:00Z | 5,227 MW |
| 2026-10-25T16:00Z | 5,415 MW |
| 2026-10-25T17:00Z | 5,352 MW |
| 2026-10-25T18:00Z | 5,323 MW |
| 2026-10-25T19:00Z | 5,141 MW |
| 2026-10-25T20:00Z | 4,952 MW |
| 2026-10-25T21:00Z | 4,754 MW |
| 2026-10-25T22:00Z | 4,494 MW |
| 2026-10-25T23:00Z | 4,205 MW |
| 2026-10-26T00:00Z | 4,090 MW |
| 2026-10-26T01:00Z | 4,037 MW |
| 2026-10-26T02:00Z | 4,021 MW |
| 2026-10-26T03:00Z | 4,124 MW |
| 2026-10-26T04:00Z | 4,479 MW |
| 2026-10-26T05:00Z | 5,143 MW |
| 2026-10-26T06:00Z | 5,281 MW |
| 2026-10-26T07:00Z | 4,994 MW |
| 2026-10-26T08:00Z | 4,678 MW |
| 2026-10-26T09:00Z | 4,647 MW |
| 2026-10-26T10:00Z | 4,763 MW |
| 2026-10-26T11:00Z | 4,961 MW |
| 2026-10-26T12:00Z | 5,064 MW |
| 2026-10-26T13:00Z | 5,290 MW |
| 2026-10-26T14:00Z | 5,679 MW |
| 2026-10-26T15:00Z | 6,039 MW |
| 2026-10-26T16:00Z | 6,105 MW |
| 2026-10-26T17:00Z | 6,104 MW |
| 2026-10-26T18:00Z | 6,054 MW |
| 2026-10-26T19:00Z | 5,825 MW |
| 2026-10-26T20:00Z | 5,693 MW |
| 2026-10-26T21:00Z | 5,373 MW |
| 2026-10-26T22:00Z | 5,098 MW |
| 2026-10-26T23:00Z | 4,829 MW |
| 2026-10-27T00:00Z | 4,588 MW |
| 2026-10-27T01:00Z | 4,510 MW |
| 2026-10-27T02:00Z | 4,509 MW |
| 2026-10-27T03:00Z | 4,637 MW |
| 2026-10-27T04:00Z | 4,951 MW |
| 2026-10-27T05:00Z | 5,465 MW |
| 2026-10-27T06:00Z | 5,425 MW |
| 2026-10-27T07:00Z | 4,949 MW |
| 2026-10-27T08:00Z | 4,457 MW |
| 2026-10-27T09:00Z | 4,294 MW |
| 2026-10-27T10:00Z | 4,401 MW |
| 2026-10-27T11:00Z | 4,525 MW |
| 2026-10-27T12:00Z | 4,593 MW |
| 2026-10-27T13:00Z | 4,845 MW |
| 2026-10-27T14:00Z | 5,468 MW |
| 2026-10-27T15:00Z | 5,985 MW |
| 2026-10-27T16:00Z | 6,198 MW |
| 2026-10-27T17:00Z | 6,192 MW |
| 2026-10-27T18:00Z | 6,186 MW |
| 2026-10-27T19:00Z | 5,965 MW |
| 2026-10-27T20:00Z | 5,802 MW |
| 2026-10-27T21:00Z | 5,565 MW |
| 2026-10-27T22:00Z | 5,265 MW |
| 2026-10-27T23:00Z | 4,896 MW |
| 2026-10-28T00:00Z | 4,638 MW |
| 2026-10-28T01:00Z | 4,570 MW |
| 2026-10-28T02:00Z | 4,537 MW |
| 2026-10-28T03:00Z | 4,680 MW |
| 2026-10-28T04:00Z | 4,971 MW |
| 2026-10-28T05:00Z | 5,501 MW |
| 2026-10-28T06:00Z | 5,446 MW |
| 2026-10-28T07:00Z | 4,958 MW |
| 2026-10-28T08:00Z | 4,454 MW |
| 2026-10-28T09:00Z | 4,340 MW |
| 2026-10-28T10:00Z | 4,286 MW |
| 2026-10-28T11:00Z | 4,455 MW |
| 2026-10-28T12:00Z | 4,471 MW |
| 2026-10-28T13:00Z | 4,884 MW |
| 2026-10-28T14:00Z | 5,503 MW |
| 2026-10-28T15:00Z | 6,007 MW |
| 2026-10-28T16:00Z | 6,159 MW |
| 2026-10-28T17:00Z | 6,181 MW |
| 2026-10-28T18:00Z | 6,146 MW |
| 2026-10-28T19:00Z | 5,883 MW |
| 2026-10-28T20:00Z | 5,775 MW |
| 2026-10-28T21:00Z | 5,499 MW |
| 2026-10-28T22:00Z | 5,275 MW |
| 2026-10-28T23:00Z | 4,838 MW |
| 2026-10-29T00:00Z | 4,647 MW |
| 2026-10-29T01:00Z | 4,609 MW |
| 2026-10-29T02:00Z | 4,634 MW |
| 2026-10-29T03:00Z | 4,583 MW |
| 2026-10-29T04:00Z | 4,879 MW |
| 2026-10-29T05:00Z | 5,424 MW |
| 2026-10-29T06:00Z | 5,626 MW |
| 2026-10-29T07:00Z | 5,415 MW |
| 2026-10-29T08:00Z | 5,324 MW |
| 2026-10-29T09:00Z | 5,335 MW |
| 2026-10-29T10:00Z | 5,373 MW |
| 2026-10-29T11:00Z | 5,424 MW |
| 2026-10-29T12:00Z | 5,369 MW |
| 2026-10-29T13:00Z | 5,572 MW |
| 2026-10-29T14:00Z | 5,928 MW |
| 2026-10-29T15:00Z | 6,136 MW |
| 2026-10-29T16:00Z | 6,223 MW |
| 2026-10-29T17:00Z | 6,163 MW |
| 2026-10-29T18:00Z | 6,067 MW |
| 2026-10-29T19:00Z | 5,870 MW |
| 2026-10-29T20:00Z | 5,758 MW |
| 2026-10-29T21:00Z | 5,484 MW |
| 2026-10-29T22:00Z | 5,301 MW |
| 2026-10-29T23:00Z | 4,860 MW |
| 2026-10-30T00:00Z | 4,703 MW |
| 2026-10-30T01:00Z | 4,660 MW |
| 2026-10-30T02:00Z | 4,687 MW |
| 2026-10-30T03:00Z | 4,655 MW |
| 2026-10-30T04:00Z | 4,912 MW |
| 2026-10-30T05:00Z | 5,408 MW |
| 2026-10-30T06:00Z | 5,633 MW |
| 2026-10-30T07:00Z | 5,520 MW |
| 2026-10-30T08:00Z | 5,336 MW |
| 2026-10-30T09:00Z | 5,200 MW |
| 2026-10-30T10:00Z | 5,218 MW |
| 2026-10-30T11:00Z | 5,226 MW |
| 2026-10-30T12:00Z | 5,202 MW |
| 2026-10-30T13:00Z | 5,470 MW |
| 2026-10-30T14:00Z | 5,747 MW |
| 2026-10-30T15:00Z | 6,045 MW |
| 2026-10-30T16:00Z | 6,101 MW |
| 2026-10-30T17:00Z | 6,031 MW |
| 2026-10-30T18:00Z | 5,960 MW |
| 2026-10-30T19:00Z | 5,780 MW |
| 2026-10-30T20:00Z | 5,704 MW |
| 2026-10-30T21:00Z | 5,421 MW |
| 2026-10-30T22:00Z | 5,148 MW |
| 2026-10-30T23:00Z | 4,760 MW |
| 2026-10-31T00:00Z | 4,487 MW |
| 2026-10-31T01:00Z | 4,375 MW |
| 2026-10-31T02:00Z | 4,346 MW |
| 2026-10-31T03:00Z | 4,373 MW |
| 2026-10-31T04:00Z | 4,480 MW |
| 2026-10-31T05:00Z | 4,647 MW |
| 2026-10-31T06:00Z | 4,894 MW |
| 2026-10-31T07:00Z | 4,919 MW |
| 2026-10-31T08:00Z | 4,984 MW |
| 2026-10-31T09:00Z | 5,038 MW |
| 2026-10-31T10:00Z | 4,949 MW |
| 2026-10-31T11:00Z | 4,806 MW |
| 2026-10-31T12:00Z | 4,859 MW |
| 2026-10-31T13:00Z | 4,968 MW |
| 2026-10-31T14:00Z | 5,190 MW |
| 2026-10-31T15:00Z | 5,502 MW |
| 2026-10-31T16:00Z | 5,571 MW |
| 2026-10-31T17:00Z | 5,484 MW |
| 2026-10-31T18:00Z | 5,477 MW |
| 2026-10-31T19:00Z | 5,292 MW |
| 2026-10-31T20:00Z | 5,154 MW |
| 2026-10-31T21:00Z | 4,938 MW |
| 2026-10-31T22:00Z | 4,662 MW |
| 2026-10-31T23:00Z | 4,330 MW |
| 2026-11-01T00:00Z | 4,159 MW |
| 2026-11-01T01:00Z | 4,059 MW |
| 2026-11-01T02:00Z | 4,001 MW |
| 2026-11-01T03:00Z | 4,097 MW |
| 2026-11-01T04:00Z | 4,095 MW |
| 2026-11-01T05:00Z | 4,180 MW |
| 2026-11-01T06:00Z | 4,183 MW |
| 2026-11-01T07:00Z | 4,163 MW |
| 2026-11-01T08:00Z | 4,152 MW |
| 2026-11-01T09:00Z | 4,207 MW |
| 2026-11-01T10:00Z | 4,320 MW |
| 2026-11-01T11:00Z | 4,422 MW |
| 2026-11-01T12:00Z | 4,463 MW |
| 2026-11-01T13:00Z | 4,690 MW |
| 2026-11-01T14:00Z | 4,967 MW |
| 2026-11-01T15:00Z | 5,142 MW |
| 2026-11-01T16:00Z | 5,223 MW |
| 2026-11-01T17:00Z | 5,202 MW |
| 2026-11-01T18:00Z | 5,283 MW |
| 2026-11-01T19:00Z | 5,169 MW |
| 2026-11-01T20:00Z | 5,049 MW |
| 2026-11-01T21:00Z | 4,843 MW |
| 2026-11-01T22:00Z | 4,555 MW |
| 2026-11-01T23:00Z | 4,274 MW |
| 2026-11-02T00:00Z | 4,134 MW |
| 2026-11-02T01:00Z | 4,095 MW |
| 2026-11-02T02:00Z | 4,171 MW |
| 2026-11-02T03:00Z | 4,205 MW |
| 2026-11-02T04:00Z | 4,543 MW |
| 2026-11-02T05:00Z | 5,337 MW |
| 2026-11-02T06:00Z | 5,744 MW |
| 2026-11-02T07:00Z | 5,876 MW |
| 2026-11-02T08:00Z | 5,901 MW |
| 2026-11-02T09:00Z | 5,921 MW |
| 2026-11-02T10:00Z | 5,895 MW |
| 2026-11-02T11:00Z | 5,930 MW |
| 2026-11-02T12:00Z | 5,929 MW |
| 2026-11-02T13:00Z | 6,040 MW |
| 2026-11-02T14:00Z | 6,170 MW |
| 2026-11-02T15:00Z | 6,304 MW |
| 2026-11-02T16:00Z | 6,344 MW |
| 2026-11-02T17:00Z | 6,342 MW |
| 2026-11-02T18:00Z | 6,350 MW |
| 2026-11-02T19:00Z | 6,124 MW |
| 2026-11-02T20:00Z | 5,918 MW |
| 2026-11-02T21:00Z | 5,593 MW |
| 2026-11-02T22:00Z | 5,302 MW |
| 2026-11-02T23:00Z | 4,955 MW |
| 2026-11-03T00:00Z | 4,758 MW |
| 2026-11-03T01:00Z | 4,809 MW |
| 2026-11-03T02:00Z | 4,841 MW |
| 2026-11-03T03:00Z | 4,859 MW |
| 2026-11-03T04:00Z | 5,091 MW |
| 2026-11-03T05:00Z | 5,689 MW |
| 2026-11-03T06:00Z | 6,011 MW |
| 2026-11-03T07:00Z | 6,025 MW |
| 2026-11-03T08:00Z | 6,055 MW |
| 2026-11-03T09:00Z | 6,051 MW |
| 2026-11-03T10:00Z | 5,951 MW |
| 2026-11-03T11:00Z | 5,858 MW |
| 2026-11-03T12:00Z | 5,888 MW |
| 2026-11-03T13:00Z | 5,991 MW |
| 2026-11-03T14:00Z | 6,213 MW |
| 2026-11-03T15:00Z | 6,394 MW |
| 2026-11-03T16:00Z | 6,478 MW |
| 2026-11-03T17:00Z | 6,440 MW |
| 2026-11-03T18:00Z | 6,418 MW |
| 2026-11-03T19:00Z | 6,208 MW |
| 2026-11-03T20:00Z | 5,980 MW |
| 2026-11-03T21:00Z | 5,700 MW |
| 2026-11-03T22:00Z | 5,409 MW |
| 2026-11-03T23:00Z | 5,035 MW |
| 2026-11-04T00:00Z | 4,796 MW |
| 2026-11-04T01:00Z | 4,807 MW |
| 2026-11-04T02:00Z | 4,792 MW |
| 2026-11-04T03:00Z | 4,790 MW |
| 2026-11-04T04:00Z | 5,060 MW |
| 2026-11-04T05:00Z | 5,735 MW |
| 2026-11-04T06:00Z | 5,889 MW |
| 2026-11-04T07:00Z | 5,632 MW |
| 2026-11-04T08:00Z | 5,341 MW |
| 2026-11-04T09:00Z | 5,116 MW |
| 2026-11-04T10:00Z | 4,979 MW |
| 2026-11-04T11:00Z | 4,990 MW |
| 2026-11-04T12:00Z | 5,148 MW |
| 2026-11-04T13:00Z | 5,546 MW |
| 2026-11-04T14:00Z | 5,956 MW |
| 2026-11-04T15:00Z | 6,263 MW |
| 2026-11-04T16:00Z | 6,415 MW |
| 2026-11-04T17:00Z | 6,447 MW |
| 2026-11-04T18:00Z | 6,435 MW |
| 2026-11-04T19:00Z | 6,227 MW |
| 2026-11-04T20:00Z | 6,097 MW |
| 2026-11-04T21:00Z | 5,775 MW |
| 2026-11-04T22:00Z | 5,488 MW |
| 2026-11-04T23:00Z | 5,161 MW |
| 2026-11-05T00:00Z | 5,059 MW |
| 2026-11-05T01:00Z | 4,994 MW |
| 2026-11-05T02:00Z | 5,035 MW |
| 2026-11-05T03:00Z | 4,973 MW |
| 2026-11-05T04:00Z | 5,318 MW |
| 2026-11-05T05:00Z | 5,964 MW |
| 2026-11-05T06:00Z | 5,925 MW |
| 2026-11-05T07:00Z | 5,412 MW |
| 2026-11-05T08:00Z | 5,009 MW |
| 2026-11-05T09:00Z | 4,858 MW |
| 2026-11-05T10:00Z | 4,844 MW |
| 2026-11-05T11:00Z | 4,845 MW |
| 2026-11-05T12:00Z | 4,857 MW |
| 2026-11-05T13:00Z | 5,257 MW |
| 2026-11-05T14:00Z | 5,944 MW |
| 2026-11-05T15:00Z | 6,362 MW |
| 2026-11-05T16:00Z | 6,472 MW |
| 2026-11-05T17:00Z | 6,512 MW |
| 2026-11-05T18:00Z | 6,548 MW |
| 2026-11-05T19:00Z | 6,343 MW |
