Portugal demand was 6,402 MW in the hour starting 12 Nov 2026, 13:00 WET (UTC+00:00). Wind was the largest source in the hour starting 12 Nov 2026, 13:00 WET (UTC+00:00), at 57% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- Portugal is a bidding zone of the European electricity market, with one wholesale price per market interval.
- In the hour starting 12 Nov 2026, 13:00 WET (UTC+00:00), demand in Portugal was 6,402 MW, against a day-ahead forecast of 6,977 MW.
- Wind supplied 56.6% of Portugal's generation in the hour starting 12 Nov 2026, 13:00 WET (UTC+00:00).
- The day-ahead price in Portugal averaged EUR 115.38/MWh for delivery on 2026-11-12 (12 November 2026).
- Installed generating capacity in Portugal was 22.1 GW in 2026, as reported to ENTSO-E.
- Demand in Portugal totalled 53.0 TWh in 2025.
- Wind supplied 30.8% of Portugal's generation in 2025.
Latest Demand
Hourly operator dataLatest hour known when this page was built: 12 Nov 2026, 13:00 WET (UTC+00:00).
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00:00Z.
Generation by Source
Latest hour with generation by source: 12 Nov 2026, 13:00 WET (UTC+00:00)| Source | Output | Share |
|---|---|---|
| Wind | 2,966 MW | 56.6% |
| Solar | 823 MW | 15.7% |
| Gas | 694 MW | 13.2% |
| Hydro | 457 MW | 8.7% |
| Bioenergy | 296 MW | 5.6% |
| Other | 5 MW | 0.1% |
| Coal | 0 MW | 0.0% |
| Storage | -2,599 MW | charging |
| Total from these sources | 5,239 MW |
Generation by production type is published separately from load, so this hour can differ from the latest load hour. Negative storage values are pumping or charging.
The sources reported in this hour add up to 41% of demand, so the generation report for Portugal looks incomplete and the shares above are shares of what was reported.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00:00Z.
Day-Ahead Price
Delivery day 2026-11-12 (12 November 2026), local timePrices are in EUR per MWh as published, not converted. Full price history for Portugal and day-ahead prices in every bidding zone.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12.
Last 30 Days, Hourly
Times in UTCShow the data table (686 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-15T00:00Z | 5,068 MW |
| 2026-10-15T01:00Z | 4,856 MW |
| 2026-10-15T02:00Z | 4,758 MW |
| 2026-10-15T03:00Z | 4,682 MW |
| 2026-10-15T04:00Z | 4,763 MW |
| 2026-10-15T05:00Z | 5,211 MW |
| 2026-10-15T06:00Z | 5,923 MW |
| 2026-10-15T07:00Z | 6,703 MW |
| 2026-10-15T08:00Z | 6,840 MW |
| 2026-10-15T09:00Z | 6,649 MW |
| 2026-10-15T10:00Z | 6,541 MW |
| 2026-10-15T11:00Z | 6,301 MW |
| 2026-10-15T12:00Z | 6,163 MW |
| 2026-10-15T13:00Z | 6,348 MW |
| 2026-10-15T14:00Z | 6,385 MW |
| 2026-10-15T15:00Z | 6,577 MW |
| 2026-10-15T16:00Z | 6,722 MW |
| 2026-10-15T17:00Z | 7,025 MW |
| 2026-10-15T18:00Z | 7,601 MW |
| 2026-10-15T19:00Z | 7,420 MW |
| 2026-10-15T20:00Z | 6,892 MW |
| 2026-10-15T21:00Z | 6,384 MW |
| 2026-10-15T22:00Z | 5,821 MW |
| 2026-10-15T23:00Z | 5,443 MW |
| 2026-10-16T00:00Z | 5,149 MW |
| 2026-10-16T01:00Z | 4,915 MW |
| 2026-10-16T02:00Z | 4,788 MW |
| 2026-10-16T03:00Z | 4,725 MW |
| 2026-10-16T04:00Z | 4,804 MW |
| 2026-10-16T05:00Z | 5,241 MW |
| 2026-10-16T06:00Z | 5,954 MW |
| 2026-10-16T07:00Z | 6,675 MW |
| 2026-10-16T08:00Z | 6,767 MW |
| 2026-10-16T09:00Z | 6,683 MW |
| 2026-10-16T10:00Z | 6,585 MW |
| 2026-10-16T11:00Z | 6,347 MW |
| 2026-10-16T12:00Z | 6,240 MW |
| 2026-10-16T13:00Z | 6,394 MW |
| 2026-10-16T14:00Z | 6,436 MW |
| 2026-10-16T15:00Z | 6,500 MW |
| 2026-10-16T16:00Z | 6,656 MW |
| 2026-10-16T17:00Z | 6,918 MW |
| 2026-10-16T18:00Z | 7,452 MW |
| 2026-10-16T19:00Z | 7,260 MW |
| 2026-10-16T20:00Z | 6,760 MW |
| 2026-10-16T21:00Z | 6,270 MW |
| 2026-10-16T22:00Z | 5,793 MW |
| 2026-10-16T23:00Z | 5,481 MW |
| 2026-10-17T00:00Z | 5,198 MW |
| 2026-10-17T01:00Z | 5,001 MW |
| 2026-10-17T02:00Z | 4,823 MW |
| 2026-10-17T03:00Z | 4,712 MW |
| 2026-10-17T04:00Z | 4,696 MW |
| 2026-10-17T05:00Z | 4,874 MW |
| 2026-10-17T06:00Z | 5,101 MW |
| 2026-10-17T07:00Z | 5,454 MW |
| 2026-10-17T08:00Z | 5,632 MW |
| 2026-10-17T09:00Z | 5,605 MW |
| 2026-10-17T10:00Z | 5,576 MW |
| 2026-10-17T11:00Z | 5,586 MW |
| 2026-10-17T12:00Z | 5,418 MW |
| 2026-10-17T13:00Z | 5,309 MW |
| 2026-10-17T14:00Z | 5,333 MW |
| 2026-10-17T15:00Z | 5,348 MW |
| 2026-10-17T16:00Z | 5,669 MW |
| 2026-10-17T17:00Z | 6,101 MW |
| 2026-10-17T18:00Z | 6,617 MW |
| 2026-10-17T19:00Z | 6,441 MW |
| 2026-10-17T20:00Z | 6,024 MW |
| 2026-10-17T21:00Z | 5,724 MW |
| 2026-10-17T22:00Z | 5,339 MW |
| 2026-10-17T23:00Z | 5,018 MW |
| 2026-10-18T00:00Z | 4,762 MW |
| 2026-10-18T01:00Z | 4,571 MW |
| 2026-10-18T02:00Z | 4,438 MW |
| 2026-10-18T03:00Z | 4,350 MW |
| 2026-10-18T04:00Z | 4,355 MW |
| 2026-10-18T05:00Z | 4,458 MW |
| 2026-10-18T06:00Z | 4,584 MW |
| 2026-10-18T07:00Z | 4,790 MW |
| 2026-10-18T08:00Z | 4,937 MW |
| 2026-10-18T09:00Z | 4,929 MW |
| 2026-10-18T10:00Z | 5,013 MW |
| 2026-10-18T11:00Z | 5,106 MW |
| 2026-10-18T12:00Z | 4,859 MW |
| 2026-10-18T13:00Z | 4,692 MW |
| 2026-10-18T14:00Z | 4,652 MW |
| 2026-10-18T15:00Z | 4,827 MW |
| 2026-10-18T16:00Z | 5,212 MW |
| 2026-10-18T17:00Z | 5,816 MW |
| 2026-10-18T18:00Z | 6,472 MW |
| 2026-10-18T19:00Z | 6,404 MW |
| 2026-10-18T20:00Z | 5,980 MW |
| 2026-10-18T21:00Z | 5,616 MW |
| 2026-10-18T22:00Z | 5,244 MW |
| 2026-10-18T23:00Z | 5,007 MW |
| 2026-10-19T00:00Z | 4,764 MW |
| 2026-10-19T01:00Z | 4,597 MW |
| 2026-10-19T02:00Z | 4,464 MW |
| 2026-10-19T03:00Z | 4,374 MW |
| 2026-10-19T04:00Z | 4,504 MW |
| 2026-10-19T05:00Z | 4,999 MW |
| 2026-10-19T06:00Z | 5,671 MW |
| 2026-10-19T07:00Z | 6,352 MW |
| 2026-10-19T08:00Z | 6,444 MW |
| 2026-10-19T09:00Z | 6,211 MW |
| 2026-10-19T10:00Z | 6,119 MW |
| 2026-10-19T11:00Z | 5,841 MW |
| 2026-10-19T12:00Z | 5,667 MW |
| 2026-10-19T13:00Z | 5,811 MW |
| 2026-10-19T14:00Z | 5,911 MW |
| 2026-10-19T15:00Z | 6,167 MW |
| 2026-10-19T16:00Z | 6,414 MW |
| 2026-10-19T17:00Z | 6,814 MW |
| 2026-10-19T18:00Z | 7,524 MW |
| 2026-10-19T19:00Z | 7,298 MW |
| 2026-10-19T20:00Z | 6,792 MW |
| 2026-10-19T21:00Z | 6,240 MW |
| 2026-10-19T22:00Z | 5,670 MW |
| 2026-10-19T23:00Z | 5,228 MW |
| 2026-10-20T00:00Z | 4,934 MW |
| 2026-10-20T01:00Z | 4,738 MW |
| 2026-10-20T02:00Z | 4,620 MW |
| 2026-10-20T03:00Z | 4,565 MW |
| 2026-10-20T04:00Z | 4,673 MW |
| 2026-10-20T05:00Z | 5,122 MW |
| 2026-10-20T06:00Z | 5,856 MW |
| 2026-10-20T07:00Z | 6,622 MW |
| 2026-10-20T08:00Z | 6,882 MW |
| 2026-10-20T09:00Z | 6,735 MW |
| 2026-10-20T10:00Z | 6,733 MW |
| 2026-10-20T11:00Z | 6,318 MW |
| 2026-10-20T12:00Z | 6,119 MW |
| 2026-10-20T13:00Z | 6,256 MW |
| 2026-10-20T14:00Z | 6,258 MW |
| 2026-10-20T15:00Z | 6,523 MW |
| 2026-10-20T16:00Z | 6,577 MW |
| 2026-10-20T17:00Z | 6,915 MW |
| 2026-10-20T18:00Z | 7,563 MW |
| 2026-10-20T19:00Z | 7,383 MW |
| 2026-10-20T20:00Z | 6,906 MW |
| 2026-10-20T21:00Z | 6,356 MW |
| 2026-10-20T22:00Z | 5,790 MW |
| 2026-10-20T23:00Z | 5,491 MW |
| 2026-10-21T00:00Z | 5,208 MW |
| 2026-10-21T01:00Z | 5,036 MW |
| 2026-10-21T02:00Z | 4,914 MW |
| 2026-10-21T03:00Z | 4,843 MW |
| 2026-10-21T04:00Z | 4,907 MW |
| 2026-10-21T05:00Z | 5,370 MW |
| 2026-10-21T06:00Z | 6,158 MW |
| 2026-10-21T07:00Z | 6,874 MW |
| 2026-10-21T08:00Z | 7,015 MW |
| 2026-10-21T09:00Z | 6,654 MW |
| 2026-10-21T10:00Z | 6,457 MW |
| 2026-10-21T11:00Z | 6,175 MW |
| 2026-10-21T12:00Z | 6,012 MW |
| 2026-10-21T13:00Z | 6,144 MW |
| 2026-10-21T14:00Z | 6,216 MW |
| 2026-10-21T15:00Z | 6,420 MW |
| 2026-10-21T16:00Z | 6,575 MW |
| 2026-10-21T17:00Z | 6,941 MW |
| 2026-10-21T18:00Z | 7,631 MW |
| 2026-10-21T19:00Z | 7,471 MW |
| 2026-10-21T20:00Z | 6,989 MW |
| 2026-10-21T21:00Z | 6,436 MW |
| 2026-10-21T22:00Z | 5,836 MW |
| 2026-10-21T23:00Z | 5,473 MW |
| 2026-10-22T00:00Z | 5,170 MW |
| 2026-10-22T01:00Z | 4,951 MW |
| 2026-10-22T02:00Z | 4,841 MW |
| 2026-10-22T03:00Z | 4,788 MW |
| 2026-10-22T04:00Z | 4,935 MW |
| 2026-10-22T05:00Z | 5,455 MW |
| 2026-10-22T06:00Z | 6,212 MW |
| 2026-10-22T07:00Z | 6,870 MW |
| 2026-10-22T08:00Z | 6,970 MW |
| 2026-10-22T09:00Z | 6,656 MW |
| 2026-10-22T10:00Z | 6,470 MW |
| 2026-10-22T11:00Z | 6,189 MW |
| 2026-10-22T12:00Z | 6,082 MW |
| 2026-10-22T13:00Z | 6,244 MW |
| 2026-10-22T14:00Z | 6,396 MW |
| 2026-10-22T15:00Z | 6,671 MW |
| 2026-10-22T16:00Z | 6,778 MW |
| 2026-10-22T17:00Z | 7,130 MW |
| 2026-10-22T18:00Z | 7,828 MW |
| 2026-10-22T19:00Z | 7,643 MW |
| 2026-10-22T20:00Z | 7,172 MW |
| 2026-10-22T21:00Z | 6,602 MW |
| 2026-10-22T22:00Z | 6,042 MW |
| 2026-10-22T23:00Z | 5,687 MW |
| 2026-10-23T00:00Z | 5,372 MW |
| 2026-10-23T01:00Z | 5,169 MW |
| 2026-10-23T02:00Z | 5,053 MW |
| 2026-10-23T03:00Z | 4,968 MW |
| 2026-10-23T04:00Z | 5,037 MW |
| 2026-10-23T05:00Z | 5,472 MW |
| 2026-10-23T06:00Z | 6,233 MW |
| 2026-10-23T07:00Z | 7,005 MW |
| 2026-10-23T08:00Z | 7,074 MW |
| 2026-10-23T09:00Z | 6,757 MW |
| 2026-10-23T10:00Z | 6,612 MW |
| 2026-10-23T11:00Z | 6,322 MW |
| 2026-10-23T12:00Z | 6,108 MW |
| 2026-10-23T13:00Z | 6,258 MW |
| 2026-10-23T14:00Z | 6,289 MW |
| 2026-10-23T15:00Z | 6,490 MW |
| 2026-10-23T16:00Z | 6,618 MW |
| 2026-10-23T17:00Z | 6,995 MW |
| 2026-10-23T18:00Z | 7,602 MW |
| 2026-10-23T19:00Z | 7,427 MW |
| 2026-10-23T20:00Z | 6,994 MW |
| 2026-10-23T21:00Z | 6,490 MW |
| 2026-10-23T22:00Z | 5,906 MW |
| 2026-10-23T23:00Z | 5,520 MW |
| 2026-10-24T00:00Z | 5,154 MW |
| 2026-10-24T01:00Z | 4,879 MW |
| 2026-10-24T02:00Z | 4,718 MW |
| 2026-10-24T03:00Z | 4,674 MW |
| 2026-10-24T04:00Z | 4,721 MW |
| 2026-10-24T05:00Z | 4,865 MW |
| 2026-10-24T06:00Z | 5,147 MW |
| 2026-10-24T07:00Z | 5,514 MW |
| 2026-10-24T08:00Z | 5,729 MW |
