Poland demand was 23,038 MW in the hour starting 12 Nov 2026, 13:00 CET (UTC+01:00). Coal was the largest source in the hour starting 12 Nov 2026, 13:00 CET (UTC+01:00), at 61% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Poland is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 12 Nov 2026, 13:00 CET (UTC+01:00), demand in Poland was 23,038 MW, against a day-ahead forecast of 23,400 MW.
- Coal supplied 61.0% of Poland's generation in the hour starting 12 Nov 2026, 13:00 CET (UTC+01:00).
- The day-ahead price in Poland averaged EUR 126.41/MWh for delivery on 2026-11-13 (13 November 2026).
- Installed generating capacity in Poland was 68.3 GW in 2026, as reported to ENTSO-E.
- Demand in Poland totalled 158 TWh in 2025.
- Coal supplied 53.4% of Poland's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 12 Nov 2026, 13:00 CET (UTC+01:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T12:00:00Z.
Generation by Source
Latest hour with generation by source: 12 Nov 2026, 13:00 CET (UTC+01:00)| Source | Output | Share |
|---|---|---|
| Coal | 12,840 MW | 61.0% |
| Gas | 2,631 MW | 12.5% |
| Solar | 1,966 MW | 9.3% |
| Wind | 1,632 MW | 7.7% |
| Storage | 756 MW | 3.6% |
| Other | 455 MW | 2.2% |
| Bioenergy | 346 MW | 1.6% |
| Oil | 191 MW | 0.9% |
| Hydro | 126 MW | 0.6% |
| Other renewables | 121 MW | 0.6% |
| Total from these sources | 21,065 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T12:00:00Z.
Day-Ahead Price
Delivery day 2026-11-13 (13 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Poland and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-13.
Last 30 Days, Hourly
Times in UTCShow the data table (686 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-14T23:00Z | 15,763 MW |
| 2026-10-15T00:00Z | 15,414 MW |
| 2026-10-15T01:00Z | 15,511 MW |
| 2026-10-15T02:00Z | 15,881 MW |
| 2026-10-15T03:00Z | 17,039 MW |
| 2026-10-15T04:00Z | 19,674 MW |
| 2026-10-15T05:00Z | 21,233 MW |
| 2026-10-15T06:00Z | 21,853 MW |
| 2026-10-15T07:00Z | 21,630 MW |
| 2026-10-15T08:00Z | 21,467 MW |
| 2026-10-15T09:00Z | 21,709 MW |
| 2026-10-15T10:00Z | 21,332 MW |
| 2026-10-15T11:00Z | 21,048 MW |
| 2026-10-15T12:00Z | 21,221 MW |
| 2026-10-15T13:00Z | 21,610 MW |
| 2026-10-15T14:00Z | 21,827 MW |
| 2026-10-15T15:00Z | 21,703 MW |
| 2026-10-15T16:00Z | 22,381 MW |
| 2026-10-15T17:00Z | 22,552 MW |
| 2026-10-15T18:00Z | 21,892 MW |
| 2026-10-15T19:00Z | 20,229 MW |
| 2026-10-15T20:00Z | 18,801 MW |
| 2026-10-15T21:00Z | 17,418 MW |
| 2026-10-15T22:00Z | 16,488 MW |
| 2026-10-15T23:00Z | 15,903 MW |
| 2026-10-16T00:00Z | 15,619 MW |
| 2026-10-16T01:00Z | 15,640 MW |
| 2026-10-16T02:00Z | 16,141 MW |
| 2026-10-16T03:00Z | 17,138 MW |
| 2026-10-16T04:00Z | 19,805 MW |
| 2026-10-16T05:00Z | 20,948 MW |
| 2026-10-16T06:00Z | 21,428 MW |
| 2026-10-16T07:00Z | 21,281 MW |
| 2026-10-16T08:00Z | 20,170 MW |
| 2026-10-16T09:00Z | 19,759 MW |
| 2026-10-16T10:00Z | 20,166 MW |
| 2026-10-16T11:00Z | 20,259 MW |
| 2026-10-16T12:00Z | 20,420 MW |
| 2026-10-16T13:00Z | 20,613 MW |
| 2026-10-16T14:00Z | 21,303 MW |
| 2026-10-16T15:00Z | 21,117 MW |
| 2026-10-16T16:00Z | 21,579 MW |
| 2026-10-16T17:00Z | 21,597 MW |
| 2026-10-16T18:00Z | 21,170 MW |
| 2026-10-16T19:00Z | 19,627 MW |
| 2026-10-16T20:00Z | 18,289 MW |
| 2026-10-16T21:00Z | 17,260 MW |
| 2026-10-16T22:00Z | 16,496 MW |
| 2026-10-16T23:00Z | 15,765 MW |
| 2026-10-17T00:00Z | 15,494 MW |
| 2026-10-17T01:00Z | 15,389 MW |
| 2026-10-17T02:00Z | 15,547 MW |
| 2026-10-17T03:00Z | 15,907 MW |
| 2026-10-17T04:00Z | 16,996 MW |
| 2026-10-17T05:00Z | 17,848 MW |
| 2026-10-17T06:00Z | 18,686 MW |
| 2026-10-17T07:00Z | 19,094 MW |
| 2026-10-17T08:00Z | 18,490 MW |
| 2026-10-17T09:00Z | 18,304 MW |
| 2026-10-17T10:00Z | 18,486 MW |
| 2026-10-17T11:00Z | 18,675 MW |
| 2026-10-17T12:00Z | 18,471 MW |
| 2026-10-17T13:00Z | 18,572 MW |
| 2026-10-17T14:00Z | 18,911 MW |
| 2026-10-17T15:00Z | 18,985 MW |
| 2026-10-17T16:00Z | 19,559 MW |
| 2026-10-17T17:00Z | 19,482 MW |
| 2026-10-17T18:00Z | 18,912 MW |
| 2026-10-17T19:00Z | 17,850 MW |
| 2026-10-17T20:00Z | 16,835 MW |
| 2026-10-17T21:00Z | 15,618 MW |
| 2026-10-17T22:00Z | 14,725 MW |
| 2026-10-17T23:00Z | 14,146 MW |
| 2026-10-18T00:00Z | 13,789 MW |
| 2026-10-18T01:00Z | 13,579 MW |
| 2026-10-18T02:00Z | 13,749 MW |
| 2026-10-18T03:00Z | 13,955 MW |
| 2026-10-18T04:00Z | 14,480 MW |
| 2026-10-18T05:00Z | 14,884 MW |
| 2026-10-18T06:00Z | 15,806 MW |
| 2026-10-18T07:00Z | 16,255 MW |
| 2026-10-18T08:00Z | 16,214 MW |
| 2026-10-18T09:00Z | 16,128 MW |
| 2026-10-18T10:00Z | 16,193 MW |
| 2026-10-18T11:00Z | 16,215 MW |
| 2026-10-18T12:00Z | 16,169 MW |
| 2026-10-18T13:00Z | 16,424 MW |
| 2026-10-18T14:00Z | 17,105 MW |
| 2026-10-18T15:00Z | 17,612 MW |
| 2026-10-18T16:00Z | 18,308 MW |
| 2026-10-18T17:00Z | 18,658 MW |
| 2026-10-18T18:00Z | 18,170 MW |
| 2026-10-18T19:00Z | 17,164 MW |
| 2026-10-18T20:00Z | 16,438 MW |
| 2026-10-18T21:00Z | 15,356 MW |
| 2026-10-18T22:00Z | 14,687 MW |
| 2026-10-18T23:00Z | 14,167 MW |
| 2026-10-19T00:00Z | 14,052 MW |
| 2026-10-19T01:00Z | 14,084 MW |
| 2026-10-19T02:00Z | 14,550 MW |
| 2026-10-19T03:00Z | 16,008 MW |
| 2026-10-19T04:00Z | 19,216 MW |
| 2026-10-19T05:00Z | 21,048 MW |
| 2026-10-19T06:00Z | 22,164 MW |
| 2026-10-19T07:00Z | 22,719 MW |
| 2026-10-19T08:00Z | 22,203 MW |
| 2026-10-19T09:00Z | 22,519 MW |
| 2026-10-19T10:00Z | 22,735 MW |
| 2026-10-19T11:00Z | 22,538 MW |
| 2026-10-19T12:00Z | 22,096 MW |
| 2026-10-19T13:00Z | 22,509 MW |
| 2026-10-19T14:00Z | 22,514 MW |
| 2026-10-19T15:00Z | 22,301 MW |
| 2026-10-19T16:00Z | 22,942 MW |
| 2026-10-19T17:00Z | 22,743 MW |
| 2026-10-19T18:00Z | 22,130 MW |
| 2026-10-19T19:00Z | 20,506 MW |
| 2026-10-19T20:00Z | 18,948 MW |
| 2026-10-19T21:00Z | 17,721 MW |
| 2026-10-19T22:00Z | 16,795 MW |
| 2026-10-19T23:00Z | 16,184 MW |
| 2026-10-20T00:00Z | 15,884 MW |
| 2026-10-20T01:00Z | 15,931 MW |
| 2026-10-20T02:00Z | 16,361 MW |
| 2026-10-20T03:00Z | 17,382 MW |
| 2026-10-20T04:00Z | 20,278 MW |
| 2026-10-20T05:00Z | 21,831 MW |
| 2026-10-20T06:00Z | 22,668 MW |
| 2026-10-20T07:00Z | 22,967 MW |
| 2026-10-20T08:00Z | 23,001 MW |
| 2026-10-20T09:00Z | 23,203 MW |
| 2026-10-20T10:00Z | 23,388 MW |
| 2026-10-20T11:00Z | 22,869 MW |
| 2026-10-20T12:00Z | 22,565 MW |
| 2026-10-20T13:00Z | 22,466 MW |
| 2026-10-20T14:00Z | 22,164 MW |
| 2026-10-20T15:00Z | 22,237 MW |
| 2026-10-20T16:00Z | 22,820 MW |
| 2026-10-20T17:00Z | 22,770 MW |
| 2026-10-20T18:00Z | 22,042 MW |
| 2026-10-20T19:00Z | 20,232 MW |
| 2026-10-20T20:00Z | 18,735 MW |
| 2026-10-20T21:00Z | 17,366 MW |
| 2026-10-20T22:00Z | 16,486 MW |
| 2026-10-20T23:00Z | 15,841 MW |
| 2026-10-21T00:00Z | 15,628 MW |
| 2026-10-21T01:00Z | 15,695 MW |
| 2026-10-21T02:00Z | 16,115 MW |
| 2026-10-21T03:00Z | 17,210 MW |
| 2026-10-21T04:00Z | 19,872 MW |
| 2026-10-21T05:00Z | 21,246 MW |
| 2026-10-21T06:00Z | 21,611 MW |
| 2026-10-21T07:00Z | 21,431 MW |
| 2026-10-21T08:00Z | 20,928 MW |
| 2026-10-21T09:00Z | 20,401 MW |
| 2026-10-21T10:00Z | 20,140 MW |
| 2026-10-21T11:00Z | 20,186 MW |
| 2026-10-21T12:00Z | 20,492 MW |
| 2026-10-21T13:00Z | 21,157 MW |
| 2026-10-21T14:00Z | 21,407 MW |
| 2026-10-21T15:00Z | 21,433 MW |
| 2026-10-21T16:00Z | 22,173 MW |
| 2026-10-21T17:00Z | 22,174 MW |
| 2026-10-21T18:00Z | 21,532 MW |
| 2026-10-21T19:00Z | 20,026 MW |
| 2026-10-21T20:00Z | 18,617 MW |
| 2026-10-21T21:00Z | 17,236 MW |
| 2026-10-21T22:00Z | 16,456 MW |
| 2026-10-21T23:00Z | 16,035 MW |
| 2026-10-22T00:00Z | 15,634 MW |
| 2026-10-22T01:00Z | 15,668 MW |
| 2026-10-22T02:00Z | 16,037 MW |
| 2026-10-22T03:00Z | 17,077 MW |
| 2026-10-22T04:00Z | 19,916 MW |
| 2026-10-22T05:00Z | 21,452 MW |
| 2026-10-22T06:00Z | 22,269 MW |
| 2026-10-22T07:00Z | 22,583 MW |
| 2026-10-22T08:00Z | 22,642 MW |
| 2026-10-22T09:00Z | 22,963 MW |
| 2026-10-22T10:00Z | 23,008 MW |
| 2026-10-22T11:00Z | 22,801 MW |
| 2026-10-22T12:00Z | 22,481 MW |
| 2026-10-22T13:00Z | 22,481 MW |
| 2026-10-22T14:00Z | 22,321 MW |
| 2026-10-22T15:00Z | 22,528 MW |
| 2026-10-22T16:00Z | 22,880 MW |
| 2026-10-22T17:00Z | 22,746 MW |
| 2026-10-22T18:00Z | 22,313 MW |
| 2026-10-22T19:00Z | 20,586 MW |
| 2026-10-22T20:00Z | 19,085 MW |
| 2026-10-22T21:00Z | 17,740 MW |
| 2026-10-22T22:00Z | 16,885 MW |
| 2026-10-22T23:00Z | 16,314 MW |
| 2026-10-23T00:00Z | 16,004 MW |
| 2026-10-23T01:00Z | 16,004 MW |
| 2026-10-23T02:00Z | 16,359 MW |
| 2026-10-23T03:00Z | 17,543 MW |
| 2026-10-23T04:00Z | 20,315 MW |
| 2026-10-23T05:00Z | 21,581 MW |
| 2026-10-23T06:00Z | 21,882 MW |
| 2026-10-23T07:00Z | 21,497 MW |
| 2026-10-23T08:00Z | 20,534 MW |
| 2026-10-23T09:00Z | 20,135 MW |
| 2026-10-23T10:00Z | 20,143 MW |
| 2026-10-23T11:00Z | 20,374 MW |
| 2026-10-23T12:00Z | 20,583 MW |
| 2026-10-23T13:00Z | 21,378 MW |
| 2026-10-23T14:00Z | 21,678 MW |
| 2026-10-23T15:00Z | 21,523 MW |
| 2026-10-23T16:00Z | 21,906 MW |
| 2026-10-23T17:00Z | 22,062 MW |
| 2026-10-23T18:00Z | 21,399 MW |
| 2026-10-23T19:00Z | 19,754 MW |
| 2026-10-23T20:00Z | 18,498 MW |
| 2026-10-23T21:00Z | 17,195 MW |
| 2026-10-23T22:00Z | 16,307 MW |
| 2026-10-23T23:00Z | 15,627 MW |
| 2026-10-24T00:00Z | 15,195 MW |
| 2026-10-24T01:00Z | 15,103 MW |
| 2026-10-24T02:00Z | 15,280 MW |
| 2026-10-24T03:00Z | 15,660 MW |
| 2026-10-24T04:00Z | 16,723 MW |
| 2026-10-24T05:00Z | 17,447 MW |
| 2026-10-24T06:00Z | 18,549 MW |
| 2026-10-24T07:00Z | 19,342 MW |
| 2026-10-24T08:00Z | 19,480 MW |
| 2026-10-24T09:00Z | 19,843 MW |
| 2026-10-24T10:00Z | 19,364 MW |
| 2026-10-24T11:00Z | 18,952 MW |
| 2026-10-24T12:00Z | 18,882 MW |
| 2026-10-24T13:00Z | 18,698 MW |
| 2026-10-24T14:00Z | 18,745 MW |
| 2026-10-24T15:00Z | 18,969 MW |
| 2026-10-24T16:00Z | 19,463 MW |
| 2026-10-24T17:00Z | 19,417 MW |
| 2026-10-24T18:00Z | 18,729 MW |
| 2026-10-24T19:00Z | 17,737 MW |
| 2026-10-24T20:00Z | 16,798 MW |
| 2026-10-24T21:00Z | 15,663 MW |
| 2026-10-24T22:00Z | 14,879 MW |
| 2026-10-24T23:00Z | 14,216 MW |
| 2026-10-25T00:00Z | 13,677 MW |
| 2026-10-25T01:00Z | 13,407 MW |
| 2026-10-25T02:00Z | 13,577 MW |
| 2026-10-25T03:00Z | 13,681 MW |
| 2026-10-25T04:00Z | 13,893 MW |
| 2026-10-25T05:00Z | 14,140 MW |
| 2026-10-25T06:00Z | 14,850 MW |
| 2026-10-25T07:00Z | 16,070 MW |
| 2026-10-25T08:00Z | 16,147 MW |
| 2026-10-25T09:00Z | 16,295 MW |
| 2026-10-25T10:00Z | 16,791 MW |
| 2026-10-25T11:00Z | 17,200 MW |
| 2026-10-25T12:00Z | 17,471 MW |
| 2026-10-25T13:00Z | 17,454 MW |
| 2026-10-25T14:00Z | 17,437 MW |
| 2026-10-25T15:00Z | 17,769 MW |
| 2026-10-25T16:00Z | 18,272 MW |
| 2026-10-25T17:00Z | 18,484 MW |
| 2026-10-25T18:00Z | 18,396 MW |
| 2026-10-25T19:00Z | 17,888 MW |
| 2026-10-25T20:00Z | 16,976 MW |
| 2026-10-25T21:00Z | 16,042 MW |
| 2026-10-25T22:00Z | 15,025 MW |
| 2026-10-25T23:00Z | 14,412 MW |
| 2026-10-26T00:00Z | 13,936 MW |