| 2026-11-05T20:00Z | 6,219 MW |
| 2026-11-05T21:00Z | 5,912 MW |
| 2026-11-05T22:00Z | 5,619 MW |
| 2026-11-05T23:00Z | 5,274 MW |
| 2026-11-06T00:00Z | 5,124 MW |
| 2026-11-06T01:00Z | 5,163 MW |
| 2026-11-06T02:00Z | 5,187 MW |
| 2026-11-06T03:00Z | 5,119 MW |
| 2026-11-06T04:00Z | 5,434 MW |
| 2026-11-06T05:00Z | 6,069 MW |
| 2026-11-06T06:00Z | 6,042 MW |
| 2026-11-06T07:00Z | 5,500 MW |
| 2026-11-06T08:00Z | 5,027 MW |
| 2026-11-06T09:00Z | 4,803 MW |
| 2026-11-06T10:00Z | 4,845 MW |
| 2026-11-06T11:00Z | 4,895 MW |
| 2026-11-06T12:00Z | 4,955 MW |
| 2026-11-06T13:00Z | 5,349 MW |
| 2026-11-06T14:00Z | 5,905 MW |
| 2026-11-06T15:00Z | 6,309 MW |
| 2026-11-06T16:00Z | 6,409 MW |
| 2026-11-06T17:00Z | 6,418 MW |
| 2026-11-06T18:00Z | 6,419 MW |
| 2026-11-06T19:00Z | 6,219 MW |
| 2026-11-06T20:00Z | 6,092 MW |
| 2026-11-06T21:00Z | 5,831 MW |
| 2026-11-06T22:00Z | 5,516 MW |
| 2026-11-06T23:00Z | 5,197 MW |
| 2026-11-07T00:00Z | 4,925 MW |
| 2026-11-07T01:00Z | 4,850 MW |
| 2026-11-07T02:00Z | 4,848 MW |
| 2026-11-07T03:00Z | 4,960 MW |
| 2026-11-07T04:00Z | 5,008 MW |
| 2026-11-07T05:00Z | 5,242 MW |
| 2026-11-07T06:00Z | 5,249 MW |
| 2026-11-07T07:00Z | 4,902 MW |
| 2026-11-07T08:00Z | 4,516 MW |
| 2026-11-07T09:00Z | 4,467 MW |
| 2026-11-07T10:00Z | 4,460 MW |
| 2026-11-07T11:00Z | 4,466 MW |
| 2026-11-07T12:00Z | 4,400 MW |
| 2026-11-07T13:00Z | 4,805 MW |
| 2026-11-07T14:00Z | 5,449 MW |
| 2026-11-07T15:00Z | 5,931 MW |
| 2026-11-07T16:00Z | 5,981 MW |
| 2026-11-07T17:00Z | 5,939 MW |
| 2026-11-07T18:00Z | 5,948 MW |
| 2026-11-07T19:00Z | 5,797 MW |
| 2026-11-07T20:00Z | 5,762 MW |
| 2026-11-07T21:00Z | 5,565 MW |
| 2026-11-07T22:00Z | 5,261 MW |
| 2026-11-07T23:00Z | 4,896 MW |
| 2026-11-08T00:00Z | 4,692 MW |
| 2026-11-08T01:00Z | 4,628 MW |
| 2026-11-08T02:00Z | 4,620 MW |
| 2026-11-08T03:00Z | 4,633 MW |
| 2026-11-08T04:00Z | 4,732 MW |
| 2026-11-08T05:00Z | 4,933 MW |
| 2026-11-08T06:00Z | 4,989 MW |
| 2026-11-08T07:00Z | 4,790 MW |
| 2026-11-08T08:00Z | 4,538 MW |
| 2026-11-08T09:00Z | 4,523 MW |
| 2026-11-08T10:00Z | 4,584 MW |
| 2026-11-08T11:00Z | 4,562 MW |
| 2026-11-08T12:00Z | 4,562 MW |
| 2026-11-08T13:00Z | 4,864 MW |
| 2026-11-08T14:00Z | 5,405 MW |
| 2026-11-08T15:00Z | 5,885 MW |
| 2026-11-08T16:00Z | 5,961 MW |
| 2026-11-08T17:00Z | 5,953 MW |
| 2026-11-08T18:00Z | 5,947 MW |
| 2026-11-08T19:00Z | 5,775 MW |
| 2026-11-08T20:00Z | 5,670 MW |
| 2026-11-08T21:00Z | 5,438 MW |
| 2026-11-08T22:00Z | 5,105 MW |
| 2026-11-08T23:00Z | 4,789 MW |
| 2026-11-09T00:00Z | 4,699 MW |
| 2026-11-09T01:00Z | 4,811 MW |
| 2026-11-09T02:00Z | 4,801 MW |
| 2026-11-09T03:00Z | 4,730 MW |
| 2026-11-09T04:00Z | 5,095 MW |
| 2026-11-09T05:00Z | 5,871 MW |
| 2026-11-09T06:00Z | 6,112 MW |
| 2026-11-09T07:00Z | 6,133 MW |
| 2026-11-09T08:00Z | 6,123 MW |
| 2026-11-09T09:00Z | 6,194 MW |
| 2026-11-09T10:00Z | 6,324 MW |
| 2026-11-09T11:00Z | 6,282 MW |
| 2026-11-09T12:00Z | 6,186 MW |
| 2026-11-09T13:00Z | 6,173 MW |
| 2026-11-09T14:00Z | 6,333 MW |
| 2026-11-09T15:00Z | 6,523 MW |
| 2026-11-09T16:00Z | 6,541 MW |
| 2026-11-09T17:00Z | 6,549 MW |
| 2026-11-09T18:00Z | 6,539 MW |
| 2026-11-09T19:00Z | 6,355 MW |
| 2026-11-09T20:00Z | 6,204 MW |
| 2026-11-09T21:00Z | 5,953 MW |
| 2026-11-09T22:00Z | 5,878 MW |
| 2026-11-09T23:00Z | 5,336 MW |
| 2026-11-10T00:00Z | 5,187 MW |
| 2026-11-10T01:00Z | 5,055 MW |
| 2026-11-10T02:00Z | 5,090 MW |
| 2026-11-10T03:00Z | 4,997 MW |
| 2026-11-10T04:00Z | 5,318 MW |
| 2026-11-10T05:00Z | 6,005 MW |
| 2026-11-10T06:00Z | 6,358 MW |
| 2026-11-10T07:00Z | 6,509 MW |
| 2026-11-10T08:00Z | 6,667 MW |
| 2026-11-10T09:00Z | 6,799 MW |
| 2026-11-10T10:00Z | 6,816 MW |
| 2026-11-10T11:00Z | 6,864 MW |
| 2026-11-10T12:00Z | 6,727 MW |
| 2026-11-10T13:00Z | 6,697 MW |
| 2026-11-10T14:00Z | 6,710 MW |
| 2026-11-10T15:00Z | 6,745 MW |
| 2026-11-10T16:00Z | 6,691 MW |
| 2026-11-10T17:00Z | 6,628 MW |
| 2026-11-10T18:00Z | 6,573 MW |
| 2026-11-10T19:00Z | 6,320 MW |
| 2026-11-10T20:00Z | 6,139 MW |
| 2026-11-10T21:00Z | 5,859 MW |
| 2026-11-10T22:00Z | 5,627 MW |
| 2026-11-10T23:00Z | 5,286 MW |
| 2026-11-11T00:00Z | 5,164 MW |
| 2026-11-11T01:00Z | 5,101 MW |
| 2026-11-11T02:00Z | 5,006 MW |
| 2026-11-11T03:00Z | 4,947 MW |
| 2026-11-11T04:00Z | 5,274 MW |
| 2026-11-11T05:00Z | 5,995 MW |
| 2026-11-11T06:00Z | 6,252 MW |
| 2026-11-11T07:00Z | 6,254 MW |
| 2026-11-11T08:00Z | 6,291 MW |
| 2026-11-11T09:00Z | 6,413 MW |
| 2026-11-11T10:00Z | 6,508 MW |
| 2026-11-11T11:00Z | 6,555 MW |
| 2026-11-11T12:00Z | 6,491 MW |
| 2026-11-11T13:00Z | 6,567 MW |
| 2026-11-11T14:00Z | 6,615 MW |
| 2026-11-11T15:00Z | 6,680 MW |
| 2026-11-11T16:00Z | 6,602 MW |
| 2026-11-11T17:00Z | 6,551 MW |
| 2026-11-11T18:00Z | 6,512 MW |
| 2026-11-11T19:00Z | 6,289 MW |
| 2026-11-11T20:00Z | 6,122 MW |
| 2026-11-11T21:00Z | 5,834 MW |
| 2026-11-11T22:00Z | 5,579 MW |
| 2026-11-11T23:00Z | 5,148 MW |
| 2026-11-12T00:00Z | 4,959 MW |
| 2026-11-12T01:00Z | 5,004 MW |
| 2026-11-12T02:00Z | 4,994 MW |
| 2026-11-12T03:00Z | 4,939 MW |
| 2026-11-12T04:00Z | 5,222 MW |
| 2026-11-12T05:00Z | 5,837 MW |
| 2026-11-12T06:00Z | 6,121 MW |
| 2026-11-12T07:00Z | 6,238 MW |
| 2026-11-12T08:00Z | 6,312 MW |
| 2026-11-12T09:00Z | 6,346 MW |
| 2026-11-12T10:00Z | 6,328 MW |
| 2026-11-12T11:00Z | 6,338 MW |
| 2026-11-12T12:00Z | 6,268 MW |
| 2026-11-12T13:00Z | n/a |
Show the data table (687 rows)
| Hour starting (UTC) | Nuclear | Gas | Solar | Coal | Bioenergy |
|---|---|---|---|---|---|
| 2026-10-14T23:00Z | 1,449 MW | 434 MW | 1 MW | 180 MW | 200 MW |
| 2026-10-15T00:00Z | 1,449 MW | 456 MW | 1 MW | 179 MW | 199 MW |
| 2026-10-15T01:00Z | 1,450 MW | 473 MW | 1 MW | 182 MW | 198 MW |
| 2026-10-15T02:00Z | 1,449 MW | 449 MW | 1 MW | 185 MW | 198 MW |
| 2026-10-15T03:00Z | 1,449 MW | 476 MW | 1 MW | 149 MW | 198 MW |
| 2026-10-15T04:00Z | 1,449 MW | 538 MW | 1 MW | 96 MW | 200 MW |
| 2026-10-15T05:00Z | 1,448 MW | 613 MW | 112 MW | 82 MW | 200 MW |
| 2026-10-15T06:00Z | 1,447 MW | 633 MW | 456 MW | 101 MW | 200 MW |
| 2026-10-15T07:00Z | 1,447 MW | 546 MW | 902 MW | 147 MW | 200 MW |
| 2026-10-15T08:00Z | 1,447 MW | 448 MW | 1,544 MW | 162 MW | 201 MW |
| 2026-10-15T09:00Z | 1,450 MW | 318 MW | 1,861 MW | 137 MW | 202 MW |
| 2026-10-15T10:00Z | 1,449 MW | 398 MW | 1,917 MW | 145 MW | 172 MW |
| 2026-10-15T11:00Z | 1,448 MW | 466 MW | 1,944 MW | 171 MW | 156 MW |
| 2026-10-15T12:00Z | 1,447 MW | 477 MW | 1,866 MW | 171 MW | 152 MW |
| 2026-10-15T13:00Z | 1,446 MW | 534 MW | 1,508 MW | 171 MW | 152 MW |
| 2026-10-15T14:00Z | 1,444 MW | 698 MW | 775 MW | 170 MW | 151 MW |
| 2026-10-15T15:00Z | 1,444 MW | 962 MW | 125 MW | 194 MW | 152 MW |
| 2026-10-15T16:00Z | 1,443 MW | 1,064 MW | 6 MW | 243 MW | 152 MW |
| 2026-10-15T17:00Z | 1,441 MW | 1,053 MW | 4 MW | 295 MW | 154 MW |
| 2026-10-15T18:00Z | 1,440 MW | 1,037 MW | 3 MW | 331 MW | 154 MW |
| 2026-10-15T19:00Z | 1,441 MW | 1,038 MW | 0 MW | 304 MW | 153 MW |
| 2026-10-15T20:00Z | 1,443 MW | 1,032 MW | 1 MW | 252 MW | 152 MW |
| 2026-10-15T21:00Z | 1,443 MW | 852 MW | 0 MW | 227 MW | 151 MW |
| 2026-10-15T22:00Z | 1,384 MW | 656 MW | 1 MW | 236 MW | 150 MW |
| 2026-10-15T23:00Z | 1,270 MW | 687 MW | 0 MW | 179 MW | 150 MW |
| 2026-10-16T00:00Z | 1,197 MW | 694 MW | 1 MW | 155 MW | 150 MW |
| 2026-10-16T01:00Z | 1,194 MW | 702 MW | 0 MW | 144 MW | 149 MW |
| 2026-10-16T02:00Z | 1,194 MW | 738 MW | 0 MW | 151 MW | 150 MW |
| 2026-10-16T03:00Z | 1,193 MW | 784 MW | 0 MW | 154 MW | 150 MW |
| 2026-10-16T04:00Z | 1,193 MW | 1,009 MW | 1 MW | 160 MW | 151 MW |
| 2026-10-16T05:00Z | 1,192 MW | 1,008 MW | 234 MW | 164 MW | 152 MW |
| 2026-10-16T06:00Z | 1,191 MW | 924 MW | 1,383 MW | 151 MW | 151 MW |
| 2026-10-16T07:00Z | 1,192 MW | 659 MW | 2,690 MW | 0 MW | 151 MW |
| 2026-10-16T08:00Z | 1,194 MW | 429 MW | 3,428 MW | 0 MW | 150 MW |
| 2026-10-16T09:00Z | 1,194 MW | 353 MW | 3,679 MW | 0 MW | 150 MW |
| 2026-10-16T10:00Z | 1,194 MW | 306 MW | 3,677 MW | 0 MW | 150 MW |
| 2026-10-16T11:00Z | 1,195 MW | 296 MW | 3,623 MW | 0 MW | 150 MW |
| 2026-10-16T12:00Z | 1,195 MW | 360 MW | 3,380 MW | 0 MW | 149 MW |
| 2026-10-16T13:00Z | 1,196 MW | 433 MW | 2,715 MW | 0 MW | 146 MW |
| 2026-10-16T14:00Z | 1,197 MW | 728 MW | 1,410 MW | 0 MW | 144 MW |
| 2026-10-16T15:00Z | 1,203 MW | 986 MW | 219 MW | 4 MW | 145 MW |
| 2026-10-16T16:00Z | 1,199 MW | 1,025 MW | 14 MW | 21 MW | 146 MW |
| 2026-10-16T17:00Z | 1,200 MW | 1,055 MW | 19 MW | 55 MW | 149 MW |
| 2026-10-16T18:00Z | 1,199 MW | 1,032 MW | 10 MW | 107 MW | 151 MW |
| 2026-10-16T19:00Z | 1,199 MW | 1,022 MW | 4 MW | 140 MW | 152 MW |
| 2026-10-16T20:00Z | 1,198 MW | 971 MW | 0 MW | 154 MW | 153 MW |
| 2026-10-16T21:00Z | 1,199 MW | 905 MW | 4 MW | 104 MW | 153 MW |
| 2026-10-16T22:00Z | 1,193 MW | 637 MW | 1 MW | 158 MW | 153 MW |
| 2026-10-16T23:00Z | 1,193 MW | 523 MW | 1 MW | 163 MW | 153 MW |