| 2026-10-24T09:00Z | 5,644 MW |
| 2026-10-24T10:00Z | 5,552 MW |
| 2026-10-24T11:00Z | 5,528 MW |
| 2026-10-24T12:00Z | 5,295 MW |
| 2026-10-24T13:00Z | 5,147 MW |
| 2026-10-24T14:00Z | 5,137 MW |
| 2026-10-24T15:00Z | 5,299 MW |
| 2026-10-24T16:00Z | 5,611 MW |
| 2026-10-24T17:00Z | 6,089 MW |
| 2026-10-24T18:00Z | 6,767 MW |
| 2026-10-24T19:00Z | 6,616 MW |
| 2026-10-24T20:00Z | 6,183 MW |
| 2026-10-24T21:00Z | 5,778 MW |
| 2026-10-24T22:00Z | 5,430 MW |
| 2026-10-24T23:00Z | 5,060 MW |
| 2026-10-25T00:00Z | 4,776 MW |
| 2026-10-25T01:00Z | 4,555 MW |
| 2026-10-25T02:00Z | 4,420 MW |
| 2026-10-25T03:00Z | 4,317 MW |
| 2026-10-25T04:00Z | 4,295 MW |
| 2026-10-25T05:00Z | 4,308 MW |
| 2026-10-25T06:00Z | 4,426 MW |
| 2026-10-25T07:00Z | 4,571 MW |
| 2026-10-25T08:00Z | 4,976 MW |
| 2026-10-25T09:00Z | 5,214 MW |
| 2026-10-25T10:00Z | 5,366 MW |
| 2026-10-25T11:00Z | 5,500 MW |
| 2026-10-25T12:00Z | 5,504 MW |
| 2026-10-25T13:00Z | 5,208 MW |
| 2026-10-25T14:00Z | 5,064 MW |
| 2026-10-25T15:00Z | 5,148 MW |
| 2026-10-25T16:00Z | 5,381 MW |
| 2026-10-25T17:00Z | 5,797 MW |
| 2026-10-25T18:00Z | 6,459 MW |
| 2026-10-25T19:00Z | 6,693 MW |
| 2026-10-25T20:00Z | 6,451 MW |
| 2026-10-25T21:00Z | 6,018 MW |
| 2026-10-25T22:00Z | 5,633 MW |
| 2026-10-25T23:00Z | 5,201 MW |
| 2026-10-26T00:00Z | 4,899 MW |
| 2026-10-26T01:00Z | 4,666 MW |
| 2026-10-26T02:00Z | 4,503 MW |
| 2026-10-26T03:00Z | 4,358 MW |
| 2026-10-26T04:00Z | 4,353 MW |
| 2026-10-26T05:00Z | 4,499 MW |
| 2026-10-26T06:00Z | 5,021 MW |
| 2026-10-26T07:00Z | 5,795 MW |
| 2026-10-26T08:00Z | 6,515 MW |
| 2026-10-26T09:00Z | 6,609 MW |
| 2026-10-26T10:00Z | 6,431 MW |
| 2026-10-26T11:00Z | 6,402 MW |
| 2026-10-26T12:00Z | 6,278 MW |
| 2026-10-26T13:00Z | 6,248 MW |
| 2026-10-26T14:00Z | 6,492 MW |
| 2026-10-26T15:00Z | 6,609 MW |
| 2026-10-26T16:00Z | 6,743 MW |
| 2026-10-26T17:00Z | 6,974 MW |
| 2026-10-26T18:00Z | 7,475 MW |
| 2026-10-26T19:00Z | 7,616 MW |
| 2026-10-26T20:00Z | 7,368 MW |
| 2026-10-26T21:00Z | 6,929 MW |
| 2026-10-26T22:00Z | 6,339 MW |
| 2026-10-26T23:00Z | 5,741 MW |
| 2026-10-27T00:00Z | 5,358 MW |
| 2026-10-27T01:00Z | 5,065 MW |
| 2026-10-27T02:00Z | 4,868 MW |
| 2026-10-27T03:00Z | 4,768 MW |
| 2026-10-27T04:00Z | 4,804 MW |
| 2026-10-27T05:00Z | 4,926 MW |
| 2026-10-27T06:00Z | 5,412 MW |
| 2026-10-27T07:00Z | 6,120 MW |
| 2026-10-27T08:00Z | 6,847 MW |
| 2026-10-27T09:00Z | 7,001 MW |
| 2026-10-27T10:00Z | 6,955 MW |
| 2026-10-27T11:00Z | 7,110 MW |
| 2026-10-27T12:00Z | 6,935 MW |
| 2026-10-27T13:00Z | 6,891 MW |
| 2026-10-27T14:00Z | 7,130 MW |
| 2026-10-27T15:00Z | 7,181 MW |
| 2026-10-27T16:00Z | 7,187 MW |
| 2026-10-27T17:00Z | 7,343 MW |
| 2026-10-27T18:00Z | 7,813 MW |
| 2026-10-27T19:00Z | 8,007 MW |
| 2026-10-27T20:00Z | 7,709 MW |
| 2026-10-27T21:00Z | 7,186 MW |
| 2026-10-27T22:00Z | 6,584 MW |
| 2026-10-27T23:00Z | 5,989 MW |
| 2026-10-28T00:00Z | 5,479 MW |
| 2026-10-28T01:00Z | 5,167 MW |
| 2026-10-28T02:00Z | 4,968 MW |
| 2026-10-28T03:00Z | 4,857 MW |
| 2026-10-28T04:00Z | 4,778 MW |
| 2026-10-28T05:00Z | 4,918 MW |
| 2026-10-28T06:00Z | 5,416 MW |
| 2026-10-28T07:00Z | 6,195 MW |
| 2026-10-28T08:00Z | 6,973 MW |
| 2026-10-28T09:00Z | 7,175 MW |
| 2026-10-28T10:00Z | 7,000 MW |
| 2026-10-28T11:00Z | 6,843 MW |
| 2026-10-28T12:00Z | 6,635 MW |
| 2026-10-28T13:00Z | 6,558 MW |
| 2026-10-28T14:00Z | 6,731 MW |
| 2026-10-28T15:00Z | 6,904 MW |
| 2026-10-28T16:00Z | 7,145 MW |
| 2026-10-28T17:00Z | 7,289 MW |
| 2026-10-28T18:00Z | 7,745 MW |
| 2026-10-28T19:00Z | 7,888 MW |
| 2026-10-28T20:00Z | 7,608 MW |
| 2026-10-28T21:00Z | 7,121 MW |
| 2026-10-28T22:00Z | 6,549 MW |
| 2026-10-28T23:00Z | 5,941 MW |
| 2026-10-29T00:00Z | 5,552 MW |
| 2026-10-29T01:00Z | 5,246 MW |
| 2026-10-29T02:00Z | 5,044 MW |
| 2026-10-29T03:00Z | 4,945 MW |
| 2026-10-29T04:00Z | 4,862 MW |
| 2026-10-29T05:00Z | 4,915 MW |
| 2026-10-29T06:00Z | 5,394 MW |
| 2026-10-29T07:00Z | 6,084 MW |
| 2026-10-29T08:00Z | 6,756 MW |
| 2026-10-29T09:00Z | 6,778 MW |
| 2026-10-29T10:00Z | 6,585 MW |
| 2026-10-29T11:00Z | 6,582 MW |
| 2026-10-29T12:00Z | 6,423 MW |
| 2026-10-29T13:00Z | 6,409 MW |
| 2026-10-29T14:00Z | 6,664 MW |
| 2026-10-29T15:00Z | 6,757 MW |
| 2026-10-29T16:00Z | 6,984 MW |
| 2026-10-29T17:00Z | 7,232 MW |
| 2026-10-29T18:00Z | 7,639 MW |
| 2026-10-29T19:00Z | 7,782 MW |
| 2026-10-29T20:00Z | 7,544 MW |
| 2026-10-29T21:00Z | 7,065 MW |
| 2026-10-29T22:00Z | 6,526 MW |
| 2026-10-29T23:00Z | 5,955 MW |
| 2026-10-30T00:00Z | 5,477 MW |
| 2026-10-30T01:00Z | 5,165 MW |
| 2026-10-30T02:00Z | 4,957 MW |
| 2026-10-30T03:00Z | 4,823 MW |
| 2026-10-30T04:00Z | 4,789 MW |
| 2026-10-30T05:00Z | 4,891 MW |
| 2026-10-30T06:00Z | 5,360 MW |
| 2026-10-30T07:00Z | 5,996 MW |
| 2026-10-30T08:00Z | 6,672 MW |
| 2026-10-30T09:00Z | 6,813 MW |
| 2026-10-30T10:00Z | 6,776 MW |
| 2026-10-30T11:00Z | 6,877 MW |
| 2026-10-30T12:00Z | 6,773 MW |
| 2026-10-30T13:00Z | 6,846 MW |
| 2026-10-30T14:00Z | 6,990 MW |
| 2026-10-30T15:00Z | 6,998 MW |
| 2026-10-30T16:00Z | 7,172 MW |
| 2026-10-30T17:00Z | 7,352 MW |
| 2026-10-30T18:00Z | 7,593 MW |
| 2026-10-30T19:00Z | 7,586 MW |
| 2026-10-30T20:00Z | 7,337 MW |
| 2026-10-30T21:00Z | 6,864 MW |
| 2026-10-30T22:00Z | 6,364 MW |
| 2026-10-30T23:00Z | 5,852 MW |
| 2026-10-31T00:00Z | 5,479 MW |
| 2026-10-31T01:00Z | 5,181 MW |
| 2026-10-31T02:00Z | 5,004 MW |
| 2026-10-31T03:00Z | 4,876 MW |
| 2026-10-31T04:00Z | 4,773 MW |
| 2026-10-31T05:00Z | 4,785 MW |
| 2026-10-31T06:00Z | 4,923 MW |
| 2026-10-31T07:00Z | 5,103 MW |
| 2026-10-31T08:00Z | 5,389 MW |
| 2026-10-31T09:00Z | 5,455 MW |
| 2026-10-31T10:00Z | 5,429 MW |
| 2026-10-31T11:00Z | 5,472 MW |
| 2026-10-31T12:00Z | 5,585 MW |
| 2026-10-31T13:00Z | 5,503 MW |
| 2026-10-31T14:00Z | 5,441 MW |
| 2026-10-31T15:00Z | 5,612 MW |
| 2026-10-31T16:00Z | 5,742 MW |
| 2026-10-31T17:00Z | 6,045 MW |
| 2026-10-31T18:00Z | 6,540 MW |
| 2026-10-31T19:00Z | 6,596 MW |
| 2026-10-31T20:00Z | 6,326 MW |
| 2026-10-31T21:00Z | 5,921 MW |
| 2026-10-31T22:00Z | 5,542 MW |
| 2026-10-31T23:00Z | 5,243 MW |
| 2026-11-01T00:00Z | 4,942 MW |
| 2026-11-01T01:00Z | 4,710 MW |
| 2026-11-01T02:00Z | 4,545 MW |
| 2026-11-01T03:00Z | 4,421 MW |
| 2026-11-01T04:00Z | 4,374 MW |
| 2026-11-01T05:00Z | 4,351 MW |
| 2026-11-01T06:00Z | 4,448 MW |
| 2026-11-01T07:00Z | 4,466 MW |
| 2026-11-01T08:00Z | 4,685 MW |
| 2026-11-01T09:00Z | 4,837 MW |
| 2026-11-01T10:00Z | 4,925 MW |
| 2026-11-01T11:00Z | 5,065 MW |
| 2026-11-01T12:00Z | 5,202 MW |
| 2026-11-01T13:00Z | 5,074 MW |
| 2026-11-01T14:00Z | 5,001 MW |
| 2026-11-01T15:00Z | 5,137 MW |
| 2026-11-01T16:00Z | 5,363 MW |
| 2026-11-01T17:00Z | 5,786 MW |
| 2026-11-01T18:00Z | 6,309 MW |
| 2026-11-01T19:00Z | 6,492 MW |
| 2026-11-01T20:00Z | 6,324 MW |
| 2026-11-01T21:00Z | 5,998 MW |
| 2026-11-01T22:00Z | 5,648 MW |
| 2026-11-01T23:00Z | 5,232 MW |
| 2026-11-02T00:00Z | 4,915 MW |
| 2026-11-02T01:00Z | 4,706 MW |
| 2026-11-02T02:00Z | 4,598 MW |
| 2026-11-02T03:00Z | 4,520 MW |
| 2026-11-02T04:00Z | 4,512 MW |
| 2026-11-02T05:00Z | 4,648 MW |
| 2026-11-02T06:00Z | 5,170 MW |
| 2026-11-02T07:00Z | 5,838 MW |
| 2026-11-02T08:00Z | 6,495 MW |
| 2026-11-02T09:00Z | 6,571 MW |
| 2026-11-02T10:00Z | 6,410 MW |
| 2026-11-02T11:00Z | 6,407 MW |
| 2026-11-02T12:00Z | 6,302 MW |
| 2026-11-02T13:00Z | 6,319 MW |
| 2026-11-02T14:00Z | 6,622 MW |
| 2026-11-02T15:00Z | 6,904 MW |
| 2026-11-02T16:00Z | 6,992 MW |
| 2026-11-02T17:00Z | 7,189 MW |
| 2026-11-02T18:00Z | 7,563 MW |
| 2026-11-02T19:00Z | 7,751 MW |
| 2026-11-02T20:00Z | 7,497 MW |
| 2026-11-02T21:00Z | 7,030 MW |
| 2026-11-02T22:00Z | 6,463 MW |
| 2026-11-02T23:00Z | 5,902 MW |
| 2026-11-03T00:00Z | 5,511 MW |
| 2026-11-03T01:00Z | 5,185 MW |
| 2026-11-03T02:00Z | 4,936 MW |
| 2026-11-03T03:00Z | 4,837 MW |
| 2026-11-03T04:00Z | 4,829 MW |
| 2026-11-03T05:00Z | 4,934 MW |
| 2026-11-03T06:00Z | 5,446 MW |
| 2026-11-03T07:00Z | 6,130 MW |
| 2026-11-03T08:00Z | 6,586 MW |
| 2026-11-03T09:00Z | 6,594 MW |
| 2026-11-03T10:00Z | 6,399 MW |
| 2026-11-03T11:00Z | 6,357 MW |
| 2026-11-03T12:00Z | 6,233 MW |
| 2026-11-03T13:00Z | 6,195 MW |
| 2026-11-03T14:00Z | 6,468 MW |
| 2026-11-03T15:00Z | 6,702 MW |
| 2026-11-03T16:00Z | 7,011 MW |
| 2026-11-03T17:00Z | 7,205 MW |
| 2026-11-03T18:00Z | 7,680 MW |
| 2026-11-03T19:00Z | 7,885 MW |
| 2026-11-03T20:00Z | 7,670 MW |
| 2026-11-03T21:00Z | 7,219 MW |
| 2026-11-03T22:00Z | 6,595 MW |
| 2026-11-03T23:00Z | 5,941 MW |
| 2026-11-04T00:00Z | 5,443 MW |
| 2026-11-04T01:00Z | 5,120 MW |
| 2026-11-04T02:00Z | 4,911 MW |
| 2026-11-04T03:00Z | 4,800 MW |
| 2026-11-04T04:00Z | 4,759 MW |
| 2026-11-04T05:00Z | 4,852 MW |
| 2026-11-04T06:00Z | 5,327 MW |
| 2026-11-04T07:00Z | 5,987 MW |
| 2026-11-04T08:00Z | 6,500 MW |
| 2026-11-04T09:00Z | 6,523 MW |
| 2026-11-04T10:00Z | 6,422 MW |
| 2026-11-04T11:00Z | 6,409 MW |
| 2026-11-04T12:00Z | 6,261 MW |
| 2026-11-04T13:00Z | 6,252 MW |
| 2026-11-04T14:00Z | 6,519 MW |
| 2026-11-04T15:00Z | 6,655 MW |
| 2026-11-04T16:00Z | 6,994 MW |
| 2026-11-04T17:00Z | 7,338 MW |
| 2026-11-04T18:00Z | 7,816 MW |
| 2026-11-04T19:00Z | 8,049 MW |
| 2026-11-04T20:00Z | 7,832 MW |
| 2026-11-04T21:00Z | 7,350 MW |
| 2026-11-04T22:00Z | 6,731 MW |
| 2026-11-04T23:00Z | 6,110 MW |
| 2026-11-05T00:00Z | 5,590 MW |
| 2026-11-05T01:00Z | 5,255 MW |
| 2026-11-05T02:00Z | 5,025 MW |
| 2026-11-05T03:00Z | 4,911 MW |
| 2026-11-05T04:00Z | 4,853 MW |
| 2026-11-05T05:00Z | 4,970 MW |
| 2026-11-05T06:00Z | 5,444 MW |
| 2026-11-05T07:00Z | 6,130 MW |
| 2026-11-05T08:00Z | 6,760 MW |
| 2026-11-05T09:00Z | 6,754 MW |
| 2026-11-05T10:00Z | 6,673 MW |
| 2026-11-05T11:00Z | 6,643 MW |