| 2026-10-26T01:00Z | 13,952 MW |
| 2026-10-26T02:00Z | 14,055 MW |
| 2026-10-26T03:00Z | 14,604 MW |
| 2026-10-26T04:00Z | 16,103 MW |
| 2026-10-26T05:00Z | 19,085 MW |
| 2026-10-26T06:00Z | 21,024 MW |
| 2026-10-26T07:00Z | 21,818 MW |
| 2026-10-26T08:00Z | 21,715 MW |
| 2026-10-26T09:00Z | 21,272 MW |
| 2026-10-26T10:00Z | 21,801 MW |
| 2026-10-26T11:00Z | 21,759 MW |
| 2026-10-26T12:00Z | 21,672 MW |
| 2026-10-26T13:00Z | 21,833 MW |
| 2026-10-26T14:00Z | 21,782 MW |
| 2026-10-26T15:00Z | 22,082 MW |
| 2026-10-26T16:00Z | 22,642 MW |
| 2026-10-26T17:00Z | 22,691 MW |
| 2026-10-26T18:00Z | 22,456 MW |
| 2026-10-26T19:00Z | 21,805 MW |
| 2026-10-26T20:00Z | 20,244 MW |
| 2026-10-26T21:00Z | 18,805 MW |
| 2026-10-26T22:00Z | 17,680 MW |
| 2026-10-26T23:00Z | 16,948 MW |
| 2026-10-27T00:00Z | 16,447 MW |
| 2026-10-27T01:00Z | 16,369 MW |
| 2026-10-27T02:00Z | 16,515 MW |
| 2026-10-27T03:00Z | 16,918 MW |
| 2026-10-27T04:00Z | 18,102 MW |
| 2026-10-27T05:00Z | 20,508 MW |
| 2026-10-27T06:00Z | 21,492 MW |
| 2026-10-27T07:00Z | 21,705 MW |
| 2026-10-27T08:00Z | 21,511 MW |
| 2026-10-27T09:00Z | 20,756 MW |
| 2026-10-27T10:00Z | 20,650 MW |
| 2026-10-27T11:00Z | 20,848 MW |
| 2026-10-27T12:00Z | 21,096 MW |
| 2026-10-27T13:00Z | 21,601 MW |
| 2026-10-27T14:00Z | 21,963 MW |
| 2026-10-27T15:00Z | 21,976 MW |
| 2026-10-27T16:00Z | 22,671 MW |
| 2026-10-27T17:00Z | 22,658 MW |
| 2026-10-27T18:00Z | 22,695 MW |
| 2026-10-27T19:00Z | 22,054 MW |
| 2026-10-27T20:00Z | 20,407 MW |
| 2026-10-27T21:00Z | 18,901 MW |
| 2026-10-27T22:00Z | 17,658 MW |
| 2026-10-27T23:00Z | 16,830 MW |
| 2026-10-28T00:00Z | 16,372 MW |
| 2026-10-28T01:00Z | 16,095 MW |
| 2026-10-28T02:00Z | 16,141 MW |
| 2026-10-28T03:00Z | 16,683 MW |
| 2026-10-28T04:00Z | 17,900 MW |
| 2026-10-28T05:00Z | 20,193 MW |
| 2026-10-28T06:00Z | 21,926 MW |
| 2026-10-28T07:00Z | 22,809 MW |
| 2026-10-28T08:00Z | 22,799 MW |
| 2026-10-28T09:00Z | 22,514 MW |
| 2026-10-28T10:00Z | 22,703 MW |
| 2026-10-28T11:00Z | 22,831 MW |
| 2026-10-28T12:00Z | 22,548 MW |
| 2026-10-28T13:00Z | 22,471 MW |
| 2026-10-28T14:00Z | 22,540 MW |
| 2026-10-28T15:00Z | 22,720 MW |
| 2026-10-28T16:00Z | 23,154 MW |
| 2026-10-28T17:00Z | 22,982 MW |
| 2026-10-28T18:00Z | 22,660 MW |
| 2026-10-28T19:00Z | 22,110 MW |
| 2026-10-28T20:00Z | 20,434 MW |
| 2026-10-28T21:00Z | 18,908 MW |
| 2026-10-28T22:00Z | 17,639 MW |
| 2026-10-28T23:00Z | 16,692 MW |
| 2026-10-29T00:00Z | 16,136 MW |
| 2026-10-29T01:00Z | 15,901 MW |
| 2026-10-29T02:00Z | 15,944 MW |
| 2026-10-29T03:00Z | 16,363 MW |
| 2026-10-29T04:00Z | 17,502 MW |
| 2026-10-29T05:00Z | 19,955 MW |
| 2026-10-29T06:00Z | 21,488 MW |
| 2026-10-29T07:00Z | 22,378 MW |
| 2026-10-29T08:00Z | 22,612 MW |
| 2026-10-29T09:00Z | 22,707 MW |
| 2026-10-29T10:00Z | 22,810 MW |
| 2026-10-29T11:00Z | 22,953 MW |
| 2026-10-29T12:00Z | 22,906 MW |
| 2026-10-29T13:00Z | 22,667 MW |
| 2026-10-29T14:00Z | 22,650 MW |
| 2026-10-29T15:00Z | 22,855 MW |
| 2026-10-29T16:00Z | 23,046 MW |
| 2026-10-29T17:00Z | 22,812 MW |
| 2026-10-29T18:00Z | 22,685 MW |
| 2026-10-29T19:00Z | 22,003 MW |
| 2026-10-29T20:00Z | 20,490 MW |
| 2026-10-29T21:00Z | 18,957 MW |
| 2026-10-29T22:00Z | 17,608 MW |
| 2026-10-29T23:00Z | 16,772 MW |
| 2026-10-30T00:00Z | 16,207 MW |
| 2026-10-30T01:00Z | 16,024 MW |
| 2026-10-30T02:00Z | 16,015 MW |
| 2026-10-30T03:00Z | 16,382 MW |
| 2026-10-30T04:00Z | 17,585 MW |
| 2026-10-30T05:00Z | 19,898 MW |
| 2026-10-30T06:00Z | 21,551 MW |
| 2026-10-30T07:00Z | 22,053 MW |
| 2026-10-30T08:00Z | 22,089 MW |
| 2026-10-30T09:00Z | 22,113 MW |
| 2026-10-30T10:00Z | 22,336 MW |
| 2026-10-30T11:00Z | 22,575 MW |
| 2026-10-30T12:00Z | 22,490 MW |
| 2026-10-30T13:00Z | 22,254 MW |
| 2026-10-30T14:00Z | 22,216 MW |
| 2026-10-30T15:00Z | 22,556 MW |
| 2026-10-30T16:00Z | 22,721 MW |
| 2026-10-30T17:00Z | 22,472 MW |
| 2026-10-30T18:00Z | 22,220 MW |
| 2026-10-30T19:00Z | 21,483 MW |
| 2026-10-30T20:00Z | 19,952 MW |
| 2026-10-30T21:00Z | 18,555 MW |
| 2026-10-30T22:00Z | 17,266 MW |
| 2026-10-30T23:00Z | 16,330 MW |
| 2026-10-31T00:00Z | 15,609 MW |
| 2026-10-31T01:00Z | 15,339 MW |
| 2026-10-31T02:00Z | 15,169 MW |
| 2026-10-31T03:00Z | 15,212 MW |
| 2026-10-31T04:00Z | 15,356 MW |
| 2026-10-31T05:00Z | 16,043 MW |
| 2026-10-31T06:00Z | 17,084 MW |
| 2026-10-31T07:00Z | 18,283 MW |
| 2026-10-31T08:00Z | 19,216 MW |
| 2026-10-31T09:00Z | 19,125 MW |
| 2026-10-31T10:00Z | 19,353 MW |
| 2026-10-31T11:00Z | 19,495 MW |
| 2026-10-31T12:00Z | 19,441 MW |
| 2026-10-31T13:00Z | 19,355 MW |
| 2026-10-31T14:00Z | 19,229 MW |
| 2026-10-31T15:00Z | 19,538 MW |
| 2026-10-31T16:00Z | 19,710 MW |
| 2026-10-31T17:00Z | 19,370 MW |
| 2026-10-31T18:00Z | 19,224 MW |
| 2026-10-31T19:00Z | 18,648 MW |
| 2026-10-31T20:00Z | 17,542 MW |
| 2026-10-31T21:00Z | 16,473 MW |
| 2026-10-31T22:00Z | 15,148 MW |
| 2026-10-31T23:00Z | 14,195 MW |
| 2026-11-01T00:00Z | 13,637 MW |
| 2026-11-01T01:00Z | 13,262 MW |
| 2026-11-01T02:00Z | 13,166 MW |
| 2026-11-01T03:00Z | 13,205 MW |
| 2026-11-01T04:00Z | 13,433 MW |
| 2026-11-01T05:00Z | 13,721 MW |
| 2026-11-01T06:00Z | 14,691 MW |
| 2026-11-01T07:00Z | 15,589 MW |
| 2026-11-01T08:00Z | 16,195 MW |
| 2026-11-01T09:00Z | 16,208 MW |
| 2026-11-01T10:00Z | 16,381 MW |
| 2026-11-01T11:00Z | 16,217 MW |
| 2026-11-01T12:00Z | 16,559 MW |
| 2026-11-01T13:00Z | 16,436 MW |
| 2026-11-01T14:00Z | 16,531 MW |
| 2026-11-01T15:00Z | 16,838 MW |
| 2026-11-01T16:00Z | 17,248 MW |
| 2026-11-01T17:00Z | 17,473 MW |
| 2026-11-01T18:00Z | 17,626 MW |
| 2026-11-01T19:00Z | 17,264 MW |
| 2026-11-01T20:00Z | 16,523 MW |
| 2026-11-01T21:00Z | 15,770 MW |
| 2026-11-01T22:00Z | 14,769 MW |
| 2026-11-01T23:00Z | 14,089 MW |
| 2026-11-02T00:00Z | 13,594 MW |
| 2026-11-02T01:00Z | 13,530 MW |
| 2026-11-02T02:00Z | 13,530 MW |
| 2026-11-02T03:00Z | 13,998 MW |
| 2026-11-02T04:00Z | 15,523 MW |
| 2026-11-02T05:00Z | 18,629 MW |
| 2026-11-02T06:00Z | 20,662 MW |
| 2026-11-02T07:00Z | 21,890 MW |
| 2026-11-02T08:00Z | 22,383 MW |
| 2026-11-02T09:00Z | 22,487 MW |
| 2026-11-02T10:00Z | 22,711 MW |
| 2026-11-02T11:00Z | 22,831 MW |
| 2026-11-02T12:00Z | 22,860 MW |
| 2026-11-02T13:00Z | 22,527 MW |
| 2026-11-02T14:00Z | 22,366 MW |
| 2026-11-02T15:00Z | 22,685 MW |
| 2026-11-02T16:00Z | 22,738 MW |
| 2026-11-02T17:00Z | 22,607 MW |
| 2026-11-02T18:00Z | 22,462 MW |
| 2026-11-02T19:00Z | 21,831 MW |
| 2026-11-02T20:00Z | 20,255 MW |
| 2026-11-02T21:00Z | 18,775 MW |
| 2026-11-02T22:00Z | 17,498 MW |
| 2026-11-02T23:00Z | 16,741 MW |
| 2026-11-03T00:00Z | 16,241 MW |
| 2026-11-03T01:00Z | 16,150 MW |
| 2026-11-03T02:00Z | 16,194 MW |
| 2026-11-03T03:00Z | 16,587 MW |
| 2026-11-03T04:00Z | 17,673 MW |
| 2026-11-03T05:00Z | 20,281 MW |
| 2026-11-03T06:00Z | 21,861 MW |
| 2026-11-03T07:00Z | 22,761 MW |
| 2026-11-03T08:00Z | 22,991 MW |
| 2026-11-03T09:00Z | 22,840 MW |
| 2026-11-03T10:00Z | 23,254 MW |
| 2026-11-03T11:00Z | 23,685 MW |
| 2026-11-03T12:00Z | 23,434 MW |
| 2026-11-03T13:00Z | 23,003 MW |
| 2026-11-03T14:00Z | 22,974 MW |
| 2026-11-03T15:00Z | 23,345 MW |
| 2026-11-03T16:00Z | 23,476 MW |
| 2026-11-03T17:00Z | 23,380 MW |
| 2026-11-03T18:00Z | 23,172 MW |
| 2026-11-03T19:00Z | 22,368 MW |
| 2026-11-03T20:00Z | 20,787 MW |
| 2026-11-03T21:00Z | 19,266 MW |
| 2026-11-03T22:00Z | 17,946 MW |
| 2026-11-03T23:00Z | 16,955 MW |
| 2026-11-04T00:00Z | 16,528 MW |
| 2026-11-04T01:00Z | 16,306 MW |
| 2026-11-04T02:00Z | 16,334 MW |
| 2026-11-04T03:00Z | 16,681 MW |
| 2026-11-04T04:00Z | 17,896 MW |
| 2026-11-04T05:00Z | 20,330 MW |
| 2026-11-04T06:00Z | 22,043 MW |
| 2026-11-04T07:00Z | 22,567 MW |
| 2026-11-04T08:00Z | 21,877 MW |
| 2026-11-04T09:00Z | 22,204 MW |
| 2026-11-04T10:00Z | 22,649 MW |
| 2026-11-04T11:00Z | 22,741 MW |
| 2026-11-04T12:00Z | 22,864 MW |
| 2026-11-04T13:00Z | 22,804 MW |
| 2026-11-04T14:00Z | 22,844 MW |
| 2026-11-04T15:00Z | 23,164 MW |
| 2026-11-04T16:00Z | 23,528 MW |
| 2026-11-04T17:00Z | 23,330 MW |
| 2026-11-04T18:00Z | 23,202 MW |
| 2026-11-04T19:00Z | 22,503 MW |
| 2026-11-04T20:00Z | 20,981 MW |
| 2026-11-04T21:00Z | 19,530 MW |
| 2026-11-04T22:00Z | 18,344 MW |
| 2026-11-04T23:00Z | 17,554 MW |
| 2026-11-05T00:00Z | 17,019 MW |
| 2026-11-05T01:00Z | 16,688 MW |
| 2026-11-05T02:00Z | 16,773 MW |
| 2026-11-05T03:00Z | 17,317 MW |
| 2026-11-05T04:00Z | 18,383 MW |
| 2026-11-05T05:00Z | 20,962 MW |
| 2026-11-05T06:00Z | 22,239 MW |
| 2026-11-05T07:00Z | 22,861 MW |
| 2026-11-05T08:00Z | 22,491 MW |
| 2026-11-05T09:00Z | 21,871 MW |
| 2026-11-05T10:00Z | 21,771 MW |
| 2026-11-05T11:00Z | 21,800 MW |
| 2026-11-05T12:00Z | 22,151 MW |
| 2026-11-05T13:00Z | 22,681 MW |
| 2026-11-05T14:00Z | 22,923 MW |
| 2026-11-05T15:00Z | 23,390 MW |
| 2026-11-05T16:00Z | 23,640 MW |
| 2026-11-05T17:00Z | 23,452 MW |
| 2026-11-05T18:00Z | 23,247 MW |
| 2026-11-05T19:00Z | 22,619 MW |
| 2026-11-05T20:00Z | 21,017 MW |
| 2026-11-05T21:00Z | 19,562 MW |
| 2026-11-05T22:00Z | 18,165 MW |
| 2026-11-05T23:00Z | 17,479 MW |
| 2026-11-06T00:00Z | 16,963 MW |
| 2026-11-06T01:00Z | 16,790 MW |
| 2026-11-06T02:00Z | 16,846 MW |
| 2026-11-06T03:00Z | 17,244 MW |
| 2026-11-06T04:00Z | 18,462 MW |
| 2026-11-06T05:00Z | 20,864 MW |
| 2026-11-06T06:00Z | 22,541 MW |
| 2026-11-06T07:00Z | 23,210 MW |
| 2026-11-06T08:00Z | 23,389 MW |
| 2026-11-06T09:00Z | 22,941 MW |
| 2026-11-06T10:00Z | 23,165 MW |
| 2026-11-06T11:00Z | 23,087 MW |
| 2026-11-06T12:00Z | 23,097 MW |
| 2026-11-06T13:00Z | 22,904 MW |
| 2026-11-06T14:00Z | 22,976 MW |
| 2026-11-06T15:00Z | 23,291 MW |
| 2026-11-06T16:00Z | 23,565 MW |
| 2026-11-06T17:00Z | 23,353 MW |
| 2026-11-06T18:00Z | 23,229 MW |
| 2026-11-06T19:00Z | 22,418 MW |
| 2026-11-06T20:00Z | 20,992 MW |
| 2026-11-06T21:00Z | 19,721 MW |
| 2026-11-06T22:00Z | 18,459 MW |
| 2026-11-06T23:00Z | 17,573 MW |
| 2026-11-07T00:00Z | 17,065 MW |
| 2026-11-07T01:00Z | 16,725 MW |
| 2026-11-07T02:00Z | 16,698 MW |
| 2026-11-07T03:00Z | 16,799 MW |
| 2026-11-07T04:00Z | 17,144 MW |
| 2026-11-07T05:00Z | 18,001 MW |
| 2026-11-07T06:00Z | 18,813 MW |
| 2026-11-07T07:00Z | 19,697 MW |
| 2026-11-07T08:00Z | 19,994 MW |
| 2026-11-07T09:00Z | 19,912 MW |
| 2026-11-07T10:00Z | 19,706 MW |
| 2026-11-07T11:00Z | 19,659 MW |
| 2026-11-07T12:00Z | 19,833 MW |
| 2026-11-07T13:00Z | 20,200 MW |
| 2026-11-07T14:00Z | 20,248 MW |
| 2026-11-07T15:00Z | 20,630 MW |
| 2026-11-07T16:00Z | 20,760 MW |
| 2026-11-07T17:00Z | 20,597 MW |
| 2026-11-07T18:00Z | 20,397 MW |
| 2026-11-07T19:00Z | 19,992 MW |
| 2026-11-07T20:00Z | 19,024 MW |
| 2026-11-07T21:00Z | 18,055 MW |
| 2026-11-07T22:00Z | 16,898 MW |
| 2026-11-07T23:00Z | 16,208 MW |
| 2026-11-08T00:00Z | 15,714 MW |
| 2026-11-08T01:00Z | 15,424 MW |
| 2026-11-08T02:00Z | 15,342 MW |
| 2026-11-08T03:00Z | 15,508 MW |