| 2026-10-17T00:00Z | 1,193 MW | 531 MW | 1 MW | 160 MW | 153 MW |
| 2026-10-17T01:00Z | 1,194 MW | 530 MW | 1 MW | 159 MW | 152 MW |
| 2026-10-17T02:00Z | 1,195 MW | 544 MW | 2 MW | 159 MW | 152 MW |
| 2026-10-17T03:00Z | 1,195 MW | 552 MW | 2 MW | 158 MW | 152 MW |
| 2026-10-17T04:00Z | 1,195 MW | 644 MW | 1 MW | 160 MW | 153 MW |
| 2026-10-17T05:00Z | 1,195 MW | 675 MW | 134 MW | 158 MW | 154 MW |
| 2026-10-17T06:00Z | 1,195 MW | 431 MW | 802 MW | 158 MW | 153 MW |
| 2026-10-17T07:00Z | 1,194 MW | 360 MW | 1,498 MW | 158 MW | 151 MW |
| 2026-10-17T08:00Z | 1,193 MW | 348 MW | 2,071 MW | 150 MW | 151 MW |
| 2026-10-17T09:00Z | 1,194 MW | 284 MW | 2,391 MW | 118 MW | 151 MW |
| 2026-10-17T10:00Z | 1,195 MW | 264 MW | 2,447 MW | 117 MW | 157 MW |
| 2026-10-17T11:00Z | 1,195 MW | 230 MW | 2,364 MW | 125 MW | 157 MW |
| 2026-10-17T12:00Z | 1,195 MW | 256 MW | 1,955 MW | 125 MW | 157 MW |
| 2026-10-17T13:00Z | 1,198 MW | 357 MW | 1,402 MW | 158 MW | 156 MW |
| 2026-10-17T14:00Z | 1,196 MW | 596 MW | 679 MW | 171 MW | 154 MW |
| 2026-10-17T15:00Z | 1,200 MW | 912 MW | 114 MW | 171 MW | 154 MW |
| 2026-10-17T16:00Z | 1,195 MW | 935 MW | 18 MW | 192 MW | 154 MW |
| 2026-10-17T17:00Z | 1,195 MW | 961 MW | 20 MW | 196 MW | 155 MW |
| 2026-10-17T18:00Z | 1,195 MW | 943 MW | 4 MW | 187 MW | 156 MW |
| 2026-10-17T19:00Z | 1,196 MW | 936 MW | 0 MW | 174 MW | 155 MW |
| 2026-10-17T20:00Z | 1,195 MW | 900 MW | 5 MW | 189 MW | 110 MW |
| 2026-10-17T21:00Z | 1,195 MW | 904 MW | 3 MW | 173 MW | 109 MW |
| 2026-10-17T22:00Z | 1,198 MW | 637 MW | 1 MW | 173 MW | 109 MW |
| 2026-10-17T23:00Z | 1,200 MW | 422 MW | 1 MW | 175 MW | 109 MW |
| 2026-10-18T00:00Z | 1,202 MW | 398 MW | 1 MW | 172 MW | 115 MW |
| 2026-10-18T01:00Z | 1,204 MW | 402 MW | 0 MW | 172 MW | 145 MW |
| 2026-10-18T02:00Z | 1,205 MW | 411 MW | 1 MW | 173 MW | 154 MW |
| 2026-10-18T03:00Z | 1,206 MW | 428 MW | 2 MW | 172 MW | 154 MW |
| 2026-10-18T04:00Z | 1,205 MW | 443 MW | 0 MW | 172 MW | 154 MW |
| 2026-10-18T05:00Z | 1,203 MW | 425 MW | 108 MW | 171 MW | 155 MW |
| 2026-10-18T06:00Z | 1,203 MW | 346 MW | 651 MW | 170 MW | 152 MW |
| 2026-10-18T07:00Z | 1,203 MW | 294 MW | 1,365 MW | 171 MW | 151 MW |
| 2026-10-18T08:00Z | 1,202 MW | 265 MW | 2,192 MW | 170 MW | 152 MW |
| 2026-10-18T09:00Z | 1,203 MW | 268 MW | 2,756 MW | 169 MW | 153 MW |
| 2026-10-18T10:00Z | 1,204 MW | 239 MW | 3,057 MW | 159 MW | 153 MW |
| 2026-10-18T11:00Z | 1,204 MW | 228 MW | 3,268 MW | 158 MW | 153 MW |
| 2026-10-18T12:00Z | 1,204 MW | 298 MW | 2,909 MW | 158 MW | 152 MW |
| 2026-10-18T13:00Z | 1,204 MW | 337 MW | 2,149 MW | 172 MW | 151 MW |
| 2026-10-18T14:00Z | 1,205 MW | 504 MW | 1,059 MW | 176 MW | 150 MW |
| 2026-10-18T15:00Z | 1,206 MW | 851 MW | 157 MW | 272 MW | 149 MW |
| 2026-10-18T16:00Z | 1,206 MW | 889 MW | 13 MW | 332 MW | 150 MW |
| 2026-10-18T17:00Z | 1,207 MW | 921 MW | 16 MW | 306 MW | 151 MW |
| 2026-10-18T18:00Z | 1,206 MW | 905 MW | 7 MW | 297 MW | 151 MW |
| 2026-10-18T19:00Z | 1,206 MW | 922 MW | 11 MW | 302 MW | 151 MW |
| 2026-10-18T20:00Z | 1,205 MW | 909 MW | 3 MW | 282 MW | 150 MW |
| 2026-10-18T21:00Z | 1,205 MW | 862 MW | 0 MW | 220 MW | 152 MW |
| 2026-10-18T22:00Z | 1,205 MW | 645 MW | 1 MW | 209 MW | 152 MW |
| 2026-10-18T23:00Z | 1,205 MW | 677 MW | 1 MW | 211 MW | 150 MW |
| 2026-10-19T00:00Z | 1,205 MW | 718 MW | 4 MW | 209 MW | 149 MW |
| 2026-10-19T01:00Z | 1,205 MW | 745 MW | 2 MW | 208 MW | 150 MW |
| 2026-10-19T02:00Z | 1,206 MW | 725 MW | 1 MW | 208 MW | 151 MW |
| 2026-10-19T03:00Z | 1,206 MW | 921 MW | 5 MW | 220 MW | 153 MW |
| 2026-10-19T04:00Z | 1,205 MW | 1,014 MW | 1 MW | 273 MW | 153 MW |
| 2026-10-19T05:00Z | 1,204 MW | 986 MW | 196 MW | 275 MW | 153 MW |
| 2026-10-19T06:00Z | 1,204 MW | 853 MW | 1,399 MW | 265 MW | 152 MW |
| 2026-10-19T07:00Z | 1,206 MW | 684 MW | 2,616 MW | 224 MW | 152 MW |
| 2026-10-19T08:00Z | 1,205 MW | 426 MW | 3,263 MW | 224 MW | 152 MW |
| 2026-10-19T09:00Z | 1,205 MW | 325 MW | 3,418 MW | 223 MW | 153 MW |
| 2026-10-19T10:00Z | 1,205 MW | 310 MW | 3,319 MW | 222 MW | 154 MW |
| 2026-10-19T11:00Z | 1,204 MW | 331 MW | 2,901 MW | 218 MW | 154 MW |
| 2026-10-19T12:00Z | 1,205 MW | 374 MW | 2,418 MW | 233 MW | 154 MW |
| 2026-10-19T13:00Z | 1,205 MW | 431 MW | 1,568 MW | 255 MW | 153 MW |
| 2026-10-19T14:00Z | 1,204 MW | 744 MW | 737 MW | 298 MW | 152 MW |
| 2026-10-19T15:00Z | 1,203 MW | 1,182 MW | 120 MW | 330 MW | 151 MW |
| 2026-10-19T16:00Z | 1,204 MW | 1,197 MW | 15 MW | 315 MW | 152 MW |
| 2026-10-19T17:00Z | 1,205 MW | 1,193 MW | 15 MW | 334 MW | 154 MW |
| 2026-10-19T18:00Z | 1,204 MW | 1,180 MW | 3 MW | 332 MW | 159 MW |
| 2026-10-19T19:00Z | 1,204 MW | 1,170 MW | 5 MW | 332 MW | 163 MW |
| 2026-10-19T20:00Z | 1,204 MW | 1,190 MW | 6 MW | 330 MW | 182 MW |
| 2026-10-19T21:00Z | 1,203 MW | 1,129 MW | 3 MW | 305 MW | 199 MW |
| 2026-10-19T22:00Z | 1,203 MW | 938 MW | 0 MW | 317 MW | 200 MW |
| 2026-10-19T23:00Z | 1,203 MW | 950 MW | 1 MW | 338 MW | 195 MW |
| 2026-10-20T00:00Z | 1,202 MW | 963 MW | 1 MW | 340 MW | 197 MW |
| 2026-10-20T01:00Z | 1,201 MW | 966 MW | 0 MW | 338 MW | 198 MW |
| 2026-10-20T02:00Z | 1,202 MW | 953 MW | 0 MW | 339 MW | 198 MW |
| 2026-10-20T03:00Z | 1,202 MW | 992 MW | 3 MW | 337 MW | 198 MW |
| 2026-10-20T04:00Z | 1,201 MW | 1,038 MW | 4 MW | 334 MW | 198 MW |
| 2026-10-20T05:00Z | 1,200 MW | 1,028 MW | 121 MW | 329 MW | 198 MW |
| 2026-10-20T06:00Z | 1,201 MW | 921 MW | 734 MW | 312 MW | 198 MW |
| 2026-10-20T07:00Z | 1,204 MW | 653 MW | 1,409 MW | 270 MW | 199 MW |
| 2026-10-20T08:00Z | 1,204 MW | 514 MW | 2,078 MW | 247 MW | 200 MW |
| 2026-10-20T09:00Z | 1,203 MW | 459 MW | 2,632 MW | 240 MW | 201 MW |
| 2026-10-20T10:00Z | 1,204 MW | 411 MW | 2,812 MW | 240 MW | 202 MW |
| 2026-10-20T11:00Z | 1,203 MW | 395 MW | 2,804 MW | 243 MW | 201 MW |
| 2026-10-20T12:00Z | 1,205 MW | 507 MW | 2,631 MW | 240 MW | 201 MW |
| 2026-10-20T13:00Z | 1,205 MW | 660 MW | 1,901 MW | 246 MW | 199 MW |
| 2026-10-20T14:00Z | 1,203 MW | 892 MW | 853 MW | 278 MW | 197 MW |
| 2026-10-20T15:00Z | 1,202 MW | 1,147 MW | 119 MW | 316 MW | 195 MW |
| 2026-10-20T16:00Z | 1,202 MW | 1,204 MW | 9 MW | 309 MW | 196 MW |
| 2026-10-20T17:00Z | 1,201 MW | 1,290 MW | 10 MW | 303 MW | 198 MW |
| 2026-10-20T18:00Z | 1,201 MW | 1,228 MW | 14 MW | 320 MW | 198 MW |
| 2026-10-20T19:00Z | 1,200 MW | 1,252 MW | 4 MW | 317 MW | 198 MW |
| 2026-10-20T20:00Z | 1,200 MW | 1,210 MW | 4 MW | 321 MW | 199 MW |
| 2026-10-20T21:00Z | 1,202 MW | 1,078 MW | 0 MW | 304 MW | 199 MW |
| 2026-10-20T22:00Z | 1,203 MW | 807 MW | 2 MW | 315 MW | 200 MW |
| 2026-10-20T23:00Z | 1,204 MW | 858 MW | 0 MW | 323 MW | 200 MW |
| 2026-10-21T00:00Z | 1,203 MW | 905 MW | 0 MW | 323 MW | 200 MW |
| 2026-10-21T01:00Z | 1,196 MW | 876 MW | 0 MW | 323 MW | 197 MW |
| 2026-10-21T02:00Z | 1,196 MW | 735 MW | 1 MW | 322 MW | 197 MW |
| 2026-10-21T03:00Z | 1,198 MW | 789 MW | 0 MW | 320 MW | 195 MW |
| 2026-10-21T04:00Z | 1,198 MW | 959 MW | 1 MW | 319 MW | 196 MW |
| 2026-10-21T05:00Z | 1,200 MW | 1,018 MW | 173 MW | 322 MW | 195 MW |
| 2026-10-21T06:00Z | 952 MW | 942 MW | 1,203 MW | 312 MW | 187 MW |
| 2026-10-21T07:00Z | 935 MW | 679 MW | 2,413 MW | 259 MW | 184 MW |
| 2026-10-21T08:00Z | 925 MW | 411 MW | 3,127 MW | 237 MW | 194 MW |
| 2026-10-21T09:00Z | 926 MW | 337 MW | 3,416 MW | 238 MW | 185 MW |
| 2026-10-21T10:00Z | 924 MW | 342 MW | 3,368 MW | 237 MW | 186 MW |
| 2026-10-21T11:00Z | 924 MW | 351 MW | 3,089 MW | 236 MW | 187 MW |
| 2026-10-21T12:00Z | 925 MW | 403 MW | 2,540 MW | 235 MW | 193 MW |
| 2026-10-21T13:00Z | 927 MW | 458 MW | 1,702 MW | 245 MW | 197 MW |
| 2026-10-21T14:00Z | 927 MW | 556 MW | 634 MW | 297 MW | 195 MW |
| 2026-10-21T15:00Z | 960 MW | 778 MW | 70 MW | 337 MW | 196 MW |
| 2026-10-21T16:00Z | 1,026 MW | 995 MW | 6 MW | 337 MW | 196 MW |
| 2026-10-21T17:00Z | 1,088 MW | 1,035 MW | 17 MW | 338 MW | 197 MW |
| 2026-10-21T18:00Z | 1,146 MW | 1,006 MW | 5 MW | 339 MW | 197 MW |
| 2026-10-21T19:00Z | 1,183 MW | 984 MW | 0 MW | 338 MW | 197 MW |
| 2026-10-21T20:00Z | 1,187 MW | 638 MW | 8 MW | 315 MW | 198 MW |
| 2026-10-21T21:00Z | 1,187 MW | 537 MW | 4 MW | 277 MW | 200 MW |
| 2026-10-21T22:00Z | 1,186 MW | 417 MW | 1 MW | 271 MW | 203 MW |
| 2026-10-21T23:00Z | 1,186 MW | 457 MW | 1 MW | 275 MW | 200 MW |
| 2026-10-22T00:00Z | 1,186 MW | 469 MW | 1 MW | 271 MW | 200 MW |
| 2026-10-22T01:00Z | 1,182 MW | 424 MW | 2 MW | 271 MW | 198 MW |
| 2026-10-22T02:00Z | 1,181 MW | 407 MW | 1 MW | 270 MW | 197 MW |
| 2026-10-22T03:00Z | 1,180 MW | 465 MW | 0 MW | 270 MW | 197 MW |
| 2026-10-22T04:00Z | 1,181 MW | 560 MW | 0 MW | 265 MW | 198 MW |
| 2026-10-22T05:00Z | 1,183 MW | 646 MW | 14 MW | 302 MW | 199 MW |
| 2026-10-22T06:00Z | 1,184 MW | 646 MW | 140 MW | 311 MW | 187 MW |
| 2026-10-22T07:00Z | 1,181 MW | 643 MW | 401 MW | 279 MW | 187 MW |
| 2026-10-22T08:00Z | 1,182 MW | 721 MW | 731 MW | 233 MW | 192 MW |