| 2026-11-05T12:00Z | 6,470 MW |
| 2026-11-05T13:00Z | 6,403 MW |
| 2026-11-05T14:00Z | 6,687 MW |
| 2026-11-05T15:00Z | 6,792 MW |
| 2026-11-05T16:00Z | 7,058 MW |
| 2026-11-05T17:00Z | 7,406 MW |
| 2026-11-05T18:00Z | 7,867 MW |
| 2026-11-05T19:00Z | 8,136 MW |
| 2026-11-05T20:00Z | 7,903 MW |
| 2026-11-05T21:00Z | 7,454 MW |
| 2026-11-05T22:00Z | 6,848 MW |
| 2026-11-05T23:00Z | 6,185 MW |
| 2026-11-06T00:00Z | 5,670 MW |
| 2026-11-06T01:00Z | 5,298 MW |
| 2026-11-06T02:00Z | 5,076 MW |
| 2026-11-06T03:00Z | 4,937 MW |
| 2026-11-06T04:00Z | 4,857 MW |
| 2026-11-06T05:00Z | 4,963 MW |
| 2026-11-06T06:00Z | 5,443 MW |
| 2026-11-06T07:00Z | 6,173 MW |
| 2026-11-06T08:00Z | 6,992 MW |
| 2026-11-06T09:00Z | 7,435 MW |
| 2026-11-06T10:00Z | 7,439 MW |
| 2026-11-06T11:00Z | 7,547 MW |
| 2026-11-06T12:00Z | 7,570 MW |
| 2026-11-06T13:00Z | 7,606 MW |
| 2026-11-06T14:00Z | 7,783 MW |
| 2026-11-06T15:00Z | 7,628 MW |
| 2026-11-06T16:00Z | 7,586 MW |
| 2026-11-06T17:00Z | 7,695 MW |
| 2026-11-06T18:00Z | 8,011 MW |
| 2026-11-06T19:00Z | 8,187 MW |
| 2026-11-06T20:00Z | 7,954 MW |
| 2026-11-06T21:00Z | 7,466 MW |
| 2026-11-06T22:00Z | 6,882 MW |
| 2026-11-06T23:00Z | 6,233 MW |
| 2026-11-07T00:00Z | 5,702 MW |
| 2026-11-07T01:00Z | 5,310 MW |
| 2026-11-07T02:00Z | 5,015 MW |
| 2026-11-07T03:00Z | 4,841 MW |
| 2026-11-07T04:00Z | 4,745 MW |
| 2026-11-07T05:00Z | 4,819 MW |
| 2026-11-07T06:00Z | 4,987 MW |
| 2026-11-07T07:00Z | 5,183 MW |
| 2026-11-07T08:00Z | 5,741 MW |
| 2026-11-07T09:00Z | 6,077 MW |
| 2026-11-07T10:00Z | 6,117 MW |
| 2026-11-07T11:00Z | 6,117 MW |
| 2026-11-07T12:00Z | 6,141 MW |
| 2026-11-07T13:00Z | 6,112 MW |
| 2026-11-07T14:00Z | 6,027 MW |
| 2026-11-07T15:00Z | 6,048 MW |
| 2026-11-07T16:00Z | 6,034 MW |
| 2026-11-07T17:00Z | 6,385 MW |
| 2026-11-07T18:00Z | 6,857 MW |
| 2026-11-07T19:00Z | 6,974 MW |
| 2026-11-07T20:00Z | 6,727 MW |
| 2026-11-07T21:00Z | 6,294 MW |
| 2026-11-07T22:00Z | 5,895 MW |
| 2026-11-07T23:00Z | 5,521 MW |
| 2026-11-08T00:00Z | 5,238 MW |
| 2026-11-08T01:00Z | 4,951 MW |
| 2026-11-08T02:00Z | 4,709 MW |
| 2026-11-08T03:00Z | 4,591 MW |
| 2026-11-08T04:00Z | 4,500 MW |
| 2026-11-08T05:00Z | 4,497 MW |
| 2026-11-08T06:00Z | 4,622 MW |
| 2026-11-08T07:00Z | 4,721 MW |
| 2026-11-08T08:00Z | 5,060 MW |
| 2026-11-08T09:00Z | 5,322 MW |
| 2026-11-08T10:00Z | 5,690 MW |
| 2026-11-08T11:00Z | 6,046 MW |
| 2026-11-08T12:00Z | 6,295 MW |
| 2026-11-08T13:00Z | 6,096 MW |
| 2026-11-08T14:00Z | 5,955 MW |
| 2026-11-08T15:00Z | 5,963 MW |
| 2026-11-08T16:00Z | 6,044 MW |
| 2026-11-08T17:00Z | 6,414 MW |
| 2026-11-08T18:00Z | 6,851 MW |
| 2026-11-08T19:00Z | 7,027 MW |
| 2026-11-08T20:00Z | 6,882 MW |
| 2026-11-08T21:00Z | 6,464 MW |
| 2026-11-08T22:00Z | 5,965 MW |
| 2026-11-08T23:00Z | 5,492 MW |
| 2026-11-09T00:00Z | 5,172 MW |
| 2026-11-09T01:00Z | 4,891 MW |
| 2026-11-09T02:00Z | 4,724 MW |
| 2026-11-09T03:00Z | 4,639 MW |
| 2026-11-09T04:00Z | 4,557 MW |
| 2026-11-09T05:00Z | 4,643 MW |
| 2026-11-09T06:00Z | 5,245 MW |
| 2026-11-09T07:00Z | 5,933 MW |
| 2026-11-09T08:00Z | 6,730 MW |
| 2026-11-09T09:00Z | 6,931 MW |
| 2026-11-09T10:00Z | 7,003 MW |
| 2026-11-09T11:00Z | 7,287 MW |
| 2026-11-09T12:00Z | 7,322 MW |
| 2026-11-09T13:00Z | 7,192 MW |
| 2026-11-09T14:00Z | 7,434 MW |
| 2026-11-09T15:00Z | 7,482 MW |
| 2026-11-09T16:00Z | 7,434 MW |
| 2026-11-09T17:00Z | 7,574 MW |
| 2026-11-09T18:00Z | 7,869 MW |
| 2026-11-09T19:00Z | 8,049 MW |
| 2026-11-09T20:00Z | 7,808 MW |
| 2026-11-09T21:00Z | 7,302 MW |
| 2026-11-09T22:00Z | 6,679 MW |
| 2026-11-09T23:00Z | 6,066 MW |
| 2026-11-10T00:00Z | 5,749 MW |
| 2026-11-10T01:00Z | 5,440 MW |
| 2026-11-10T02:00Z | 5,193 MW |
| 2026-11-10T03:00Z | 5,068 MW |
| 2026-11-10T04:00Z | 4,978 MW |
| 2026-11-10T05:00Z | 5,079 MW |
| 2026-11-10T06:00Z | 5,523 MW |
| 2026-11-10T07:00Z | 6,203 MW |
| 2026-11-10T08:00Z | 6,978 MW |
| 2026-11-10T09:00Z | 7,256 MW |
| 2026-11-10T10:00Z | 7,387 MW |
| 2026-11-10T11:00Z | 7,559 MW |
| 2026-11-10T12:00Z | 7,514 MW |
| 2026-11-10T13:00Z | 7,479 MW |
| 2026-11-10T14:00Z | 7,602 MW |
| 2026-11-10T15:00Z | 7,630 MW |
| 2026-11-10T16:00Z | 7,642 MW |
| 2026-11-10T17:00Z | 7,732 MW |
| 2026-11-10T18:00Z | 8,004 MW |
| 2026-11-10T19:00Z | 8,180 MW |
| 2026-11-10T20:00Z | 7,953 MW |
| 2026-11-10T21:00Z | 7,431 MW |
| 2026-11-10T22:00Z | 6,861 MW |
| 2026-11-10T23:00Z | 6,215 MW |
| 2026-11-11T00:00Z | 5,733 MW |
| 2026-11-11T01:00Z | 5,407 MW |
| 2026-11-11T02:00Z | 5,169 MW |
| 2026-11-11T03:00Z | 4,963 MW |
| 2026-11-11T04:00Z | 4,863 MW |
| 2026-11-11T05:00Z | 4,938 MW |
| 2026-11-11T06:00Z | 5,158 MW |
| 2026-11-11T07:00Z | 5,503 MW |
| 2026-11-11T08:00Z | 6,319 MW |
| 2026-11-11T09:00Z | 6,899 MW |
| 2026-11-11T10:00Z | 7,215 MW |
| 2026-11-11T11:00Z | 7,545 MW |
| 2026-11-11T12:00Z | 7,610 MW |
| 2026-11-11T13:00Z | 7,455 MW |
| 2026-11-11T14:00Z | 7,333 MW |
| 2026-11-11T15:00Z | 7,169 MW |
| 2026-11-11T16:00Z | 7,127 MW |
| 2026-11-11T17:00Z | 7,284 MW |
| 2026-11-11T18:00Z | 7,573 MW |
| 2026-11-11T19:00Z | 7,701 MW |
| 2026-11-11T20:00Z | 7,350 MW |
| 2026-11-11T21:00Z | 6,794 MW |
| 2026-11-11T22:00Z | 6,265 MW |
| 2026-11-11T23:00Z | 5,725 MW |
| 2026-11-12T00:00Z | 5,284 MW |
| 2026-11-12T01:00Z | 5,053 MW |
| 2026-11-12T02:00Z | 4,842 MW |
| 2026-11-12T03:00Z | 4,767 MW |
| 2026-11-12T04:00Z | 4,772 MW |
| 2026-11-12T05:00Z | 4,842 MW |
| 2026-11-12T06:00Z | 5,216 MW |
| 2026-11-12T07:00Z | 6,048 MW |
| 2026-11-12T08:00Z | 6,745 MW |
| 2026-11-12T09:00Z | 7,003 MW |
| 2026-11-12T10:00Z | 6,500 MW |
| 2026-11-12T11:00Z | 6,536 MW |
| 2026-11-12T12:00Z | 6,440 MW |
| 2026-11-12T13:00Z | 6,402 MW |
Show the data table (686 rows)
| Hour starting (UTC) | Wind | Gas | Solar | Storage | Hydro |
|---|---|---|---|---|---|
| 2026-10-15T00:00Z | 374 MW | 998 MW | 0 MW | 198 MW | 76 MW |
| 2026-10-15T01:00Z | 449 MW | 962 MW | 0 MW | 272 MW | 76 MW |
| 2026-10-15T02:00Z | 499 MW | 970 MW | 0 MW | 273 MW | 76 MW |
| 2026-10-15T03:00Z | 550 MW | 965 MW | 0 MW | 158 MW | 78 MW |
| 2026-10-15T04:00Z | 676 MW | 1,089 MW | 0 MW | 689 MW | 294 MW |
| 2026-10-15T05:00Z | 765 MW | 1,093 MW | 0 MW | 1,324 MW | 1,188 MW |
| 2026-10-15T06:00Z | 796 MW | 1,109 MW | 7 MW | 1,343 MW | 1,489 MW |
| 2026-10-15T07:00Z | 788 MW | 1,046 MW | 485 MW | 1,037 MW | 455 MW |
| 2026-10-15T08:00Z | 658 MW | 863 MW | 1,621 MW | -153 MW | 296 MW |
| 2026-10-15T09:00Z | 506 MW | 585 MW | 2,470 MW | -1,641 MW | 216 MW |
| 2026-10-15T10:00Z | 398 MW | 646 MW | 2,866 MW | -2,003 MW | 186 MW |
| 2026-10-15T11:00Z | 351 MW | 632 MW | 3,039 MW | -2,251 MW | 83 MW |
| 2026-10-15T12:00Z | 334 MW | 681 MW | 3,267 MW | -2,213 MW | 74 MW |
| 2026-10-15T13:00Z | 272 MW | 716 MW | 3,152 MW | -2,156 MW | 93 MW |
| 2026-10-15T14:00Z | 236 MW | 703 MW | 2,854 MW | -1,884 MW | 141 MW |
| 2026-10-15T15:00Z | 270 MW | 876 MW | 2,290 MW | -436 MW | 213 MW |
| 2026-10-15T16:00Z | 332 MW | 1,223 MW | 1,245 MW | 1,069 MW | 287 MW |
| 2026-10-15T17:00Z | 416 MW | 1,404 MW | 202 MW | 1,933 MW | 1,162 MW |
| 2026-10-15T18:00Z | 495 MW | 1,447 MW | 15 MW | 2,005 MW | 1,316 MW |
| 2026-10-15T19:00Z | 528 MW | 1,420 MW | 11 MW | 1,774 MW | 1,270 MW |
| 2026-10-15T20:00Z | 526 MW | 1,143 MW | 0 MW | 1,135 MW | 732 MW |
| 2026-10-15T21:00Z | 509 MW | 832 MW | 0 MW | 1,010 MW | 558 MW |
| 2026-10-15T22:00Z | 469 MW | 741 MW | 0 MW | 313 MW | 504 MW |
| 2026-10-15T23:00Z | 389 MW | 734 MW | 0 MW | 284 MW | 446 MW |
| 2026-10-16T00:00Z | 374 MW | 687 MW | 0 MW | 214 MW | 398 MW |
| 2026-10-16T01:00Z | 376 MW | 694 MW | 0 MW | -1 MW | 365 MW |
| 2026-10-16T02:00Z | 356 MW | 685 MW | 0 MW | -3 MW | 527 MW |
| 2026-10-16T03:00Z | 344 MW | 677 MW | 0 MW | -2 MW | 540 MW |
| 2026-10-16T04:00Z | 335 MW | 706 MW | 0 MW | 607 MW | 810 MW |
| 2026-10-16T05:00Z | 305 MW | 780 MW | 0 MW | 1,107 MW | 1,404 MW |
| 2026-10-16T06:00Z | 285 MW | 782 MW | 5 MW | 1,180 MW | 1,630 MW |
| 2026-10-16T07:00Z | 283 MW | 769 MW | 492 MW | 1,163 MW | 1,029 MW |
| 2026-10-16T08:00Z | 215 MW | 659 MW | 1,689 MW | 651 MW | 555 MW |
| 2026-10-16T09:00Z | 150 MW | 592 MW | 2,531 MW | -712 MW | 415 MW |
| 2026-10-16T10:00Z | 118 MW | 667 MW | 3,004 MW | -1,214 MW | 304 MW |
| 2026-10-16T11:00Z | 152 MW | 677 MW | 3,197 MW | -1,623 MW | 278 MW |
| 2026-10-16T12:00Z | 191 MW | 670 MW | 3,101 MW | -1,662 MW | 202 MW |
| 2026-10-16T13:00Z | 311 MW | 672 MW | 2,983 MW | -1,503 MW | 199 MW |
| 2026-10-16T14:00Z | 535 MW | 676 MW | 2,668 MW | -1,350 MW | 223 MW |
| 2026-10-16T15:00Z | 590 MW | 686 MW | 2,028 MW | -486 MW | 268 MW |
| 2026-10-16T16:00Z | 649 MW | 732 MW | 1,052 MW | 757 MW | 482 MW |
| 2026-10-16T17:00Z | 820 MW | 723 MW | 166 MW | 1,618 MW | 890 MW |
| 2026-10-16T18:00Z | 1,006 MW | 767 MW | 15 MW | 1,374 MW | 803 MW |
| 2026-10-16T19:00Z | 1,039 MW | 740 MW | 5 MW | 987 MW | 692 MW |
| 2026-10-16T20:00Z | 939 MW | 704 MW | 0 MW | 279 MW | 720 MW |
| 2026-10-16T21:00Z | 841 MW | 683 MW | 0 MW | 236 MW | 692 MW |
| 2026-10-16T22:00Z | 794 MW | 703 MW | 0 MW | 836 MW | 864 MW |
| 2026-10-16T23:00Z | 780 MW | 656 MW | 0 MW | 483 MW | 645 MW |
| 2026-10-17T00:00Z | 762 MW | 599 MW | 0 MW | 226 MW | 604 MW |
| 2026-10-17T01:00Z | 769 MW | 615 MW | 0 MW | 262 MW | 556 MW |
| 2026-10-17T02:00Z | 941 MW | 624 MW | 0 MW | 231 MW | 452 MW |
| 2026-10-17T03:00Z | 1,177 MW | 605 MW | 0 MW | 302 MW | 420 MW |
| 2026-10-17T04:00Z | 1,408 MW | 601 MW | 0 MW | 405 MW | 409 MW |
| 2026-10-17T05:00Z | 1,627 MW | 620 MW | 0 MW | 870 MW | 549 MW |
| 2026-10-17T06:00Z | 1,830 MW | 626 MW | 4 MW | 747 MW | 635 MW |
| 2026-10-17T07:00Z | 2,025 MW | 596 MW | 232 MW | 75 MW | 296 MW |
| 2026-10-17T08:00Z | 2,013 MW | 548 MW | 1,102 MW | -1,769 MW | 152 MW |