| 2026-11-08T04:00Z | 15,820 MW |
| 2026-11-08T05:00Z | 16,158 MW |
| 2026-11-08T06:00Z | 16,625 MW |
| 2026-11-08T07:00Z | 17,092 MW |
| 2026-11-08T08:00Z | 17,334 MW |
| 2026-11-08T09:00Z | 17,498 MW |
| 2026-11-08T10:00Z | 17,531 MW |
| 2026-11-08T11:00Z | 17,796 MW |
| 2026-11-08T12:00Z | 18,255 MW |
| 2026-11-08T13:00Z | 18,635 MW |
| 2026-11-08T14:00Z | 18,739 MW |
| 2026-11-08T15:00Z | 19,340 MW |
| 2026-11-08T16:00Z | 19,689 MW |
| 2026-11-08T17:00Z | 19,868 MW |
| 2026-11-08T18:00Z | 19,922 MW |
| 2026-11-08T19:00Z | 19,564 MW |
| 2026-11-08T20:00Z | 18,751 MW |
| 2026-11-08T21:00Z | 17,960 MW |
| 2026-11-08T22:00Z | 16,955 MW |
| 2026-11-08T23:00Z | 16,384 MW |
| 2026-11-09T00:00Z | 16,160 MW |
| 2026-11-09T01:00Z | 16,031 MW |
| 2026-11-09T02:00Z | 16,178 MW |
| 2026-11-09T03:00Z | 16,692 MW |
| 2026-11-09T04:00Z | 18,080 MW |
| 2026-11-09T05:00Z | 21,035 MW |
| 2026-11-09T06:00Z | 22,695 MW |
| 2026-11-09T07:00Z | 23,427 MW |
| 2026-11-09T08:00Z | 22,927 MW |
| 2026-11-09T09:00Z | 22,575 MW |
| 2026-11-09T10:00Z | 22,584 MW |
| 2026-11-09T11:00Z | 22,799 MW |
| 2026-11-09T12:00Z | 23,019 MW |
| 2026-11-09T13:00Z | 23,227 MW |
| 2026-11-09T14:00Z | 23,270 MW |
| 2026-11-09T15:00Z | 23,822 MW |
| 2026-11-09T16:00Z | 23,935 MW |
| 2026-11-09T17:00Z | 23,916 MW |
| 2026-11-09T18:00Z | 23,722 MW |
| 2026-11-09T19:00Z | 23,139 MW |
| 2026-11-09T20:00Z | 21,445 MW |
| 2026-11-09T21:00Z | 20,079 MW |
| 2026-11-09T22:00Z | 18,821 MW |
| 2026-11-09T23:00Z | 17,970 MW |
| 2026-11-10T00:00Z | 17,438 MW |
| 2026-11-10T01:00Z | 17,279 MW |
| 2026-11-10T02:00Z | 17,335 MW |
| 2026-11-10T03:00Z | 17,828 MW |
| 2026-11-10T04:00Z | 18,933 MW |
| 2026-11-10T05:00Z | 21,394 MW |
| 2026-11-10T06:00Z | 22,851 MW |
| 2026-11-10T07:00Z | 23,512 MW |
| 2026-11-10T08:00Z | 23,698 MW |
| 2026-11-10T09:00Z | 23,853 MW |
| 2026-11-10T10:00Z | 24,460 MW |
| 2026-11-10T11:00Z | 24,917 MW |
| 2026-11-10T12:00Z | 24,381 MW |
| 2026-11-10T13:00Z | 23,897 MW |
| 2026-11-10T14:00Z | 23,628 MW |
| 2026-11-10T15:00Z | 24,048 MW |
| 2026-11-10T16:00Z | 23,935 MW |
| 2026-11-10T17:00Z | 23,553 MW |
| 2026-11-10T18:00Z | 23,306 MW |
| 2026-11-10T19:00Z | 22,600 MW |
| 2026-11-10T20:00Z | 21,001 MW |
| 2026-11-10T21:00Z | 19,688 MW |
| 2026-11-10T22:00Z | 18,399 MW |
| 2026-11-10T23:00Z | 17,574 MW |
| 2026-11-11T00:00Z | 16,843 MW |
| 2026-11-11T01:00Z | 16,463 MW |
| 2026-11-11T02:00Z | 16,382 MW |
| 2026-11-11T03:00Z | 16,314 MW |
| 2026-11-11T04:00Z | 16,105 MW |
| 2026-11-11T05:00Z | 16,209 MW |
| 2026-11-11T06:00Z | 16,636 MW |
| 2026-11-11T07:00Z | 17,579 MW |
| 2026-11-11T08:00Z | 18,272 MW |
| 2026-11-11T09:00Z | 18,707 MW |
| 2026-11-11T10:00Z | 19,097 MW |
| 2026-11-11T11:00Z | 19,604 MW |
| 2026-11-11T12:00Z | 19,967 MW |
| 2026-11-11T13:00Z | 19,751 MW |
| 2026-11-11T14:00Z | 19,446 MW |
| 2026-11-11T15:00Z | 19,707 MW |
| 2026-11-11T16:00Z | 19,645 MW |
| 2026-11-11T17:00Z | 19,710 MW |
| 2026-11-11T18:00Z | 19,549 MW |
| 2026-11-11T19:00Z | 19,181 MW |
| 2026-11-11T20:00Z | 18,285 MW |
| 2026-11-11T21:00Z | 17,530 MW |
| 2026-11-11T22:00Z | 16,476 MW |
| 2026-11-11T23:00Z | 15,835 MW |
| 2026-11-12T00:00Z | 15,480 MW |
| 2026-11-12T01:00Z | 15,253 MW |
| 2026-11-12T02:00Z | 15,414 MW |
| 2026-11-12T03:00Z | 15,877 MW |
| 2026-11-12T04:00Z | 16,974 MW |
| 2026-11-12T05:00Z | 19,831 MW |
| 2026-11-12T06:00Z | 21,492 MW |
| 2026-11-12T07:00Z | 22,676 MW |
| 2026-11-12T08:00Z | 22,790 MW |
| 2026-11-12T09:00Z | 22,625 MW |
| 2026-11-12T10:00Z | 22,887 MW |
| 2026-11-12T11:00Z | 22,840 MW |
| 2026-11-12T12:00Z | 23,038 MW |
Show the data table (686 rows)
| Hour starting (UTC) | Coal | Gas | Wind | Solar | Other |
|---|---|---|---|---|---|
| 2026-10-14T23:00Z | 12,027 MW | 1,789 MW | 3,394 MW | 0 MW | 533 MW |
| 2026-10-15T00:00Z | 11,709 MW | 1,520 MW | 3,380 MW | 0 MW | 534 MW |
| 2026-10-15T01:00Z | 11,556 MW | 1,540 MW | 3,167 MW | 0 MW | 535 MW |
| 2026-10-15T02:00Z | 11,445 MW | 1,677 MW | 2,994 MW | 0 MW | 534 MW |
| 2026-10-15T03:00Z | 11,452 MW | 1,857 MW | 2,745 MW | 0 MW | 539 MW |
| 2026-10-15T04:00Z | 12,360 MW | 2,260 MW | 2,248 MW | 2 MW | 532 MW |
| 2026-10-15T05:00Z | 12,770 MW | 2,449 MW | 1,790 MW | 385 MW | 546 MW |
| 2026-10-15T06:00Z | 13,225 MW | 2,475 MW | 1,347 MW | 1,529 MW | 539 MW |
| 2026-10-15T07:00Z | 13,809 MW | 2,379 MW | 891 MW | 2,987 MW | 532 MW |
| 2026-10-15T08:00Z | 12,893 MW | 2,136 MW | 595 MW | 5,130 MW | 523 MW |
| 2026-10-15T09:00Z | 11,704 MW | 1,963 MW | 481 MW | 7,384 MW | 513 MW |
| 2026-10-15T10:00Z | 10,762 MW | 1,756 MW | 605 MW | 8,126 MW | 510 MW |
| 2026-10-15T11:00Z | 10,775 MW | 1,686 MW | 603 MW | 7,862 MW | 497 MW |
| 2026-10-15T12:00Z | 11,195 MW | 1,763 MW | 584 MW | 6,895 MW | 516 MW |
| 2026-10-15T13:00Z | 11,661 MW | 2,060 MW | 542 MW | 4,850 MW | 515 MW |
| 2026-10-15T14:00Z | 12,809 MW | 2,168 MW | 507 MW | 2,432 MW | 526 MW |
| 2026-10-15T15:00Z | 13,490 MW | 2,751 MW | 649 MW | 474 MW | 541 MW |
| 2026-10-15T16:00Z | 13,632 MW | 2,756 MW | 878 MW | 0 MW | 534 MW |
| 2026-10-15T17:00Z | 13,465 MW | 2,427 MW | 1,132 MW | 0 MW | 543 MW |
| 2026-10-15T18:00Z | 13,489 MW | 2,497 MW | 1,362 MW | 0 MW | 553 MW |
| 2026-10-15T19:00Z | 12,956 MW | 2,184 MW | 1,509 MW | 0 MW | 544 MW |
| 2026-10-15T20:00Z | 12,388 MW | 1,971 MW | 1,522 MW | 0 MW | 541 MW |
| 2026-10-15T21:00Z | 12,617 MW | 1,948 MW | 1,612 MW | 0 MW | 535 MW |
| 2026-10-15T22:00Z | 12,087 MW | 1,821 MW | 1,661 MW | 0 MW | 504 MW |
| 2026-10-15T23:00Z | 11,493 MW | 1,805 MW | 1,788 MW | 0 MW | 506 MW |
| 2026-10-16T00:00Z | 11,241 MW | 1,802 MW | 1,832 MW | 0 MW | 509 MW |
| 2026-10-16T01:00Z | 11,232 MW | 1,823 MW | 1,789 MW | 0 MW | 514 MW |
| 2026-10-16T02:00Z | 11,710 MW | 1,805 MW | 1,798 MW | 0 MW | 499 MW |
| 2026-10-16T03:00Z | 12,485 MW | 1,833 MW | 1,810 MW | 0 MW | 497 MW |
| 2026-10-16T04:00Z | 13,625 MW | 2,091 MW | 2,025 MW | 2 MW | 506 MW |
| 2026-10-16T05:00Z | 13,454 MW | 2,360 MW | 2,234 MW | 556 MW | 510 MW |
| 2026-10-16T06:00Z | 12,487 MW | 2,098 MW | 2,268 MW | 3,251 MW | 502 MW |
| 2026-10-16T07:00Z | 10,387 MW | 1,737 MW | 1,540 MW | 7,174 MW | 486 MW |
| 2026-10-16T08:00Z | 9,631 MW | 1,572 MW | 899 MW | 9,774 MW | 476 MW |
| 2026-10-16T09:00Z | 8,843 MW | 1,507 MW | 1,002 MW | 11,117 MW | 474 MW |
| 2026-10-16T10:00Z | 8,832 MW | 1,483 MW | 1,207 MW | 11,512 MW | 469 MW |
| 2026-10-16T11:00Z | 8,786 MW | 1,561 MW | 1,297 MW | 11,293 MW | 467 MW |
| 2026-10-16T12:00Z | 8,995 MW | 1,653 MW | 1,114 MW | 10,178 MW | 470 MW |
| 2026-10-16T13:00Z | 9,702 MW | 1,950 MW | 1,036 MW | 7,691 MW | 498 MW |
| 2026-10-16T14:00Z | 12,676 MW | 2,277 MW | 1,022 MW | 3,822 MW | 509 MW |
| 2026-10-16T15:00Z | 13,278 MW | 2,542 MW | 1,573 MW | 620 MW | 528 MW |
| 2026-10-16T16:00Z | 12,952 MW | 2,580 MW | 2,553 MW | 0 MW | 532 MW |
| 2026-10-16T17:00Z | 12,964 MW | 2,476 MW | 3,405 MW | 0 MW | 535 MW |
| 2026-10-16T18:00Z | 13,032 MW | 2,513 MW | 3,955 MW | 0 MW | 539 MW |
| 2026-10-16T19:00Z | 12,573 MW | 2,211 MW | 4,151 MW | 0 MW | 528 MW |
| 2026-10-16T20:00Z | 11,691 MW | 2,011 MW | 3,971 MW | 0 MW | 520 MW |
| 2026-10-16T21:00Z | 11,350 MW | 2,061 MW | 3,620 MW | 0 MW | 518 MW |
| 2026-10-16T22:00Z | 10,465 MW | 2,084 MW | 3,419 MW | 0 MW | 531 MW |
| 2026-10-16T23:00Z | 10,548 MW | 2,074 MW | 3,020 MW | 0 MW | 528 MW |
| 2026-10-17T00:00Z | 10,300 MW | 2,075 MW | 2,669 MW | 0 MW | 527 MW |
| 2026-10-17T01:00Z | 10,439 MW | 1,968 MW | 2,294 MW | 0 MW | 526 MW |
| 2026-10-17T02:00Z | 10,611 MW | 1,943 MW | 1,854 MW | 0 MW | 528 MW |
| 2026-10-17T03:00Z | 10,736 MW | 1,991 MW | 1,479 MW | 0 MW | 529 MW |
| 2026-10-17T04:00Z | 10,761 MW | 2,157 MW | 1,283 MW | 2 MW | 533 MW |
| 2026-10-17T05:00Z | 11,032 MW | 2,166 MW | 1,088 MW | 577 MW | 536 MW |
| 2026-10-17T06:00Z | 10,717 MW | 1,956 MW | 898 MW | 2,770 MW | 531 MW |
| 2026-10-17T07:00Z | 9,868 MW | 1,908 MW | 538 MW | 5,556 MW | 529 MW |
| 2026-10-17T08:00Z | 9,302 MW | 1,696 MW | 198 MW | 7,622 MW | 525 MW |
| 2026-10-17T09:00Z | 8,873 MW | 1,658 MW | 166 MW | 9,481 MW | 521 MW |
| 2026-10-17T10:00Z | 8,082 MW | 1,697 MW | 184 MW | 10,450 MW | 513 MW |
| 2026-10-17T11:00Z | 8,449 MW | 1,720 MW | 134 MW | 9,983 MW | 514 MW |
| 2026-10-17T12:00Z | 9,235 MW | 1,739 MW | 161 MW | 8,051 MW | 513 MW |
| 2026-10-17T13:00Z | 10,606 MW | 2,142 MW | 321 MW | 5,119 MW | 519 MW |
| 2026-10-17T14:00Z | 11,346 MW | 1,963 MW | 507 MW | 2,249 MW | 543 MW |
| 2026-10-17T15:00Z | 12,319 MW | 2,507 MW | 652 MW | 335 MW | 561 MW |
| 2026-10-17T16:00Z | 11,990 MW | 2,585 MW | 891 MW | 0 MW | 562 MW |
| 2026-10-17T17:00Z | 11,833 MW | 2,528 MW | 1,150 MW | 0 MW | 563 MW |
| 2026-10-17T18:00Z | 11,781 MW | 2,255 MW | 1,283 MW | 0 MW | 552 MW |
| 2026-10-17T19:00Z | 11,707 MW | 1,955 MW | 1,410 MW | 0 MW | 546 MW |
| 2026-10-17T20:00Z | 11,565 MW | 1,944 MW | 1,450 MW | 0 MW | 548 MW |
| 2026-10-17T21:00Z | 10,889 MW | 1,948 MW | 1,551 MW | 0 MW | 542 MW |
| 2026-10-17T22:00Z | 10,619 MW | 1,824 MW | 1,779 MW | 0 MW | 533 MW |
| 2026-10-17T23:00Z | 9,958 MW | 1,768 MW | 2,024 MW | 0 MW | 530 MW |
| 2026-10-18T00:00Z | 9,558 MW | 1,761 MW | 2,107 MW | 0 MW | 528 MW |
| 2026-10-18T01:00Z | 9,504 MW | 1,767 MW | 2,273 MW | 0 MW | 528 MW |
| 2026-10-18T02:00Z | 9,649 MW | 1,771 MW | 2,382 MW | 0 MW | 529 MW |
| 2026-10-18T03:00Z | 9,820 MW | 1,779 MW | 2,459 MW | 0 MW | 533 MW |
| 2026-10-18T04:00Z | 10,165 MW | 1,768 MW | 2,573 MW | 2 MW | 531 MW |
| 2026-10-18T05:00Z | 10,226 MW | 1,793 MW | 2,613 MW | 315 MW | 536 MW |
| 2026-10-18T06:00Z | 9,578 MW | 1,761 MW | 2,457 MW | 1,912 MW | 528 MW |
| 2026-10-18T07:00Z | 8,995 MW | 1,730 MW | 2,110 MW | 3,836 MW | 522 MW |
| 2026-10-18T08:00Z | 8,940 MW | 1,700 MW | 1,953 MW | 5,807 MW | 518 MW |
| 2026-10-18T09:00Z | 8,132 MW | 1,588 MW | 2,190 MW | 6,995 MW | 515 MW |
| 2026-10-18T10:00Z | 8,100 MW | 1,588 MW | 2,340 MW | 7,542 MW | 513 MW |
| 2026-10-18T11:00Z | 8,333 MW | 1,637 MW | 2,363 MW | 7,193 MW | 501 MW |
| 2026-10-18T12:00Z | 8,623 MW | 1,689 MW | 2,517 MW | 6,069 MW | 496 MW |
| 2026-10-18T13:00Z | 9,200 MW | 1,914 MW | 2,911 MW | 4,098 MW | 514 MW |
| 2026-10-18T14:00Z | 10,397 MW | 1,870 MW | 3,078 MW | 2,008 MW | 515 MW |
| 2026-10-18T15:00Z | 10,443 MW | 1,906 MW | 3,364 MW | 362 MW | 535 MW |
| 2026-10-18T16:00Z | 10,944 MW | 1,956 MW | 3,600 MW | 0 MW | 534 MW |
| 2026-10-18T17:00Z | 11,099 MW | 1,916 MW | 3,892 MW | 0 MW | 534 MW |
| 2026-10-18T18:00Z | 10,697 MW | 1,926 MW | 3,740 MW | 0 MW | 541 MW |
| 2026-10-18T19:00Z | 10,937 MW | 1,912 MW | 3,409 MW | 0 MW | 532 MW |
| 2026-10-18T20:00Z | 11,198 MW | 1,927 MW | 3,335 MW | 0 MW | 532 MW |
| 2026-10-18T21:00Z | 11,034 MW | 1,906 MW | 3,150 MW | 0 MW | 528 MW |
| 2026-10-18T22:00Z | 10,930 MW | 1,811 MW | 3,098 MW | 0 MW | 509 MW |
| 2026-10-18T23:00Z | 10,934 MW | 1,841 MW | 2,946 MW | 0 MW | 508 MW |