| 2026-10-22T09:00Z | 1,183 MW | 893 MW | 1,092 MW | 239 MW | 198 MW |
| 2026-10-22T10:00Z | 1,185 MW | 735 MW | 1,256 MW | 213 MW | 198 MW |
| 2026-10-22T11:00Z | 1,184 MW | 549 MW | 1,258 MW | 198 MW | 200 MW |
| 2026-10-22T12:00Z | 1,184 MW | 476 MW | 1,319 MW | 206 MW | 200 MW |
| 2026-10-22T13:00Z | 1,180 MW | 459 MW | 1,147 MW | 232 MW | 199 MW |
| 2026-10-22T14:00Z | 1,179 MW | 582 MW | 514 MW | 277 MW | 198 MW |
| 2026-10-22T15:00Z | 1,180 MW | 654 MW | 67 MW | 328 MW | 197 MW |
| 2026-10-22T16:00Z | 1,181 MW | 658 MW | 7 MW | 334 MW | 197 MW |
| 2026-10-22T17:00Z | 1,183 MW | 678 MW | 12 MW | 339 MW | 197 MW |
| 2026-10-22T18:00Z | 1,182 MW | 666 MW | 3 MW | 341 MW | 197 MW |
| 2026-10-22T19:00Z | 1,180 MW | 655 MW | 12 MW | 339 MW | 197 MW |
| 2026-10-22T20:00Z | 1,181 MW | 597 MW | 1 MW | 341 MW | 197 MW |
| 2026-10-22T21:00Z | 1,183 MW | 622 MW | 0 MW | 341 MW | 197 MW |
| 2026-10-22T22:00Z | 1,181 MW | 787 MW | 0 MW | 324 MW | 197 MW |
| 2026-10-22T23:00Z | 1,182 MW | 921 MW | 0 MW | 283 MW | 196 MW |
| 2026-10-23T00:00Z | 1,182 MW | 911 MW | 1 MW | 240 MW | 197 MW |
| 2026-10-23T01:00Z | 1,183 MW | 923 MW | 0 MW | 199 MW | 196 MW |
| 2026-10-23T02:00Z | 1,185 MW | 751 MW | 1 MW | 162 MW | 196 MW |
| 2026-10-23T03:00Z | 1,184 MW | 545 MW | 0 MW | 158 MW | 197 MW |
| 2026-10-23T04:00Z | 1,184 MW | 583 MW | 1 MW | 162 MW | 197 MW |
| 2026-10-23T05:00Z | 1,185 MW | 598 MW | 128 MW | 163 MW | 199 MW |
| 2026-10-23T06:00Z | 1,183 MW | 523 MW | 1,040 MW | 163 MW | 200 MW |
| 2026-10-23T07:00Z | 1,183 MW | 476 MW | 2,134 MW | 163 MW | 195 MW |
| 2026-10-23T08:00Z | 1,182 MW | 420 MW | 2,764 MW | 151 MW | 188 MW |
| 2026-10-23T09:00Z | 1,182 MW | 494 MW | 3,272 MW | 147 MW | 174 MW |
| 2026-10-23T10:00Z | 1,181 MW | 518 MW | 3,414 MW | 105 MW | 151 MW |
| 2026-10-23T11:00Z | 1,183 MW | 512 MW | 3,203 MW | 95 MW | 151 MW |
| 2026-10-23T12:00Z | 1,181 MW | 603 MW | 2,447 MW | 126 MW | 176 MW |
| 2026-10-23T13:00Z | 1,179 MW | 345 MW | 1,566 MW | 153 MW | 189 MW |
| 2026-10-23T14:00Z | 1,182 MW | 492 MW | 590 MW | 164 MW | 200 MW |
| 2026-10-23T15:00Z | 1,182 MW | 546 MW | 75 MW | 163 MW | 169 MW |
| 2026-10-23T16:00Z | 1,182 MW | 570 MW | 12 MW | 163 MW | 154 MW |
| 2026-10-23T17:00Z | 1,182 MW | 616 MW | 15 MW | 163 MW | 153 MW |
| 2026-10-23T18:00Z | 1,180 MW | 601 MW | 4 MW | 163 MW | 153 MW |
| 2026-10-23T19:00Z | 1,181 MW | 552 MW | 0 MW | 163 MW | 150 MW |
| 2026-10-23T20:00Z | 1,180 MW | 708 MW | 1 MW | 163 MW | 154 MW |
| 2026-10-23T21:00Z | 1,178 MW | 792 MW | 1 MW | 163 MW | 164 MW |
| 2026-10-23T22:00Z | 1,179 MW | 768 MW | 0 MW | 163 MW | 195 MW |
| 2026-10-23T23:00Z | 1,179 MW | 886 MW | 0 MW | 163 MW | 198 MW |
| 2026-10-24T00:00Z | 1,181 MW | 670 MW | 2 MW | 163 MW | 197 MW |
| 2026-10-24T01:00Z | 1,181 MW | 515 MW | 1 MW | 163 MW | 196 MW |
| 2026-10-24T02:00Z | 1,177 MW | 509 MW | 0 MW | 163 MW | 196 MW |
| 2026-10-24T03:00Z | 1,176 MW | 516 MW | 0 MW | 163 MW | 196 MW |
| 2026-10-24T04:00Z | 1,177 MW | 568 MW | 1 MW | 162 MW | 198 MW |
| 2026-10-24T05:00Z | 1,176 MW | 567 MW | 88 MW | 162 MW | 196 MW |
| 2026-10-24T06:00Z | 1,178 MW | 502 MW | 624 MW | 163 MW | 193 MW |
| 2026-10-24T07:00Z | 1,178 MW | 445 MW | 1,205 MW | 161 MW | 192 MW |
| 2026-10-24T08:00Z | 1,179 MW | 381 MW | 1,564 MW | 156 MW | 192 MW |
| 2026-10-24T09:00Z | 1,181 MW | 336 MW | 1,780 MW | 161 MW | 194 MW |
| 2026-10-24T10:00Z | 1,180 MW | 324 MW | 1,872 MW | 163 MW | 195 MW |
| 2026-10-24T11:00Z | 1,179 MW | 429 MW | 1,813 MW | 164 MW | 194 MW |
| 2026-10-24T12:00Z | 1,178 MW | 625 MW | 1,328 MW | 163 MW | 196 MW |
| 2026-10-24T13:00Z | 1,177 MW | 544 MW | 790 MW | 164 MW | 196 MW |
| 2026-10-24T14:00Z | 1,176 MW | 579 MW | 266 MW | 164 MW | 195 MW |
| 2026-10-24T15:00Z | 1,175 MW | 628 MW | 31 MW | 163 MW | 195 MW |
| 2026-10-24T16:00Z | 1,175 MW | 625 MW | 14 MW | 163 MW | 194 MW |
| 2026-10-24T17:00Z | 1,175 MW | 692 MW | 5 MW | 164 MW | 195 MW |
| 2026-10-24T18:00Z | 1,174 MW | 716 MW | 6 MW | 163 MW | 197 MW |
| 2026-10-24T19:00Z | 1,174 MW | 720 MW | 7 MW | 164 MW | 196 MW |
| 2026-10-24T20:00Z | 1,176 MW | 672 MW | 5 MW | 163 MW | 197 MW |
| 2026-10-24T21:00Z | 1,179 MW | 600 MW | 1 MW | 166 MW | 198 MW |
| 2026-10-24T22:00Z | 1,175 MW | 549 MW | 0 MW | 167 MW | 201 MW |
| 2026-10-24T23:00Z | 1,175 MW | 529 MW | 0 MW | 167 MW | 201 MW |
| 2026-10-25T00:00Z | 1,175 MW | 506 MW | 0 MW | 184 MW | 200 MW |
| 2026-10-25T01:00Z | 1,175 MW | 589 MW | 6 MW | 199 MW | 200 MW |
| 2026-10-25T02:00Z | 1,176 MW | 533 MW | 0 MW | 200 MW | 198 MW |
| 2026-10-25T03:00Z | 1,176 MW | 534 MW | 0 MW | 200 MW | 199 MW |
| 2026-10-25T04:00Z | 1,176 MW | 536 MW | 1 MW | 193 MW | 197 MW |
| 2026-10-25T05:00Z | 1,176 MW | 558 MW | 105 MW | 180 MW | 197 MW |
| 2026-10-25T06:00Z | 1,177 MW | 499 MW | 909 MW | 181 MW | 197 MW |
| 2026-10-25T07:00Z | 1,183 MW | 435 MW | 1,843 MW | 180 MW | 193 MW |
| 2026-10-25T08:00Z | 1,188 MW | 366 MW | 2,504 MW | 159 MW | 182 MW |
| 2026-10-25T09:00Z | 1,190 MW | 323 MW | 3,026 MW | 159 MW | 184 MW |
| 2026-10-25T10:00Z | 1,182 MW | 321 MW | 3,006 MW | 156 MW | 190 MW |
| 2026-10-25T11:00Z | 1,201 MW | 319 MW | 2,560 MW | 128 MW | 201 MW |
| 2026-10-25T12:00Z | 1,183 MW | 319 MW | 1,923 MW | 127 MW | 201 MW |
| 2026-10-25T13:00Z | 1,189 MW | 339 MW | 1,136 MW | 160 MW | 199 MW |
| 2026-10-25T14:00Z | 1,195 MW | 506 MW | 385 MW | 189 MW | 199 MW |
| 2026-10-25T15:00Z | 1,184 MW | 688 MW | 36 MW | 190 MW | 199 MW |
| 2026-10-25T16:00Z | 1,186 MW | 718 MW | 2 MW | 189 MW | 198 MW |
| 2026-10-25T17:00Z | 1,185 MW | 657 MW | 13 MW | 191 MW | 198 MW |
| 2026-10-25T18:00Z | 1,184 MW | 667 MW | 7 MW | 191 MW | 198 MW |
| 2026-10-25T19:00Z | 1,183 MW | 706 MW | 7 MW | 189 MW | 198 MW |
| 2026-10-25T20:00Z | 1,182 MW | 740 MW | 11 MW | 189 MW | 198 MW |
| 2026-10-25T21:00Z | 1,180 MW | 791 MW | 2 MW | 191 MW | 199 MW |
| 2026-10-25T22:00Z | 1,202 MW | 688 MW | 1 MW | 191 MW | 199 MW |
| 2026-10-25T23:00Z | 1,239 MW | 590 MW | 2 MW | 191 MW | 183 MW |
| 2026-10-26T00:00Z | 1,268 MW | 655 MW | 1 MW | 192 MW | 182 MW |
| 2026-10-26T01:00Z | 1,288 MW | 728 MW | 1 MW | 191 MW | 180 MW |
| 2026-10-26T02:00Z | 1,266 MW | 911 MW | 2 MW | 193 MW | 180 MW |
| 2026-10-26T03:00Z | 1,255 MW | 992 MW | 1 MW | 192 MW | 180 MW |
| 2026-10-26T04:00Z | 1,279 MW | 1,006 MW | 1 MW | 192 MW | 181 MW |
| 2026-10-26T05:00Z | 1,287 MW | 1,056 MW | 37 MW | 185 MW | 182 MW |
| 2026-10-26T06:00Z | 1,278 MW | 1,010 MW | 542 MW | 189 MW | 183 MW |
| 2026-10-26T07:00Z | 1,308 MW | 937 MW | 1,508 MW | 190 MW | 184 MW |
| 2026-10-26T08:00Z | 1,353 MW | 929 MW | 2,159 MW | 188 MW | 184 MW |
| 2026-10-26T09:00Z | 1,346 MW | 1,010 MW | 2,373 MW | 184 MW | 184 MW |
| 2026-10-26T10:00Z | 1,373 MW | 941 MW | 2,173 MW | 183 MW | 185 MW |
| 2026-10-26T11:00Z | 1,401 MW | 825 MW | 1,865 MW | 184 MW | 184 MW |
| 2026-10-26T12:00Z | 1,411 MW | 860 MW | 1,502 MW | 185 MW | 182 MW |
| 2026-10-26T13:00Z | 1,412 MW | 953 MW | 1,074 MW | 189 MW | 183 MW |
| 2026-10-26T14:00Z | 1,413 MW | 1,023 MW | 484 MW | 189 MW | 181 MW |
| 2026-10-26T15:00Z | 1,413 MW | 1,143 MW | 47 MW | 188 MW | 179 MW |
| 2026-10-26T16:00Z | 1,413 MW | 1,088 MW | 3 MW | 186 MW | 181 MW |
| 2026-10-26T17:00Z | 1,413 MW | 1,084 MW | 7 MW | 196 MW | 181 MW |
| 2026-10-26T18:00Z | 1,413 MW | 1,104 MW | 4 MW | 195 MW | 181 MW |
| 2026-10-26T19:00Z | 1,372 MW | 1,195 MW | 0 MW | 188 MW | 180 MW |
| 2026-10-26T20:00Z | 1,299 MW | 1,288 MW | 2 MW | 183 MW | 180 MW |
| 2026-10-26T21:00Z | 1,298 MW | 1,193 MW | 1 MW | 167 MW | 181 MW |
| 2026-10-26T22:00Z | 1,297 MW | 1,042 MW | 1 MW | 182 MW | 181 MW |
| 2026-10-26T23:00Z | 1,297 MW | 929 MW | 1 MW | 187 MW | 180 MW |
| 2026-10-27T00:00Z | 1,209 MW | 945 MW | 1 MW | 191 MW | 179 MW |
| 2026-10-27T01:00Z | 1,179 MW | 936 MW | 0 MW | 191 MW | 179 MW |
| 2026-10-27T02:00Z | 1,178 MW | 919 MW | 1 MW | 192 MW | 178 MW |
| 2026-10-27T03:00Z | 1,177 MW | 941 MW | 1 MW | 193 MW | 137 MW |
| 2026-10-27T04:00Z | 1,177 MW | 954 MW | 2 MW | 191 MW | 133 MW |
| 2026-10-27T05:00Z | 1,176 MW | 968 MW | 84 MW | 185 MW | 134 MW |
| 2026-10-27T06:00Z | 1,177 MW | 947 MW | 980 MW | 187 MW | 135 MW |
| 2026-10-27T07:00Z | 1,178 MW | 807 MW | 2,206 MW | 187 MW | 135 MW |
| 2026-10-27T08:00Z | 1,180 MW | 691 MW | 2,896 MW | 186 MW | 136 MW |
| 2026-10-27T09:00Z | 1,182 MW | 616 MW | 3,281 MW | 186 MW | 153 MW |
| 2026-10-27T10:00Z | 1,182 MW | 542 MW | 3,402 MW | 183 MW | 178 MW |
| 2026-10-27T11:00Z | 1,181 MW | 538 MW | 3,242 MW | 185 MW | 188 MW |
| 2026-10-27T12:00Z | 1,181 MW | 544 MW | 2,813 MW | 184 MW | 188 MW |
| 2026-10-27T13:00Z | 1,180 MW | 856 MW | 2,034 MW | 185 MW | 186 MW |
| 2026-10-27T14:00Z | 1,179 MW | 1,076 MW | 860 MW | 188 MW | 186 MW |
| 2026-10-27T15:00Z | 1,178 MW | 1,153 MW | 84 MW | 188 MW | 184 MW |
| 2026-10-27T16:00Z | 1,176 MW | 1,109 MW | 16 MW | 189 MW | 181 MW |
| 2026-10-27T17:00Z | 1,175 MW | 1,133 MW | 4 MW | 187 MW | 180 MW |