| 2026-10-17T09:00Z | 1,926 MW | 527 MW | 1,800 MW | -2,357 MW | 124 MW |
| 2026-10-17T10:00Z | 1,862 MW | 640 MW | 2,144 MW | -2,423 MW | 165 MW |
| 2026-10-17T11:00Z | 1,876 MW | 616 MW | 2,364 MW | -2,425 MW | 154 MW |
| 2026-10-17T12:00Z | 1,913 MW | 624 MW | 2,219 MW | -2,423 MW | 153 MW |
| 2026-10-17T13:00Z | 2,005 MW | 627 MW | 1,883 MW | -2,424 MW | 154 MW |
| 2026-10-17T14:00Z | 2,005 MW | 624 MW | 1,656 MW | -2,342 MW | 154 MW |
| 2026-10-17T15:00Z | 2,031 MW | 616 MW | 1,513 MW | -2,039 MW | 141 MW |
| 2026-10-17T16:00Z | 1,975 MW | 663 MW | 861 MW | -588 MW | 121 MW |
| 2026-10-17T17:00Z | 2,270 MW | 649 MW | 183 MW | 941 MW | 229 MW |
| 2026-10-17T18:00Z | 2,666 MW | 605 MW | 15 MW | 1,546 MW | 370 MW |
| 2026-10-17T19:00Z | 2,879 MW | 681 MW | 6 MW | 1,357 MW | 266 MW |
| 2026-10-17T20:00Z | 2,971 MW | 731 MW | 0 MW | 994 MW | 68 MW |
| 2026-10-17T21:00Z | 3,178 MW | 721 MW | 0 MW | 611 MW | 57 MW |
| 2026-10-17T22:00Z | 3,346 MW | 732 MW | 0 MW | -267 MW | 38 MW |
| 2026-10-17T23:00Z | 3,385 MW | 727 MW | 0 MW | -568 MW | 43 MW |
| 2026-10-18T00:00Z | 3,574 MW | 734 MW | 0 MW | -923 MW | 53 MW |
| 2026-10-18T01:00Z | 3,707 MW | 715 MW | 0 MW | -1,364 MW | 34 MW |
| 2026-10-18T02:00Z | 3,782 MW | 656 MW | 0 MW | -1,398 MW | 51 MW |
| 2026-10-18T03:00Z | 3,628 MW | 732 MW | 0 MW | -1,482 MW | 52 MW |
| 2026-10-18T04:00Z | 3,608 MW | 651 MW | 0 MW | -1,118 MW | 39 MW |
| 2026-10-18T05:00Z | 3,553 MW | 632 MW | 0 MW | -1,087 MW | 68 MW |
| 2026-10-18T06:00Z | 3,531 MW | 656 MW | 2 MW | -551 MW | 127 MW |
| 2026-10-18T07:00Z | 3,481 MW | 654 MW | 281 MW | -1,152 MW | 171 MW |
| 2026-10-18T08:00Z | 3,503 MW | 640 MW | 1,085 MW | -2,107 MW | 135 MW |
| 2026-10-18T09:00Z | 3,546 MW | 598 MW | 1,707 MW | -2,415 MW | 124 MW |
| 2026-10-18T10:00Z | 3,455 MW | 648 MW | 1,956 MW | -2,453 MW | 165 MW |
| 2026-10-18T11:00Z | 3,311 MW | 654 MW | 2,086 MW | -2,405 MW | 168 MW |
| 2026-10-18T12:00Z | 3,100 MW | 633 MW | 2,205 MW | -2,410 MW | 152 MW |
| 2026-10-18T13:00Z | 2,830 MW | 656 MW | 1,854 MW | -2,320 MW | 172 MW |
| 2026-10-18T14:00Z | 2,664 MW | 657 MW | 1,870 MW | -2,289 MW | 168 MW |
| 2026-10-18T15:00Z | 2,608 MW | 689 MW | 1,629 MW | -2,184 MW | 180 MW |
| 2026-10-18T16:00Z | 2,696 MW | 705 MW | 964 MW | -897 MW | 194 MW |
| 2026-10-18T17:00Z | 2,825 MW | 688 MW | 147 MW | 810 MW | 319 MW |
| 2026-10-18T18:00Z | 3,086 MW | 618 MW | 15 MW | 1,812 MW | 455 MW |
| 2026-10-18T19:00Z | 3,300 MW | 612 MW | 12 MW | 1,660 MW | 518 MW |
| 2026-10-18T20:00Z | 3,549 MW | 628 MW | 0 MW | 1,301 MW | 141 MW |
| 2026-10-18T21:00Z | 3,530 MW | 646 MW | 0 MW | 541 MW | 95 MW |
| 2026-10-18T22:00Z | 3,450 MW | 641 MW | 0 MW | 617 MW | 128 MW |
| 2026-10-18T23:00Z | 3,335 MW | 682 MW | 0 MW | 100 MW | 174 MW |
| 2026-10-19T00:00Z | 3,151 MW | 688 MW | 0 MW | -199 MW | 77 MW |
| 2026-10-19T01:00Z | 3,021 MW | 675 MW | 0 MW | 85 MW | 81 MW |
| 2026-10-19T02:00Z | 2,960 MW | 658 MW | 0 MW | 302 MW | 199 MW |
| 2026-10-19T03:00Z | 2,841 MW | 648 MW | 0 MW | 629 MW | 238 MW |
| 2026-10-19T04:00Z | 2,657 MW | 730 MW | 0 MW | 499 MW | 182 MW |
| 2026-10-19T05:00Z | 2,520 MW | 778 MW | 0 MW | 1,179 MW | 561 MW |
| 2026-10-19T06:00Z | 2,357 MW | 823 MW | 3 MW | 2,066 MW | 1,121 MW |
| 2026-10-19T07:00Z | 2,079 MW | 770 MW | 427 MW | 1,137 MW | 799 MW |
| 2026-10-19T08:00Z | 1,567 MW | 701 MW | 1,580 MW | -287 MW | 477 MW |
| 2026-10-19T09:00Z | 1,235 MW | 700 MW | 2,386 MW | -369 MW | 346 MW |
| 2026-10-19T10:00Z | 938 MW | 702 MW | 2,765 MW | -620 MW | 308 MW |
| 2026-10-19T11:00Z | 661 MW | 761 MW | 3,012 MW | -254 MW | 249 MW |
| 2026-10-19T12:00Z | 486 MW | 711 MW | 3,140 MW | -169 MW | 216 MW |
| 2026-10-19T13:00Z | 331 MW | 711 MW | 2,983 MW | -65 MW | 200 MW |
| 2026-10-19T14:00Z | 209 MW | 763 MW | 2,654 MW | -69 MW | 337 MW |
| 2026-10-19T15:00Z | 273 MW | 917 MW | 2,141 MW | 603 MW | 409 MW |
| 2026-10-19T16:00Z | 430 MW | 1,079 MW | 1,146 MW | 1,690 MW | 828 MW |
| 2026-10-19T17:00Z | 516 MW | 1,269 MW | 167 MW | 2,122 MW | 1,111 MW |
| 2026-10-19T18:00Z | 527 MW | 1,418 MW | 16 MW | 2,366 MW | 1,692 MW |
| 2026-10-19T19:00Z | 482 MW | 1,437 MW | 8 MW | 2,298 MW | 1,577 MW |
| 2026-10-19T20:00Z | 431 MW | 1,437 MW | 1 MW | 1,687 MW | 812 MW |
| 2026-10-19T21:00Z | 345 MW | 1,271 MW | 1 MW | 999 MW | 727 MW |
| 2026-10-19T22:00Z | 307 MW | 1,103 MW | 0 MW | 1,079 MW | 658 MW |
| 2026-10-19T23:00Z | 283 MW | 1,089 MW | 0 MW | 1,102 MW | 604 MW |
| 2026-10-20T00:00Z | 297 MW | 1,145 MW | 0 MW | 862 MW | 546 MW |
| 2026-10-20T01:00Z | 333 MW | 1,171 MW | 0 MW | 662 MW | 492 MW |
| 2026-10-20T02:00Z | 434 MW | 842 MW | 0 MW | 519 MW | 456 MW |
| 2026-10-20T03:00Z | 534 MW | 744 MW | 0 MW | 530 MW | 509 MW |
| 2026-10-20T04:00Z | 518 MW | 767 MW | 0 MW | 630 MW | 621 MW |
| 2026-10-20T05:00Z | 518 MW | 769 MW | 0 MW | 1,447 MW | 723 MW |
| 2026-10-20T06:00Z | 488 MW | 848 MW | 3 MW | 1,940 MW | 789 MW |
| 2026-10-20T07:00Z | 418 MW | 807 MW | 211 MW | 1,389 MW | 606 MW |
| 2026-10-20T08:00Z | 406 MW | 694 MW | 865 MW | 800 MW | 514 MW |
| 2026-10-20T09:00Z | 409 MW | 703 MW | 1,600 MW | -784 MW | 345 MW |
| 2026-10-20T10:00Z | 368 MW | 678 MW | 2,194 MW | -1,772 MW | 350 MW |
| 2026-10-20T11:00Z | 292 MW | 639 MW | 2,574 MW | -2,228 MW | 277 MW |
| 2026-10-20T12:00Z | 293 MW | 635 MW | 2,844 MW | -2,459 MW | 200 MW |
| 2026-10-20T13:00Z | 530 MW | 607 MW | 2,914 MW | -2,453 MW | 187 MW |
| 2026-10-20T14:00Z | 829 MW | 663 MW | 2,793 MW | -2,451 MW | 142 MW |
| 2026-10-20T15:00Z | 1,118 MW | 660 MW | 2,252 MW | -1,763 MW | 284 MW |
| 2026-10-20T16:00Z | 1,648 MW | 717 MW | 1,059 MW | 493 MW | 418 MW |
| 2026-10-20T17:00Z | 1,758 MW | 737 MW | 148 MW | 1,955 MW | 958 MW |
| 2026-10-20T18:00Z | 1,725 MW | 752 MW | 15 MW | 2,063 MW | 1,179 MW |
| 2026-10-20T19:00Z | 2,144 MW | 699 MW | 13 MW | 1,136 MW | 682 MW |
| 2026-10-20T20:00Z | 2,578 MW | 688 MW | 0 MW | 135 MW | 223 MW |
| 2026-10-20T21:00Z | 2,668 MW | 649 MW | 0 MW | -83 MW | 218 MW |
| 2026-10-20T22:00Z | 2,545 MW | 634 MW | 0 MW | 81 MW | 233 MW |
| 2026-10-20T23:00Z | 2,490 MW | 699 MW | 0 MW | -280 MW | 225 MW |
| 2026-10-21T00:00Z | 2,397 MW | 631 MW | 0 MW | -47 MW | 216 MW |
| 2026-10-21T01:00Z | 2,101 MW | 655 MW | 0 MW | 261 MW | 239 MW |
| 2026-10-21T02:00Z | 2,039 MW | 624 MW | 0 MW | 230 MW | 127 MW |
| 2026-10-21T03:00Z | 1,729 MW | 679 MW | 0 MW | 639 MW | 81 MW |
| 2026-10-21T04:00Z | 1,491 MW | 669 MW | 0 MW | 790 MW | 310 MW |
| 2026-10-21T05:00Z | 1,440 MW | 739 MW | 0 MW | 1,080 MW | 406 MW |
| 2026-10-21T06:00Z | 1,508 MW | 809 MW | 3 MW | 1,782 MW | 582 MW |
| 2026-10-21T07:00Z | 1,353 MW | 765 MW | 353 MW | 774 MW | 465 MW |
| 2026-10-21T08:00Z | 1,082 MW | 606 MW | 1,280 MW | -1,070 MW | 265 MW |
| 2026-10-21T09:00Z | 899 MW | 575 MW | 2,004 MW | -2,278 MW | 227 MW |
| 2026-10-21T10:00Z | 662 MW | 619 MW | 2,318 MW | -2,302 MW | 221 MW |
| 2026-10-21T11:00Z | 621 MW | 598 MW | 2,453 MW | -2,302 MW | 167 MW |
| 2026-10-21T12:00Z | 542 MW | 674 MW | 2,358 MW | -2,239 MW | 152 MW |
| 2026-10-21T13:00Z | 562 MW | 544 MW | 2,356 MW | -2,185 MW | 103 MW |
| 2026-10-21T14:00Z | 610 MW | 636 MW | 2,161 MW | -2,054 MW | 154 MW |
| 2026-10-21T15:00Z | 633 MW | 688 MW | 2,102 MW | -1,721 MW | 201 MW |
| 2026-10-21T16:00Z | 688 MW | 901 MW | 1,180 MW | 679 MW | 268 MW |
| 2026-10-21T17:00Z | 797 MW | 1,174 MW | 153 MW | 1,783 MW | 622 MW |
| 2026-10-21T18:00Z | 787 MW | 1,292 MW | 15 MW | 2,272 MW | 1,291 MW |
| 2026-10-21T19:00Z | 682 MW | 1,189 MW | 13 MW | 2,297 MW | 1,204 MW |
| 2026-10-21T20:00Z | 607 MW | 1,109 MW | 0 MW | 1,729 MW | 456 MW |
| 2026-10-21T21:00Z | 650 MW | 954 MW | 0 MW | 1,228 MW | 302 MW |
| 2026-10-21T22:00Z | 637 MW | 920 MW | 0 MW | 990 MW | 373 MW |
| 2026-10-21T23:00Z | 566 MW | 932 MW | 0 MW | 1,065 MW | 404 MW |
| 2026-10-22T00:00Z | 570 MW | 853 MW | 0 MW | 1,099 MW | 347 MW |
| 2026-10-22T01:00Z | 565 MW | 775 MW | 0 MW | 1,098 MW | 179 MW |
| 2026-10-22T02:00Z | 418 MW | 749 MW | 0 MW | 1,201 MW | 176 MW |
| 2026-10-22T03:00Z | 321 MW | 719 MW | 0 MW | 1,041 MW | 180 MW |
| 2026-10-22T04:00Z | 327 MW | 778 MW | 0 MW | 1,153 MW | 344 MW |
| 2026-10-22T05:00Z | 310 MW | 789 MW | 0 MW | 1,637 MW | 1,083 MW |
| 2026-10-22T06:00Z | 272 MW | 796 MW | 3 MW | 1,957 MW | 1,930 MW |
| 2026-10-22T07:00Z | 253 MW | 759 MW | 447 MW | 1,352 MW | 986 MW |
| 2026-10-22T08:00Z | 186 MW | 606 MW | 1,744 MW | -643 MW | 239 MW |
| 2026-10-22T09:00Z | 166 MW | 608 MW | 2,637 MW | -1,791 MW | 193 MW |
| 2026-10-22T10:00Z | 245 MW | 593 MW | 2,916 MW | -2,138 MW | 174 MW |
| 2026-10-22T11:00Z | 387 MW | 563 MW | 2,887 MW | -2,333 MW | 144 MW |
| 2026-10-22T12:00Z | 716 MW | 611 MW | 2,674 MW | -2,334 MW | 143 MW |
| 2026-10-22T13:00Z | 1,179 MW | 568 MW | 2,530 MW | -2,268 MW | 133 MW |
| 2026-10-22T14:00Z | 1,814 MW | 637 MW | 2,314 MW | -2,302 MW | 162 MW |
| 2026-10-22T15:00Z | 2,251 MW | 644 MW | 2,026 MW | -1,946 MW | 175 MW |
| 2026-10-22T16:00Z | 2,332 MW | 677 MW | 1,094 MW | 30 MW | 235 MW |
| 2026-10-22T17:00Z | 2,344 MW | 760 MW | 120 MW | 1,984 MW | 851 MW |
| 2026-10-22T18:00Z | 2,310 MW | 758 MW | 15 MW | 2,025 MW | 983 MW |
| 2026-10-22T19:00Z | 2,403 MW | 715 MW | 8 MW | 1,290 MW | 244 MW |
| 2026-10-22T20:00Z | 2,699 MW | 672 MW | 0 MW | 651 MW | 90 MW |
| 2026-10-22T21:00Z | 2,909 MW | 665 MW | 0 MW | 422 MW | 70 MW |
| 2026-10-22T22:00Z | 3,030 MW | 671 MW | 0 MW | -232 MW | 79 MW |
| 2026-10-22T23:00Z | 2,868 MW | 746 MW | 0 MW | -402 MW | 119 MW |
| 2026-10-23T00:00Z | 2,752 MW | 668 MW | 0 MW | -913 MW | 183 MW |
| 2026-10-23T01:00Z | 2,604 MW | 688 MW | 0 MW | -1,133 MW | 149 MW |