| 2026-10-19T00:00Z | 10,994 MW | 1,821 MW | 2,853 MW | 0 MW | 507 MW |
| 2026-10-19T01:00Z | 11,134 MW | 1,825 MW | 2,794 MW | 0 MW | 507 MW |
| 2026-10-19T02:00Z | 10,980 MW | 1,830 MW | 2,854 MW | 0 MW | 503 MW |
| 2026-10-19T03:00Z | 10,886 MW | 1,845 MW | 2,995 MW | 0 MW | 516 MW |
| 2026-10-19T04:00Z | 12,972 MW | 2,036 MW | 3,193 MW | 0 MW | 522 MW |
| 2026-10-19T05:00Z | 13,680 MW | 2,315 MW | 3,279 MW | 338 MW | 524 MW |
| 2026-10-19T06:00Z | 13,763 MW | 2,226 MW | 2,924 MW | 2,155 MW | 503 MW |
| 2026-10-19T07:00Z | 12,824 MW | 1,991 MW | 2,029 MW | 4,690 MW | 502 MW |
| 2026-10-19T08:00Z | 12,110 MW | 1,841 MW | 1,850 MW | 6,188 MW | 496 MW |
| 2026-10-19T09:00Z | 11,231 MW | 1,820 MW | 2,138 MW | 7,178 MW | 492 MW |
| 2026-10-19T10:00Z | 11,382 MW | 1,807 MW | 1,683 MW | 7,480 MW | 490 MW |
| 2026-10-19T11:00Z | 12,366 MW | 1,877 MW | 1,548 MW | 6,800 MW | 497 MW |
| 2026-10-19T12:00Z | 12,262 MW | 1,983 MW | 1,464 MW | 5,369 MW | 494 MW |
| 2026-10-19T13:00Z | 12,956 MW | 2,158 MW | 1,489 MW | 4,038 MW | 528 MW |
| 2026-10-19T14:00Z | 14,159 MW | 2,545 MW | 1,493 MW | 1,995 MW | 546 MW |
| 2026-10-19T15:00Z | 14,647 MW | 2,668 MW | 1,686 MW | 293 MW | 558 MW |
| 2026-10-19T16:00Z | 14,474 MW | 2,447 MW | 2,109 MW | 0 MW | 557 MW |
| 2026-10-19T17:00Z | 14,270 MW | 2,502 MW | 2,106 MW | 0 MW | 557 MW |
| 2026-10-19T18:00Z | 14,367 MW | 2,566 MW | 1,884 MW | 0 MW | 546 MW |
| 2026-10-19T19:00Z | 14,480 MW | 2,270 MW | 1,652 MW | 0 MW | 538 MW |
| 2026-10-19T20:00Z | 13,971 MW | 2,254 MW | 1,343 MW | 0 MW | 539 MW |
| 2026-10-19T21:00Z | 13,059 MW | 2,023 MW | 1,193 MW | 0 MW | 535 MW |
| 2026-10-19T22:00Z | 12,380 MW | 2,006 MW | 1,279 MW | 0 MW | 529 MW |
| 2026-10-19T23:00Z | 12,450 MW | 1,863 MW | 1,386 MW | 0 MW | 524 MW |
| 2026-10-20T00:00Z | 12,485 MW | 1,835 MW | 1,360 MW | 0 MW | 520 MW |
| 2026-10-20T01:00Z | 12,135 MW | 1,823 MW | 1,357 MW | 0 MW | 523 MW |
| 2026-10-20T02:00Z | 12,280 MW | 1,829 MW | 1,397 MW | 0 MW | 521 MW |
| 2026-10-20T03:00Z | 12,857 MW | 1,803 MW | 1,469 MW | 0 MW | 523 MW |
| 2026-10-20T04:00Z | 13,638 MW | 2,279 MW | 1,532 MW | 0 MW | 518 MW |
| 2026-10-20T05:00Z | 13,882 MW | 2,628 MW | 1,583 MW | 169 MW | 534 MW |
| 2026-10-20T06:00Z | 13,850 MW | 2,673 MW | 1,640 MW | 722 MW | 527 MW |
| 2026-10-20T07:00Z | 14,302 MW | 2,719 MW | 1,713 MW | 1,583 MW | 529 MW |
| 2026-10-20T08:00Z | 13,916 MW | 2,699 MW | 1,842 MW | 2,302 MW | 529 MW |
| 2026-10-20T09:00Z | 13,584 MW | 2,791 MW | 2,024 MW | 3,017 MW | 524 MW |
| 2026-10-20T10:00Z | 13,624 MW | 2,588 MW | 2,119 MW | 3,494 MW | 519 MW |
| 2026-10-20T11:00Z | 13,662 MW | 2,733 MW | 2,363 MW | 3,083 MW | 518 MW |
| 2026-10-20T12:00Z | 13,526 MW | 2,593 MW | 2,722 MW | 2,616 MW | 516 MW |
| 2026-10-20T13:00Z | 13,559 MW | 2,530 MW | 3,030 MW | 2,076 MW | 517 MW |
| 2026-10-20T14:00Z | 13,964 MW | 2,611 MW | 3,462 MW | 948 MW | 528 MW |
| 2026-10-20T15:00Z | 14,146 MW | 2,451 MW | 4,129 MW | 179 MW | 536 MW |
| 2026-10-20T16:00Z | 13,966 MW | 2,389 MW | 4,825 MW | 0 MW | 543 MW |
| 2026-10-20T17:00Z | 13,512 MW | 2,207 MW | 5,344 MW | 0 MW | 543 MW |
| 2026-10-20T18:00Z | 13,134 MW | 2,011 MW | 5,303 MW | 0 MW | 545 MW |
| 2026-10-20T19:00Z | 13,118 MW | 1,750 MW | 5,366 MW | 0 MW | 539 MW |
| 2026-10-20T20:00Z | 13,143 MW | 1,687 MW | 5,209 MW | 0 MW | 535 MW |
| 2026-10-20T21:00Z | 12,643 MW | 1,653 MW | 5,134 MW | 0 MW | 527 MW |
| 2026-10-20T22:00Z | 11,895 MW | 1,500 MW | 5,157 MW | 0 MW | 513 MW |
| 2026-10-20T23:00Z | 11,173 MW | 1,472 MW | 5,170 MW | 0 MW | 511 MW |
| 2026-10-21T00:00Z | 11,196 MW | 1,474 MW | 5,217 MW | 0 MW | 510 MW |
| 2026-10-21T01:00Z | 11,135 MW | 1,463 MW | 5,186 MW | 0 MW | 512 MW |
| 2026-10-21T02:00Z | 11,316 MW | 1,525 MW | 5,358 MW | 0 MW | 511 MW |
| 2026-10-21T03:00Z | 11,684 MW | 1,575 MW | 5,425 MW | 0 MW | 512 MW |
| 2026-10-21T04:00Z | 12,832 MW | 1,696 MW | 5,461 MW | 0 MW | 516 MW |
| 2026-10-21T05:00Z | 13,055 MW | 1,686 MW | 5,357 MW | 304 MW | 506 MW |
| 2026-10-21T06:00Z | 12,927 MW | 1,573 MW | 5,280 MW | 2,009 MW | 502 MW |
| 2026-10-21T07:00Z | 12,239 MW | 1,537 MW | 4,883 MW | 4,648 MW | 498 MW |
| 2026-10-21T08:00Z | 11,435 MW | 1,694 MW | 4,528 MW | 7,042 MW | 487 MW |
| 2026-10-21T09:00Z | 10,402 MW | 1,464 MW | 4,507 MW | 8,675 MW | 480 MW |
| 2026-10-21T10:00Z | 9,878 MW | 1,401 MW | 4,634 MW | 9,311 MW | 483 MW |
| 2026-10-21T11:00Z | 9,528 MW | 1,423 MW | 4,807 MW | 9,492 MW | 485 MW |
| 2026-10-21T12:00Z | 10,033 MW | 1,544 MW | 4,895 MW | 8,310 MW | 480 MW |
| 2026-10-21T13:00Z | 10,766 MW | 1,717 MW | 4,893 MW | 5,568 MW | 481 MW |
| 2026-10-21T14:00Z | 12,990 MW | 1,893 MW | 4,778 MW | 2,318 MW | 476 MW |
| 2026-10-21T15:00Z | 13,374 MW | 1,742 MW | 5,479 MW | 276 MW | 486 MW |
| 2026-10-21T16:00Z | 13,165 MW | 1,644 MW | 6,228 MW | 0 MW | 487 MW |
| 2026-10-21T17:00Z | 12,880 MW | 1,605 MW | 6,587 MW | 0 MW | 485 MW |
| 2026-10-21T18:00Z | 13,085 MW | 1,517 MW | 6,772 MW | 0 MW | 493 MW |
| 2026-10-21T19:00Z | 12,707 MW | 1,520 MW | 6,675 MW | 0 MW | 490 MW |
| 2026-10-21T20:00Z | 11,777 MW | 1,449 MW | 6,327 MW | 0 MW | 492 MW |
| 2026-10-21T21:00Z | 10,899 MW | 1,433 MW | 6,056 MW | 0 MW | 484 MW |
| 2026-10-21T22:00Z | 10,225 MW | 1,422 MW | 5,874 MW | 0 MW | 491 MW |
| 2026-10-21T23:00Z | 10,271 MW | 1,429 MW | 5,642 MW | 0 MW | 490 MW |
| 2026-10-22T00:00Z | 10,219 MW | 1,471 MW | 5,295 MW | 0 MW | 489 MW |
| 2026-10-22T01:00Z | 9,949 MW | 1,525 MW | 5,115 MW | 0 MW | 493 MW |
| 2026-10-22T02:00Z | 10,188 MW | 1,543 MW | 5,045 MW | 0 MW | 490 MW |
| 2026-10-22T03:00Z | 10,877 MW | 1,572 MW | 4,982 MW | 0 MW | 495 MW |
| 2026-10-22T04:00Z | 12,313 MW | 1,767 MW | 4,988 MW | 0 MW | 506 MW |
| 2026-10-22T05:00Z | 12,567 MW | 1,738 MW | 4,528 MW | 149 MW | 509 MW |
| 2026-10-22T06:00Z | 13,052 MW | 1,854 MW | 4,262 MW | 505 MW | 479 MW |
| 2026-10-22T07:00Z | 13,069 MW | 1,807 MW | 3,968 MW | 958 MW | 502 MW |
| 2026-10-22T08:00Z | 13,096 MW | 1,813 MW | 3,825 MW | 1,313 MW | 500 MW |
| 2026-10-22T09:00Z | 13,417 MW | 2,011 MW | 3,575 MW | 1,680 MW | 500 MW |
| 2026-10-22T10:00Z | 13,216 MW | 1,881 MW | 3,286 MW | 1,919 MW | 501 MW |
| 2026-10-22T11:00Z | 13,298 MW | 1,956 MW | 3,146 MW | 2,040 MW | 508 MW |
| 2026-10-22T12:00Z | 12,834 MW | 1,871 MW | 3,094 MW | 2,030 MW | 507 MW |
| 2026-10-22T13:00Z | 12,322 MW | 1,852 MW | 3,069 MW | 1,602 MW | 514 MW |
| 2026-10-22T14:00Z | 13,019 MW | 1,846 MW | 3,016 MW | 813 MW | 516 MW |
| 2026-10-22T15:00Z | 13,105 MW | 2,108 MW | 3,182 MW | 174 MW | 523 MW |
| 2026-10-22T16:00Z | 13,270 MW | 2,058 MW | 3,526 MW | 0 MW | 521 MW |
| 2026-10-22T17:00Z | 12,564 MW | 2,146 MW | 4,008 MW | 0 MW | 518 MW |
| 2026-10-22T18:00Z | 12,939 MW | 1,977 MW | 4,208 MW | 0 MW | 521 MW |
| 2026-10-22T19:00Z | 12,549 MW | 1,831 MW | 4,287 MW | 0 MW | 516 MW |
| 2026-10-22T20:00Z | 12,268 MW | 1,758 MW | 4,139 MW | 0 MW | 515 MW |
| 2026-10-22T21:00Z | 11,842 MW | 1,676 MW | 3,956 MW | 0 MW | 514 MW |
| 2026-10-22T22:00Z | 11,613 MW | 1,549 MW | 3,897 MW | 0 MW | 522 MW |
| 2026-10-22T23:00Z | 11,608 MW | 1,673 MW | 3,603 MW | 0 MW | 518 MW |
| 2026-10-23T00:00Z | 11,470 MW | 1,747 MW | 3,480 MW | 0 MW | 524 MW |
| 2026-10-23T01:00Z | 11,299 MW | 1,806 MW | 3,460 MW | 0 MW | 524 MW |
| 2026-10-23T02:00Z | 11,578 MW | 1,771 MW | 3,313 MW | 0 MW | 525 MW |
| 2026-10-23T03:00Z | 11,627 MW | 1,867 MW | 3,036 MW | 0 MW | 526 MW |
| 2026-10-23T04:00Z | 12,690 MW | 2,435 MW | 2,878 MW | 0 MW | 530 MW |
| 2026-10-23T05:00Z | 12,610 MW | 2,556 MW | 2,691 MW | 325 MW | 533 MW |
| 2026-10-23T06:00Z | 12,499 MW | 2,324 MW | 2,410 MW | 2,865 MW | 534 MW |
| 2026-10-23T07:00Z | 10,752 MW | 1,793 MW | 1,488 MW | 6,769 MW | 527 MW |
| 2026-10-23T08:00Z | 10,662 MW | 1,702 MW | 747 MW | 9,739 MW | 515 MW |
| 2026-10-23T09:00Z | 9,489 MW | 1,633 MW | 761 MW | 11,314 MW | 503 MW |
| 2026-10-23T10:00Z | 8,652 MW | 1,540 MW | 1,421 MW | 11,643 MW | 502 MW |
| 2026-10-23T11:00Z | 8,852 MW | 1,580 MW | 1,901 MW | 9,864 MW | 507 MW |
| 2026-10-23T12:00Z | 10,287 MW | 1,853 MW | 1,874 MW | 7,425 MW | 504 MW |
| 2026-10-23T13:00Z | 11,845 MW | 2,084 MW | 1,639 MW | 4,451 MW | 515 MW |
| 2026-10-23T14:00Z | 13,250 MW | 2,540 MW | 1,804 MW | 1,606 MW | 519 MW |
| 2026-10-23T15:00Z | 12,851 MW | 2,526 MW | 2,661 MW | 201 MW | 533 MW |
| 2026-10-23T16:00Z | 12,989 MW | 2,419 MW | 3,759 MW | 0 MW | 539 MW |
| 2026-10-23T17:00Z | 12,931 MW | 2,124 MW | 4,822 MW | 0 MW | 541 MW |
| 2026-10-23T18:00Z | 12,287 MW | 1,787 MW | 5,503 MW | 0 MW | 516 MW |
| 2026-10-23T19:00Z | 11,367 MW | 1,431 MW | 5,968 MW | 0 MW | 513 MW |
| 2026-10-23T20:00Z | 10,465 MW | 1,341 MW | 6,139 MW | 0 MW | 504 MW |
| 2026-10-23T21:00Z | 9,557 MW | 1,117 MW | 6,252 MW | 0 MW | 497 MW |
| 2026-10-23T22:00Z | 8,260 MW | 1,021 MW | 6,253 MW | 0 MW | 494 MW |
| 2026-10-23T23:00Z | 7,678 MW | 1,030 MW | 6,224 MW | 0 MW | 492 MW |
| 2026-10-24T00:00Z | 7,394 MW | 1,018 MW | 6,089 MW | 0 MW | 493 MW |
| 2026-10-24T01:00Z | 7,574 MW | 1,023 MW | 6,032 MW | 0 MW | 494 MW |
| 2026-10-24T02:00Z | 7,490 MW | 1,026 MW | 5,974 MW | 0 MW | 495 MW |
| 2026-10-24T03:00Z | 7,949 MW | 1,041 MW | 5,842 MW | 0 MW | 499 MW |
| 2026-10-24T04:00Z | 8,610 MW | 1,124 MW | 5,899 MW | 0 MW | 505 MW |
| 2026-10-24T05:00Z | 8,976 MW | 1,184 MW | 5,517 MW | 339 MW | 506 MW |
| 2026-10-24T06:00Z | 8,915 MW | 1,212 MW | 5,056 MW | 2,142 MW | 500 MW |
| 2026-10-24T07:00Z | 8,492 MW | 1,122 MW | 4,218 MW | 4,950 MW | 491 MW |
| 2026-10-24T08:00Z | 7,573 MW | 1,072 MW | 3,294 MW | 6,952 MW | 490 MW |
| 2026-10-24T09:00Z | 7,726 MW | 995 MW | 3,216 MW | 7,569 MW | 480 MW |
| 2026-10-24T10:00Z | 8,523 MW | 1,065 MW | 3,128 MW | 6,990 MW | 485 MW |
| 2026-10-24T11:00Z | 8,640 MW | 975 MW | 3,406 MW | 6,139 MW | 491 MW |
| 2026-10-24T12:00Z | 8,185 MW | 1,134 MW | 3,827 MW | 5,123 MW | 489 MW |
| 2026-10-24T13:00Z | 9,033 MW | 1,384 MW | 3,690 MW | 3,335 MW | 495 MW |
| 2026-10-24T14:00Z | 10,469 MW | 1,748 MW | 3,552 MW | 1,458 MW | 501 MW |
| 2026-10-24T15:00Z | 10,828 MW | 1,734 MW | 3,835 MW | 187 MW | 514 MW |
| 2026-10-24T16:00Z | 11,149 MW | 1,739 MW | 4,153 MW | 0 MW | 518 MW |
| 2026-10-24T17:00Z | 10,968 MW | 1,655 MW | 4,323 MW | 0 MW | 518 MW |
| 2026-10-24T18:00Z | 10,948 MW | 1,627 MW | 4,167 MW | 0 MW | 521 MW |
| 2026-10-24T19:00Z | 10,627 MW | 1,371 MW | 4,122 MW | 0 MW | 519 MW |
| 2026-10-24T20:00Z | 10,107 MW | 1,224 MW | 4,275 MW | 0 MW | 513 MW |
| 2026-10-24T21:00Z | 8,850 MW | 1,124 MW | 4,256 MW | 0 MW | 509 MW |
| 2026-10-24T22:00Z | 7,782 MW | 1,065 MW | 4,497 MW | 0 MW | 515 MW |
| 2026-10-24T23:00Z | 7,284 MW | 1,017 MW | 4,699 MW | 0 MW | 511 MW |
| 2026-10-25T00:00Z | 6,700 MW | 999 MW | 5,110 MW | 0 MW | 510 MW |
| 2026-10-25T01:00Z | 6,037 MW | 945 MW | 5,553 MW | 0 MW | 499 MW |