| 2026-10-27T18:00Z | 1,175 MW | 1,140 MW | 2 MW | 187 MW | 179 MW |
| 2026-10-27T19:00Z | 1,175 MW | 1,152 MW | 1 MW | 188 MW | 180 MW |
| 2026-10-27T20:00Z | 1,175 MW | 1,180 MW | 7 MW | 182 MW | 179 MW |
| 2026-10-27T21:00Z | 1,200 MW | 1,126 MW | 2 MW | 182 MW | 180 MW |
| 2026-10-27T22:00Z | 1,260 MW | 996 MW | 1 MW | 190 MW | 181 MW |
| 2026-10-27T23:00Z | 1,250 MW | 993 MW | 1 MW | 189 MW | 182 MW |
| 2026-10-28T00:00Z | 1,107 MW | 1,029 MW | 1 MW | 187 MW | 181 MW |
| 2026-10-28T01:00Z | 1,057 MW | 1,033 MW | 1 MW | 189 MW | 180 MW |
| 2026-10-28T02:00Z | 1,080 MW | 1,046 MW | 1 MW | 189 MW | 179 MW |
| 2026-10-28T03:00Z | 1,129 MW | 1,045 MW | 1 MW | 188 MW | 179 MW |
| 2026-10-28T04:00Z | 1,148 MW | 1,063 MW | 1 MW | 185 MW | 180 MW |
| 2026-10-28T05:00Z | 1,146 MW | 1,100 MW | 76 MW | 188 MW | 181 MW |
| 2026-10-28T06:00Z | 1,146 MW | 1,060 MW | 945 MW | 187 MW | 183 MW |
| 2026-10-28T07:00Z | 1,157 MW | 982 MW | 2,183 MW | 186 MW | 183 MW |
| 2026-10-28T08:00Z | 1,149 MW | 924 MW | 2,950 MW | 185 MW | 184 MW |
| 2026-10-28T09:00Z | 1,145 MW | 873 MW | 3,291 MW | 184 MW | 186 MW |
| 2026-10-28T10:00Z | 1,143 MW | 878 MW | 3,279 MW | 186 MW | 187 MW |
| 2026-10-28T11:00Z | 1,145 MW | 846 MW | 3,306 MW | 186 MW | 187 MW |
| 2026-10-28T12:00Z | 1,148 MW | 946 MW | 2,921 MW | 186 MW | 187 MW |
| 2026-10-28T13:00Z | 1,151 MW | 1,071 MW | 2,047 MW | 184 MW | 187 MW |
| 2026-10-28T14:00Z | 1,155 MW | 1,316 MW | 696 MW | 184 MW | 186 MW |
| 2026-10-28T15:00Z | 1,155 MW | 1,433 MW | 43 MW | 183 MW | 183 MW |
| 2026-10-28T16:00Z | 1,154 MW | 1,466 MW | 13 MW | 187 MW | 182 MW |
| 2026-10-28T17:00Z | 1,144 MW | 1,474 MW | 11 MW | 186 MW | 181 MW |
| 2026-10-28T18:00Z | 1,126 MW | 1,494 MW | 10 MW | 186 MW | 181 MW |
| 2026-10-28T19:00Z | 1,126 MW | 1,529 MW | 1 MW | 184 MW | 181 MW |
| 2026-10-28T20:00Z | 1,148 MW | 1,531 MW | 1 MW | 187 MW | 181 MW |
| 2026-10-28T21:00Z | 1,154 MW | 1,450 MW | 1 MW | 179 MW | 181 MW |
| 2026-10-28T22:00Z | 1,157 MW | 1,082 MW | 1 MW | 174 MW | 181 MW |
| 2026-10-28T23:00Z | 1,156 MW | 1,019 MW | 0 MW | 186 MW | 181 MW |
| 2026-10-29T00:00Z | 1,155 MW | 991 MW | 0 MW | 188 MW | 181 MW |
| 2026-10-29T01:00Z | 1,160 MW | 991 MW | 0 MW | 189 MW | 180 MW |
| 2026-10-29T02:00Z | 1,161 MW | 976 MW | 0 MW | 177 MW | 180 MW |
| 2026-10-29T03:00Z | 1,163 MW | 1,005 MW | 0 MW | 173 MW | 180 MW |
| 2026-10-29T04:00Z | 1,164 MW | 1,012 MW | 0 MW | 179 MW | 179 MW |
| 2026-10-29T05:00Z | 1,162 MW | 1,100 MW | 35 MW | 178 MW | 178 MW |
| 2026-10-29T06:00Z | 1,164 MW | 1,150 MW | 373 MW | 175 MW | 179 MW |
| 2026-10-29T07:00Z | 1,174 MW | 1,097 MW | 1,097 MW | 175 MW | 180 MW |
| 2026-10-29T08:00Z | 1,170 MW | 1,059 MW | 1,603 MW | 172 MW | 182 MW |
| 2026-10-29T09:00Z | 1,172 MW | 1,030 MW | 1,896 MW | 175 MW | 182 MW |
| 2026-10-29T10:00Z | 1,170 MW | 1,022 MW | 2,098 MW | 172 MW | 183 MW |
| 2026-10-29T11:00Z | 1,169 MW | 1,060 MW | 1,814 MW | 176 MW | 184 MW |
| 2026-10-29T12:00Z | 1,151 MW | 1,104 MW | 1,472 MW | 183 MW | 184 MW |
| 2026-10-29T13:00Z | 1,170 MW | 1,345 MW | 911 MW | 185 MW | 179 MW |
| 2026-10-29T14:00Z | 1,156 MW | 1,710 MW | 332 MW | 186 MW | 141 MW |
| 2026-10-29T15:00Z | 1,155 MW | 1,796 MW | 28 MW | 188 MW | 140 MW |
| 2026-10-29T16:00Z | 1,112 MW | 1,816 MW | 8 MW | 194 MW | 142 MW |
| 2026-10-29T17:00Z | 1,100 MW | 1,816 MW | 6 MW | 196 MW | 177 MW |
| 2026-10-29T18:00Z | 1,100 MW | 1,723 MW | 5 MW | 192 MW | 181 MW |
| 2026-10-29T19:00Z | 1,061 MW | 1,732 MW | 18 MW | 187 MW | 182 MW |
| 2026-10-29T20:00Z | 998 MW | 1,705 MW | 9 MW | 186 MW | 182 MW |
| 2026-10-29T21:00Z | 947 MW | 1,610 MW | 3 MW | 185 MW | 182 MW |
| 2026-10-29T22:00Z | 948 MW | 1,254 MW | 2 MW | 188 MW | 181 MW |
| 2026-10-29T23:00Z | 949 MW | 1,119 MW | 1 MW | 185 MW | 183 MW |
| 2026-10-30T00:00Z | 949 MW | 1,124 MW | 1 MW | 184 MW | 182 MW |
| 2026-10-30T01:00Z | 949 MW | 1,139 MW | 1 MW | 181 MW | 182 MW |
| 2026-10-30T02:00Z | 949 MW | 1,153 MW | 1 MW | 184 MW | 181 MW |
| 2026-10-30T03:00Z | 949 MW | 1,161 MW | 1 MW | 183 MW | 181 MW |
| 2026-10-30T04:00Z | 948 MW | 1,156 MW | 1 MW | 182 MW | 141 MW |
| 2026-10-30T05:00Z | 948 MW | 1,242 MW | 32 MW | 179 MW | 136 MW |
| 2026-10-30T06:00Z | 948 MW | 1,290 MW | 290 MW | 181 MW | 138 MW |
| 2026-10-30T07:00Z | 948 MW | 1,240 MW | 705 MW | 179 MW | 164 MW |
| 2026-10-30T08:00Z | 948 MW | 1,135 MW | 1,154 MW | 186 MW | 179 MW |
| 2026-10-30T09:00Z | 948 MW | 1,097 MW | 1,586 MW | 181 MW | 181 MW |
| 2026-10-30T10:00Z | 948 MW | 1,074 MW | 1,754 MW | 186 MW | 182 MW |
| 2026-10-30T11:00Z | 948 MW | 1,114 MW | 1,748 MW | 182 MW | 183 MW |
| 2026-10-30T12:00Z | 948 MW | 1,228 MW | 1,465 MW | 183 MW | 183 MW |
| 2026-10-30T13:00Z | 948 MW | 1,465 MW | 1,012 MW | 186 MW | 185 MW |
| 2026-10-30T14:00Z | 947 MW | 1,631 MW | 348 MW | 180 MW | 183 MW |
| 2026-10-30T15:00Z | 947 MW | 1,698 MW | 30 MW | 187 MW | 182 MW |
| 2026-10-30T16:00Z | 948 MW | 1,836 MW | 8 MW | 187 MW | 180 MW |
| 2026-10-30T17:00Z | 948 MW | 1,828 MW | 1 MW | 187 MW | 181 MW |
| 2026-10-30T18:00Z | 948 MW | 1,795 MW | 1 MW | 189 MW | 181 MW |
| 2026-10-30T19:00Z | 947 MW | 1,816 MW | 2 MW | 187 MW | 181 MW |
| 2026-10-30T20:00Z | 947 MW | 1,796 MW | 4 MW | 186 MW | 181 MW |
| 2026-10-30T21:00Z | 947 MW | 1,527 MW | 1 MW | 188 MW | 182 MW |
| 2026-10-30T22:00Z | 947 MW | 1,178 MW | 1 MW | 185 MW | 181 MW |
| 2026-10-30T23:00Z | 947 MW | 1,148 MW | 1 MW | 191 MW | 181 MW |
| 2026-10-31T00:00Z | 947 MW | 1,159 MW | 0 MW | 191 MW | 179 MW |
| 2026-10-31T01:00Z | 948 MW | 1,170 MW | 1 MW | 188 MW | 179 MW |
| 2026-10-31T02:00Z | 949 MW | 1,131 MW | 1 MW | 187 MW | 179 MW |
| 2026-10-31T03:00Z | 949 MW | 1,135 MW | 3 MW | 185 MW | 179 MW |
| 2026-10-31T04:00Z | 948 MW | 1,146 MW | 1 MW | 186 MW | 179 MW |
| 2026-10-31T05:00Z | 948 MW | 1,123 MW | 26 MW | 189 MW | 180 MW |
| 2026-10-31T06:00Z | 949 MW | 1,155 MW | 402 MW | 188 MW | 181 MW |
| 2026-10-31T07:00Z | 949 MW | 1,159 MW | 1,075 MW | 189 MW | 181 MW |
| 2026-10-31T08:00Z | 949 MW | 1,120 MW | 1,735 MW | 190 MW | 182 MW |
| 2026-10-31T09:00Z | 949 MW | 1,044 MW | 1,993 MW | 187 MW | 182 MW |
| 2026-10-31T10:00Z | 949 MW | 991 MW | 1,916 MW | 187 MW | 182 MW |
| 2026-10-31T11:00Z | 949 MW | 1,048 MW | 1,541 MW | 188 MW | 182 MW |
| 2026-10-31T12:00Z | 949 MW | 1,084 MW | 1,219 MW | 189 MW | 183 MW |
| 2026-10-31T13:00Z | 948 MW | 1,210 MW | 915 MW | 189 MW | 182 MW |
| 2026-10-31T14:00Z | 954 MW | 1,353 MW | 331 MW | 189 MW | 183 MW |
| 2026-10-31T15:00Z | 979 MW | 1,429 MW | 24 MW | 184 MW | 181 MW |
| 2026-10-31T16:00Z | 984 MW | 1,403 MW | 2 MW | 185 MW | 179 MW |
| 2026-10-31T17:00Z | 1,036 MW | 1,343 MW | 4 MW | 187 MW | 179 MW |
| 2026-10-31T18:00Z | 1,084 MW | 1,342 MW | 8 MW | 188 MW | 179 MW |
| 2026-10-31T19:00Z | 1,144 MW | 1,334 MW | 2 MW | 192 MW | 179 MW |
| 2026-10-31T20:00Z | 1,193 MW | 1,319 MW | 1 MW | 187 MW | 179 MW |
| 2026-10-31T21:00Z | 1,200 MW | 1,284 MW | 2 MW | 190 MW | 178 MW |
| 2026-10-31T22:00Z | 1,202 MW | 1,132 MW | 2 MW | 191 MW | 178 MW |
| 2026-10-31T23:00Z | 1,203 MW | 1,123 MW | 3 MW | 192 MW | 179 MW |
| 2026-11-01T00:00Z | 1,203 MW | 1,085 MW | 3 MW | 191 MW | 179 MW |
| 2026-11-01T01:00Z | 1,204 MW | 1,038 MW | 1 MW | 190 MW | 179 MW |
| 2026-11-01T02:00Z | 1,206 MW | 1,045 MW | 1 MW | 189 MW | 178 MW |
| 2026-11-01T03:00Z | 1,202 MW | 1,047 MW | 1 MW | 190 MW | 178 MW |
| 2026-11-01T04:00Z | 1,203 MW | 1,064 MW | 0 MW | 185 MW | 178 MW |
| 2026-11-01T05:00Z | 1,203 MW | 1,156 MW | 47 MW | 184 MW | 178 MW |
| 2026-11-01T06:00Z | 1,178 MW | 1,158 MW | 616 MW | 189 MW | 179 MW |
| 2026-11-01T07:00Z | 1,150 MW | 1,117 MW | 1,641 MW | 188 MW | 180 MW |
| 2026-11-01T08:00Z | 1,157 MW | 1,014 MW | 2,296 MW | 179 MW | 181 MW |
| 2026-11-01T09:00Z | 1,183 MW | 1,002 MW | 2,306 MW | 184 MW | 181 MW |
| 2026-11-01T10:00Z | 1,170 MW | 1,028 MW | 2,131 MW | 186 MW | 181 MW |
| 2026-11-01T11:00Z | 1,208 MW | 935 MW | 1,905 MW | 185 MW | 181 MW |
| 2026-11-01T12:00Z | 1,260 MW | 1,020 MW | 1,395 MW | 190 MW | 181 MW |
| 2026-11-01T13:00Z | 1,314 MW | 1,106 MW | 742 MW | 187 MW | 181 MW |
| 2026-11-01T14:00Z | 1,370 MW | 1,239 MW | 190 MW | 190 MW | 181 MW |
| 2026-11-01T15:00Z | 1,394 MW | 1,261 MW | 15 MW | 192 MW | 185 MW |
| 2026-11-01T16:00Z | 1,415 MW | 1,290 MW | 2 MW | 212 MW | 192 MW |
| 2026-11-01T17:00Z | 1,442 MW | 1,275 MW | 6 MW | 224 MW | 195 MW |
| 2026-11-01T18:00Z | 1,453 MW | 1,264 MW | 3 MW | 258 MW | 199 MW |
| 2026-11-01T19:00Z | 1,453 MW | 1,227 MW | 0 MW | 297 MW | 200 MW |
| 2026-11-01T20:00Z | 1,453 MW | 1,203 MW | 1 MW | 325 MW | 200 MW |
| 2026-11-01T21:00Z | 1,451 MW | 1,174 MW | 1 MW | 322 MW | 200 MW |
| 2026-11-01T22:00Z | 1,454 MW | 1,137 MW | 1 MW | 309 MW | 199 MW |
| 2026-11-01T23:00Z | 1,450 MW | 1,060 MW | 1 MW | 268 MW | 199 MW |
| 2026-11-02T00:00Z | 1,453 MW | 1,027 MW | 0 MW | 267 MW | 199 MW |
| 2026-11-02T01:00Z | 1,455 MW | 1,026 MW | 0 MW | 268 MW | 195 MW |