| 2026-10-23T02:00Z | 2,545 MW | 667 MW | 0 MW | -1,304 MW | 141 MW |
| 2026-10-23T03:00Z | 2,365 MW | 672 MW | 0 MW | -993 MW | 136 MW |
| 2026-10-23T04:00Z | 2,232 MW | 668 MW | 0 MW | -412 MW | 90 MW |
| 2026-10-23T05:00Z | 2,124 MW | 704 MW | 0 MW | 435 MW | 217 MW |
| 2026-10-23T06:00Z | 2,114 MW | 627 MW | 1 MW | 1,148 MW | 372 MW |
| 2026-10-23T07:00Z | 2,075 MW | 675 MW | 218 MW | 534 MW | 134 MW |
| 2026-10-23T08:00Z | 1,823 MW | 654 MW | 1,060 MW | -1,095 MW | 201 MW |
| 2026-10-23T09:00Z | 1,569 MW | 618 MW | 1,388 MW | -2,133 MW | 229 MW |
| 2026-10-23T10:00Z | 1,189 MW | 682 MW | 1,681 MW | -2,362 MW | 299 MW |
| 2026-10-23T11:00Z | 795 MW | 681 MW | 2,001 MW | -2,294 MW | 210 MW |
| 2026-10-23T12:00Z | 676 MW | 694 MW | 2,088 MW | -2,243 MW | 222 MW |
| 2026-10-23T13:00Z | 916 MW | 638 MW | 1,862 MW | -2,212 MW | 239 MW |
| 2026-10-23T14:00Z | 1,098 MW | 605 MW | 1,755 MW | -2,392 MW | 232 MW |
| 2026-10-23T15:00Z | 1,126 MW | 658 MW | 1,723 MW | -1,852 MW | 210 MW |
| 2026-10-23T16:00Z | 1,356 MW | 666 MW | 1,016 MW | 93 MW | 99 MW |
| 2026-10-23T17:00Z | 1,563 MW | 748 MW | 130 MW | 1,575 MW | 449 MW |
| 2026-10-23T18:00Z | 1,669 MW | 736 MW | 15 MW | 2,149 MW | 765 MW |
| 2026-10-23T19:00Z | 1,704 MW | 723 MW | 15 MW | 1,871 MW | 568 MW |
| 2026-10-23T20:00Z | 1,863 MW | 643 MW | 1 MW | 1,291 MW | 238 MW |
| 2026-10-23T21:00Z | 1,826 MW | 686 MW | 0 MW | 931 MW | 125 MW |
| 2026-10-23T22:00Z | 1,290 MW | 705 MW | 0 MW | 1,133 MW | 16 MW |
| 2026-10-23T23:00Z | 1,183 MW | 711 MW | 0 MW | 1,120 MW | 16 MW |
| 2026-10-24T00:00Z | 1,124 MW | 668 MW | 0 MW | 945 MW | 70 MW |
| 2026-10-24T01:00Z | 950 MW | 640 MW | 0 MW | 805 MW | 85 MW |
| 2026-10-24T02:00Z | 897 MW | 634 MW | 0 MW | 693 MW | 150 MW |
| 2026-10-24T03:00Z | 664 MW | 684 MW | 0 MW | 664 MW | 216 MW |
| 2026-10-24T04:00Z | 331 MW | 696 MW | 0 MW | 791 MW | 288 MW |
| 2026-10-24T05:00Z | 225 MW | 644 MW | 0 MW | 1,260 MW | 391 MW |
| 2026-10-24T06:00Z | 280 MW | 698 MW | 2 MW | 1,464 MW | 498 MW |
| 2026-10-24T07:00Z | 318 MW | 711 MW | 374 MW | 727 MW | 351 MW |
| 2026-10-24T08:00Z | 188 MW | 678 MW | 1,632 MW | -1,408 MW | 259 MW |
| 2026-10-24T09:00Z | 97 MW | 654 MW | 2,505 MW | -2,282 MW | 228 MW |
| 2026-10-24T10:00Z | 88 MW | 654 MW | 2,535 MW | -2,377 MW | 237 MW |
| 2026-10-24T11:00Z | 122 MW | 659 MW | 2,476 MW | -2,337 MW | 206 MW |
| 2026-10-24T12:00Z | 161 MW | 667 MW | 2,523 MW | -2,286 MW | 171 MW |
| 2026-10-24T13:00Z | 284 MW | 638 MW | 2,225 MW | -2,219 MW | 142 MW |
| 2026-10-24T14:00Z | 508 MW | 592 MW | 2,184 MW | -2,253 MW | 148 MW |
| 2026-10-24T15:00Z | 743 MW | 663 MW | 1,988 MW | -1,992 MW | 241 MW |
| 2026-10-24T16:00Z | 968 MW | 677 MW | 1,099 MW | -147 MW | 190 MW |
| 2026-10-24T17:00Z | 1,215 MW | 706 MW | 128 MW | 1,595 MW | 403 MW |
| 2026-10-24T18:00Z | 1,417 MW | 793 MW | 15 MW | 2,019 MW | 663 MW |
| 2026-10-24T19:00Z | 1,603 MW | 779 MW | 15 MW | 1,693 MW | 699 MW |
| 2026-10-24T20:00Z | 1,596 MW | 708 MW | 1 MW | 1,173 MW | 420 MW |
| 2026-10-24T21:00Z | 1,554 MW | 696 MW | 0 MW | 550 MW | 59 MW |
| 2026-10-24T22:00Z | 1,520 MW | 698 MW | 0 MW | 312 MW | 33 MW |
| 2026-10-24T23:00Z | 1,497 MW | 685 MW | 0 MW | -27 MW | 140 MW |
| 2026-10-25T00:00Z | 1,507 MW | 662 MW | 0 MW | -284 MW | 144 MW |
| 2026-10-25T01:00Z | 1,674 MW | 590 MW | 0 MW | -515 MW | 134 MW |
| 2026-10-25T02:00Z | 1,952 MW | 663 MW | 0 MW | -735 MW | 21 MW |
| 2026-10-25T03:00Z | 2,295 MW | 644 MW | 0 MW | -1,218 MW | 20 MW |
| 2026-10-25T04:00Z | 2,630 MW | 651 MW | 0 MW | -1,426 MW | 7 MW |
| 2026-10-25T05:00Z | 2,655 MW | 693 MW | 0 MW | -1,173 MW | 7 MW |
| 2026-10-25T06:00Z | 2,544 MW | 727 MW | 1 MW | -524 MW | 10 MW |
| 2026-10-25T07:00Z | 2,071 MW | 612 MW | 211 MW | -2,066 MW | 299 MW |
| 2026-10-25T08:00Z | 1,486 MW | 676 MW | 746 MW | -2,387 MW | 419 MW |
| 2026-10-25T09:00Z | 1,194 MW | 639 MW | 1,152 MW | -2,017 MW | 292 MW |
| 2026-10-25T10:00Z | 848 MW | 683 MW | 1,404 MW | -2,218 MW | 391 MW |
| 2026-10-25T11:00Z | 682 MW | 674 MW | 1,572 MW | -1,917 MW | 183 MW |
| 2026-10-25T12:00Z | 592 MW | 651 MW | 1,634 MW | -1,949 MW | 167 MW |
| 2026-10-25T13:00Z | 543 MW | 632 MW | 1,641 MW | -1,842 MW | 153 MW |
| 2026-10-25T14:00Z | 618 MW | 630 MW | 1,584 MW | -1,837 MW | 162 MW |
| 2026-10-25T15:00Z | 670 MW | 659 MW | 1,378 MW | -1,823 MW | 224 MW |
| 2026-10-25T16:00Z | 820 MW | 682 MW | 774 MW | -506 MW | 211 MW |
| 2026-10-25T17:00Z | 1,112 MW | 691 MW | 91 MW | 1,474 MW | 413 MW |
| 2026-10-25T18:00Z | 1,338 MW | 690 MW | 15 MW | 1,565 MW | 419 MW |
| 2026-10-25T19:00Z | 1,253 MW | 732 MW | 15 MW | 1,708 MW | 953 MW |
| 2026-10-25T20:00Z | 1,084 MW | 642 MW | 15 MW | 1,886 MW | 902 MW |
| 2026-10-25T21:00Z | 915 MW | 660 MW | 9 MW | 1,722 MW | 332 MW |
| 2026-10-25T22:00Z | 732 MW | 592 MW | 0 MW | 1,572 MW | 75 MW |
| 2026-10-25T23:00Z | 634 MW | 646 MW | 0 MW | 649 MW | 91 MW |
| 2026-10-26T00:00Z | 554 MW | 642 MW | 0 MW | 654 MW | 190 MW |
| 2026-10-26T01:00Z | 402 MW | 648 MW | 0 MW | 527 MW | 361 MW |
| 2026-10-26T02:00Z | 266 MW | 665 MW | 0 MW | 655 MW | 164 MW |
| 2026-10-26T03:00Z | 257 MW | 650 MW | 0 MW | 607 MW | 205 MW |
| 2026-10-26T04:00Z | 351 MW | 661 MW | 0 MW | 666 MW | 324 MW |
| 2026-10-26T05:00Z | 467 MW | 755 MW | 0 MW | 1,213 MW | 734 MW |
| 2026-10-26T06:00Z | 547 MW | 743 MW | 1 MW | 1,752 MW | 1,323 MW |
| 2026-10-26T07:00Z | 628 MW | 729 MW | 349 MW | 1,120 MW | 949 MW |
| 2026-10-26T08:00Z | 527 MW | 634 MW | 1,533 MW | -156 MW | 440 MW |
| 2026-10-26T09:00Z | 497 MW | 621 MW | 2,461 MW | -1,411 MW | 179 MW |
| 2026-10-26T10:00Z | 463 MW | 633 MW | 2,578 MW | -1,937 MW | 194 MW |
| 2026-10-26T11:00Z | 518 MW | 624 MW | 2,786 MW | -2,011 MW | 211 MW |
| 2026-10-26T12:00Z | 604 MW | 714 MW | 3,110 MW | -2,108 MW | 200 MW |
| 2026-10-26T13:00Z | 636 MW | 805 MW | 3,054 MW | -2,273 MW | 231 MW |
| 2026-10-26T14:00Z | 590 MW | 766 MW | 2,786 MW | -2,119 MW | 227 MW |
| 2026-10-26T15:00Z | 456 MW | 799 MW | 2,200 MW | -781 MW | 214 MW |
| 2026-10-26T16:00Z | 527 MW | 962 MW | 1,018 MW | 1,198 MW | 681 MW |
| 2026-10-26T17:00Z | 636 MW | 973 MW | 101 MW | 2,263 MW | 1,287 MW |
| 2026-10-26T18:00Z | 788 MW | 969 MW | 15 MW | 2,308 MW | 1,550 MW |
| 2026-10-26T19:00Z | 796 MW | 988 MW | 15 MW | 2,469 MW | 1,640 MW |
| 2026-10-26T20:00Z | 968 MW | 991 MW | 12 MW | 2,103 MW | 1,501 MW |
| 2026-10-26T21:00Z | 1,158 MW | 916 MW | 0 MW | 1,254 MW | 973 MW |
| 2026-10-26T22:00Z | 1,021 MW | 801 MW | 0 MW | 724 MW | 717 MW |
| 2026-10-26T23:00Z | 1,035 MW | 730 MW | 0 MW | 688 MW | 289 MW |
| 2026-10-27T00:00Z | 918 MW | 751 MW | 0 MW | 598 MW | 292 MW |
| 2026-10-27T01:00Z | 814 MW | 684 MW | 0 MW | 265 MW | 415 MW |
| 2026-10-27T02:00Z | 834 MW | 684 MW | 0 MW | 248 MW | 422 MW |
| 2026-10-27T03:00Z | 718 MW | 681 MW | 0 MW | 306 MW | 402 MW |
| 2026-10-27T04:00Z | 557 MW | 712 MW | 0 MW | 438 MW | 393 MW |
| 2026-10-27T05:00Z | 464 MW | 795 MW | 0 MW | 837 MW | 828 MW |
| 2026-10-27T06:00Z | 574 MW | 734 MW | 0 MW | 1,585 MW | 1,115 MW |
| 2026-10-27T07:00Z | 674 MW | 735 MW | 161 MW | 1,095 MW | 1,016 MW |
| 2026-10-27T08:00Z | 711 MW | 647 MW | 991 MW | 219 MW | 616 MW |
| 2026-10-27T09:00Z | 689 MW | 663 MW | 1,734 MW | -925 MW | 274 MW |
| 2026-10-27T10:00Z | 639 MW | 684 MW | 2,276 MW | -1,653 MW | 241 MW |
| 2026-10-27T11:00Z | 531 MW | 762 MW | 2,469 MW | -1,705 MW | 238 MW |
| 2026-10-27T12:00Z | 317 MW | 711 MW | 2,576 MW | -1,583 MW | 213 MW |
| 2026-10-27T13:00Z | 404 MW | 711 MW | 2,712 MW | -1,306 MW | 211 MW |
| 2026-10-27T14:00Z | 578 MW | 676 MW | 2,621 MW | -437 MW | 205 MW |
| 2026-10-27T15:00Z | 677 MW | 724 MW | 2,004 MW | 542 MW | 152 MW |
| 2026-10-27T16:00Z | 777 MW | 815 MW | 882 MW | 1,862 MW | 970 MW |
| 2026-10-27T17:00Z | 757 MW | 799 MW | 71 MW | 2,295 MW | 1,863 MW |
| 2026-10-27T18:00Z | 638 MW | 759 MW | 0 MW | 2,186 MW | 1,800 MW |
| 2026-10-27T19:00Z | 559 MW | 761 MW | 0 MW | 1,823 MW | 1,692 MW |
| 2026-10-27T20:00Z | 444 MW | 781 MW | 0 MW | 1,397 MW | 1,061 MW |
| 2026-10-27T21:00Z | 385 MW | 755 MW | 0 MW | 1,170 MW | 763 MW |
| 2026-10-27T22:00Z | 353 MW | 713 MW | 0 MW | 723 MW | 629 MW |
| 2026-10-27T23:00Z | 334 MW | 712 MW | 0 MW | 631 MW | 570 MW |
| 2026-10-28T00:00Z | 310 MW | 709 MW | 0 MW | 254 MW | 445 MW |
| 2026-10-28T01:00Z | 306 MW | 716 MW | 0 MW | 213 MW | 474 MW |
| 2026-10-28T02:00Z | 312 MW | 708 MW | 0 MW | 377 MW | 483 MW |
| 2026-10-28T03:00Z | 403 MW | 676 MW | 0 MW | 206 MW | 489 MW |
| 2026-10-28T04:00Z | 558 MW | 711 MW | 0 MW | 268 MW | 598 MW |
| 2026-10-28T05:00Z | 738 MW | 774 MW | 0 MW | 1,001 MW | 979 MW |
| 2026-10-28T06:00Z | 797 MW | 860 MW | 0 MW | 1,779 MW | 1,779 MW |
| 2026-10-28T07:00Z | 704 MW | 788 MW | 226 MW | 1,071 MW | 957 MW |
| 2026-10-28T08:00Z | 526 MW | 673 MW | 1,021 MW | -715 MW | 469 MW |
| 2026-10-28T09:00Z | 405 MW | 746 MW | 1,841 MW | -1,524 MW | 354 MW |
| 2026-10-28T10:00Z | 360 MW | 682 MW | 2,558 MW | -1,677 MW | 281 MW |
| 2026-10-28T11:00Z | 290 MW | 760 MW | 2,933 MW | -2,172 MW | 252 MW |
| 2026-10-28T12:00Z | 240 MW | 850 MW | 3,052 MW | -2,265 MW | 128 MW |
| 2026-10-28T13:00Z | 211 MW | 909 MW | 3,046 MW | -2,194 MW | 133 MW |
| 2026-10-28T14:00Z | 194 MW | 987 MW | 2,790 MW | -1,614 MW | 126 MW |
| 2026-10-28T15:00Z | 236 MW | 1,393 MW | 2,178 MW | -578 MW | 309 MW |
| 2026-10-28T16:00Z | 288 MW | 1,601 MW | 961 MW | 1,203 MW | 1,148 MW |
| 2026-10-28T17:00Z | 360 MW | 1,640 MW | 93 MW | 2,623 MW | 2,000 MW |
| 2026-10-28T18:00Z | 450 MW | 1,656 MW | 23 MW | 2,621 MW | 2,321 MW |
| 2026-10-28T19:00Z | 512 MW | 1,697 MW | 1 MW | 2,540 MW | 2,077 MW |
| 2026-10-28T20:00Z | 578 MW | 1,700 MW | 0 MW | 2,051 MW | 1,657 MW |