| 2026-10-25T02:00Z | 6,304 MW | 958 MW | 5,178 MW | 0 MW | 510 MW |
| 2026-10-25T03:00Z | 6,474 MW | 957 MW | 5,516 MW | 0 MW | 508 MW |
| 2026-10-25T04:00Z | 6,555 MW | 959 MW | 6,170 MW | 0 MW | 509 MW |
| 2026-10-25T05:00Z | 6,742 MW | 981 MW | 6,727 MW | 0 MW | 512 MW |
| 2026-10-25T06:00Z | 6,427 MW | 939 MW | 7,013 MW | 1,774 MW | 507 MW |
| 2026-10-25T07:00Z | 6,164 MW | 997 MW | 6,084 MW | 4,094 MW | 504 MW |
| 2026-10-25T08:00Z | 6,481 MW | 1,018 MW | 4,981 MW | 5,137 MW | 500 MW |
| 2026-10-25T09:00Z | 5,933 MW | 957 MW | 5,473 MW | 5,484 MW | 492 MW |
| 2026-10-25T10:00Z | 6,400 MW | 969 MW | 6,391 MW | 4,940 MW | 488 MW |
| 2026-10-25T11:00Z | 6,302 MW | 966 MW | 7,354 MW | 4,342 MW | 486 MW |
| 2026-10-25T12:00Z | 6,403 MW | 994 MW | 7,616 MW | 3,511 MW | 484 MW |
| 2026-10-25T13:00Z | 6,076 MW | 971 MW | 8,308 MW | 2,046 MW | 488 MW |
| 2026-10-25T14:00Z | 7,058 MW | 1,068 MW | 8,030 MW | 834 MW | 503 MW |
| 2026-10-25T15:00Z | 8,115 MW | 1,201 MW | 7,820 MW | 128 MW | 528 MW |
| 2026-10-25T16:00Z | 8,098 MW | 1,253 MW | 7,558 MW | 0 MW | 538 MW |
| 2026-10-25T17:00Z | 7,761 MW | 1,399 MW | 7,407 MW | 0 MW | 548 MW |
| 2026-10-25T18:00Z | 7,985 MW | 1,412 MW | 7,042 MW | 0 MW | 551 MW |
| 2026-10-25T19:00Z | 7,994 MW | 1,396 MW | 6,438 MW | 0 MW | 547 MW |
| 2026-10-25T20:00Z | 7,818 MW | 1,377 MW | 6,151 MW | 0 MW | 534 MW |
| 2026-10-25T21:00Z | 7,829 MW | 1,236 MW | 6,134 MW | 0 MW | 532 MW |
| 2026-10-25T22:00Z | 7,606 MW | 1,091 MW | 5,707 MW | 0 MW | 521 MW |
| 2026-10-25T23:00Z | 7,441 MW | 1,092 MW | 5,581 MW | 0 MW | 498 MW |
| 2026-10-26T00:00Z | 8,160 MW | 1,105 MW | 4,761 MW | 0 MW | 502 MW |
| 2026-10-26T01:00Z | 8,394 MW | 1,095 MW | 4,666 MW | 0 MW | 503 MW |
| 2026-10-26T02:00Z | 8,435 MW | 1,091 MW | 4,718 MW | 0 MW | 502 MW |
| 2026-10-26T03:00Z | 8,744 MW | 1,095 MW | 4,915 MW | 0 MW | 505 MW |
| 2026-10-26T04:00Z | 9,648 MW | 1,146 MW | 4,936 MW | 0 MW | 508 MW |
| 2026-10-26T05:00Z | 10,975 MW | 1,274 MW | 5,508 MW | 90 MW | 519 MW |
| 2026-10-26T06:00Z | 11,518 MW | 1,278 MW | 5,684 MW | 1,401 MW | 525 MW |
| 2026-10-26T07:00Z | 10,256 MW | 1,223 MW | 5,328 MW | 4,064 MW | 520 MW |
| 2026-10-26T08:00Z | 8,685 MW | 1,101 MW | 4,716 MW | 6,543 MW | 513 MW |
| 2026-10-26T09:00Z | 8,433 MW | 1,156 MW | 4,393 MW | 7,972 MW | 507 MW |
| 2026-10-26T10:00Z | 8,587 MW | 1,229 MW | 4,119 MW | 8,049 MW | 503 MW |
| 2026-10-26T11:00Z | 9,395 MW | 1,349 MW | 3,809 MW | 7,066 MW | 504 MW |
| 2026-10-26T12:00Z | 10,244 MW | 1,475 MW | 3,546 MW | 5,829 MW | 498 MW |
| 2026-10-26T13:00Z | 11,041 MW | 2,018 MW | 3,250 MW | 4,039 MW | 507 MW |
| 2026-10-26T14:00Z | 12,026 MW | 2,369 MW | 2,746 MW | 1,724 MW | 518 MW |
| 2026-10-26T15:00Z | 12,260 MW | 2,461 MW | 2,823 MW | 127 MW | 524 MW |
| 2026-10-26T16:00Z | 12,249 MW | 2,449 MW | 3,335 MW | 0 MW | 522 MW |
| 2026-10-26T17:00Z | 12,180 MW | 2,197 MW | 3,727 MW | 0 MW | 528 MW |
| 2026-10-26T18:00Z | 12,295 MW | 2,233 MW | 3,866 MW | 0 MW | 528 MW |
| 2026-10-26T19:00Z | 12,349 MW | 2,383 MW | 3,745 MW | 0 MW | 529 MW |
| 2026-10-26T20:00Z | 12,179 MW | 1,953 MW | 3,368 MW | 0 MW | 529 MW |
| 2026-10-26T21:00Z | 12,142 MW | 1,825 MW | 3,036 MW | 0 MW | 522 MW |
| 2026-10-26T22:00Z | 11,566 MW | 1,773 MW | 2,741 MW | 0 MW | 525 MW |
| 2026-10-26T23:00Z | 11,385 MW | 1,620 MW | 2,250 MW | 0 MW | 493 MW |
| 2026-10-27T00:00Z | 11,295 MW | 1,604 MW | 1,993 MW | 0 MW | 491 MW |
| 2026-10-27T01:00Z | 11,678 MW | 1,656 MW | 1,755 MW | 0 MW | 488 MW |
| 2026-10-27T02:00Z | 11,940 MW | 1,731 MW | 1,641 MW | 0 MW | 490 MW |
| 2026-10-27T03:00Z | 12,025 MW | 1,704 MW | 1,817 MW | 0 MW | 487 MW |
| 2026-10-27T04:00Z | 12,533 MW | 1,817 MW | 2,251 MW | 0 MW | 492 MW |
| 2026-10-27T05:00Z | 12,794 MW | 2,030 MW | 2,975 MW | 194 MW | 493 MW |
| 2026-10-27T06:00Z | 11,334 MW | 1,462 MW | 3,711 MW | 2,498 MW | 491 MW |
| 2026-10-27T07:00Z | 9,746 MW | 1,361 MW | 3,850 MW | 6,099 MW | 484 MW |
| 2026-10-27T08:00Z | 9,482 MW | 1,210 MW | 2,622 MW | 8,507 MW | 478 MW |
| 2026-10-27T09:00Z | 8,746 MW | 1,161 MW | 2,419 MW | 9,349 MW | 468 MW |
| 2026-10-27T10:00Z | 8,760 MW | 1,100 MW | 2,466 MW | 9,529 MW | 464 MW |
| 2026-10-27T11:00Z | 8,315 MW | 1,171 MW | 2,298 MW | 10,199 MW | 461 MW |
| 2026-10-27T12:00Z | 9,238 MW | 1,294 MW | 2,669 MW | 8,807 MW | 468 MW |
| 2026-10-27T13:00Z | 10,167 MW | 1,674 MW | 2,835 MW | 6,193 MW | 467 MW |
| 2026-10-27T14:00Z | 11,564 MW | 2,000 MW | 2,787 MW | 2,325 MW | 489 MW |
| 2026-10-27T15:00Z | 12,758 MW | 2,277 MW | 3,510 MW | 150 MW | 486 MW |
| 2026-10-27T16:00Z | 12,861 MW | 2,119 MW | 4,985 MW | 0 MW | 475 MW |
| 2026-10-27T17:00Z | 12,605 MW | 1,914 MW | 5,775 MW | 0 MW | 505 MW |
| 2026-10-27T18:00Z | 12,544 MW | 1,929 MW | 6,296 MW | 0 MW | 509 MW |
| 2026-10-27T19:00Z | 12,375 MW | 1,942 MW | 6,392 MW | 0 MW | 512 MW |
| 2026-10-27T20:00Z | 12,016 MW | 1,910 MW | 6,161 MW | 0 MW | 510 MW |
| 2026-10-27T21:00Z | 11,112 MW | 1,876 MW | 5,932 MW | 0 MW | 508 MW |
| 2026-10-27T22:00Z | 10,452 MW | 1,821 MW | 5,879 MW | 0 MW | 498 MW |
| 2026-10-27T23:00Z | 11,047 MW | 1,807 MW | 5,584 MW | 0 MW | 493 MW |
| 2026-10-28T00:00Z | 11,321 MW | 1,780 MW | 5,136 MW | 0 MW | 494 MW |
| 2026-10-28T01:00Z | 11,857 MW | 1,770 MW | 4,565 MW | 0 MW | 495 MW |
| 2026-10-28T02:00Z | 11,710 MW | 1,790 MW | 4,228 MW | 0 MW | 496 MW |
| 2026-10-28T03:00Z | 11,444 MW | 1,919 MW | 3,919 MW | 0 MW | 494 MW |
| 2026-10-28T04:00Z | 11,606 MW | 2,041 MW | 3,444 MW | 0 MW | 497 MW |
| 2026-10-28T05:00Z | 12,574 MW | 2,643 MW | 2,949 MW | 112 MW | 506 MW |
| 2026-10-28T06:00Z | 12,808 MW | 2,538 MW | 2,472 MW | 1,308 MW | 493 MW |
| 2026-10-28T07:00Z | 13,083 MW | 2,784 MW | 1,587 MW | 3,079 MW | 500 MW |
| 2026-10-28T08:00Z | 13,482 MW | 3,043 MW | 932 MW | 4,261 MW | 494 MW |
| 2026-10-28T09:00Z | 13,580 MW | 2,765 MW | 630 MW | 5,124 MW | 492 MW |
| 2026-10-28T10:00Z | 12,996 MW | 2,622 MW | 543 MW | 5,195 MW | 488 MW |
| 2026-10-28T11:00Z | 13,352 MW | 2,766 MW | 570 MW | 4,477 MW | 489 MW |
| 2026-10-28T12:00Z | 13,216 MW | 2,872 MW | 581 MW | 3,292 MW | 494 MW |
| 2026-10-28T13:00Z | 13,516 MW | 3,030 MW | 466 MW | 2,042 MW | 502 MW |
| 2026-10-28T14:00Z | 13,569 MW | 3,149 MW | 475 MW | 858 MW | 524 MW |
| 2026-10-28T15:00Z | 13,628 MW | 3,133 MW | 542 MW | 110 MW | 524 MW |
| 2026-10-28T16:00Z | 13,808 MW | 2,999 MW | 689 MW | 0 MW | 533 MW |
| 2026-10-28T17:00Z | 13,678 MW | 2,973 MW | 747 MW | 0 MW | 544 MW |
| 2026-10-28T18:00Z | 13,668 MW | 3,044 MW | 864 MW | 0 MW | 551 MW |
| 2026-10-28T19:00Z | 13,655 MW | 3,045 MW | 1,009 MW | 0 MW | 552 MW |
| 2026-10-28T20:00Z | 13,578 MW | 2,978 MW | 987 MW | 0 MW | 552 MW |
| 2026-10-28T21:00Z | 13,495 MW | 2,790 MW | 1,050 MW | 0 MW | 543 MW |
| 2026-10-28T22:00Z | 13,291 MW | 2,636 MW | 995 MW | 0 MW | 534 MW |
| 2026-10-28T23:00Z | 12,877 MW | 2,656 MW | 1,029 MW | 0 MW | 531 MW |
| 2026-10-29T00:00Z | 12,600 MW | 2,520 MW | 978 MW | 0 MW | 533 MW |
| 2026-10-29T01:00Z | 12,669 MW | 2,301 MW | 954 MW | 0 MW | 530 MW |
| 2026-10-29T02:00Z | 12,617 MW | 2,103 MW | 857 MW | 0 MW | 532 MW |
| 2026-10-29T03:00Z | 12,670 MW | 2,363 MW | 870 MW | 0 MW | 535 MW |
| 2026-10-29T04:00Z | 12,819 MW | 2,334 MW | 834 MW | 0 MW | 537 MW |
| 2026-10-29T05:00Z | 13,648 MW | 3,031 MW | 932 MW | 65 MW | 542 MW |
| 2026-10-29T06:00Z | 13,522 MW | 2,715 MW | 979 MW | 626 MW | 547 MW |
| 2026-10-29T07:00Z | 13,813 MW | 2,798 MW | 817 MW | 1,787 MW | 535 MW |
| 2026-10-29T08:00Z | 13,593 MW | 2,745 MW | 670 MW | 3,060 MW | 533 MW |
| 2026-10-29T09:00Z | 13,207 MW | 2,674 MW | 728 MW | 4,160 MW | 527 MW |
| 2026-10-29T10:00Z | 13,064 MW | 2,772 MW | 761 MW | 4,235 MW | 525 MW |
| 2026-10-29T11:00Z | 13,124 MW | 2,913 MW | 770 MW | 4,033 MW | 524 MW |
| 2026-10-29T12:00Z | 13,406 MW | 2,849 MW | 747 MW | 3,509 MW | 528 MW |
| 2026-10-29T13:00Z | 13,517 MW | 2,832 MW | 805 MW | 2,290 MW | 542 MW |
| 2026-10-29T14:00Z | 13,675 MW | 2,997 MW | 933 MW | 927 MW | 535 MW |
| 2026-10-29T15:00Z | 13,797 MW | 3,222 MW | 857 MW | 93 MW | 535 MW |
| 2026-10-29T16:00Z | 13,771 MW | 3,129 MW | 947 MW | 0 MW | 545 MW |
| 2026-10-29T17:00Z | 13,779 MW | 2,828 MW | 952 MW | 0 MW | 552 MW |
| 2026-10-29T18:00Z | 13,716 MW | 2,966 MW | 1,061 MW | 0 MW | 556 MW |
| 2026-10-29T19:00Z | 13,684 MW | 3,004 MW | 1,160 MW | 0 MW | 555 MW |
| 2026-10-29T20:00Z | 13,800 MW | 2,779 MW | 1,229 MW | 0 MW | 554 MW |
| 2026-10-29T21:00Z | 13,510 MW | 2,754 MW | 1,166 MW | 0 MW | 548 MW |
| 2026-10-29T22:00Z | 12,963 MW | 2,574 MW | 988 MW | 0 MW | 540 MW |
| 2026-10-29T23:00Z | 12,725 MW | 2,286 MW | 934 MW | 0 MW | 532 MW |
| 2026-10-30T00:00Z | 12,628 MW | 2,074 MW | 963 MW | 0 MW | 522 MW |
| 2026-10-30T01:00Z | 12,785 MW | 1,993 MW | 907 MW | 0 MW | 535 MW |
| 2026-10-30T02:00Z | 12,917 MW | 2,136 MW | 857 MW | 0 MW | 537 MW |
| 2026-10-30T03:00Z | 12,878 MW | 2,189 MW | 908 MW | 0 MW | 533 MW |
| 2026-10-30T04:00Z | 12,816 MW | 2,598 MW | 950 MW | 0 MW | 537 MW |
| 2026-10-30T05:00Z | 13,320 MW | 2,909 MW | 1,109 MW | 67 MW | 536 MW |
| 2026-10-30T06:00Z | 13,341 MW | 2,872 MW | 1,168 MW | 598 MW | 531 MW |
| 2026-10-30T07:00Z | 13,315 MW | 2,745 MW | 1,017 MW | 1,586 MW | 534 MW |
| 2026-10-30T08:00Z | 13,354 MW | 2,449 MW | 892 MW | 2,494 MW | 524 MW |
| 2026-10-30T09:00Z | 13,252 MW | 2,373 MW | 884 MW | 3,206 MW | 512 MW |
| 2026-10-30T10:00Z | 13,053 MW | 2,374 MW | 1,019 MW | 3,265 MW | 507 MW |
| 2026-10-30T11:00Z | 13,159 MW | 2,332 MW | 1,192 MW | 3,096 MW | 506 MW |
| 2026-10-30T12:00Z | 13,224 MW | 2,659 MW | 1,343 MW | 2,323 MW | 502 MW |
| 2026-10-30T13:00Z | 13,394 MW | 2,823 MW | 1,348 MW | 1,301 MW | 505 MW |
| 2026-10-30T14:00Z | 13,584 MW | 2,946 MW | 1,306 MW | 477 MW | 509 MW |
| 2026-10-30T15:00Z | 13,756 MW | 3,035 MW | 1,477 MW | 73 MW | 519 MW |
| 2026-10-30T16:00Z | 13,750 MW | 3,003 MW | 1,628 MW | 0 MW | 525 MW |
| 2026-10-30T17:00Z | 13,780 MW | 3,018 MW | 1,640 MW | 0 MW | 531 MW |
| 2026-10-30T18:00Z | 13,785 MW | 2,993 MW | 1,695 MW | 0 MW | 537 MW |
| 2026-10-30T19:00Z | 13,843 MW | 2,890 MW | 1,699 MW | 0 MW | 536 MW |
| 2026-10-30T20:00Z | 13,897 MW | 2,616 MW | 1,790 MW | 0 MW | 534 MW |
| 2026-10-30T21:00Z | 13,304 MW | 2,409 MW | 1,913 MW | 0 MW | 524 MW |
| 2026-10-30T22:00Z | 12,771 MW | 2,003 MW | 1,991 MW | 0 MW | 519 MW |
| 2026-10-30T23:00Z | 11,607 MW | 2,006 MW | 1,950 MW | 0 MW | 502 MW |
| 2026-10-31T00:00Z | 11,782 MW | 2,000 MW | 1,847 MW | 0 MW | 497 MW |
| 2026-10-31T01:00Z | 11,562 MW | 1,940 MW | 2,051 MW | 0 MW | 497 MW |
| 2026-10-31T02:00Z | 11,330 MW | 1,884 MW | 2,241 MW | 0 MW | 485 MW |
| 2026-10-31T03:00Z | 11,311 MW | 1,887 MW | 2,243 MW | 0 MW | 495 MW |
| 2026-10-31T04:00Z | 11,153 MW | 1,892 MW | 2,217 MW | 0 MW | 497 MW |
| 2026-10-31T05:00Z | 11,410 MW | 2,010 MW | 2,252 MW | 63 MW | 497 MW |