| 2026-11-02T02:00Z | 1,456 MW | 1,066 MW | 0 MW | 267 MW | 192 MW |
| 2026-11-02T03:00Z | 1,454 MW | 1,055 MW | 0 MW | 269 MW | 195 MW |
| 2026-11-02T04:00Z | 1,454 MW | 1,083 MW | 0 MW | 270 MW | 198 MW |
| 2026-11-02T05:00Z | 1,453 MW | 1,225 MW | 12 MW | 265 MW | 198 MW |
| 2026-11-02T06:00Z | 1,452 MW | 1,298 MW | 144 MW | 270 MW | 199 MW |
| 2026-11-02T07:00Z | 1,454 MW | 1,271 MW | 394 MW | 271 MW | 199 MW |
| 2026-11-02T08:00Z | 1,453 MW | 1,236 MW | 701 MW | 270 MW | 200 MW |
| 2026-11-02T09:00Z | 1,453 MW | 1,218 MW | 1,026 MW | 275 MW | 200 MW |
| 2026-11-02T10:00Z | 1,450 MW | 1,209 MW | 1,082 MW | 276 MW | 198 MW |
| 2026-11-02T11:00Z | 1,453 MW | 1,256 MW | 801 MW | 275 MW | 197 MW |
| 2026-11-02T12:00Z | 1,449 MW | 1,312 MW | 564 MW | 295 MW | 196 MW |
| 2026-11-02T13:00Z | 1,453 MW | 1,379 MW | 323 MW | 337 MW | 200 MW |
| 2026-11-02T14:00Z | 1,451 MW | 1,407 MW | 124 MW | 350 MW | 199 MW |
| 2026-11-02T15:00Z | 1,452 MW | 1,435 MW | 11 MW | 359 MW | 199 MW |
| 2026-11-02T16:00Z | 1,451 MW | 1,438 MW | 6 MW | 360 MW | 199 MW |
| 2026-11-02T17:00Z | 1,450 MW | 1,354 MW | 1 MW | 354 MW | 199 MW |
| 2026-11-02T18:00Z | 1,449 MW | 1,358 MW | 1 MW | 341 MW | 198 MW |
| 2026-11-02T19:00Z | 1,450 MW | 1,391 MW | 0 MW | 303 MW | 199 MW |
| 2026-11-02T20:00Z | 1,450 MW | 1,281 MW | 1 MW | 289 MW | 198 MW |
| 2026-11-02T21:00Z | 1,451 MW | 1,146 MW | 1 MW | 269 MW | 199 MW |
| 2026-11-02T22:00Z | 1,452 MW | 1,101 MW | 1 MW | 267 MW | 199 MW |
| 2026-11-02T23:00Z | 1,454 MW | 1,043 MW | 1 MW | 260 MW | 200 MW |
| 2026-11-03T00:00Z | 1,455 MW | 1,094 MW | 1 MW | 266 MW | 199 MW |
| 2026-11-03T01:00Z | 1,456 MW | 1,071 MW | 1 MW | 260 MW | 199 MW |
| 2026-11-03T02:00Z | 1,458 MW | 1,099 MW | 1 MW | 261 MW | 199 MW |
| 2026-11-03T03:00Z | 1,458 MW | 1,103 MW | 1 MW | 261 MW | 199 MW |
| 2026-11-03T04:00Z | 1,455 MW | 1,161 MW | 0 MW | 260 MW | 199 MW |
| 2026-11-03T05:00Z | 1,452 MW | 1,273 MW | 12 MW | 258 MW | 200 MW |
| 2026-11-03T06:00Z | 1,451 MW | 1,246 MW | 158 MW | 259 MW | 200 MW |
| 2026-11-03T07:00Z | 1,396 MW | 1,253 MW | 452 MW | 272 MW | 200 MW |
| 2026-11-03T08:00Z | 1,372 MW | 1,253 MW | 779 MW | 279 MW | 201 MW |
| 2026-11-03T09:00Z | 1,380 MW | 1,244 MW | 1,199 MW | 285 MW | 200 MW |
| 2026-11-03T10:00Z | 1,350 MW | 1,243 MW | 1,329 MW | 289 MW | 199 MW |
| 2026-11-03T11:00Z | 1,365 MW | 1,265 MW | 1,244 MW | 298 MW | 200 MW |
| 2026-11-03T12:00Z | 1,373 MW | 1,303 MW | 1,018 MW | 297 MW | 200 MW |
| 2026-11-03T13:00Z | 1,385 MW | 1,309 MW | 603 MW | 303 MW | 201 MW |
| 2026-11-03T14:00Z | 1,377 MW | 1,352 MW | 182 MW | 339 MW | 196 MW |
| 2026-11-03T15:00Z | 1,375 MW | 1,352 MW | 16 MW | 352 MW | 200 MW |
| 2026-11-03T16:00Z | 1,395 MW | 1,371 MW | 10 MW | 352 MW | 200 MW |
| 2026-11-03T17:00Z | 1,426 MW | 1,345 MW | 3 MW | 355 MW | 200 MW |
| 2026-11-03T18:00Z | 1,447 MW | 1,360 MW | 0 MW | 358 MW | 200 MW |
| 2026-11-03T19:00Z | 1,457 MW | 1,325 MW | 1 MW | 344 MW | 201 MW |
| 2026-11-03T20:00Z | 1,454 MW | 1,292 MW | 1 MW | 296 MW | 200 MW |
| 2026-11-03T21:00Z | 1,458 MW | 1,255 MW | 1 MW | 280 MW | 200 MW |
| 2026-11-03T22:00Z | 1,458 MW | 1,249 MW | 1 MW | 274 MW | 200 MW |
| 2026-11-03T23:00Z | 1,459 MW | 1,195 MW | 1 MW | 264 MW | 200 MW |
| 2026-11-04T00:00Z | 1,458 MW | 1,162 MW | 1 MW | 260 MW | 201 MW |
| 2026-11-04T01:00Z | 1,456 MW | 1,147 MW | 0 MW | 261 MW | 200 MW |
| 2026-11-04T02:00Z | 1,456 MW | 1,179 MW | 1 MW | 261 MW | 199 MW |
| 2026-11-04T03:00Z | 1,455 MW | 1,170 MW | 1 MW | 264 MW | 199 MW |
| 2026-11-04T04:00Z | 1,455 MW | 1,213 MW | 1 MW | 262 MW | 200 MW |
| 2026-11-04T05:00Z | 1,454 MW | 1,323 MW | 23 MW | 260 MW | 201 MW |
| 2026-11-04T06:00Z | 1,455 MW | 1,349 MW | 400 MW | 262 MW | 201 MW |
| 2026-11-04T07:00Z | 1,457 MW | 1,313 MW | 1,248 MW | 262 MW | 201 MW |
| 2026-11-04T08:00Z | 1,458 MW | 1,259 MW | 1,968 MW | 261 MW | 200 MW |
| 2026-11-04T09:00Z | 1,455 MW | 1,237 MW | 2,401 MW | 270 MW | 191 MW |
| 2026-11-04T10:00Z | 1,458 MW | 1,263 MW | 2,587 MW | 268 MW | 195 MW |
| 2026-11-04T11:00Z | 1,455 MW | 1,218 MW | 2,449 MW | 267 MW | 198 MW |
| 2026-11-04T12:00Z | 1,458 MW | 1,244 MW | 2,068 MW | 269 MW | 199 MW |
| 2026-11-04T13:00Z | 1,458 MW | 1,317 MW | 1,280 MW | 310 MW | 197 MW |
| 2026-11-04T14:00Z | 1,457 MW | 1,369 MW | 364 MW | 329 MW | 198 MW |
| 2026-11-04T15:00Z | 1,455 MW | 1,341 MW | 13 MW | 337 MW | 193 MW |
| 2026-11-04T16:00Z | 1,456 MW | 1,365 MW | 5 MW | 331 MW | 195 MW |
| 2026-11-04T17:00Z | 1,456 MW | 1,359 MW | 3 MW | 349 MW | 196 MW |
| 2026-11-04T18:00Z | 1,456 MW | 1,396 MW | 9 MW | 357 MW | 194 MW |
| 2026-11-04T19:00Z | 1,455 MW | 1,368 MW | 5 MW | 338 MW | 194 MW |
| 2026-11-04T20:00Z | 1,454 MW | 1,299 MW | 3 MW | 325 MW | 190 MW |
| 2026-11-04T21:00Z | 1,454 MW | 1,256 MW | 1 MW | 265 MW | 191 MW |
| 2026-11-04T22:00Z | 1,454 MW | 1,199 MW | 1 MW | 256 MW | 183 MW |
| 2026-11-04T23:00Z | 1,455 MW | 1,200 MW | 1 MW | 272 MW | 195 MW |
| 2026-11-05T00:00Z | 1,458 MW | 1,182 MW | 1 MW | 273 MW | 197 MW |
| 2026-11-05T01:00Z | 1,458 MW | 1,195 MW | 0 MW | 270 MW | 196 MW |
| 2026-11-05T02:00Z | 1,458 MW | 1,168 MW | 1 MW | 273 MW | 196 MW |
| 2026-11-05T03:00Z | 1,458 MW | 1,184 MW | 0 MW | 272 MW | 193 MW |
| 2026-11-05T04:00Z | 1,456 MW | 1,245 MW | 2 MW | 274 MW | 193 MW |
| 2026-11-05T05:00Z | 1,455 MW | 1,367 MW | 56 MW | 287 MW | 197 MW |
| 2026-11-05T06:00Z | 1,454 MW | 1,298 MW | 737 MW | 290 MW | 198 MW |
| 2026-11-05T07:00Z | 1,228 MW | 1,253 MW | 1,961 MW | 288 MW | 195 MW |
| 2026-11-05T08:00Z | 1,275 MW | 1,223 MW | 2,804 MW | 276 MW | 199 MW |
| 2026-11-05T09:00Z | 1,309 MW | 1,209 MW | 3,172 MW | 271 MW | 199 MW |
| 2026-11-05T10:00Z | 1,347 MW | 1,178 MW | 3,275 MW | 274 MW | 200 MW |
| 2026-11-05T11:00Z | 1,393 MW | 1,240 MW | 3,176 MW | 272 MW | 200 MW |
| 2026-11-05T12:00Z | 1,439 MW | 1,317 MW | 2,795 MW | 269 MW | 196 MW |
| 2026-11-05T13:00Z | 1,458 MW | 1,501 MW | 1,869 MW | 277 MW | 190 MW |
| 2026-11-05T14:00Z | 1,454 MW | 1,775 MW | 574 MW | 305 MW | 195 MW |
| 2026-11-05T15:00Z | 1,452 MW | 1,858 MW | 29 MW | 331 MW | 200 MW |
| 2026-11-05T16:00Z | 1,459 MW | 1,893 MW | 20 MW | 344 MW | 200 MW |
| 2026-11-05T17:00Z | 1,457 MW | 1,858 MW | 6 MW | 344 MW | 198 MW |
| 2026-11-05T18:00Z | 1,456 MW | 1,877 MW | 9 MW | 343 MW | 197 MW |
| 2026-11-05T19:00Z | 1,457 MW | 1,862 MW | 7 MW | 343 MW | 197 MW |
| 2026-11-05T20:00Z | 1,457 MW | 1,798 MW | 4 MW | 339 MW | 197 MW |
| 2026-11-05T21:00Z | 1,455 MW | 1,699 MW | 2 MW | 280 MW | 198 MW |
| 2026-11-05T22:00Z | 1,456 MW | 1,531 MW | 0 MW | 258 MW | 198 MW |
| 2026-11-05T23:00Z | 1,458 MW | 1,578 MW | 0 MW | 258 MW | 199 MW |
| 2026-11-06T00:00Z | 1,458 MW | 1,605 MW | 0 MW | 266 MW | 199 MW |
| 2026-11-06T01:00Z | 1,458 MW | 1,571 MW | 1 MW | 259 MW | 198 MW |
| 2026-11-06T02:00Z | 1,458 MW | 1,553 MW | 1 MW | 262 MW | 197 MW |
| 2026-11-06T03:00Z | 1,459 MW | 1,569 MW | 1 MW | 264 MW | 197 MW |
| 2026-11-06T04:00Z | 1,458 MW | 1,669 MW | 2 MW | 281 MW | 198 MW |
| 2026-11-06T05:00Z | 1,458 MW | 1,723 MW | 41 MW | 290 MW | 199 MW |
| 2026-11-06T06:00Z | 1,456 MW | 1,705 MW | 728 MW | 292 MW | 199 MW |
| 2026-11-06T07:00Z | 1,456 MW | 1,648 MW | 2,040 MW | 260 MW | 200 MW |
| 2026-11-06T08:00Z | 1,458 MW | 1,633 MW | 2,862 MW | 287 MW | 201 MW |
| 2026-11-06T09:00Z | 1,457 MW | 1,620 MW | 3,208 MW | 318 MW | 200 MW |
| 2026-11-06T10:00Z | 1,457 MW | 1,587 MW | 3,285 MW | 346 MW | 200 MW |
| 2026-11-06T11:00Z | 1,458 MW | 1,592 MW | 3,101 MW | 298 MW | 200 MW |
| 2026-11-06T12:00Z | 1,459 MW | 1,563 MW | 2,712 MW | 262 MW | 201 MW |
| 2026-11-06T13:00Z | 1,456 MW | 1,622 MW | 1,808 MW | 274 MW | 201 MW |
| 2026-11-06T14:00Z | 1,456 MW | 1,828 MW | 564 MW | 308 MW | 200 MW |
| 2026-11-06T15:00Z | 1,456 MW | 1,865 MW | 34 MW | 332 MW | 201 MW |
| 2026-11-06T16:00Z | 1,459 MW | 1,840 MW | 18 MW | 344 MW | 200 MW |
| 2026-11-06T17:00Z | 1,458 MW | 1,848 MW | 6 MW | 352 MW | 198 MW |
| 2026-11-06T18:00Z | 1,459 MW | 1,859 MW | 7 MW | 350 MW | 196 MW |
| 2026-11-06T19:00Z | 1,457 MW | 1,862 MW | 2 MW | 346 MW | 195 MW |
| 2026-11-06T20:00Z | 1,457 MW | 1,827 MW | 0 MW | 332 MW | 196 MW |
| 2026-11-06T21:00Z | 1,456 MW | 1,646 MW | 2 MW | 298 MW | 198 MW |
| 2026-11-06T22:00Z | 1,457 MW | 1,337 MW | 1 MW | 275 MW | 198 MW |
| 2026-11-06T23:00Z | 1,456 MW | 1,215 MW | 1 MW | 262 MW | 198 MW |
| 2026-11-07T00:00Z | 1,459 MW | 1,201 MW | 0 MW | 265 MW | 195 MW |
| 2026-11-07T01:00Z | 1,461 MW | 1,183 MW | 0 MW | 265 MW | 195 MW |
| 2026-11-07T02:00Z | 1,459 MW | 1,188 MW | 0 MW | 266 MW | 194 MW |
| 2026-11-07T03:00Z | 1,459 MW | 1,183 MW | 1 MW | 268 MW | 197 MW |
| 2026-11-07T04:00Z | 1,458 MW | 1,205 MW | 1 MW | 263 MW | 198 MW |
| 2026-11-07T05:00Z | 1,458 MW | 1,226 MW | 45 MW | 270 MW | 198 MW |
| 2026-11-07T06:00Z | 1,457 MW | 1,235 MW | 793 MW | 270 MW | 199 MW |
| 2026-11-07T07:00Z | 1,223 MW | 1,215 MW | 2,215 MW | 271 MW | 200 MW |