| 2026-10-28T21:00Z | 705 MW | 1,161 MW | 0 MW | 1,679 MW | 1,299 MW |
| 2026-10-28T22:00Z | 799 MW | 787 MW | 0 MW | 1,707 MW | 1,008 MW |
| 2026-10-28T23:00Z | 852 MW | 729 MW | 0 MW | 424 MW | 759 MW |
| 2026-10-29T00:00Z | 834 MW | 745 MW | 0 MW | 291 MW | 659 MW |
| 2026-10-29T01:00Z | 804 MW | 735 MW | 0 MW | 74 MW | 478 MW |
| 2026-10-29T02:00Z | 804 MW | 745 MW | 0 MW | -54 MW | 519 MW |
| 2026-10-29T03:00Z | 829 MW | 717 MW | 0 MW | -114 MW | 464 MW |
| 2026-10-29T04:00Z | 808 MW | 746 MW | 0 MW | 185 MW | 547 MW |
| 2026-10-29T05:00Z | 778 MW | 785 MW | 0 MW | 1,032 MW | 951 MW |
| 2026-10-29T06:00Z | 690 MW | 875 MW | 1 MW | 1,969 MW | 1,708 MW |
| 2026-10-29T07:00Z | 641 MW | 773 MW | 317 MW | 1,454 MW | 1,640 MW |
| 2026-10-29T08:00Z | 497 MW | 707 MW | 1,517 MW | 260 MW | 613 MW |
| 2026-10-29T09:00Z | 365 MW | 629 MW | 2,506 MW | -1,258 MW | 507 MW |
| 2026-10-29T10:00Z | 332 MW | 630 MW | 2,836 MW | -2,249 MW | 360 MW |
| 2026-10-29T11:00Z | 315 MW | 651 MW | 3,064 MW | -2,472 MW | 360 MW |
| 2026-10-29T12:00Z | 261 MW | 677 MW | 3,157 MW | -2,573 MW | 365 MW |
| 2026-10-29T13:00Z | 190 MW | 662 MW | 3,049 MW | -2,336 MW | 355 MW |
| 2026-10-29T14:00Z | 134 MW | 719 MW | 2,787 MW | -1,596 MW | 324 MW |
| 2026-10-29T15:00Z | 109 MW | 836 MW | 2,107 MW | -40 MW | 444 MW |
| 2026-10-29T16:00Z | 91 MW | 1,429 MW | 909 MW | 1,645 MW | 892 MW |
| 2026-10-29T17:00Z | 94 MW | 2,006 MW | 74 MW | 2,195 MW | 1,610 MW |
| 2026-10-29T18:00Z | 101 MW | 2,230 MW | 15 MW | 2,432 MW | 2,076 MW |
| 2026-10-29T19:00Z | 140 MW | 2,246 MW | 13 MW | 2,493 MW | 2,380 MW |
| 2026-10-29T20:00Z | 159 MW | 2,125 MW | 0 MW | 2,182 MW | 2,188 MW |
| 2026-10-29T21:00Z | 152 MW | 1,916 MW | 0 MW | 1,431 MW | 1,635 MW |
| 2026-10-29T22:00Z | 141 MW | 1,405 MW | 0 MW | 1,492 MW | 1,497 MW |
| 2026-10-29T23:00Z | 146 MW | 1,441 MW | 0 MW | 530 MW | 594 MW |
| 2026-10-30T00:00Z | 115 MW | 1,269 MW | 0 MW | 181 MW | 721 MW |
| 2026-10-30T01:00Z | 79 MW | 1,133 MW | 0 MW | -53 MW | 778 MW |
| 2026-10-30T02:00Z | 61 MW | 1,152 MW | 0 MW | -114 MW | 786 MW |
| 2026-10-30T03:00Z | 70 MW | 1,139 MW | 0 MW | -264 MW | 751 MW |
| 2026-10-30T04:00Z | 87 MW | 1,149 MW | 0 MW | 75 MW | 684 MW |
| 2026-10-30T05:00Z | 76 MW | 1,190 MW | 0 MW | 726 MW | 823 MW |
| 2026-10-30T06:00Z | 51 MW | 1,354 MW | 0 MW | 1,560 MW | 1,623 MW |
| 2026-10-30T07:00Z | 43 MW | 1,315 MW | 209 MW | 1,414 MW | 1,560 MW |
| 2026-10-30T08:00Z | 33 MW | 1,119 MW | 1,027 MW | 306 MW | 769 MW |
| 2026-10-30T09:00Z | 27 MW | 668 MW | 1,846 MW | -817 MW | 636 MW |
| 2026-10-30T10:00Z | 17 MW | 742 MW | 2,121 MW | -1,932 MW | 714 MW |
| 2026-10-30T11:00Z | 9 MW | 775 MW | 2,351 MW | -1,861 MW | 752 MW |
| 2026-10-30T12:00Z | 19 MW | 716 MW | 2,471 MW | -1,908 MW | 653 MW |
| 2026-10-30T13:00Z | 28 MW | 784 MW | 2,364 MW | -1,660 MW | 626 MW |
| 2026-10-30T14:00Z | 38 MW | 805 MW | 1,838 MW | -1,093 MW | 559 MW |
| 2026-10-30T15:00Z | 73 MW | 1,047 MW | 1,347 MW | 174 MW | 533 MW |
| 2026-10-30T16:00Z | 113 MW | 1,331 MW | 689 MW | 1,480 MW | 1,064 MW |
| 2026-10-30T17:00Z | 158 MW | 1,489 MW | 241 MW | 2,396 MW | 1,961 MW |
| 2026-10-30T18:00Z | 235 MW | 1,489 MW | 93 MW | 2,159 MW | 1,915 MW |
| 2026-10-30T19:00Z | 280 MW | 1,505 MW | 15 MW | 2,274 MW | 1,877 MW |
| 2026-10-30T20:00Z | 296 MW | 1,483 MW | 5 MW | 2,064 MW | 1,283 MW |
| 2026-10-30T21:00Z | 300 MW | 1,213 MW | 0 MW | 1,357 MW | 1,030 MW |
| 2026-10-30T22:00Z | 326 MW | 1,112 MW | 0 MW | 408 MW | 807 MW |
| 2026-10-30T23:00Z | 325 MW | 887 MW | 0 MW | 589 MW | 879 MW |
| 2026-10-31T00:00Z | 306 MW | 791 MW | 0 MW | 827 MW | 930 MW |
| 2026-10-31T01:00Z | 278 MW | 833 MW | 0 MW | 782 MW | 1,003 MW |
| 2026-10-31T02:00Z | 282 MW | 764 MW | 0 MW | 510 MW | 883 MW |
| 2026-10-31T03:00Z | 272 MW | 802 MW | 0 MW | 497 MW | 736 MW |
| 2026-10-31T04:00Z | 345 MW | 775 MW | 0 MW | 454 MW | 514 MW |
| 2026-10-31T05:00Z | 393 MW | 808 MW | 0 MW | 526 MW | 601 MW |
| 2026-10-31T06:00Z | 394 MW | 791 MW | 0 MW | 477 MW | 521 MW |
| 2026-10-31T07:00Z | 518 MW | 736 MW | 289 MW | 462 MW | 455 MW |
| 2026-10-31T08:00Z | 522 MW | 607 MW | 1,501 MW | -698 MW | 272 MW |
| 2026-10-31T09:00Z | 347 MW | 594 MW | 2,558 MW | -1,804 MW | 209 MW |
| 2026-10-31T10:00Z | 186 MW | 634 MW | 2,978 MW | -2,448 MW | 194 MW |
| 2026-10-31T11:00Z | 130 MW | 645 MW | 3,153 MW | -2,625 MW | 184 MW |
| 2026-10-31T12:00Z | 102 MW | 652 MW | 3,217 MW | -2,564 MW | 129 MW |
| 2026-10-31T13:00Z | 151 MW | 632 MW | 3,110 MW | -2,642 MW | 105 MW |
| 2026-10-31T14:00Z | 137 MW | 644 MW | 2,822 MW | -2,520 MW | 108 MW |
| 2026-10-31T15:00Z | 101 MW | 748 MW | 2,139 MW | -892 MW | 132 MW |
| 2026-10-31T16:00Z | 127 MW | 799 MW | 873 MW | 1,536 MW | 378 MW |
| 2026-10-31T17:00Z | 230 MW | 794 MW | 70 MW | 2,509 MW | 995 MW |
| 2026-10-31T18:00Z | 302 MW | 795 MW | 34 MW | 2,538 MW | 1,184 MW |
| 2026-10-31T19:00Z | 333 MW | 800 MW | 21 MW | 1,732 MW | 749 MW |
| 2026-10-31T20:00Z | 412 MW | 775 MW | 15 MW | 1,058 MW | 512 MW |
| 2026-10-31T21:00Z | 524 MW | 756 MW | 0 MW | 862 MW | 330 MW |
| 2026-10-31T22:00Z | 739 MW | 709 MW | 0 MW | 408 MW | 234 MW |
| 2026-10-31T23:00Z | 877 MW | 761 MW | 19 MW | 622 MW | 26 MW |
| 2026-11-01T00:00Z | 1,033 MW | 776 MW | 0 MW | 440 MW | 17 MW |
| 2026-11-01T01:00Z | 1,172 MW | 788 MW | 0 MW | 450 MW | 110 MW |
| 2026-11-01T02:00Z | 1,223 MW | 697 MW | 0 MW | 170 MW | 135 MW |
| 2026-11-01T03:00Z | 1,252 MW | 655 MW | 0 MW | 98 MW | 133 MW |
| 2026-11-01T04:00Z | 1,283 MW | 636 MW | 0 MW | 169 MW | 140 MW |
| 2026-11-01T05:00Z | 1,357 MW | 728 MW | 0 MW | 338 MW | 153 MW |
| 2026-11-01T06:00Z | 1,273 MW | 754 MW | 0 MW | 520 MW | 101 MW |
| 2026-11-01T07:00Z | 1,273 MW | 639 MW | 266 MW | -462 MW | 156 MW |
| 2026-11-01T08:00Z | 1,117 MW | 629 MW | 900 MW | -2,547 MW | 238 MW |
| 2026-11-01T09:00Z | 791 MW | 610 MW | 1,309 MW | -2,743 MW | 152 MW |
| 2026-11-01T10:00Z | 477 MW | 612 MW | 1,565 MW | -2,785 MW | 92 MW |
| 2026-11-01T11:00Z | 279 MW | 573 MW | 1,665 MW | -2,800 MW | 135 MW |
| 2026-11-01T12:00Z | 186 MW | 556 MW | 1,661 MW | -2,801 MW | 109 MW |
| 2026-11-01T13:00Z | 125 MW | 546 MW | 1,636 MW | -2,725 MW | 104 MW |
| 2026-11-01T14:00Z | 84 MW | 554 MW | 1,446 MW | -2,708 MW | 143 MW |
| 2026-11-01T15:00Z | 65 MW | 597 MW | 1,369 MW | -2,649 MW | 160 MW |
| 2026-11-01T16:00Z | 82 MW | 745 MW | 636 MW | -646 MW | 144 MW |
| 2026-11-01T17:00Z | 189 MW | 707 MW | 48 MW | 1,503 MW | 371 MW |
| 2026-11-01T18:00Z | 371 MW | 711 MW | 15 MW | 1,427 MW | 498 MW |
| 2026-11-01T19:00Z | 499 MW | 733 MW | 36 MW | 1,740 MW | 440 MW |
| 2026-11-01T20:00Z | 550 MW | 744 MW | 20 MW | 1,357 MW | 274 MW |
| 2026-11-01T21:00Z | 641 MW | 728 MW | 6 MW | 911 MW | 148 MW |
| 2026-11-01T22:00Z | 841 MW | 682 MW | 0 MW | 534 MW | 139 MW |
| 2026-11-01T23:00Z | 1,057 MW | 632 MW | 0 MW | 255 MW | 136 MW |
| 2026-11-02T00:00Z | 1,374 MW | 582 MW | 0 MW | 64 MW | 71 MW |
| 2026-11-02T01:00Z | 1,726 MW | 564 MW | 0 MW | -36 MW | 86 MW |
| 2026-11-02T02:00Z | 1,748 MW | 645 MW | 0 MW | -52 MW | 16 MW |
| 2026-11-02T03:00Z | 1,755 MW | 595 MW | 0 MW | -32 MW | 14 MW |
| 2026-11-02T04:00Z | 1,967 MW | 563 MW | 0 MW | -2 MW | 40 MW |
| 2026-11-02T05:00Z | 2,012 MW | 671 MW | 0 MW | 246 MW | 57 MW |
| 2026-11-02T06:00Z | 2,042 MW | 705 MW | 19 MW | 847 MW | 95 MW |
| 2026-11-02T07:00Z | 1,995 MW | 614 MW | 270 MW | 250 MW | 108 MW |
| 2026-11-02T08:00Z | 2,034 MW | 568 MW | 1,363 MW | -2,156 MW | 117 MW |
| 2026-11-02T09:00Z | 1,896 MW | 528 MW | 1,887 MW | -2,860 MW | 188 MW |
| 2026-11-02T10:00Z | 1,653 MW | 576 MW | 2,103 MW | -2,785 MW | 92 MW |
| 2026-11-02T11:00Z | 1,351 MW | 608 MW | 2,253 MW | -2,826 MW | 100 MW |
| 2026-11-02T12:00Z | 1,060 MW | 574 MW | 2,304 MW | -2,778 MW | 75 MW |
| 2026-11-02T13:00Z | 812 MW | 594 MW | 2,287 MW | -2,658 MW | 70 MW |
| 2026-11-02T14:00Z | 559 MW | 599 MW | 2,087 MW | -2,603 MW | 97 MW |
| 2026-11-02T15:00Z | 435 MW | 634 MW | 1,877 MW | -2,067 MW | 154 MW |
| 2026-11-02T16:00Z | 404 MW | 719 MW | 790 MW | 1,394 MW | 255 MW |
| 2026-11-02T17:00Z | 606 MW | 690 MW | 64 MW | 2,634 MW | 962 MW |
| 2026-11-02T18:00Z | 835 MW | 703 MW | 15 MW | 2,554 MW | 963 MW |
| 2026-11-02T19:00Z | 994 MW | 720 MW | 15 MW | 2,318 MW | 1,264 MW |
| 2026-11-02T20:00Z | 1,147 MW | 670 MW | 11 MW | 1,522 MW | 726 MW |
| 2026-11-02T21:00Z | 1,553 MW | 650 MW | 0 MW | 985 MW | 344 MW |
| 2026-11-02T22:00Z | 2,046 MW | 597 MW | 0 MW | 315 MW | 47 MW |
| 2026-11-02T23:00Z | 2,067 MW | 650 MW | 0 MW | -147 MW | 13 MW |
| 2026-11-03T00:00Z | 1,862 MW | 649 MW | 0 MW | -201 MW | 43 MW |
| 2026-11-03T01:00Z | 1,749 MW | 611 MW | 0 MW | -357 MW | 46 MW |
| 2026-11-03T02:00Z | 1,751 MW | 584 MW | 0 MW | -409 MW | 46 MW |
| 2026-11-03T03:00Z | 2,037 MW | 580 MW | 0 MW | -510 MW | 43 MW |
| 2026-11-03T04:00Z | 2,346 MW | 580 MW | 0 MW | -546 MW | 18 MW |
| 2026-11-03T05:00Z | 2,552 MW | 648 MW | 0 MW | 388 MW | 37 MW |
| 2026-11-03T06:00Z | 2,792 MW | 739 MW | 0 MW | 1,659 MW | 481 MW |
| 2026-11-03T07:00Z | 2,900 MW | 671 MW | 214 MW | 1,125 MW | 594 MW |
| 2026-11-03T08:00Z | 2,833 MW | 529 MW | 1,212 MW | -1,178 MW | 207 MW |
| 2026-11-03T09:00Z | 2,798 MW | 542 MW | 2,029 MW | -2,745 MW | 131 MW |
| 2026-11-03T10:00Z | 2,767 MW | 557 MW | 2,222 MW | -2,679 MW | 125 MW |
| 2026-11-03T11:00Z | 2,444 MW | 618 MW | 2,455 MW | -2,721 MW | 120 MW |
| 2026-11-03T12:00Z | 2,121 MW | 571 MW | 2,774 MW | -2,747 MW | 120 MW |
| 2026-11-03T13:00Z | 1,906 MW | 596 MW | 2,779 MW | -2,665 MW | 189 MW |
| 2026-11-03T14:00Z | 1,714 MW | 653 MW | 2,523 MW | -2,023 MW | 231 MW |
| 2026-11-03T15:00Z | 1,575 MW | 726 MW | 1,928 MW | -254 MW | 97 MW |