| 2026-10-31T06:00Z | 11,352 MW | 2,006 MW | 2,253 MW | 689 MW | 511 MW |
| 2026-10-31T07:00Z | 11,074 MW | 2,020 MW | 2,096 MW | 2,052 MW | 505 MW |
| 2026-10-31T08:00Z | 10,845 MW | 2,005 MW | 2,122 MW | 3,342 MW | 496 MW |
| 2026-10-31T09:00Z | 10,665 MW | 1,969 MW | 2,281 MW | 3,934 MW | 490 MW |
| 2026-10-31T10:00Z | 10,983 MW | 1,984 MW | 2,497 MW | 4,260 MW | 492 MW |
| 2026-10-31T11:00Z | 11,034 MW | 2,060 MW | 2,471 MW | 3,943 MW | 492 MW |
| 2026-10-31T12:00Z | 11,441 MW | 2,260 MW | 2,450 MW | 3,205 MW | 493 MW |
| 2026-10-31T13:00Z | 11,516 MW | 2,367 MW | 2,661 MW | 2,038 MW | 493 MW |
| 2026-10-31T14:00Z | 12,326 MW | 2,697 MW | 2,800 MW | 745 MW | 495 MW |
| 2026-10-31T15:00Z | 12,152 MW | 2,867 MW | 3,013 MW | 48 MW | 500 MW |
| 2026-10-31T16:00Z | 11,897 MW | 2,790 MW | 3,103 MW | 0 MW | 510 MW |
| 2026-10-31T17:00Z | 11,642 MW | 2,759 MW | 3,034 MW | 0 MW | 513 MW |
| 2026-10-31T18:00Z | 11,862 MW | 2,732 MW | 2,847 MW | 0 MW | 516 MW |
| 2026-10-31T19:00Z | 11,901 MW | 2,674 MW | 2,509 MW | 0 MW | 517 MW |
| 2026-10-31T20:00Z | 12,022 MW | 2,239 MW | 2,288 MW | 0 MW | 516 MW |
| 2026-10-31T21:00Z | 11,728 MW | 2,129 MW | 2,121 MW | 0 MW | 513 MW |
| 2026-10-31T22:00Z | 11,336 MW | 2,038 MW | 1,760 MW | 0 MW | 508 MW |
| 2026-10-31T23:00Z | 10,324 MW | 1,908 MW | 1,605 MW | 0 MW | 497 MW |
| 2026-11-01T00:00Z | 10,297 MW | 1,947 MW | 1,394 MW | 0 MW | 498 MW |
| 2026-11-01T01:00Z | 10,451 MW | 1,968 MW | 1,195 MW | 0 MW | 499 MW |
| 2026-11-01T02:00Z | 10,544 MW | 1,936 MW | 1,088 MW | 0 MW | 503 MW |
| 2026-11-01T03:00Z | 10,420 MW | 1,945 MW | 962 MW | 0 MW | 499 MW |
| 2026-11-01T04:00Z | 10,693 MW | 1,947 MW | 873 MW | 0 MW | 503 MW |
| 2026-11-01T05:00Z | 10,574 MW | 1,950 MW | 768 MW | 48 MW | 511 MW |
| 2026-11-01T06:00Z | 10,338 MW | 1,965 MW | 597 MW | 640 MW | 514 MW |
| 2026-11-01T07:00Z | 10,396 MW | 1,946 MW | 340 MW | 1,840 MW | 503 MW |
| 2026-11-01T08:00Z | 10,788 MW | 1,949 MW | 226 MW | 2,970 MW | 500 MW |
| 2026-11-01T09:00Z | 10,875 MW | 1,894 MW | 175 MW | 4,094 MW | 499 MW |
| 2026-11-01T10:00Z | 10,346 MW | 1,814 MW | 177 MW | 4,726 MW | 498 MW |
| 2026-11-01T11:00Z | 10,805 MW | 1,956 MW | 208 MW | 3,924 MW | 482 MW |
| 2026-11-01T12:00Z | 11,714 MW | 2,112 MW | 241 MW | 2,857 MW | 476 MW |
| 2026-11-01T13:00Z | 12,272 MW | 2,328 MW | 248 MW | 1,558 MW | 477 MW |
| 2026-11-01T14:00Z | 12,280 MW | 2,412 MW | 285 MW | 588 MW | 477 MW |
| 2026-11-01T15:00Z | 12,467 MW | 2,521 MW | 278 MW | 51 MW | 475 MW |
| 2026-11-01T16:00Z | 12,539 MW | 2,793 MW | 369 MW | 0 MW | 486 MW |
| 2026-11-01T17:00Z | 12,563 MW | 2,694 MW | 377 MW | 0 MW | 487 MW |
| 2026-11-01T18:00Z | 12,512 MW | 2,863 MW | 331 MW | 0 MW | 490 MW |
| 2026-11-01T19:00Z | 12,456 MW | 2,697 MW | 316 MW | 0 MW | 493 MW |
| 2026-11-01T20:00Z | 12,618 MW | 2,307 MW | 306 MW | 0 MW | 492 MW |
| 2026-11-01T21:00Z | 12,206 MW | 2,170 MW | 319 MW | 0 MW | 483 MW |
| 2026-11-01T22:00Z | 11,623 MW | 1,943 MW | 302 MW | 0 MW | 487 MW |
| 2026-11-01T23:00Z | 11,344 MW | 1,927 MW | 351 MW | 0 MW | 465 MW |
| 2026-11-02T00:00Z | 11,891 MW | 1,946 MW | 348 MW | 0 MW | 470 MW |
| 2026-11-02T01:00Z | 11,857 MW | 1,931 MW | 337 MW | 0 MW | 476 MW |
| 2026-11-02T02:00Z | 11,679 MW | 1,918 MW | 346 MW | 0 MW | 477 MW |
| 2026-11-02T03:00Z | 11,698 MW | 1,941 MW | 375 MW | 0 MW | 478 MW |
| 2026-11-02T04:00Z | 12,545 MW | 2,078 MW | 353 MW | 0 MW | 483 MW |
| 2026-11-02T05:00Z | 13,450 MW | 2,494 MW | 282 MW | 39 MW | 501 MW |
| 2026-11-02T06:00Z | 13,882 MW | 2,851 MW | 240 MW | 410 MW | 505 MW |
| 2026-11-02T07:00Z | 14,305 MW | 3,050 MW | 208 MW | 1,119 MW | 499 MW |
| 2026-11-02T08:00Z | 14,436 MW | 3,129 MW | 187 MW | 1,852 MW | 500 MW |
| 2026-11-02T09:00Z | 14,252 MW | 3,078 MW | 161 MW | 2,446 MW | 492 MW |
| 2026-11-02T10:00Z | 14,313 MW | 3,146 MW | 150 MW | 2,749 MW | 489 MW |
| 2026-11-02T11:00Z | 14,324 MW | 3,170 MW | 244 MW | 2,488 MW | 488 MW |
| 2026-11-02T12:00Z | 14,270 MW | 3,189 MW | 249 MW | 1,956 MW | 491 MW |
| 2026-11-02T13:00Z | 14,358 MW | 3,195 MW | 212 MW | 1,201 MW | 488 MW |
| 2026-11-02T14:00Z | 14,130 MW | 3,098 MW | 252 MW | 432 MW | 482 MW |
| 2026-11-02T15:00Z | 14,112 MW | 2,893 MW | 341 MW | 25 MW | 488 MW |
| 2026-11-02T16:00Z | 14,213 MW | 2,663 MW | 471 MW | 0 MW | 493 MW |
| 2026-11-02T17:00Z | 14,127 MW | 2,712 MW | 559 MW | 0 MW | 492 MW |
| 2026-11-02T18:00Z | 13,993 MW | 2,524 MW | 626 MW | 0 MW | 496 MW |
| 2026-11-02T19:00Z | 14,098 MW | 2,728 MW | 605 MW | 0 MW | 500 MW |
| 2026-11-02T20:00Z | 14,159 MW | 2,498 MW | 670 MW | 0 MW | 496 MW |
| 2026-11-02T21:00Z | 13,580 MW | 2,387 MW | 773 MW | 0 MW | 489 MW |
| 2026-11-02T22:00Z | 12,979 MW | 2,347 MW | 848 MW | 0 MW | 487 MW |
| 2026-11-02T23:00Z | 12,947 MW | 2,127 MW | 926 MW | 0 MW | 491 MW |
| 2026-11-03T00:00Z | 12,890 MW | 2,052 MW | 1,067 MW | 0 MW | 483 MW |
| 2026-11-03T01:00Z | 13,001 MW | 2,119 MW | 1,162 MW | 0 MW | 482 MW |
| 2026-11-03T02:00Z | 12,997 MW | 2,167 MW | 1,169 MW | 0 MW | 485 MW |
| 2026-11-03T03:00Z | 13,040 MW | 2,280 MW | 1,069 MW | 0 MW | 471 MW |
| 2026-11-03T04:00Z | 13,598 MW | 2,602 MW | 1,063 MW | 0 MW | 462 MW |
| 2026-11-03T05:00Z | 13,692 MW | 2,727 MW | 1,467 MW | 42 MW | 470 MW |
| 2026-11-03T06:00Z | 13,905 MW | 2,670 MW | 1,471 MW | 630 MW | 468 MW |
| 2026-11-03T07:00Z | 13,869 MW | 2,861 MW | 1,290 MW | 1,989 MW | 450 MW |
| 2026-11-03T08:00Z | 13,847 MW | 2,902 MW | 993 MW | 3,451 MW | 458 MW |
| 2026-11-03T09:00Z | 13,391 MW | 2,806 MW | 844 MW | 4,494 MW | 453 MW |
| 2026-11-03T10:00Z | 12,962 MW | 2,999 MW | 961 MW | 4,805 MW | 454 MW |
| 2026-11-03T11:00Z | 13,096 MW | 2,839 MW | 1,187 MW | 4,469 MW | 463 MW |
| 2026-11-03T12:00Z | 13,266 MW | 2,966 MW | 1,221 MW | 3,203 MW | 461 MW |
| 2026-11-03T13:00Z | 13,672 MW | 2,973 MW | 1,208 MW | 1,772 MW | 462 MW |
| 2026-11-03T14:00Z | 13,695 MW | 3,065 MW | 1,288 MW | 623 MW | 467 MW |
| 2026-11-03T15:00Z | 14,300 MW | 3,056 MW | 1,473 MW | 28 MW | 474 MW |
| 2026-11-03T16:00Z | 14,614 MW | 3,097 MW | 1,485 MW | 0 MW | 482 MW |
| 2026-11-03T17:00Z | 14,755 MW | 3,131 MW | 1,484 MW | 0 MW | 485 MW |
| 2026-11-03T18:00Z | 14,520 MW | 3,065 MW | 1,649 MW | 0 MW | 476 MW |
| 2026-11-03T19:00Z | 14,285 MW | 3,080 MW | 1,712 MW | 0 MW | 467 MW |
| 2026-11-03T20:00Z | 14,153 MW | 2,860 MW | 1,711 MW | 0 MW | 466 MW |
| 2026-11-03T21:00Z | 13,590 MW | 2,358 MW | 1,687 MW | 0 MW | 458 MW |
| 2026-11-03T22:00Z | 13,070 MW | 2,074 MW | 1,707 MW | 0 MW | 454 MW |
| 2026-11-03T23:00Z | 12,055 MW | 2,252 MW | 1,801 MW | 0 MW | 393 MW |
| 2026-11-04T00:00Z | 12,361 MW | 2,472 MW | 1,914 MW | 0 MW | 418 MW |
| 2026-11-04T01:00Z | 12,177 MW | 2,262 MW | 1,845 MW | 0 MW | 417 MW |
| 2026-11-04T02:00Z | 12,145 MW | 2,397 MW | 1,724 MW | 0 MW | 409 MW |
| 2026-11-04T03:00Z | 12,089 MW | 2,578 MW | 1,707 MW | 0 MW | 405 MW |
| 2026-11-04T04:00Z | 12,565 MW | 2,906 MW | 1,599 MW | 0 MW | 422 MW |
| 2026-11-04T05:00Z | 13,150 MW | 2,952 MW | 1,495 MW | 41 MW | 427 MW |
| 2026-11-04T06:00Z | 13,787 MW | 3,146 MW | 1,229 MW | 869 MW | 438 MW |
| 2026-11-04T07:00Z | 13,647 MW | 2,840 MW | 865 MW | 2,519 MW | 435 MW |
| 2026-11-04T08:00Z | 13,083 MW | 2,582 MW | 520 MW | 3,995 MW | 416 MW |
| 2026-11-04T09:00Z | 12,734 MW | 2,541 MW | 468 MW | 6,244 MW | 412 MW |
| 2026-11-04T10:00Z | 12,009 MW | 2,381 MW | 501 MW | 7,198 MW | 423 MW |
| 2026-11-04T11:00Z | 12,790 MW | 2,716 MW | 519 MW | 6,432 MW | 425 MW |
| 2026-11-04T12:00Z | 13,436 MW | 2,977 MW | 563 MW | 5,058 MW | 418 MW |
| 2026-11-04T13:00Z | 13,674 MW | 3,025 MW | 605 MW | 3,062 MW | 422 MW |
| 2026-11-04T14:00Z | 13,689 MW | 3,072 MW | 612 MW | 1,022 MW | 424 MW |
| 2026-11-04T15:00Z | 14,249 MW | 3,171 MW | 796 MW | 44 MW | 421 MW |
| 2026-11-04T16:00Z | 14,635 MW | 3,161 MW | 1,191 MW | 0 MW | 425 MW |
| 2026-11-04T17:00Z | 14,283 MW | 3,140 MW | 1,262 MW | 0 MW | 426 MW |
| 2026-11-04T18:00Z | 14,381 MW | 3,240 MW | 1,089 MW | 0 MW | 425 MW |
| 2026-11-04T19:00Z | 14,463 MW | 3,257 MW | 894 MW | 0 MW | 424 MW |
| 2026-11-04T20:00Z | 14,276 MW | 2,974 MW | 778 MW | 0 MW | 422 MW |
| 2026-11-04T21:00Z | 13,744 MW | 2,819 MW | 657 MW | 0 MW | 414 MW |
| 2026-11-04T22:00Z | 13,379 MW | 2,885 MW | 641 MW | 0 MW | 415 MW |
| 2026-11-04T23:00Z | 13,391 MW | 2,710 MW | 721 MW | 0 MW | 402 MW |
| 2026-11-05T00:00Z | 13,140 MW | 2,587 MW | 963 MW | 0 MW | 404 MW |
| 2026-11-05T01:00Z | 12,981 MW | 2,608 MW | 1,079 MW | 0 MW | 403 MW |
| 2026-11-05T02:00Z | 12,878 MW | 2,560 MW | 1,281 MW | 0 MW | 401 MW |
| 2026-11-05T03:00Z | 12,963 MW | 2,521 MW | 1,552 MW | 0 MW | 399 MW |
| 2026-11-05T04:00Z | 12,961 MW | 2,505 MW | 1,925 MW | 0 MW | 399 MW |
| 2026-11-05T05:00Z | 13,736 MW | 3,045 MW | 2,109 MW | 52 MW | 414 MW |
| 2026-11-05T06:00Z | 13,722 MW | 2,996 MW | 2,083 MW | 1,074 MW | 426 MW |
| 2026-11-05T07:00Z | 13,642 MW | 3,098 MW | 1,971 MW | 3,477 MW | 427 MW |
| 2026-11-05T08:00Z | 12,607 MW | 2,351 MW | 1,700 MW | 5,735 MW | 421 MW |
| 2026-11-05T09:00Z | 12,052 MW | 2,191 MW | 1,407 MW | 7,336 MW | 413 MW |
| 2026-11-05T10:00Z | 11,463 MW | 2,044 MW | 1,461 MW | 8,318 MW | 412 MW |
| 2026-11-05T11:00Z | 11,144 MW | 2,045 MW | 1,630 MW | 8,350 MW | 414 MW |
| 2026-11-05T12:00Z | 11,635 MW | 2,119 MW | 1,685 MW | 7,210 MW | 421 MW |
| 2026-11-05T13:00Z | 12,267 MW | 2,468 MW | 1,626 MW | 4,712 MW | 424 MW |
| 2026-11-05T14:00Z | 13,539 MW | 2,945 MW | 1,678 MW | 1,460 MW | 428 MW |
| 2026-11-05T15:00Z | 13,954 MW | 3,167 MW | 2,105 MW | 36 MW | 432 MW |
| 2026-11-05T16:00Z | 14,000 MW | 3,020 MW | 2,433 MW | 0 MW | 436 MW |
| 2026-11-05T17:00Z | 14,046 MW | 3,155 MW | 2,577 MW | 0 MW | 435 MW |
| 2026-11-05T18:00Z | 14,033 MW | 3,059 MW | 2,402 MW | 0 MW | 439 MW |
| 2026-11-05T19:00Z | 14,072 MW | 3,031 MW | 2,186 MW | 0 MW | 439 MW |
| 2026-11-05T20:00Z | 14,325 MW | 3,130 MW | 1,906 MW | 0 MW | 437 MW |
| 2026-11-05T21:00Z | 13,928 MW | 3,024 MW | 1,798 MW | 0 MW | 428 MW |
| 2026-11-05T22:00Z | 13,447 MW | 2,788 MW | 1,619 MW | 0 MW | 407 MW |
| 2026-11-05T23:00Z | 13,146 MW | 2,672 MW | 1,602 MW | 0 MW | 408 MW |
| 2026-11-06T00:00Z | 13,055 MW | 2,826 MW | 1,645 MW | 0 MW | 409 MW |
| 2026-11-06T01:00Z | 12,912 MW | 2,786 MW | 1,759 MW | 0 MW | 403 MW |
| 2026-11-06T02:00Z | 13,075 MW | 2,598 MW | 1,646 MW | 0 MW | 399 MW |
| 2026-11-06T03:00Z | 13,119 MW | 2,561 MW | 1,558 MW | 0 MW | 402 MW |
| 2026-11-06T04:00Z | 13,354 MW | 2,832 MW | 1,615 MW | 0 MW | 403 MW |
| 2026-11-06T05:00Z | 14,045 MW | 3,359 MW | 1,561 MW | 63 MW | 415 MW |
| 2026-11-06T06:00Z | 14,517 MW | 3,277 MW | 1,497 MW | 943 MW | 416 MW |
| 2026-11-06T07:00Z | 13,767 MW | 3,064 MW | 1,277 MW | 2,876 MW | 404 MW |
| 2026-11-06T08:00Z | 13,099 MW | 2,596 MW | 883 MW | 5,204 MW | 405 MW |
| 2026-11-06T09:00Z | 12,661 MW | 2,557 MW | 593 MW | 6,505 MW | 399 MW |