| 2026-11-07T08:00Z | 1,223 MW | 1,164 MW | 3,079 MW | 270 MW | 200 MW |
| 2026-11-07T09:00Z | 1,222 MW | 1,099 MW | 3,470 MW | 269 MW | 200 MW |
| 2026-11-07T10:00Z | 1,193 MW | 1,063 MW | 3,556 MW | 269 MW | 200 MW |
| 2026-11-07T11:00Z | 1,190 MW | 1,065 MW | 3,427 MW | 269 MW | 199 MW |
| 2026-11-07T12:00Z | 993 MW | 1,091 MW | 2,972 MW | 267 MW | 199 MW |
| 2026-11-07T13:00Z | 972 MW | 1,182 MW | 1,896 MW | 267 MW | 199 MW |
| 2026-11-07T14:00Z | 964 MW | 1,309 MW | 521 MW | 267 MW | 200 MW |
| 2026-11-07T15:00Z | 996 MW | 1,363 MW | 17 MW | 268 MW | 199 MW |
| 2026-11-07T16:00Z | 1,065 MW | 1,338 MW | 11 MW | 269 MW | 198 MW |
| 2026-11-07T17:00Z | 1,146 MW | 1,365 MW | 20 MW | 271 MW | 198 MW |
| 2026-11-07T18:00Z | 1,244 MW | 1,374 MW | 13 MW | 270 MW | 198 MW |
| 2026-11-07T19:00Z | 1,346 MW | 1,386 MW | 7 MW | 270 MW | 198 MW |
| 2026-11-07T20:00Z | 1,430 MW | 1,370 MW | 4 MW | 271 MW | 198 MW |
| 2026-11-07T21:00Z | 1,456 MW | 1,284 MW | 1 MW | 275 MW | 198 MW |
| 2026-11-07T22:00Z | 1,448 MW | 1,198 MW | 1 MW | 274 MW | 199 MW |
| 2026-11-07T23:00Z | 1,455 MW | 1,172 MW | 1 MW | 270 MW | 199 MW |
| 2026-11-08T00:00Z | 1,452 MW | 1,142 MW | 3 MW | 271 MW | 198 MW |
| 2026-11-08T01:00Z | 1,449 MW | 1,120 MW | 0 MW | 270 MW | 198 MW |
| 2026-11-08T02:00Z | 1,452 MW | 1,135 MW | 1 MW | 271 MW | 196 MW |
| 2026-11-08T03:00Z | 1,456 MW | 1,149 MW | 0 MW | 271 MW | 196 MW |
| 2026-11-08T04:00Z | 1,457 MW | 1,165 MW | 0 MW | 273 MW | 196 MW |
| 2026-11-08T05:00Z | 1,456 MW | 1,165 MW | 32 MW | 273 MW | 197 MW |
| 2026-11-08T06:00Z | 1,456 MW | 1,131 MW | 676 MW | 273 MW | 199 MW |
| 2026-11-08T07:00Z | 1,457 MW | 1,102 MW | 1,944 MW | 274 MW | 200 MW |
| 2026-11-08T08:00Z | 1,455 MW | 1,088 MW | 2,812 MW | 274 MW | 201 MW |
| 2026-11-08T09:00Z | 1,456 MW | 1,021 MW | 3,152 MW | 273 MW | 201 MW |
| 2026-11-08T10:00Z | 1,457 MW | 961 MW | 3,220 MW | 273 MW | 202 MW |
| 2026-11-08T11:00Z | 1,458 MW | 984 MW | 3,118 MW | 272 MW | 202 MW |
| 2026-11-08T12:00Z | 1,458 MW | 1,017 MW | 2,671 MW | 272 MW | 202 MW |
| 2026-11-08T13:00Z | 1,458 MW | 1,055 MW | 1,599 MW | 271 MW | 202 MW |
| 2026-11-08T14:00Z | 1,458 MW | 1,244 MW | 403 MW | 271 MW | 200 MW |
| 2026-11-08T15:00Z | 1,459 MW | 1,338 MW | 18 MW | 273 MW | 199 MW |
| 2026-11-08T16:00Z | 1,458 MW | 1,357 MW | 16 MW | 273 MW | 198 MW |
| 2026-11-08T17:00Z | 1,457 MW | 1,377 MW | 18 MW | 273 MW | 198 MW |
| 2026-11-08T18:00Z | 1,458 MW | 1,378 MW | 4 MW | 273 MW | 198 MW |
| 2026-11-08T19:00Z | 1,459 MW | 1,383 MW | 3 MW | 273 MW | 198 MW |
| 2026-11-08T20:00Z | 1,460 MW | 1,382 MW | 1 MW | 272 MW | 198 MW |
| 2026-11-08T21:00Z | 1,460 MW | 1,344 MW | 2 MW | 272 MW | 199 MW |
| 2026-11-08T22:00Z | 1,461 MW | 1,278 MW | 1 MW | 272 MW | 199 MW |
| 2026-11-08T23:00Z | 1,460 MW | 1,253 MW | 1 MW | 248 MW | 200 MW |
| 2026-11-09T00:00Z | 1,462 MW | 1,257 MW | 3 MW | 246 MW | 200 MW |
| 2026-11-09T01:00Z | 1,460 MW | 1,258 MW | 1 MW | 246 MW | 200 MW |
| 2026-11-09T02:00Z | 1,459 MW | 1,267 MW | 0 MW | 246 MW | 199 MW |
| 2026-11-09T03:00Z | 1,458 MW | 1,353 MW | 0 MW | 246 MW | 200 MW |
| 2026-11-09T04:00Z | 1,459 MW | 1,646 MW | 0 MW | 246 MW | 200 MW |
| 2026-11-09T05:00Z | 1,457 MW | 1,837 MW | 16 MW | 275 MW | 200 MW |
| 2026-11-09T06:00Z | 1,458 MW | 1,955 MW | 244 MW | 299 MW | 200 MW |
| 2026-11-09T07:00Z | 1,458 MW | 1,941 MW | 642 MW | 304 MW | 199 MW |
| 2026-11-09T08:00Z | 1,456 MW | 1,823 MW | 924 MW | 309 MW | 201 MW |
| 2026-11-09T09:00Z | 1,455 MW | 1,765 MW | 1,103 MW | 289 MW | 201 MW |
| 2026-11-09T10:00Z | 1,456 MW | 1,771 MW | 1,226 MW | 290 MW | 201 MW |
| 2026-11-09T11:00Z | 1,457 MW | 1,779 MW | 1,027 MW | 290 MW | 202 MW |
| 2026-11-09T12:00Z | 1,458 MW | 1,875 MW | 845 MW | 290 MW | 202 MW |
| 2026-11-09T13:00Z | 1,460 MW | 1,942 MW | 547 MW | 323 MW | 202 MW |
| 2026-11-09T14:00Z | 1,459 MW | 1,972 MW | 197 MW | 344 MW | 201 MW |
| 2026-11-09T15:00Z | 1,459 MW | 2,009 MW | 19 MW | 350 MW | 201 MW |
| 2026-11-09T16:00Z | 1,457 MW | 1,975 MW | 9 MW | 350 MW | 200 MW |
| 2026-11-09T17:00Z | 1,457 MW | 1,969 MW | 5 MW | 352 MW | 200 MW |
| 2026-11-09T18:00Z | 1,457 MW | 1,961 MW | 4 MW | 351 MW | 200 MW |
| 2026-11-09T19:00Z | 1,458 MW | 1,984 MW | 0 MW | 350 MW | 200 MW |
| 2026-11-09T20:00Z | 1,460 MW | 1,939 MW | 0 MW | 336 MW | 200 MW |
| 2026-11-09T21:00Z | 1,460 MW | 1,742 MW | 1 MW | 271 MW | 199 MW |
| 2026-11-09T22:00Z | 1,460 MW | 1,623 MW | 1 MW | 269 MW | 200 MW |
| 2026-11-09T23:00Z | 1,460 MW | 1,655 MW | 2 MW | 257 MW | 196 MW |
| 2026-11-10T00:00Z | 1,459 MW | 1,694 MW | 2 MW | 257 MW | 195 MW |
| 2026-11-10T01:00Z | 1,459 MW | 1,719 MW | 3 MW | 259 MW | 193 MW |
| 2026-11-10T02:00Z | 1,460 MW | 1,614 MW | 2 MW | 258 MW | 194 MW |
| 2026-11-10T03:00Z | 1,462 MW | 1,724 MW | 1 MW | 258 MW | 195 MW |
| 2026-11-10T04:00Z | 1,462 MW | 1,773 MW | 1 MW | 257 MW | 196 MW |
| 2026-11-10T05:00Z | 1,463 MW | 1,898 MW | 3 MW | 273 MW | 197 MW |
| 2026-11-10T06:00Z | 1,461 MW | 1,928 MW | 65 MW | 307 MW | 197 MW |
| 2026-11-10T07:00Z | 1,300 MW | 1,889 MW | 187 MW | 310 MW | 197 MW |
| 2026-11-10T08:00Z | 1,344 MW | 1,891 MW | 282 MW | 290 MW | 197 MW |
| 2026-11-10T09:00Z | 1,432 MW | 1,906 MW | 335 MW | 266 MW | 197 MW |
| 2026-11-10T10:00Z | 1,463 MW | 1,917 MW | 334 MW | 247 MW | 198 MW |
| 2026-11-10T11:00Z | 1,465 MW | 1,924 MW | 258 MW | 247 MW | 197 MW |
| 2026-11-10T12:00Z | 1,465 MW | 1,952 MW | 174 MW | 273 MW | 198 MW |
| 2026-11-10T13:00Z | 1,463 MW | 1,950 MW | 99 MW | 324 MW | 197 MW |
| 2026-11-10T14:00Z | 1,464 MW | 1,953 MW | 28 MW | 331 MW | 196 MW |
| 2026-11-10T15:00Z | 1,464 MW | 1,975 MW | 6 MW | 334 MW | 195 MW |
| 2026-11-10T16:00Z | 1,464 MW | 1,985 MW | 4 MW | 334 MW | 191 MW |
| 2026-11-10T17:00Z | 1,464 MW | 1,979 MW | 3 MW | 339 MW | 196 MW |
| 2026-11-10T18:00Z | 1,463 MW | 1,961 MW | 2 MW | 335 MW | 196 MW |
| 2026-11-10T19:00Z | 1,462 MW | 1,945 MW | 2 MW | 327 MW | 195 MW |
| 2026-11-10T20:00Z | 1,462 MW | 1,769 MW | 1 MW | 300 MW | 195 MW |
| 2026-11-10T21:00Z | 1,462 MW | 1,562 MW | 1 MW | 289 MW | 196 MW |
| 2026-11-10T22:00Z | 1,461 MW | 1,411 MW | 1 MW | 286 MW | 196 MW |
| 2026-11-10T23:00Z | 1,462 MW | 1,591 MW | 2 MW | 278 MW | 195 MW |
| 2026-11-11T00:00Z | 1,463 MW | 1,594 MW | 2 MW | 268 MW | 196 MW |
| 2026-11-11T01:00Z | 1,463 MW | 1,579 MW | 2 MW | 244 MW | 196 MW |
| 2026-11-11T02:00Z | 1,463 MW | 1,564 MW | 2 MW | 239 MW | 195 MW |
| 2026-11-11T03:00Z | 1,464 MW | 1,630 MW | 3 MW | 245 MW | 195 MW |
| 2026-11-11T04:00Z | 1,463 MW | 1,723 MW | 3 MW | 244 MW | 195 MW |
| 2026-11-11T05:00Z | 1,463 MW | 1,890 MW | 22 MW | 255 MW | 194 MW |
| 2026-11-11T06:00Z | 1,462 MW | 1,918 MW | 143 MW | 281 MW | 195 MW |
| 2026-11-11T07:00Z | 1,449 MW | 1,904 MW | 378 MW | 279 MW | 197 MW |
| 2026-11-11T08:00Z | 1,447 MW | 1,897 MW | 621 MW | 279 MW | 196 MW |
| 2026-11-11T09:00Z | 1,446 MW | 1,879 MW | 713 MW | 268 MW | 196 MW |
| 2026-11-11T10:00Z | 1,445 MW | 1,873 MW | 675 MW | 257 MW | 197 MW |
| 2026-11-11T11:00Z | 1,452 MW | 1,885 MW | 502 MW | 279 MW | 196 MW |
| 2026-11-11T12:00Z | 1,461 MW | 1,917 MW | 316 MW | 300 MW | 198 MW |
| 2026-11-11T13:00Z | 1,461 MW | 1,923 MW | n/a | 316 MW | 197 MW |
| 2026-11-11T14:00Z | 1,461 MW | 1,930 MW | n/a | 314 MW | 197 MW |
| 2026-11-11T15:00Z | 1,461 MW | 1,947 MW | n/a | 322 MW | 197 MW |
| 2026-11-11T16:00Z | 1,460 MW | 1,956 MW | n/a | 341 MW | 196 MW |
| 2026-11-11T17:00Z | 1,459 MW | 1,975 MW | n/a | 348 MW | 196 MW |
| 2026-11-11T18:00Z | 1,458 MW | 1,947 MW | n/a | 348 MW | 197 MW |
| 2026-11-11T19:00Z | 1,459 MW | 1,925 MW | n/a | 304 MW | 196 MW |
| 2026-11-11T20:00Z | 1,461 MW | 1,816 MW | n/a | 254 MW | 197 MW |
| 2026-11-11T21:00Z | 1,461 MW | 1,623 MW | n/a | 250 MW | 196 MW |
| 2026-11-11T22:00Z | 1,460 MW | 1,470 MW | n/a | 251 MW | 196 MW |
| 2026-11-11T23:00Z | 1,462 MW | 1,338 MW | n/a | 248 MW | 199 MW |
| 2026-11-12T00:00Z | 1,462 MW | 1,281 MW | n/a | 247 MW | 199 MW |
| 2026-11-12T01:00Z | 1,461 MW | 1,304 MW | n/a | 248 MW | 199 MW |
| 2026-11-12T02:00Z | 1,460 MW | 1,327 MW | n/a | 247 MW | 198 MW |
| 2026-11-12T03:00Z | 1,460 MW | 1,430 MW | n/a | 248 MW | 198 MW |
| 2026-11-12T04:00Z | 1,461 MW | 1,476 MW | n/a | 248 MW | 198 MW |
| 2026-11-12T05:00Z | 1,462 MW | 1,726 MW | n/a | 250 MW | 195 MW |
| 2026-11-12T06:00Z | 1,461 MW | 1,757 MW | n/a | 291 MW | 196 MW |
| 2026-11-12T07:00Z | 1,461 MW | 1,726 MW | n/a | 319 MW | 194 MW |
| 2026-11-12T08:00Z | 1,462 MW | 1,731 MW | n/a | 320 MW | 187 MW |
| 2026-11-12T09:00Z | 1,461 MW | 1,703 MW | n/a | 324 MW | 184 MW |
| 2026-11-12T10:00Z | 1,461 MW | 1,685 MW | n/a | 324 MW | 189 MW |
| 2026-11-12T11:00Z | 1,460 MW | 1,599 MW | n/a | 330 MW | 191 MW |
| 2026-11-12T12:00Z | 1,462 MW | 1,682 MW | n/a | 337 MW | 197 MW |
| 2026-11-12T13:00Z | 1,462 MW | 1,697 MW | n/a | 335 MW | 195 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00Z.