| 2026-11-03T16:00Z | 1,492 MW | 767 MW | 765 MW | 2,026 MW | 272 MW |
| 2026-11-03T17:00Z | 1,779 MW | 679 MW | 40 MW | 2,474 MW | 1,030 MW |
| 2026-11-03T18:00Z | 2,289 MW | 672 MW | 0 MW | 2,435 MW | 1,576 MW |
| 2026-11-03T19:00Z | 2,651 MW | 713 MW | 10 MW | 2,560 MW | 1,376 MW |
| 2026-11-03T20:00Z | 2,947 MW | 691 MW | 12 MW | 2,126 MW | 976 MW |
| 2026-11-03T21:00Z | 3,199 MW | 753 MW | 0 MW | 1,455 MW | 295 MW |
| 2026-11-03T22:00Z | 3,292 MW | 828 MW | 0 MW | 780 MW | 209 MW |
| 2026-11-03T23:00Z | 3,293 MW | 704 MW | 0 MW | 107 MW | 181 MW |
| 2026-11-04T00:00Z | 3,121 MW | 726 MW | 0 MW | -292 MW | 198 MW |
| 2026-11-04T01:00Z | 2,942 MW | 649 MW | 0 MW | -258 MW | 231 MW |
| 2026-11-04T02:00Z | 2,863 MW | 642 MW | 0 MW | -516 MW | 262 MW |
| 2026-11-04T03:00Z | 2,884 MW | 616 MW | 0 MW | -512 MW | 288 MW |
| 2026-11-04T04:00Z | 2,832 MW | 689 MW | 0 MW | -3 MW | 340 MW |
| 2026-11-04T05:00Z | 2,786 MW | 729 MW | 0 MW | 289 MW | 474 MW |
| 2026-11-04T06:00Z | 2,745 MW | 752 MW | 0 MW | 1,476 MW | 715 MW |
| 2026-11-04T07:00Z | 2,570 MW | 744 MW | 225 MW | 1,762 MW | 754 MW |
| 2026-11-04T08:00Z | 2,079 MW | 669 MW | 1,421 MW | 246 MW | 602 MW |
| 2026-11-04T09:00Z | 1,575 MW | 601 MW | 2,526 MW | -1,069 MW | 426 MW |
| 2026-11-04T10:00Z | 1,061 MW | 695 MW | 2,975 MW | -1,819 MW | 400 MW |
| 2026-11-04T11:00Z | 558 MW | 932 MW | 3,140 MW | -1,639 MW | 366 MW |
| 2026-11-04T12:00Z | 217 MW | 957 MW | 3,168 MW | -1,314 MW | 311 MW |
| 2026-11-04T13:00Z | 109 MW | 1,130 MW | 3,058 MW | -1,334 MW | 325 MW |
| 2026-11-04T14:00Z | 103 MW | 1,188 MW | 2,752 MW | -954 MW | 319 MW |
| 2026-11-04T15:00Z | 141 MW | 1,533 MW | 2,026 MW | -332 MW | 509 MW |
| 2026-11-04T16:00Z | 174 MW | 1,722 MW | 783 MW | 1,291 MW | 986 MW |
| 2026-11-04T17:00Z | 206 MW | 1,766 MW | 35 MW | 2,118 MW | 1,781 MW |
| 2026-11-04T18:00Z | 235 MW | 1,768 MW | 0 MW | 2,406 MW | 2,504 MW |
| 2026-11-04T19:00Z | 244 MW | 1,795 MW | 0 MW | 2,485 MW | 2,732 MW |
| 2026-11-04T20:00Z | 259 MW | 1,757 MW | 0 MW | 2,294 MW | 2,239 MW |
| 2026-11-04T21:00Z | 293 MW | 1,769 MW | 0 MW | 1,979 MW | 1,656 MW |
| 2026-11-04T22:00Z | 254 MW | 1,690 MW | 0 MW | 1,009 MW | 743 MW |
| 2026-11-04T23:00Z | 223 MW | 1,560 MW | 0 MW | 103 MW | 682 MW |
| 2026-11-05T00:00Z | 174 MW | 1,440 MW | 0 MW | 102 MW | 555 MW |
| 2026-11-05T01:00Z | 126 MW | 1,440 MW | 0 MW | -213 MW | 515 MW |
| 2026-11-05T02:00Z | 96 MW | 1,409 MW | 0 MW | -99 MW | 427 MW |
| 2026-11-05T03:00Z | 81 MW | 1,394 MW | 0 MW | -98 MW | 424 MW |
| 2026-11-05T04:00Z | 76 MW | 1,412 MW | 0 MW | -6 MW | 350 MW |
| 2026-11-05T05:00Z | 79 MW | 1,489 MW | 0 MW | 578 MW | 476 MW |
| 2026-11-05T06:00Z | 64 MW | 1,481 MW | 17 MW | 1,641 MW | 863 MW |
| 2026-11-05T07:00Z | 43 MW | 1,214 MW | 244 MW | 1,649 MW | 967 MW |
| 2026-11-05T08:00Z | 23 MW | 940 MW | 1,401 MW | 204 MW | 491 MW |
| 2026-11-05T09:00Z | 24 MW | 881 MW | 2,480 MW | -592 MW | 464 MW |
| 2026-11-05T10:00Z | 48 MW | 860 MW | 2,904 MW | -1,906 MW | 297 MW |
| 2026-11-05T11:00Z | 79 MW | 879 MW | 3,067 MW | -2,079 MW | 206 MW |
| 2026-11-05T12:00Z | 113 MW | 851 MW | 3,115 MW | -2,234 MW | 133 MW |
| 2026-11-05T13:00Z | 116 MW | 925 MW | 2,987 MW | -1,869 MW | 142 MW |
| 2026-11-05T14:00Z | 128 MW | 943 MW | 2,633 MW | -1,536 MW | 183 MW |
| 2026-11-05T15:00Z | 130 MW | 1,112 MW | 1,922 MW | -412 MW | 270 MW |
| 2026-11-05T16:00Z | 143 MW | 1,827 MW | 641 MW | 1,619 MW | 1,194 MW |
| 2026-11-05T17:00Z | 155 MW | 2,595 MW | 19 MW | 1,999 MW | 2,236 MW |
| 2026-11-05T18:00Z | 153 MW | 2,573 MW | 1 MW | 2,275 MW | 2,540 MW |
| 2026-11-05T19:00Z | 108 MW | 2,607 MW | 7 MW | 2,315 MW | 2,797 MW |
| 2026-11-05T20:00Z | 94 MW | 2,571 MW | 20 MW | 2,535 MW | 2,337 MW |
| 2026-11-05T21:00Z | 125 MW | 2,455 MW | 0 MW | 2,025 MW | 1,634 MW |
| 2026-11-05T22:00Z | 193 MW | 2,377 MW | 0 MW | 1,628 MW | 1,324 MW |
| 2026-11-05T23:00Z | 233 MW | 2,080 MW | 0 MW | 92 MW | 554 MW |
| 2026-11-06T00:00Z | 236 MW | 2,081 MW | 0 MW | 29 MW | 332 MW |
| 2026-11-06T01:00Z | 289 MW | 1,499 MW | 0 MW | 33 MW | 323 MW |
| 2026-11-06T02:00Z | 431 MW | 1,401 MW | 0 MW | 33 MW | 376 MW |
| 2026-11-06T03:00Z | 556 MW | 1,376 MW | 0 MW | 41 MW | 388 MW |
| 2026-11-06T04:00Z | 599 MW | 1,457 MW | 0 MW | 125 MW | 607 MW |
| 2026-11-06T05:00Z | 641 MW | 1,537 MW | 7 MW | 780 MW | 925 MW |
| 2026-11-06T06:00Z | 760 MW | 1,491 MW | 20 MW | 1,948 MW | 1,721 MW |
| 2026-11-06T07:00Z | 852 MW | 1,453 MW | 124 MW | 1,560 MW | 1,737 MW |
| 2026-11-06T08:00Z | 802 MW | 1,413 MW | 589 MW | 363 MW | 857 MW |
| 2026-11-06T09:00Z | 738 MW | 1,173 MW | 937 MW | -1,137 MW | 803 MW |
| 2026-11-06T10:00Z | 866 MW | 1,189 MW | 1,176 MW | -1,134 MW | 761 MW |
| 2026-11-06T11:00Z | 887 MW | 1,191 MW | 1,448 MW | -1,253 MW | 684 MW |
| 2026-11-06T12:00Z | 864 MW | 1,267 MW | 1,215 MW | -921 MW | 543 MW |
| 2026-11-06T13:00Z | 782 MW | 1,282 MW | 931 MW | -449 MW | 445 MW |
| 2026-11-06T14:00Z | 744 MW | 1,259 MW | 727 MW | -41 MW | 566 MW |
| 2026-11-06T15:00Z | 834 MW | 1,633 MW | 539 MW | 586 MW | 1,209 MW |
| 2026-11-06T16:00Z | 924 MW | 1,987 MW | 233 MW | 1,364 MW | 2,104 MW |
| 2026-11-06T17:00Z | 978 MW | 2,325 MW | 43 MW | 1,852 MW | 2,375 MW |
| 2026-11-06T18:00Z | 1,049 MW | 2,448 MW | 25 MW | 1,706 MW | 2,454 MW |
| 2026-11-06T19:00Z | 1,154 MW | 2,657 MW | 15 MW | 1,427 MW | 2,538 MW |
| 2026-11-06T20:00Z | 1,143 MW | 2,534 MW | 11 MW | 1,212 MW | 2,386 MW |
| 2026-11-06T21:00Z | 1,060 MW | 2,089 MW | 0 MW | 1,062 MW | 1,663 MW |
| 2026-11-06T22:00Z | 1,154 MW | 1,783 MW | 0 MW | 598 MW | 1,251 MW |
| 2026-11-06T23:00Z | 1,294 MW | 1,752 MW | 9 MW | 453 MW | 821 MW |
| 2026-11-07T00:00Z | 1,278 MW | 1,563 MW | 2 MW | -25 MW | 756 MW |
| 2026-11-07T01:00Z | 1,250 MW | 1,567 MW | 0 MW | -98 MW | 747 MW |
| 2026-11-07T02:00Z | 1,220 MW | 1,505 MW | 0 MW | -65 MW | 820 MW |
| 2026-11-07T03:00Z | 1,205 MW | 1,540 MW | 0 MW | -224 MW | 886 MW |
| 2026-11-07T04:00Z | 1,087 MW | 1,372 MW | 0 MW | -308 MW | 903 MW |
| 2026-11-07T05:00Z | 1,058 MW | 1,381 MW | 0 MW | -173 MW | 796 MW |
| 2026-11-07T06:00Z | 1,045 MW | 1,454 MW | 0 MW | -47 MW | 784 MW |
| 2026-11-07T07:00Z | 1,040 MW | 1,430 MW | 105 MW | 45 MW | 724 MW |
| 2026-11-07T08:00Z | 1,098 MW | 1,272 MW | 718 MW | -152 MW | 561 MW |
| 2026-11-07T09:00Z | 1,111 MW | 800 MW | 1,425 MW | -1,392 MW | 400 MW |
| 2026-11-07T10:00Z | 1,069 MW | 724 MW | 1,892 MW | -1,992 MW | 333 MW |
| 2026-11-07T11:00Z | 1,006 MW | 761 MW | 2,140 MW | -2,645 MW | 270 MW |
| 2026-11-07T12:00Z | 991 MW | 775 MW | 2,320 MW | -2,774 MW | 158 MW |
| 2026-11-07T13:00Z | 966 MW | 816 MW | 2,187 MW | -2,489 MW | 164 MW |
| 2026-11-07T14:00Z | 960 MW | 835 MW | 1,895 MW | -1,856 MW | 318 MW |
| 2026-11-07T15:00Z | 933 MW | 1,127 MW | 1,180 MW | -937 MW | 274 MW |
| 2026-11-07T16:00Z | 1,019 MW | 1,365 MW | 322 MW | 987 MW | 462 MW |
| 2026-11-07T17:00Z | 1,325 MW | 1,413 MW | 25 MW | 1,645 MW | 1,404 MW |
| 2026-11-07T18:00Z | 1,757 MW | 1,414 MW | 15 MW | 1,567 MW | 1,485 MW |
| 2026-11-07T19:00Z | 2,216 MW | 1,404 MW | 16 MW | 1,482 MW | 1,432 MW |
| 2026-11-07T20:00Z | 2,643 MW | 1,348 MW | 13 MW | 1,231 MW | 1,407 MW |
| 2026-11-07T21:00Z | 3,043 MW | 1,413 MW | 0 MW | 882 MW | 771 MW |
| 2026-11-07T22:00Z | 3,412 MW | 1,307 MW | 0 MW | 187 MW | 512 MW |
| 2026-11-07T23:00Z | 3,650 MW | 825 MW | 4 MW | 566 MW | 573 MW |
| 2026-11-08T00:00Z | 3,958 MW | 640 MW | 0 MW | -224 MW | 591 MW |
| 2026-11-08T01:00Z | 4,166 MW | 611 MW | 0 MW | -489 MW | 439 MW |
| 2026-11-08T02:00Z | 4,195 MW | 668 MW | 0 MW | -670 MW | 391 MW |
| 2026-11-08T03:00Z | 4,225 MW | 563 MW | 0 MW | -924 MW | 347 MW |
| 2026-11-08T04:00Z | 4,285 MW | 577 MW | 0 MW | -1,046 MW | 307 MW |
| 2026-11-08T05:00Z | 4,213 MW | 590 MW | 0 MW | -1,102 MW | 334 MW |
| 2026-11-08T06:00Z | 4,166 MW | 576 MW | 0 MW | -937 MW | 439 MW |
| 2026-11-08T07:00Z | 4,322 MW | 603 MW | 43 MW | -1,155 MW | 403 MW |
| 2026-11-08T08:00Z | 4,456 MW | 558 MW | 302 MW | -2,190 MW | 312 MW |
| 2026-11-08T09:00Z | 4,485 MW | 519 MW | 740 MW | -2,395 MW | 233 MW |
| 2026-11-08T10:00Z | 4,359 MW | 535 MW | 855 MW | -2,639 MW | 242 MW |
| 2026-11-08T11:00Z | 4,398 MW | 641 MW | 815 MW | -2,487 MW | 291 MW |
| 2026-11-08T12:00Z | 4,201 MW | 675 MW | 678 MW | -1,692 MW | 380 MW |
| 2026-11-08T13:00Z | 4,166 MW | 634 MW | 569 MW | -1,336 MW | 444 MW |
| 2026-11-08T14:00Z | 4,267 MW | 628 MW | 455 MW | -1,018 MW | 430 MW |
| 2026-11-08T15:00Z | 4,481 MW | 619 MW | 265 MW | -169 MW | 320 MW |
| 2026-11-08T16:00Z | 4,552 MW | 626 MW | 95 MW | 1,017 MW | 557 MW |
| 2026-11-08T17:00Z | 4,751 MW | 639 MW | 14 MW | 1,668 MW | 998 MW |
| 2026-11-08T18:00Z | 4,798 MW | 646 MW | 28 MW | 822 MW | 1,058 MW |
| 2026-11-08T19:00Z | 4,660 MW | 687 MW | 18 MW | 928 MW | 873 MW |
| 2026-11-08T20:00Z | 4,546 MW | 640 MW | 1 MW | 738 MW | 875 MW |
| 2026-11-08T21:00Z | 4,661 MW | 598 MW | 1 MW | 1,077 MW | 717 MW |
| 2026-11-08T22:00Z | 4,665 MW | 620 MW | 0 MW | -62 MW | 466 MW |
| 2026-11-08T23:00Z | 4,608 MW | 570 MW | 0 MW | -816 MW | 344 MW |
| 2026-11-09T00:00Z | 4,631 MW | 550 MW | 0 MW | -1,122 MW | 250 MW |
| 2026-11-09T01:00Z | 4,572 MW | 549 MW | 0 MW | -2,026 MW | 260 MW |
| 2026-11-09T02:00Z | 4,647 MW | 500 MW | 0 MW | -2,259 MW | 237 MW |
| 2026-11-09T03:00Z | 4,362 MW | 605 MW | 0 MW | -2,478 MW | 275 MW |
| 2026-11-09T04:00Z | 3,917 MW | 619 MW | 0 MW | -1,651 MW | 369 MW |
| 2026-11-09T05:00Z | 3,665 MW | 631 MW | 0 MW | -1,009 MW | 435 MW |
| 2026-11-09T06:00Z | 3,491 MW | 651 MW | 3 MW | -138 MW | 572 MW |
| 2026-11-09T07:00Z | 3,648 MW | 607 MW | 100 MW | 789 MW | 593 MW |
| 2026-11-09T08:00Z | 3,855 MW | 608 MW | 683 MW | -128 MW | 477 MW |