| 2026-11-06T10:00Z | 12,413 MW | 2,529 MW | 641 MW | 7,170 MW | 400 MW |
| 2026-11-06T11:00Z | 12,486 MW | 2,609 MW | 672 MW | 6,586 MW | 405 MW |
| 2026-11-06T12:00Z | 12,757 MW | 2,622 MW | 683 MW | 5,470 MW | 410 MW |
| 2026-11-06T13:00Z | 13,357 MW | 2,826 MW | 602 MW | 3,308 MW | 412 MW |
| 2026-11-06T14:00Z | 13,783 MW | 3,113 MW | 650 MW | 1,072 MW | 414 MW |
| 2026-11-06T15:00Z | 13,982 MW | 3,269 MW | 876 MW | 28 MW | 414 MW |
| 2026-11-06T16:00Z | 14,445 MW | 3,309 MW | 1,016 MW | 0 MW | 414 MW |
| 2026-11-06T17:00Z | 14,242 MW | 3,340 MW | 1,148 MW | 0 MW | 413 MW |
| 2026-11-06T18:00Z | 14,695 MW | 3,352 MW | 1,142 MW | 0 MW | 412 MW |
| 2026-11-06T19:00Z | 14,692 MW | 3,333 MW | 1,122 MW | 0 MW | 418 MW |
| 2026-11-06T20:00Z | 14,375 MW | 3,222 MW | 1,142 MW | 0 MW | 421 MW |
| 2026-11-06T21:00Z | 14,129 MW | 3,208 MW | 1,128 MW | 0 MW | 407 MW |
| 2026-11-06T22:00Z | 13,630 MW | 2,822 MW | 1,093 MW | 0 MW | 408 MW |
| 2026-11-06T23:00Z | 12,241 MW | 2,842 MW | 1,122 MW | 0 MW | 398 MW |
| 2026-11-07T00:00Z | 11,678 MW | 2,949 MW | 1,096 MW | 0 MW | 400 MW |
| 2026-11-07T01:00Z | 12,009 MW | 2,773 MW | 1,045 MW | 0 MW | 399 MW |
| 2026-11-07T02:00Z | 12,000 MW | 2,799 MW | 1,034 MW | 0 MW | 400 MW |
| 2026-11-07T03:00Z | 12,008 MW | 2,783 MW | 1,109 MW | 0 MW | 401 MW |
| 2026-11-07T04:00Z | 11,891 MW | 2,821 MW | 1,113 MW | 0 MW | 394 MW |
| 2026-11-07T05:00Z | 11,986 MW | 2,921 MW | 1,157 MW | 48 MW | 408 MW |
| 2026-11-07T06:00Z | 11,812 MW | 2,906 MW | 1,173 MW | 1,236 MW | 409 MW |
| 2026-11-07T07:00Z | 11,505 MW | 2,354 MW | 1,186 MW | 4,232 MW | 402 MW |
| 2026-11-07T08:00Z | 10,592 MW | 2,372 MW | 863 MW | 6,924 MW | 395 MW |
| 2026-11-07T09:00Z | 10,732 MW | 2,412 MW | 501 MW | 8,477 MW | 382 MW |
| 2026-11-07T10:00Z | 10,409 MW | 2,253 MW | 378 MW | 9,127 MW | 380 MW |
| 2026-11-07T11:00Z | 10,307 MW | 2,254 MW | 437 MW | 8,655 MW | 381 MW |
| 2026-11-07T12:00Z | 10,759 MW | 2,400 MW | 464 MW | 7,060 MW | 386 MW |
| 2026-11-07T13:00Z | 11,414 MW | 2,648 MW | 466 MW | 4,347 MW | 400 MW |
| 2026-11-07T14:00Z | 11,622 MW | 2,804 MW | 560 MW | 1,239 MW | 405 MW |
| 2026-11-07T15:00Z | 11,820 MW | 3,164 MW | 842 MW | 23 MW | 410 MW |
| 2026-11-07T16:00Z | 12,415 MW | 3,226 MW | 1,193 MW | 0 MW | 412 MW |
| 2026-11-07T17:00Z | 12,220 MW | 3,234 MW | 1,461 MW | 0 MW | 412 MW |
| 2026-11-07T18:00Z | 11,874 MW | 3,165 MW | 1,614 MW | 0 MW | 409 MW |
| 2026-11-07T19:00Z | 11,815 MW | 3,080 MW | 1,544 MW | 0 MW | 410 MW |
| 2026-11-07T20:00Z | 12,086 MW | 3,105 MW | 1,434 MW | 0 MW | 410 MW |
| 2026-11-07T21:00Z | 12,009 MW | 3,089 MW | 1,298 MW | 0 MW | 407 MW |
| 2026-11-07T22:00Z | 11,608 MW | 2,960 MW | 1,172 MW | 0 MW | 404 MW |
| 2026-11-07T23:00Z | 10,961 MW | 2,939 MW | 1,019 MW | 0 MW | 403 MW |
| 2026-11-08T00:00Z | 11,115 MW | 2,728 MW | 838 MW | 0 MW | 406 MW |
| 2026-11-08T01:00Z | 11,158 MW | 2,560 MW | 778 MW | 0 MW | 416 MW |
| 2026-11-08T02:00Z | 11,299 MW | 2,470 MW | 745 MW | 0 MW | 426 MW |
| 2026-11-08T03:00Z | 11,206 MW | 2,491 MW | 738 MW | 0 MW | 428 MW |
| 2026-11-08T04:00Z | 11,136 MW | 2,664 MW | 822 MW | 0 MW | 434 MW |
| 2026-11-08T05:00Z | 11,138 MW | 2,689 MW | 878 MW | 46 MW | 436 MW |
| 2026-11-08T06:00Z | 10,959 MW | 2,528 MW | 918 MW | 1,085 MW | 441 MW |
| 2026-11-08T07:00Z | 10,323 MW | 1,987 MW | 923 MW | 3,703 MW | 420 MW |
| 2026-11-08T08:00Z | 9,647 MW | 1,893 MW | 714 MW | 6,089 MW | 392 MW |
| 2026-11-08T09:00Z | 10,250 MW | 1,967 MW | 380 MW | 7,330 MW | 391 MW |
| 2026-11-08T10:00Z | 10,232 MW | 1,907 MW | 221 MW | 7,785 MW | 389 MW |
| 2026-11-08T11:00Z | 9,652 MW | 2,002 MW | 196 MW | 7,388 MW | 390 MW |
| 2026-11-08T12:00Z | 10,219 MW | 2,597 MW | 163 MW | 5,915 MW | 392 MW |
| 2026-11-08T13:00Z | 11,062 MW | 2,609 MW | 131 MW | 3,423 MW | 420 MW |
| 2026-11-08T14:00Z | 11,737 MW | 3,054 MW | 151 MW | 861 MW | 433 MW |
| 2026-11-08T15:00Z | 12,050 MW | 3,112 MW | 341 MW | 35 MW | 439 MW |
| 2026-11-08T16:00Z | 12,030 MW | 3,208 MW | 543 MW | 0 MW | 436 MW |
| 2026-11-08T17:00Z | 11,777 MW | 3,224 MW | 825 MW | 0 MW | 435 MW |
| 2026-11-08T18:00Z | 11,986 MW | 3,239 MW | 1,092 MW | 0 MW | 436 MW |
| 2026-11-08T19:00Z | 12,403 MW | 3,226 MW | 1,185 MW | 0 MW | 440 MW |
| 2026-11-08T20:00Z | 12,345 MW | 3,207 MW | 1,097 MW | 0 MW | 438 MW |
| 2026-11-08T21:00Z | 12,155 MW | 3,087 MW | 1,030 MW | 0 MW | 434 MW |
| 2026-11-08T22:00Z | 11,673 MW | 3,177 MW | 913 MW | 0 MW | 432 MW |
| 2026-11-08T23:00Z | 11,389 MW | 3,144 MW | 820 MW | 0 MW | 431 MW |
| 2026-11-09T00:00Z | 12,030 MW | 3,153 MW | 759 MW | 0 MW | 430 MW |
| 2026-11-09T01:00Z | 12,273 MW | 3,232 MW | 684 MW | 0 MW | 429 MW |
| 2026-11-09T02:00Z | 12,526 MW | 3,234 MW | 636 MW | 0 MW | 430 MW |
| 2026-11-09T03:00Z | 12,945 MW | 3,219 MW | 655 MW | 0 MW | 431 MW |
| 2026-11-09T04:00Z | 13,115 MW | 3,228 MW | 698 MW | 0 MW | 432 MW |
| 2026-11-09T05:00Z | 13,723 MW | 3,377 MW | 784 MW | 29 MW | 433 MW |
| 2026-11-09T06:00Z | 14,110 MW | 3,282 MW | 852 MW | 989 MW | 431 MW |
| 2026-11-09T07:00Z | 13,599 MW | 3,202 MW | 760 MW | 3,270 MW | 437 MW |
| 2026-11-09T08:00Z | 13,259 MW | 3,121 MW | 544 MW | 5,346 MW | 437 MW |
| 2026-11-09T09:00Z | 12,977 MW | 2,444 MW | 362 MW | 6,723 MW | 429 MW |
| 2026-11-09T10:00Z | 13,195 MW | 2,534 MW | 297 MW | 7,001 MW | 430 MW |
| 2026-11-09T11:00Z | 13,314 MW | 2,833 MW | 234 MW | 6,469 MW | 432 MW |
| 2026-11-09T12:00Z | 13,331 MW | 3,132 MW | 194 MW | 5,129 MW | 443 MW |
| 2026-11-09T13:00Z | 13,407 MW | 3,068 MW | 217 MW | 2,772 MW | 445 MW |
| 2026-11-09T14:00Z | 14,134 MW | 3,218 MW | 353 MW | 650 MW | 453 MW |
| 2026-11-09T15:00Z | 14,194 MW | 3,258 MW | 650 MW | 0 MW | 461 MW |
| 2026-11-09T16:00Z | 14,581 MW | 3,260 MW | 1,151 MW | 0 MW | 464 MW |
| 2026-11-09T17:00Z | 14,541 MW | 3,289 MW | 1,623 MW | 0 MW | 465 MW |
| 2026-11-09T18:00Z | 14,403 MW | 3,299 MW | 1,791 MW | 0 MW | 457 MW |
| 2026-11-09T19:00Z | 14,512 MW | 3,172 MW | 1,907 MW | 0 MW | 450 MW |
| 2026-11-09T20:00Z | 14,072 MW | 3,075 MW | 1,877 MW | 0 MW | 441 MW |
| 2026-11-09T21:00Z | 13,654 MW | 3,091 MW | 1,822 MW | 0 MW | 436 MW |
| 2026-11-09T22:00Z | 13,491 MW | 3,071 MW | 1,726 MW | 0 MW | 433 MW |
| 2026-11-09T23:00Z | 13,169 MW | 3,020 MW | 1,667 MW | 0 MW | 436 MW |
| 2026-11-10T00:00Z | 13,135 MW | 2,947 MW | 1,715 MW | 0 MW | 435 MW |
| 2026-11-10T01:00Z | 13,130 MW | 2,855 MW | 1,897 MW | 0 MW | 436 MW |
| 2026-11-10T02:00Z | 13,421 MW | 2,871 MW | 1,832 MW | 0 MW | 436 MW |
| 2026-11-10T03:00Z | 13,489 MW | 3,117 MW | 1,763 MW | 0 MW | 436 MW |
| 2026-11-10T04:00Z | 13,426 MW | 3,157 MW | 1,735 MW | 0 MW | 441 MW |
| 2026-11-10T05:00Z | 14,219 MW | 3,372 MW | 1,552 MW | 25 MW | 455 MW |
| 2026-11-10T06:00Z | 14,372 MW | 3,374 MW | 1,251 MW | 741 MW | 455 MW |
| 2026-11-10T07:00Z | 14,086 MW | 3,287 MW | 1,041 MW | 1,965 MW | 454 MW |
| 2026-11-10T08:00Z | 14,158 MW | 3,146 MW | 869 MW | 2,764 MW | 447 MW |
| 2026-11-10T09:00Z | 14,119 MW | 3,132 MW | 654 MW | 3,004 MW | 444 MW |
| 2026-11-10T10:00Z | 14,003 MW | 3,163 MW | 635 MW | 2,975 MW | 446 MW |
| 2026-11-10T11:00Z | 14,172 MW | 3,210 MW | 733 MW | 2,578 MW | 451 MW |
| 2026-11-10T12:00Z | 14,959 MW | 3,325 MW | 721 MW | 1,345 MW | 450 MW |
| 2026-11-10T13:00Z | 15,097 MW | 3,318 MW | 880 MW | 692 MW | 451 MW |
| 2026-11-10T14:00Z | 14,632 MW | 3,164 MW | 1,291 MW | 256 MW | 450 MW |
| 2026-11-10T15:00Z | 14,072 MW | 3,164 MW | 1,788 MW | 0 MW | 453 MW |
| 2026-11-10T16:00Z | 14,253 MW | 3,065 MW | 2,056 MW | 0 MW | 454 MW |
| 2026-11-10T17:00Z | 14,364 MW | 3,178 MW | 2,126 MW | 0 MW | 459 MW |
| 2026-11-10T18:00Z | 14,457 MW | 3,235 MW | 2,161 MW | 0 MW | 467 MW |
| 2026-11-10T19:00Z | 14,440 MW | 3,186 MW | 2,103 MW | 0 MW | 470 MW |
| 2026-11-10T20:00Z | 14,214 MW | 3,235 MW | 2,267 MW | 0 MW | 473 MW |
| 2026-11-10T21:00Z | 13,775 MW | 3,128 MW | 2,443 MW | 0 MW | 453 MW |
| 2026-11-10T22:00Z | 13,232 MW | 2,585 MW | 2,486 MW | 0 MW | 446 MW |
| 2026-11-10T23:00Z | 12,149 MW | 2,942 MW | 2,423 MW | 0 MW | 450 MW |
| 2026-11-11T00:00Z | 11,733 MW | 3,082 MW | 2,183 MW | 0 MW | 446 MW |
| 2026-11-11T01:00Z | 11,769 MW | 3,111 MW | 1,851 MW | 0 MW | 451 MW |
| 2026-11-11T02:00Z | 12,013 MW | 3,194 MW | 1,674 MW | 0 MW | 452 MW |
| 2026-11-11T03:00Z | 11,959 MW | 3,162 MW | 1,568 MW | 0 MW | 453 MW |
| 2026-11-11T04:00Z | 12,070 MW | 3,173 MW | 1,491 MW | 0 MW | 456 MW |
| 2026-11-11T05:00Z | 11,981 MW | 3,232 MW | 1,277 MW | 11 MW | 470 MW |
| 2026-11-11T06:00Z | 11,879 MW | 3,243 MW | 1,208 MW | 321 MW | 470 MW |
| 2026-11-11T07:00Z | 11,807 MW | 3,252 MW | 1,118 MW | 1,215 MW | 467 MW |
| 2026-11-11T08:00Z | 11,665 MW | 3,153 MW | 978 MW | 2,199 MW | 461 MW |
| 2026-11-11T09:00Z | 11,235 MW | 3,077 MW | 940 MW | 2,974 MW | 457 MW |
| 2026-11-11T10:00Z | 11,085 MW | 2,945 MW | 932 MW | 3,281 MW | 457 MW |
| 2026-11-11T11:00Z | 11,388 MW | 3,139 MW | 918 MW | 3,070 MW | 459 MW |
| 2026-11-11T12:00Z | 11,795 MW | 3,203 MW | 915 MW | 2,338 MW | 463 MW |
| 2026-11-11T13:00Z | 12,048 MW | 3,215 MW | 1,059 MW | 1,277 MW | 460 MW |
| 2026-11-11T14:00Z | 11,659 MW | 3,195 MW | 1,356 MW | 353 MW | 459 MW |
| 2026-11-11T15:00Z | 12,094 MW | 3,223 MW | 1,569 MW | 0 MW | 463 MW |
| 2026-11-11T16:00Z | 12,211 MW | 3,228 MW | 1,669 MW | 0 MW | 462 MW |
| 2026-11-11T17:00Z | 12,310 MW | 3,228 MW | 1,888 MW | 0 MW | 463 MW |
| 2026-11-11T18:00Z | 11,949 MW | 3,278 MW | 1,984 MW | 0 MW | 464 MW |
| 2026-11-11T19:00Z | 11,956 MW | 3,274 MW | 2,120 MW | 0 MW | 462 MW |
| 2026-11-11T20:00Z | 11,485 MW | 3,154 MW | 2,208 MW | 0 MW | 462 MW |
| 2026-11-11T21:00Z | 11,199 MW | 3,105 MW | 2,090 MW | 0 MW | 442 MW |
| 2026-11-11T22:00Z | 11,077 MW | 3,001 MW | 2,012 MW | 0 MW | 443 MW |
| 2026-11-11T23:00Z | 11,516 MW | 3,027 MW | 1,890 MW | 0 MW | 439 MW |
| 2026-11-12T00:00Z | 11,874 MW | 3,180 MW | 1,842 MW | 0 MW | 437 MW |
| 2026-11-12T01:00Z | 11,720 MW | 3,159 MW | 1,664 MW | 0 MW | 437 MW |
| 2026-11-12T02:00Z | 11,822 MW | 3,131 MW | 1,629 MW | 0 MW | 436 MW |
| 2026-11-12T03:00Z | 11,969 MW | 2,990 MW | 1,760 MW | 0 MW | 441 MW |
| 2026-11-12T04:00Z | 12,177 MW | 2,780 MW | 1,715 MW | 0 MW | 446 MW |
| 2026-11-12T05:00Z | 13,247 MW | 3,181 MW | 1,838 MW | 9 MW | 465 MW |
| 2026-11-12T06:00Z | 13,023 MW | 3,160 MW | 1,865 MW | 269 MW | 467 MW |
| 2026-11-12T07:00Z | 13,019 MW | 3,151 MW | 1,796 MW | 923 MW | 467 MW |
| 2026-11-12T08:00Z | 13,143 MW | 2,864 MW | 1,609 MW | 1,525 MW | 459 MW |
| 2026-11-12T09:00Z | 13,271 MW | 2,854 MW | 1,492 MW | 1,924 MW | 451 MW |
| 2026-11-12T10:00Z | 13,063 MW | 2,826 MW | 1,415 MW | 2,386 MW | 452 MW |
| 2026-11-12T11:00Z | 12,895 MW | 2,775 MW | 1,384 MW | 2,352 MW | 453 MW |
| 2026-11-12T12:00Z | 12,840 MW | 2,631 MW | 1,632 MW | 1,966 MW | 455 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T12:00Z.