Installed Capacity
Annual figure for 2026| Solar | |
|---|---|
| Gas | |
| Nuclear | |
| Other | |
| Coal | |
| Oil | |
| Bioenergy | |
| Wind | |
| Other renewables | |
| Hydro | |
| Geothermal |
Total installed capacity in Hungary: 16.9 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Budapest time dates, through 2026-11-11Show the data table (400 rows)
| Date (Europe/Budapest time) | Demand |
|---|---|
| 2025-10-08 | 118 GWh |
| 2025-10-09 | 126 GWh |
| 2025-10-10 | 124 GWh |
| 2025-10-11 | 111 GWh |
| 2025-10-12 | 105 GWh |
| 2025-10-13 | 119 GWh |
| 2025-10-14 | 122 GWh |
| 2025-10-15 | 124 GWh |
| 2025-10-16 | 124 GWh |
| 2025-10-17 | 126 GWh |
| 2025-10-18 | 119 GWh |
| 2025-10-19 | 109 GWh |
| 2025-10-20 | 124 GWh |
| 2025-10-21 | 132 GWh |
| 2025-10-22 | 121 GWh |
| 2025-10-23 | 105 GWh |
| 2025-10-24 | 105 GWh |
| 2025-10-25 | 104 GWh |
| 2025-10-26 | 112 GWh |
| 2025-10-27 | 122 GWh |
| 2025-10-28 | 125 GWh |
| 2025-10-29 | 121 GWh |
| 2025-10-30 | 125 GWh |
| 2025-10-31 | 123 GWh |
| 2025-11-01 | 99.9 GWh |
| 2025-11-02 | 103 GWh |
| 2025-11-03 | 124 GWh |
| 2025-11-04 | 122 GWh |
| 2025-11-05 | 125 GWh |
| 2025-11-06 | 127 GWh |
| 2025-11-07 | 127 GWh |
| 2025-11-08 | 122 GWh |
| 2025-11-09 | 113 GWh |
| 2025-11-10 | 128 GWh |
| 2025-11-11 | 134 GWh |
| 2025-11-12 | 141 GWh |
| 2025-11-13 | 146 GWh |
| 2025-11-14 | 145 GWh |
| 2025-11-15 | 132 GWh |
| 2025-11-16 | 123 GWh |
| 2025-11-17 | 134 GWh |
| 2025-11-18 | 135 GWh |
| 2025-11-19 | 144 GWh |
| 2025-11-20 | 143 GWh |
| 2025-11-21 | 145 GWh |
| 2025-11-22 | 135 GWh |
| 2025-11-23 | 133 GWh |
| 2025-11-24 | 148 GWh |
| 2025-11-25 | 145 GWh |
| 2025-11-26 | 146 GWh |
| 2025-11-27 | 145 GWh |
| 2025-11-28 | 146 GWh |
| 2025-11-29 | 135 GWh |
| 2025-11-30 | 129 GWh |
| 2025-12-01 | 146 GWh |
| 2025-12-02 | 150 GWh |
| 2025-12-03 | 147 GWh |
| 2025-12-04 | 144 GWh |
| 2025-12-05 | 141 GWh |
| 2025-12-06 | 126 GWh |
| 2025-12-07 | 123 GWh |
| 2025-12-08 | 140 GWh |
| 2025-12-09 | 142 GWh |
| 2025-12-10 | 145 GWh |
| 2025-12-11 | 146 GWh |
| 2025-12-12 | 145 GWh |
| 2025-12-13 | 136 GWh |
| 2025-12-14 | 131 GWh |
| 2025-12-15 | 147 GWh |
| 2025-12-16 | 150 GWh |
| 2025-12-17 | 146 GWh |
| 2025-12-18 | 141 GWh |
| 2025-12-19 | 134 GWh |
| 2025-12-20 | 125 GWh |
| 2025-12-21 | 122 GWh |
| 2025-12-22 | 127 GWh |
| 2025-12-23 | 127 GWh |
| 2025-12-24 | 117 GWh |
| 2025-12-25 | 112 GWh |
| 2025-12-26 | 109 GWh |
| 2025-12-27 | 115 GWh |
| 2025-12-28 | 115 GWh |
| 2025-12-29 | 121 GWh |
| 2025-12-30 | 124 GWh |
| 2025-12-31 | 128 GWh |
| 2026-01-01 | 115 GWh |
| 2026-01-02 | 125 GWh |
| 2026-01-03 | 121 GWh |
| 2026-01-04 | 126 GWh |
| 2026-01-05 | 150 GWh |
| 2026-01-06 | 156 GWh |
| 2026-01-07 | 158 GWh |
| 2026-01-08 | 163 GWh |
| 2026-01-09 | 167 GWh |
| 2026-01-10 | 158 GWh |
| 2026-01-11 | 151 GWh |
| 2026-01-12 | 164 GWh |
| 2026-01-13 | 169 GWh |
| 2026-01-14 | 169 GWh |
| 2026-01-15 | 166 GWh |
| 2026-01-16 | 160 GWh |
| 2026-01-17 | 144 GWh |
| 2026-01-18 | 142 GWh |
| 2026-01-19 | 163 GWh |
| 2026-01-20 | 170 GWh |
| 2026-01-21 | 174 GWh |
| 2026-01-22 | 167 GWh |
| 2026-01-23 | 159 GWh |
| 2026-01-24 | 142 GWh |
| 2026-01-25 | 135 GWh |
| 2026-01-26 | 147 GWh |
| 2026-01-27 | 145 GWh |
| 2026-01-28 | 151 GWh |
| 2026-01-29 | 150 GWh |
| 2026-01-30 | 149 GWh |
| 2026-01-31 | 138 GWh |
| 2026-02-01 | 137 GWh |
| 2026-02-02 | 152 GWh |
| 2026-02-03 | 159 GWh |
| 2026-02-04 | 155 GWh |
| 2026-02-05 | 145 GWh |
| 2026-02-06 | 141 GWh |
| 2026-02-07 | 129 GWh |
| 2026-02-08 | 122 GWh |
| 2026-02-09 | 140 GWh |
| 2026-02-10 | 146 GWh |
| 2026-02-11 | 146 GWh |
| 2026-02-12 | 137 GWh |
| 2026-02-13 | 131 GWh |
| 2026-02-14 | 123 GWh |
| 2026-02-15 | 128 GWh |
| 2026-02-16 | 148 GWh |
| 2026-02-17 | 149 GWh |
| 2026-02-18 | 141 GWh |
| 2026-02-19 | 154 GWh |
| 2026-02-20 | 152 GWh |
| 2026-02-21 | 137 GWh |
| 2026-02-22 | 129 GWh |
| 2026-02-23 | 135 GWh |
| 2026-02-24 | 132 GWh |
| 2026-02-25 | 132 GWh |
| 2026-02-26 | 130 GWh |
| 2026-02-27 | 128 GWh |
| 2026-02-28 | 116 GWh |
| 2026-03-01 | 111 GWh |
| 2026-03-02 | 132 GWh |
| 2026-03-03 | 127 GWh |
| 2026-03-04 | 129 GWh |
| 2026-03-05 | 125 GWh |
| 2026-03-06 | 123 GWh |
| 2026-03-07 | 111 GWh |
| 2026-03-08 | 108 GWh |
| 2026-03-09 | 120 GWh |
| 2026-03-10 | 123 GWh |
| 2026-03-11 | 123 GWh |
| 2026-03-12 | 123 GWh |
| 2026-03-13 | 119 GWh |
| 2026-03-14 | 104 GWh |
| 2026-03-15 | 98.1 GWh |
| 2026-03-16 | 116 GWh |
| 2026-03-17 | 125 GWh |
| 2026-03-18 | 119 GWh |
| 2026-03-19 | 126 GWh |
| 2026-03-20 | 128 GWh |
| 2026-03-21 | 117 GWh |
| 2026-03-22 | 106 GWh |
| 2026-03-23 | 119 GWh |
| 2026-03-24 | 123 GWh |
| 2026-03-25 | 121 GWh |
| 2026-03-26 | 130 GWh |
| 2026-03-27 | 131 GWh |
| 2026-03-28 | 120 GWh |
| 2026-03-29 | 115 GWh |
| 2026-03-30 | 134 GWh |
| 2026-03-31 | 141 GWh |
| 2026-04-01 | 122 GWh |
| 2026-04-02 | 121 GWh |
| 2026-04-03 | 100 GWh |
| 2026-04-04 | 95.9 GWh |
| 2026-04-05 | 87.5 GWh |
| 2026-04-06 | 88.3 GWh |
| 2026-04-07 | 103 GWh |
| 2026-04-08 | 110 GWh |
| 2026-04-09 | 117 GWh |
| 2026-04-10 | 122 GWh |
| 2026-04-11 | 108 GWh |
| 2026-04-12 | 102 GWh |
| 2026-04-13 | 116 GWh |
| 2026-04-14 | 123 GWh |
| 2026-04-15 | 117 GWh |
| 2026-04-16 | 116 GWh |
| 2026-04-17 | 109 GWh |
| 2026-04-18 | 97.4 GWh |
| 2026-04-19 | 95.1 GWh |
| 2026-04-20 | 108 GWh |
| 2026-04-21 | 118 GWh |
| 2026-04-22 | 113 GWh |
| 2026-04-23 | 109 GWh |
| 2026-04-24 | 108 GWh |
| 2026-04-25 | 95.6 GWh |
| 2026-04-26 | 89.2 GWh |
| 2026-04-27 | 103 GWh |
| 2026-04-28 | 109 GWh |
| 2026-04-29 | 110 GWh |
| 2026-04-30 | 106 GWh |
| 2026-05-01 | 91.9 GWh |
| 2026-05-02 | 89.0 GWh |
| 2026-05-03 | 86.7 GWh |
| 2026-05-04 | 99.1 GWh |
| 2026-05-05 | 103 GWh |
| 2026-05-06 | 105 GWh |
| 2026-05-07 | 114 GWh |
| 2026-05-08 | 104 GWh |
| 2026-05-09 | 94.8 GWh |
| 2026-05-10 | 88.0 GWh |
| 2026-05-11 | 107 GWh |
| 2026-05-12 | 111 GWh |
| 2026-05-13 | 103 GWh |
| 2026-05-14 | 105 GWh |
| 2026-05-15 | 111 GWh |
| 2026-05-16 | 110 GWh |
| 2026-05-17 | 101 GWh |
| 2026-05-18 | 108 GWh |
| 2026-05-19 | 106 GWh |
| 2026-05-20 | 104 GWh |
| 2026-05-21 | 106 GWh |
| 2026-05-22 | 103 GWh |
| 2026-05-23 | 91.1 GWh |
| 2026-05-24 | 82.0 GWh |
| 2026-05-25 | 85.2 GWh |
| 2026-05-26 | 102 GWh |
| 2026-05-27 | 111 GWh |
| 2026-05-28 | 103 GWh |
| 2026-05-29 | 103 GWh |
| 2026-05-30 | 99.8 GWh |
| 2026-05-31 | 90.8 GWh |
| 2026-06-01 | 112 GWh |
| 2026-06-02 | 105 GWh |
| 2026-06-03 | 113 GWh |
| 2026-06-04 | 110 GWh |
| 2026-06-05 | 109 GWh |
| 2026-06-06 | 93.8 GWh |
| 2026-06-07 | 89.8 GWh |
| 2026-06-08 | 103 GWh |
| 2026-06-09 | 111 GWh |
| 2026-06-10 | 114 GWh |
| 2026-06-11 | 111 GWh |
| 2026-06-12 | 103 GWh |
| 2026-06-13 | 97.8 GWh |
| 2026-06-14 | 96.5 GWh |
| 2026-06-15 | 102 GWh |
| 2026-06-16 | 102 GWh |
| 2026-06-17 | 110 GWh |
| 2026-06-18 | 113 GWh |
| 2026-06-19 | 114 GWh |
| 2026-06-20 | 108 GWh |
| 2026-06-21 | 106 GWh |
| 2026-06-22 | 120 GWh |
| 2026-06-23 | 123 GWh |
| 2026-06-24 | 123 GWh |
| 2026-06-25 | 123 GWh |
| 2026-06-26 | 126 GWh |
| 2026-06-27 | 120 GWh |
| 2026-06-28 | 120 GWh |
| 2026-06-29 | 138 GWh |
| 2026-06-30 | 141 GWh |
| 2026-07-01 | 137 GWh |
| 2026-07-02 | 124 GWh |
| 2026-07-03 | 119 GWh |
| 2026-07-04 | 98.4 GWh |
| 2026-07-05 | 97.8 GWh |
| 2026-07-06 | 111 GWh |
| 2026-07-07 | 117 GWh |
| 2026-07-08 | 118 GWh |
| 2026-07-09 | 109 GWh |
| 2026-07-10 | 109 GWh |
| 2026-07-11 | 99.8 GWh |
| 2026-07-12 | 97.7 GWh |
| 2026-07-13 | 108 GWh |
| 2026-07-14 | 116 GWh |
| 2026-07-15 | 123 GWh |
| 2026-07-16 | 124 GWh |
| 2026-07-17 | 125 GWh |
| 2026-07-18 | 113 GWh |
| 2026-07-19 | 105 GWh |
| 2026-07-20 | 106 GWh |
| 2026-07-21 | 110 GWh |
| 2026-07-22 | 106 GWh |
| 2026-07-23 | 108 GWh |
| 2026-07-24 | 101 GWh |
| 2026-07-25 | 89.4 GWh |
| 2026-07-26 | 88.2 GWh |
| 2026-07-27 | 107 GWh |
| 2026-07-28 | 105 GWh |
| 2026-07-29 | 110 GWh |
| 2026-07-30 | 115 GWh |
| 2026-07-31 | 120 GWh |
| 2026-08-01 | 110 GWh |
| 2026-08-02 | 107 GWh |
| 2026-08-03 | 122 GWh |
| 2026-08-04 | 126 GWh |
| 2026-08-05 | 128 GWh |
| 2026-08-06 | 130 GWh |
| 2026-08-07 | 126 GWh |
| 2026-08-08 | 106 GWh |
| 2026-08-09 | 96.2 GWh |
| 2026-08-10 | 112 GWh |
| 2026-08-11 | 122 GWh |
| 2026-08-12 | 108 GWh |
| 2026-08-13 | 106 GWh |
| 2026-08-14 | 106 GWh |
| 2026-08-15 | 98.7 GWh |
| 2026-08-16 | 97.2 GWh |
| 2026-08-17 | 114 GWh |
| 2026-08-18 | 104 GWh |
| 2026-08-19 | 106 GWh |
| 2026-08-20 | 96.9 GWh |
| 2026-08-21 | 104 GWh |
| 2026-08-22 | 93.9 GWh |
| 2026-08-23 | 90.4 GWh |
| 2026-08-24 | 105 GWh |
| 2026-08-25 | 117 GWh |
| 2026-08-26 | 116 GWh |
| 2026-08-27 | 116 GWh |
| 2026-08-28 | 115 GWh |
| 2026-08-29 | 109 GWh |
| 2026-08-30 | 101 GWh |
| 2026-08-31 | 119 GWh |
| 2026-09-01 | 116 GWh |
| 2026-09-02 | 115 GWh |
| 2026-09-03 | 116 GWh |
| 2026-09-04 | 116 GWh |
| 2026-09-05 | 107 GWh |
| 2026-09-06 | 92.6 GWh |
| 2026-09-07 | 106 GWh |
| 2026-09-08 | 114 GWh |
| 2026-09-09 | 116 GWh |
| 2026-09-10 | 119 GWh |
| 2026-09-11 | 121 GWh |
| 2026-09-12 | 98.6 GWh |
| 2026-09-13 | 93.9 GWh |
| 2026-09-14 | 115 GWh |
| 2026-09-15 | 111 GWh |
| 2026-09-16 | 110 GWh |
| 2026-09-17 | 115 GWh |
| 2026-09-18 | 110 GWh |
| 2026-09-19 | 98.9 GWh |
| 2026-09-20 | 93.7 GWh |
| 2026-09-21 | 106 GWh |
| 2026-09-22 | 112 GWh |
| 2026-09-23 | 112 GWh |
| 2026-09-24 | 119 GWh |
| 2026-09-25 | 114 GWh |
| 2026-09-26 | 99.6 GWh |
| 2026-09-27 | 95.9 GWh |
| 2026-09-28 | 107 GWh |
| 2026-09-29 | 111 GWh |
| 2026-09-30 | 112 GWh |
| 2026-10-01 | 112 GWh |
| 2026-10-02 | 111 GWh |
| 2026-10-03 | 99.7 GWh |
| 2026-10-04 | 96.0 GWh |
| 2026-10-05 | 111 GWh |
| 2026-10-06 | 113 GWh |
| 2026-10-07 | 114 GWh |
| 2026-10-08 | 120 GWh |
| 2026-10-09 | 118 GWh |
| 2026-10-10 | 108 GWh |
| 2026-10-11 | 103 GWh |
| 2026-10-12 | 114 GWh |
| 2026-10-13 | 114 GWh |
| 2026-10-14 | 123 GWh |
| 2026-10-15 | 127 GWh |
| 2026-10-16 | 118 GWh |
| 2026-10-17 | 112 GWh |
| 2026-10-18 | 104 GWh |
| 2026-10-19 | 117 GWh |
| 2026-10-20 | 124 GWh |
| 2026-10-21 | 119 GWh |
| 2026-10-22 | 126 GWh |
| 2026-10-23 | 104 GWh |
| 2026-10-24 | 110 GWh |
| 2026-10-25 | 111 GWh |
| 2026-10-26 | 122 GWh |
| 2026-10-27 | 124 GWh |
| 2026-10-28 | 124 GWh |
| 2026-10-29 | 130 GWh |
| 2026-10-30 | 129 GWh |
| 2026-10-31 | 118 GWh |
| 2026-11-01 | 109 GWh |
| 2026-11-02 | 132 GWh |
| 2026-11-03 | 138 GWh |
| 2026-11-04 | 133 GWh |
| 2026-11-05 | 133 GWh |
| 2026-11-06 | 134 GWh |
| 2026-11-07 | 124 GWh |
| 2026-11-08 | 122 GWh |
| 2026-11-09 | 141 GWh |
| 2026-11-10 | 148 GWh |
| 2026-11-11 | 145 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11. Daily totals are summed by World Power Monitor from complete Europe/Budapest local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 37.1 TWh | 28.4 TWh | Nuclear 41.6% | 315 |
| 2025 | 43.2 TWh | 33.6 TWh | Nuclear 45.3% | 365 |
| 2024 | 43.4 TWh | 32.3 TWh | Nuclear 46.9% | 366 |
| 2023 | 42.0 TWh | 30.9 TWh | Nuclear 48.7% | 365 |
| 2022 | 43.4 TWh | 31.4 TWh | Nuclear 47.6% | 365 |
| 2021 | 44.5 TWh | 31.1 TWh | Nuclear 48.4% | 365 |
| 2020 | 42.9 TWh | 30.3 TWh | Nuclear 49.5% | 366 |
| 2019 | 43.5 TWh | 29.2 TWh | Nuclear 52.2% | 365 |
| 2018 | 43.3 TWh | 28.0 TWh | Nuclear 52.8% | 365 |
| 2017 | 43.0 TWh | 28.8 TWh | Nuclear 52.6% | 365 |
| 2016 | 41.9 TWh | 27.8 TWh | Nuclear 54.4% | 366 |
| 2015 (partial) | 41.2 TWh | 26.8 TWh | Nuclear 55.1% | 362 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Power Flows With Neighbours
Net totals, 2026-10-13 (13 October 2026) to 2026-11-11 (11 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Slovakia | Hungary imports | 1.27 TWh |
| Austria | Hungary imports | 614 GWh |
| Croatia | Hungary exports | 344 GWh |
| Romania | Hungary exports | 285 GWh |
| Serbia | Hungary exports | 107 GWh |
| Slovenia | Hungary exports | 36.6 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Latest Grid Alerts
Newest alert 3 November 2026- Net imports Net imports into Hungary reached 47.8 GWh on 3 November 2026 (35% of demand), the 3rd highest daily net imports in 391 days of loaded history. All alerts that day
- Net imports Hungary imported a net 50.5 GWh on 30 October 2026, the 2nd highest daily net imports in 387 days of loaded history and 39% of its demand that day. All alerts that day
- Net imports Hungary imported a net 47.4 GWh on 29 October 2026, the 3rd highest daily net imports in 386 days of loaded history and 36% of its demand that day. All alerts that day
Follow this grid: RSS feed of Hungary alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-11-12 (12 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Hungary, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Hungary Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/hu/
World Power Monitor. Hungary Electricity Demand and Generation Mix. Data as of 2026-11-12 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/hu/
@misc{wpm_zones_hu_2026,
title = {{Hungary Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/hu/}
} Permalink: https://worldpowermonitor.com/zones/hu/
The Copy buttons add today's date as the access date.