Installed Capacity
Annual figure for 2026| Coal | |
|---|---|
| Solar | |
| Wind | |
| Gas | |
| Other | |
| Storage | |
| Hydro | |
| Bioenergy | |
| Oil |
Total installed capacity in Poland: 68.3 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Warsaw time dates, through 2026-11-11Show the data table (400 rows)
| Date (Europe/Warsaw time) | Demand |
|---|---|
| 2025-10-08 | 465 GWh |
| 2025-10-09 | 468 GWh |
| 2025-10-10 | 457 GWh |
| 2025-10-11 | 406 GWh |
| 2025-10-12 | 370 GWh |
| 2025-10-13 | 438 GWh |
| 2025-10-14 | 477 GWh |
| 2025-10-15 | 473 GWh |
| 2025-10-16 | 473 GWh |
| 2025-10-17 | 474 GWh |
| 2025-10-18 | 419 GWh |
| 2025-10-19 | 381 GWh |
| 2025-10-20 | 453 GWh |
| 2025-10-21 | 469 GWh |
| 2025-10-22 | 471 GWh |
| 2025-10-23 | 465 GWh |
| 2025-10-24 | 476 GWh |
| 2025-10-25 | 412 GWh |
| 2025-10-26 | 392 GWh |
| 2025-10-27 | 465 GWh |
| 2025-10-28 | 480 GWh |
| 2025-10-29 | 468 GWh |
| 2025-10-30 | 469 GWh |
| 2025-10-31 | 458 GWh |
| 2025-11-01 | 355 GWh |
| 2025-11-02 | 360 GWh |
| 2025-11-03 | 465 GWh |
| 2025-11-04 | 465 GWh |
| 2025-11-05 | 469 GWh |
| 2025-11-06 | 470 GWh |
| 2025-11-07 | 468 GWh |
| 2025-11-08 | 433 GWh |
| 2025-11-09 | 392 GWh |
| 2025-11-10 | 425 GWh |
| 2025-11-11 | 396 GWh |
| 2025-11-12 | 465 GWh |
| 2025-11-13 | 468 GWh |
| 2025-11-14 | 486 GWh |
| 2025-11-15 | 441 GWh |
| 2025-11-16 | 399 GWh |
| 2025-11-17 | 488 GWh |
| 2025-11-18 | 503 GWh |
| 2025-11-19 | 505 GWh |
| 2025-11-20 | 516 GWh |
| 2025-11-21 | 520 GWh |
| 2025-11-22 | 475 GWh |
| 2025-11-23 | 448 GWh |
| 2025-11-24 | 533 GWh |
| 2025-11-25 | 532 GWh |
| 2025-11-26 | 526 GWh |
| 2025-11-27 | 528 GWh |
| 2025-11-28 | 531 GWh |
| 2025-11-29 | 474 GWh |
| 2025-11-30 | 430 GWh |
| 2025-12-01 | 516 GWh |
| 2025-12-02 | 528 GWh |
| 2025-12-03 | 525 GWh |
| 2025-12-04 | 516 GWh |
| 2025-12-05 | 511 GWh |
| 2025-12-06 | 453 GWh |
| 2025-12-07 | 413 GWh |
| 2025-12-08 | 488 GWh |
| 2025-12-09 | 499 GWh |
| 2025-12-10 | 493 GWh |
| 2025-12-11 | 490 GWh |
| 2025-12-12 | 502 GWh |
| 2025-12-13 | 450 GWh |
| 2025-12-14 | 409 GWh |
| 2025-12-15 | 499 GWh |
| 2025-12-16 | 525 GWh |
| 2025-12-17 | 524 GWh |
| 2025-12-18 | 507 GWh |
| 2025-12-19 | 488 GWh |
| 2025-12-20 | 455 GWh |
| 2025-12-21 | 424 GWh |
| 2025-12-22 | 480 GWh |
| 2025-12-23 | 479 GWh |
| 2025-12-24 | 411 GWh |
| 2025-12-25 | 392 GWh |
| 2025-12-26 | 383 GWh |
| 2025-12-27 | 407 GWh |
| 2025-12-28 | 388 GWh |
| 2025-12-29 | 451 GWh |
| 2025-12-30 | 452 GWh |
| 2025-12-31 | 442 GWh |
| 2026-01-01 | 378 GWh |
| 2026-01-02 | 427 GWh |
| 2026-01-03 | 430 GWh |
| 2026-01-04 | 411 GWh |
| 2026-01-05 | 478 GWh |
| 2026-01-06 | 454 GWh |
| 2026-01-07 | 545 GWh |
| 2026-01-08 | 571 GWh |
| 2026-01-09 | 574 GWh |
| 2026-01-10 | 515 GWh |
| 2026-01-11 | 458 GWh |
| 2026-01-12 | 557 GWh |
| 2026-01-13 | 569 GWh |
| 2026-01-14 | 558 GWh |
| 2026-01-15 | 541 GWh |
| 2026-01-16 | 536 GWh |
| 2026-01-17 | 493 GWh |
| 2026-01-18 | 456 GWh |
| 2026-01-19 | 547 GWh |
| 2026-01-20 | 557 GWh |
| 2026-01-21 | 560 GWh |
| 2026-01-22 | 558 GWh |
| 2026-01-23 | 558 GWh |
| 2026-01-24 | 500 GWh |
| 2026-01-25 | 455 GWh |
| 2026-01-26 | 525 GWh |
| 2026-01-27 | 539 GWh |
| 2026-01-28 | 543 GWh |
| 2026-01-29 | 547 GWh |
| 2026-01-30 | 551 GWh |
| 2026-01-31 | 505 GWh |
| 2026-02-01 | 477 GWh |
| 2026-02-02 | 569 GWh |
| 2026-02-03 | 581 GWh |
| 2026-02-04 | 571 GWh |
| 2026-02-05 | 559 GWh |
| 2026-02-06 | 545 GWh |
| 2026-02-07 | 489 GWh |
| 2026-02-08 | 445 GWh |
| 2026-02-09 | 543 GWh |
| 2026-02-10 | 554 GWh |
| 2026-02-11 | 531 GWh |
| 2026-02-12 | 510 GWh |
| 2026-02-13 | 504 GWh |
| 2026-02-14 | 473 GWh |
| 2026-02-15 | 450 GWh |
| 2026-02-16 | 541 GWh |
| 2026-02-17 | 560 GWh |
| 2026-02-18 | 553 GWh |
| 2026-02-19 | 551 GWh |
| 2026-02-20 | 542 GWh |
| 2026-02-21 | 474 GWh |
| 2026-02-22 | 421 GWh |
| 2026-02-23 | 481 GWh |
| 2026-02-24 | 500 GWh |
| 2026-02-25 | 508 GWh |
| 2026-02-26 | 482 GWh |
| 2026-02-27 | 468 GWh |
| 2026-02-28 | 407 GWh |
| 2026-03-01 | 377 GWh |
| 2026-03-02 | 455 GWh |
| 2026-03-03 | 466 GWh |
| 2026-03-04 | 462 GWh |
| 2026-03-05 | 471 GWh |
| 2026-03-06 | 475 GWh |
| 2026-03-07 | 416 GWh |
| 2026-03-08 | 379 GWh |
| 2026-03-09 | 439 GWh |
| 2026-03-10 | 457 GWh |
| 2026-03-11 | 449 GWh |
| 2026-03-12 | 457 GWh |
| 2026-03-13 | 443 GWh |
| 2026-03-14 | 385 GWh |
| 2026-03-15 | 363 GWh |
| 2026-03-16 | 455 GWh |
| 2026-03-17 | 475 GWh |
| 2026-03-18 | 466 GWh |
| 2026-03-19 | 471 GWh |
| 2026-03-20 | 472 GWh |
| 2026-03-21 | 413 GWh |
| 2026-03-22 | 375 GWh |
| 2026-03-23 | 449 GWh |
| 2026-03-24 | 458 GWh |
| 2026-03-25 | 453 GWh |
| 2026-03-26 | 475 GWh |
| 2026-03-27 | 480 GWh |
| 2026-03-28 | 428 GWh |
| 2026-03-29 | 373 GWh |
| 2026-03-30 | 466 GWh |
| 2026-03-31 | 482 GWh |
| 2026-04-01 | 480 GWh |
| 2026-04-02 | 470 GWh |
| 2026-04-03 | 447 GWh |
| 2026-04-04 | 383 GWh |
| 2026-04-05 | 313 GWh |
| 2026-04-06 | 323 GWh |
| 2026-04-07 | 426 GWh |
| 2026-04-08 | 472 GWh |
| 2026-04-09 | 483 GWh |
| 2026-04-10 | 475 GWh |
| 2026-04-11 | 433 GWh |
| 2026-04-12 | 374 GWh |
| 2026-04-13 | 446 GWh |
| 2026-04-14 | 461 GWh |
| 2026-04-15 | 467 GWh |
| 2026-04-16 | 461 GWh |
| 2026-04-17 | 454 GWh |
| 2026-04-18 | 403 GWh |
| 2026-04-19 | 361 GWh |
| 2026-04-20 | 444 GWh |
| 2026-04-21 | 451 GWh |
| 2026-04-22 | 445 GWh |
| 2026-04-23 | 441 GWh |
| 2026-04-24 | 447 GWh |
| 2026-04-25 | 393 GWh |
| 2026-04-26 | 371 GWh |
| 2026-04-27 | 438 GWh |
| 2026-04-28 | 452 GWh |
| 2026-04-29 | 463 GWh |
| 2026-04-30 | 449 GWh |
| 2026-05-01 | 369 GWh |
| 2026-05-02 | 356 GWh |
| 2026-05-03 | 333 GWh |
| 2026-05-04 | 409 GWh |
| 2026-05-05 | 436 GWh |
| 2026-05-06 | 433 GWh |
| 2026-05-07 | 442 GWh |
| 2026-05-08 | 440 GWh |
| 2026-05-09 | 387 GWh |
| 2026-05-10 | 349 GWh |
| 2026-05-11 | 416 GWh |
| 2026-05-12 | 437 GWh |
| 2026-05-13 | 441 GWh |
| 2026-05-14 | 440 GWh |
| 2026-05-15 | 453 GWh |
| 2026-05-16 | 400 GWh |
| 2026-05-17 | 362 GWh |
| 2026-05-18 | 433 GWh |
| 2026-05-19 | 438 GWh |
| 2026-05-20 | 440 GWh |
| 2026-05-21 | 430 GWh |
| 2026-05-22 | 433 GWh |
| 2026-05-23 | 393 GWh |
| 2026-05-24 | 343 GWh |
| 2026-05-25 | 414 GWh |
| 2026-05-26 | 427 GWh |
| 2026-05-27 | 434 GWh |
| 2026-05-28 | 429 GWh |
| 2026-05-29 | 425 GWh |
| 2026-05-30 | 383 GWh |
| 2026-05-31 | 348 GWh |
| 2026-06-01 | 424 GWh |
| 2026-06-02 | 433 GWh |
| 2026-06-03 | 429 GWh |
| 2026-06-04 | 353 GWh |
| 2026-06-05 | 383 GWh |
| 2026-06-06 | 368 GWh |
| 2026-06-07 | 343 GWh |
| 2026-06-08 | 420 GWh |
| 2026-06-09 | 434 GWh |
| 2026-06-10 | 438 GWh |
| 2026-06-11 | 433 GWh |
| 2026-06-12 | 430 GWh |
| 2026-06-13 | 376 GWh |
| 2026-06-14 | 332 GWh |
| 2026-06-15 | 405 GWh |
| 2026-06-16 | 415 GWh |
| 2026-06-17 | 429 GWh |
| 2026-06-18 | 439 GWh |
| 2026-06-19 | 448 GWh |
| 2026-06-20 | 402 GWh |
| 2026-06-21 | 362 GWh |
| 2026-06-22 | 436 GWh |
| 2026-06-23 | 446 GWh |
| 2026-06-24 | 448 GWh |
| 2026-06-25 | 457 GWh |
| 2026-06-26 | 465 GWh |
| 2026-06-27 | 416 GWh |
| 2026-06-28 | 400 GWh |
| 2026-06-29 | 468 GWh |
| 2026-06-30 | 472 GWh |
| 2026-07-01 | 469 GWh |
| 2026-07-02 | 445 GWh |
| 2026-07-03 | 427 GWh |
| 2026-07-04 | 370 GWh |
| 2026-07-05 | 339 GWh |
| 2026-07-06 | 403 GWh |
| 2026-07-07 | 426 GWh |
| 2026-07-08 | 420 GWh |
| 2026-07-09 | 423 GWh |
| 2026-07-10 | 427 GWh |
| 2026-07-11 | 382 GWh |
| 2026-07-12 | 349 GWh |
| 2026-07-13 | 424 GWh |
| 2026-07-14 | 438 GWh |
| 2026-07-15 | 446 GWh |
| 2026-07-16 | 442 GWh |
| 2026-07-17 | 447 GWh |
| 2026-07-18 | 391 GWh |
| 2026-07-19 | 349 GWh |
| 2026-07-20 | 405 GWh |
| 2026-07-21 | 414 GWh |
| 2026-07-22 | 417 GWh |
| 2026-07-23 | 421 GWh |
| 2026-07-24 | 417 GWh |
| 2026-07-25 | 376 GWh |
| 2026-07-26 | 338 GWh |
| 2026-07-27 | 406 GWh |
| 2026-07-28 | 408 GWh |
| 2026-07-29 | 423 GWh |
| 2026-07-30 | 430 GWh |
| 2026-07-31 | 442 GWh |
| 2026-08-01 | 396 GWh |
| 2026-08-02 | 348 GWh |
| 2026-08-03 | 419 GWh |
| 2026-08-04 | 446 GWh |
| 2026-08-05 | 467 GWh |
| 2026-08-06 | 460 GWh |
| 2026-08-07 | 438 GWh |
| 2026-08-08 | 380 GWh |
| 2026-08-09 | 344 GWh |
| 2026-08-10 | 419 GWh |
| 2026-08-11 | 420 GWh |
| 2026-08-12 | 418 GWh |
| 2026-08-13 | 418 GWh |
| 2026-08-14 | 397 GWh |
| 2026-08-15 | 344 GWh |
| 2026-08-16 | 335 GWh |
| 2026-08-17 | 414 GWh |
| 2026-08-18 | 418 GWh |
| 2026-08-19 | 431 GWh |
| 2026-08-20 | 432 GWh |
| 2026-08-21 | 435 GWh |
| 2026-08-22 | 371 GWh |
| 2026-08-23 | 333 GWh |
| 2026-08-24 | 415 GWh |
| 2026-08-25 | 443 GWh |
| 2026-08-26 | 431 GWh |
| 2026-08-27 | 434 GWh |
| 2026-08-28 | 427 GWh |
| 2026-08-29 | 392 GWh |
| 2026-08-30 | 350 GWh |
| 2026-08-31 | 433 GWh |
| 2026-09-01 | 438 GWh |
| 2026-09-02 | 443 GWh |
| 2026-09-03 | 440 GWh |
| 2026-09-04 | 444 GWh |
| 2026-09-05 | 391 GWh |
| 2026-09-06 | 352 GWh |
| 2026-09-07 | 424 GWh |
| 2026-09-08 | 441 GWh |
| 2026-09-09 | 451 GWh |
| 2026-09-10 | 441 GWh |
| 2026-09-11 | 452 GWh |
| 2026-09-12 | 399 GWh |
| 2026-09-13 | 352 GWh |
| 2026-09-14 | 439 GWh |
| 2026-09-15 | 445 GWh |
| 2026-09-16 | 441 GWh |
| 2026-09-17 | 450 GWh |
| 2026-09-18 | 436 GWh |
| 2026-09-19 | 387 GWh |
| 2026-09-20 | 353 GWh |
| 2026-09-21 | 427 GWh |
| 2026-09-22 | 445 GWh |
| 2026-09-23 | 452 GWh |
| 2026-09-24 | 462 GWh |
| 2026-09-25 | 459 GWh |
| 2026-09-26 | 399 GWh |
| 2026-09-27 | 355 GWh |
| 2026-09-28 | 422 GWh |
| 2026-09-29 | 437 GWh |
| 2026-09-30 | 439 GWh |
| 2026-10-01 | 439 GWh |
| 2026-10-02 | 440 GWh |
| 2026-10-03 | 397 GWh |
| 2026-10-04 | 358 GWh |
| 2026-10-05 | 432 GWh |
| 2026-10-06 | 446 GWh |
| 2026-10-07 | 446 GWh |
| 2026-10-08 | 447 GWh |
| 2026-10-09 | 446 GWh |
| 2026-10-10 | 409 GWh |
| 2026-10-11 | 364 GWh |
| 2026-10-12 | 455 GWh |
| 2026-10-13 | 472 GWh |
| 2026-10-14 | 475 GWh |
| 2026-10-15 | 476 GWh |
| 2026-10-16 | 464 GWh |
| 2026-10-17 | 424 GWh |
| 2026-10-18 | 382 GWh |
| 2026-10-19 | 477 GWh |
| 2026-10-20 | 492 GWh |
| 2026-10-21 | 469 GWh |
| 2026-10-22 | 490 GWh |
| 2026-10-23 | 472 GWh |
| 2026-10-24 | 426 GWh |
| 2026-10-25 | 400 GWh |
| 2026-10-26 | 469 GWh |
| 2026-10-27 | 482 GWh |
| 2026-10-28 | 494 GWh |
| 2026-10-29 | 492 GWh |
| 2026-10-30 | 486 GWh |
| 2026-10-31 | 425 GWh |
| 2026-11-01 | 373 GWh |
| 2026-11-02 | 472 GWh |
| 2026-11-03 | 500 GWh |
| 2026-11-04 | 498 GWh |
| 2026-11-05 | 501 GWh |
| 2026-11-06 | 507 GWh |
| 2026-11-07 | 454 GWh |
| 2026-11-08 | 422 GWh |
| 2026-11-09 | 506 GWh |
| 2026-11-10 | 520 GWh |
| 2026-11-11 | 435 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11. Daily totals are summed by World Power Monitor from complete Europe/Warsaw local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 139 TWh | 142 TWh | Coal 53.9% | 315 |
| 2025 | 158 TWh | 158 TWh | Coal 53.4% | 365 |
| 2024 (partial) | 163 TWh | 158 TWh | Coal 56.8% | 365 |
| 2023 | 166 TWh | 153 TWh | Coal 63.5% | 365 |
| 2022 | 172 TWh | 163 TWh | Coal 73.1% | 365 |
| 2021 | 175 TWh | 161 TWh | Coal 75.8% | 365 |
| 2020 | 165 TWh | 141 TWh | Coal 74.6% | 366 |
| 2019 | 169 TWh | 146 TWh | Coal 78.6% | 365 |
| 2018 | 171 TWh | 152 TWh | Coal 82.5% | 365 |
| 2017 | 168 TWh | 152 TWh | Coal 82.8% | 365 |
| 2016 | 164 TWh | 149 TWh | Coal 84.7% | 366 |
| 2015 | 161 TWh | 148 TWh | Coal 86.9% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Power Flows With Neighbours
Net totals, 2026-10-13 (13 October 2026) to 2026-11-11 (11 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Germany and Luxembourg | Poland imports | 1.12 TWh |
| Czechia | Poland exports | 641 GWh |
| Slovakia | Poland exports | 365 GWh |
| Lithuania | Poland imports | 73.8 GWh |
| Sweden South (SE4) | Poland imports | 47.4 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Latest Grid Alerts
Newest alert 9 November 2026- Day ahead price Poland had a day ahead price averaging EUR 372.63/MWh for 9 November 2026, 2.4 times its own 90 day median (EUR 156.42/MWh). All alerts that day
- Day ahead price The day ahead price in Poland averaged EUR 309.89/MWh for 4 November 2026, 2 times its 90 day median of EUR 152.46/MWh. All alerts that day
- Net imports Net imports into Poland reached 36.7 GWh on 2 November 2026 (8% of demand), the highest daily net imports in 389 days of loaded history. All alerts that day
Follow this grid: RSS feed of Poland alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-11-12 (12 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Poland, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Poland Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/pl/
World Power Monitor. Poland Electricity Demand and Generation Mix. Data as of 2026-11-12 12:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/pl/
@misc{wpm_zones_pl_2026,
title = {{Poland Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12 12:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/pl/}
} Permalink: https://worldpowermonitor.com/zones/pl/
The Copy buttons add today's date as the access date.