| 2026-11-09T09:00Z | 3,979 MW | 537 MW | 1,331 MW | -1,236 MW | 273 MW |
| 2026-11-09T10:00Z | 4,007 MW | 641 MW | 1,621 MW | -2,085 MW | 301 MW |
| 2026-11-09T11:00Z | 4,097 MW | 584 MW | 1,713 MW | -2,113 MW | 406 MW |
| 2026-11-09T12:00Z | 4,100 MW | 570 MW | 1,716 MW | -2,425 MW | 533 MW |
| 2026-11-09T13:00Z | 4,255 MW | 562 MW | 1,598 MW | -2,610 MW | 367 MW |
| 2026-11-09T14:00Z | 4,192 MW | 649 MW | 1,333 MW | -1,990 MW | 454 MW |
| 2026-11-09T15:00Z | 4,171 MW | 565 MW | 805 MW | -805 MW | 288 MW |
| 2026-11-09T16:00Z | 4,152 MW | 561 MW | 240 MW | 769 MW | 549 MW |
| 2026-11-09T17:00Z | 4,269 MW | 548 MW | 27 MW | 1,726 MW | 713 MW |
| 2026-11-09T18:00Z | 4,250 MW | 616 MW | 21 MW | 1,515 MW | 1,147 MW |
| 2026-11-09T19:00Z | 4,306 MW | 630 MW | 28 MW | 1,760 MW | 1,524 MW |
| 2026-11-09T20:00Z | 4,386 MW | 574 MW | 23 MW | 1,839 MW | 1,172 MW |
| 2026-11-09T21:00Z | 4,443 MW | 590 MW | 0 MW | 1,056 MW | 1,039 MW |
| 2026-11-09T22:00Z | 4,541 MW | 541 MW | 0 MW | 508 MW | 792 MW |
| 2026-11-09T23:00Z | 4,608 MW | 572 MW | 0 MW | -496 MW | 601 MW |
| 2026-11-10T00:00Z | 4,503 MW | 573 MW | 0 MW | -790 MW | 345 MW |
| 2026-11-10T01:00Z | 4,121 MW | 603 MW | 0 MW | -1,163 MW | 248 MW |
| 2026-11-10T02:00Z | 3,564 MW | 576 MW | 0 MW | -1,027 MW | 225 MW |
| 2026-11-10T03:00Z | 3,069 MW | 580 MW | 0 MW | -465 MW | 229 MW |
| 2026-11-10T04:00Z | 2,699 MW | 633 MW | 0 MW | 177 MW | 335 MW |
| 2026-11-10T05:00Z | 2,505 MW | 580 MW | 0 MW | 685 MW | 512 MW |
| 2026-11-10T06:00Z | 2,588 MW | 645 MW | 5 MW | 1,247 MW | 905 MW |
| 2026-11-10T07:00Z | 2,915 MW | 600 MW | 58 MW | 1,533 MW | 901 MW |
| 2026-11-10T08:00Z | 3,062 MW | 589 MW | 326 MW | 165 MW | 594 MW |
| 2026-11-10T09:00Z | 3,251 MW | 571 MW | 642 MW | -826 MW | 522 MW |
| 2026-11-10T10:00Z | 3,403 MW | 702 MW | 572 MW | -1,425 MW | 560 MW |
| 2026-11-10T11:00Z | 3,582 MW | 627 MW | 582 MW | -1,340 MW | 534 MW |
| 2026-11-10T12:00Z | 3,942 MW | 602 MW | 733 MW | -1,244 MW | 339 MW |
| 2026-11-10T13:00Z | 4,238 MW | 579 MW | 552 MW | -1,345 MW | 399 MW |
| 2026-11-10T14:00Z | 4,476 MW | 513 MW | 518 MW | -635 MW | 213 MW |
| 2026-11-10T15:00Z | 4,548 MW | 557 MW | 341 MW | 493 MW | 348 MW |
| 2026-11-10T16:00Z | 4,446 MW | 583 MW | 152 MW | 1,238 MW | 737 MW |
| 2026-11-10T17:00Z | 4,314 MW | 567 MW | 5 MW | 1,749 MW | 1,249 MW |
| 2026-11-10T18:00Z | 3,891 MW | 644 MW | 12 MW | 1,813 MW | 1,486 MW |
| 2026-11-10T19:00Z | 3,519 MW | 665 MW | 26 MW | 1,925 MW | 1,921 MW |
| 2026-11-10T20:00Z | 3,423 MW | 648 MW | 15 MW | 1,431 MW | 1,857 MW |
| 2026-11-10T21:00Z | 3,150 MW | 646 MW | 5 MW | 782 MW | 1,355 MW |
| 2026-11-10T22:00Z | 3,327 MW | 577 MW | 0 MW | 642 MW | 1,027 MW |
| 2026-11-10T23:00Z | 3,583 MW | 608 MW | 11 MW | 421 MW | 529 MW |
| 2026-11-11T00:00Z | 3,575 MW | 633 MW | 0 MW | -356 MW | 576 MW |
| 2026-11-11T01:00Z | 3,440 MW | 624 MW | 0 MW | -681 MW | 807 MW |
| 2026-11-11T02:00Z | 3,408 MW | 628 MW | 0 MW | -949 MW | 791 MW |
| 2026-11-11T03:00Z | 2,993 MW | 651 MW | 0 MW | -446 MW | 611 MW |
| 2026-11-11T04:00Z | 2,649 MW | 613 MW | 0 MW | 246 MW | 538 MW |
| 2026-11-11T05:00Z | 2,128 MW | 633 MW | 0 MW | 666 MW | 635 MW |
| 2026-11-11T06:00Z | 2,076 MW | 702 MW | 10 MW | 1,033 MW | 805 MW |
| 2026-11-11T07:00Z | 2,215 MW | 775 MW | 22 MW | 1,481 MW | 1,583 MW |
| 2026-11-11T08:00Z | 2,407 MW | 843 MW | 46 MW | 1,235 MW | 1,568 MW |
| 2026-11-11T09:00Z | 2,375 MW | 917 MW | 72 MW | 1,158 MW | 1,128 MW |
| 2026-11-11T10:00Z | 2,423 MW | 927 MW | 97 MW | 1,150 MW | 906 MW |
| 2026-11-11T11:00Z | 2,579 MW | 936 MW | 133 MW | 804 MW | 803 MW |
| 2026-11-11T12:00Z | 2,905 MW | 900 MW | 148 MW | 827 MW | 940 MW |
| 2026-11-11T13:00Z | 3,053 MW | 923 MW | 129 MW | 909 MW | 1,091 MW |
| 2026-11-11T14:00Z | 3,298 MW | 928 MW | 128 MW | 606 MW | 1,098 MW |
| 2026-11-11T15:00Z | 2,935 MW | 1,067 MW | 121 MW | 874 MW | 1,791 MW |
| 2026-11-11T16:00Z | 2,566 MW | 1,104 MW | 91 MW | 1,030 MW | 2,001 MW |
| 2026-11-11T17:00Z | 1,728 MW | 1,215 MW | 13 MW | 1,357 MW | 2,354 MW |
| 2026-11-11T18:00Z | 1,140 MW | 1,172 MW | 7 MW | 1,860 MW | 2,479 MW |
| 2026-11-11T19:00Z | 1,250 MW | 1,090 MW | 20 MW | 1,687 MW | 2,600 MW |
| 2026-11-11T20:00Z | 1,474 MW | 1,094 MW | 9 MW | 1,401 MW | 2,271 MW |
| 2026-11-11T21:00Z | 1,523 MW | 1,038 MW | 0 MW | 1,131 MW | 1,893 MW |
| 2026-11-11T22:00Z | 1,640 MW | 764 MW | 0 MW | 761 MW | 2,003 MW |
| 2026-11-11T23:00Z | 1,964 MW | 576 MW | 2 MW | 713 MW | 1,404 MW |
| 2026-11-12T00:00Z | 2,388 MW | 566 MW | 0 MW | 21 MW | 1,125 MW |
| 2026-11-12T01:00Z | 3,249 MW | 595 MW | 0 MW | -1,259 MW | 1,106 MW |
| 2026-11-12T02:00Z | 3,110 MW | 643 MW | 0 MW | -1,362 MW | 1,085 MW |
| 2026-11-12T03:00Z | 3,107 MW | 568 MW | 0 MW | -851 MW | 947 MW |
| 2026-11-12T04:00Z | 2,841 MW | 646 MW | 0 MW | -797 MW | 989 MW |
| 2026-11-12T05:00Z | 2,957 MW | 591 MW | 0 MW | -766 MW | 890 MW |
| 2026-11-12T06:00Z | 3,170 MW | 612 MW | 11 MW | -336 MW | 958 MW |
| 2026-11-12T07:00Z | 3,329 MW | 620 MW | 107 MW | -524 MW | 1,037 MW |
| 2026-11-12T08:00Z | 3,139 MW | 578 MW | 567 MW | -1,453 MW | 982 MW |
| 2026-11-12T09:00Z | 3,208 MW | 595 MW | 846 MW | -2,522 MW | 693 MW |
| 2026-11-12T10:00Z | 2,891 MW | 642 MW | 537 MW | -2,618 MW | 587 MW |
| 2026-11-12T11:00Z | 2,857 MW | 626 MW | 801 MW | -2,668 MW | 509 MW |
| 2026-11-12T12:00Z | 2,928 MW | 591 MW | 908 MW | -2,555 MW | 425 MW |
| 2026-11-12T13:00Z | 2,966 MW | 694 MW | 823 MW | -2,599 MW | 457 MW |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12T13:00Z.
Installed Capacity
Annual figure for 2026| Wind | |
|---|---|
| Hydro | |
| Gas | |
| Storage | |
| Solar | |
| Bioenergy | |
| Other |
Total installed capacity in Portugal: 22.1 GW in 2026. Capacity is what could be produced, not what was produced, and each transmission operator reports it once a year.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026.
Day by Day
Daily totals, Europe/Lisbon time dates, through 2026-11-11Show the data table (400 rows)
| Date (Europe/Lisbon time) | Demand |
|---|---|
| 2025-10-08 | 146 GWh |
| 2025-10-09 | 145 GWh |
| 2025-10-10 | 144 GWh |
| 2025-10-11 | 125 GWh |
| 2025-10-12 | 119 GWh |
| 2025-10-13 | 141 GWh |
| 2025-10-14 | 145 GWh |
| 2025-10-15 | 146 GWh |
| 2025-10-16 | 147 GWh |
| 2025-10-17 | 146 GWh |
| 2025-10-18 | 128 GWh |
| 2025-10-19 | 124 GWh |
| 2025-10-20 | 145 GWh |
| 2025-10-21 | 154 GWh |
| 2025-10-22 | 154 GWh |
| 2025-10-23 | 152 GWh |
| 2025-10-24 | 151 GWh |
| 2025-10-25 | 134 GWh |
| 2025-10-26 | 123 GWh |
| 2025-10-27 | 140 GWh |
| 2025-10-28 | 151 GWh |
| 2025-10-29 | 148 GWh |
| 2025-10-30 | 150 GWh |
| 2025-10-31 | 156 GWh |
| 2025-11-01 | 127 GWh |
| 2025-11-02 | 119 GWh |
| 2025-11-03 | 142 GWh |
| 2025-11-04 | 153 GWh |
| 2025-11-05 | 153 GWh |
| 2025-11-06 | 151 GWh |
| 2025-11-07 | 154 GWh |
| 2025-11-08 | 131 GWh |
| 2025-11-09 | 124 GWh |
| 2025-11-10 | 151 GWh |
| 2025-11-11 | 154 GWh |
| 2025-11-12 | 158 GWh |
| 2025-11-13 | 159 GWh |
| 2025-11-14 | 160 GWh |
| 2025-11-15 | 140 GWh |
| 2025-11-16 | 131 GWh |
| 2025-11-17 | 152 GWh |
| 2025-11-18 | 155 GWh |
| 2025-11-19 | 159 GWh |
| 2025-11-20 | 161 GWh |
| 2025-11-21 | 165 GWh |
| 2025-11-22 | 150 GWh |
| 2025-11-23 | 145 GWh |
| 2025-11-24 | 168 GWh |
| 2025-11-25 | 167 GWh |
| 2025-11-26 | 169 GWh |
| 2025-11-27 | 170 GWh |
| 2025-11-28 | 170 GWh |
| 2025-11-29 | 153 GWh |
| 2025-11-30 | 138 GWh |
| 2025-12-01 | 146 GWh |
| 2025-12-02 | 172 GWh |
| 2025-12-03 | 179 GWh |
| 2025-12-04 | 177 GWh |
| 2025-12-05 | 175 GWh |
| 2025-12-06 | 152 GWh |
| 2025-12-07 | 139 GWh |
| 2025-12-08 | 142 GWh |
| 2025-12-09 | 169 GWh |
| 2025-12-10 | 162 GWh |
| 2025-12-11 | 168 GWh |
| 2025-12-12 | 175 GWh |
| 2025-12-13 | 146 GWh |
| 2025-12-14 | 138 GWh |
| 2025-12-15 | 175 GWh |
| 2025-12-16 | 178 GWh |
| 2025-12-17 | 176 GWh |
| 2025-12-18 | 175 GWh |
| 2025-12-19 | 170 GWh |
| 2025-12-20 | 156 GWh |
| 2025-12-21 | 153 GWh |
| 2025-12-22 | 172 GWh |
| 2025-12-23 | 167 GWh |
| 2025-12-24 | 147 GWh |
| 2025-12-25 | 134 GWh |
| 2025-12-26 | 154 GWh |
| 2025-12-27 | 158 GWh |
| 2025-12-28 | 147 GWh |
| 2025-12-29 | 159 GWh |
| 2025-12-30 | 163 GWh |
| 2025-12-31 | 155 GWh |
| 2026-01-01 | 143 GWh |
| 2026-01-02 | 156 GWh |
| 2026-01-03 | 148 GWh |
| 2026-01-04 | 141 GWh |
| 2026-01-05 | 172 GWh |
| 2026-01-06 | 186 GWh |
| 2026-01-07 | 188 GWh |
| 2026-01-08 | 193 GWh |
| 2026-01-09 | 183 GWh |
| 2026-01-10 | 162 GWh |
| 2026-01-11 | 157 GWh |
| 2026-01-12 | 181 GWh |
| 2026-01-13 | 183 GWh |
| 2026-01-14 | 179 GWh |
| 2026-01-15 | 188 GWh |
| 2026-01-16 | 186 GWh |
| 2026-01-17 | 166 GWh |
| 2026-01-18 | 157 GWh |
| 2026-01-19 | 185 GWh |
| 2026-01-20 | 194 GWh |
| 2026-01-21 | 193 GWh |
| 2026-01-22 | 196 GWh |
| 2026-01-23 | 197 GWh |
| 2026-01-24 | 174 GWh |
| 2026-01-25 | 160 GWh |
| 2026-01-26 | 187 GWh |
| 2026-01-27 | 187 GWh |
| 2026-01-28 | 169 GWh |
| 2026-01-29 | 170 GWh |
| 2026-01-30 | 170 GWh |
| 2026-01-31 | 150 GWh |
| 2026-02-01 | 149 GWh |
| 2026-02-02 | 174 GWh |
| 2026-02-03 | 183 GWh |
| 2026-02-04 | 184 GWh |
| 2026-02-05 | 175 GWh |
| 2026-02-06 | 176 GWh |
| 2026-02-07 | 162 GWh |
| 2026-02-08 | 151 GWh |
| 2026-02-09 | 177 GWh |
| 2026-02-10 | 181 GWh |
| 2026-02-11 | 181 GWh |
| 2026-02-12 | 171 GWh |
| 2026-02-13 | 175 GWh |
| 2026-02-14 | 153 GWh |
| 2026-02-15 | 149 GWh |
| 2026-02-16 | 165 GWh |
| 2026-02-17 | 150 GWh |
| 2026-02-18 | 174 GWh |
| 2026-02-19 | 170 GWh |
| 2026-02-20 | 168 GWh |
| 2026-02-21 | 145 GWh |
| 2026-02-22 | 132 GWh |
| 2026-02-23 | 153 GWh |
| 2026-02-24 | 159 GWh |
| 2026-02-25 | 163 GWh |
| 2026-02-26 | 155 GWh |
| 2026-02-27 | 165 GWh |
| 2026-02-28 | 141 GWh |
| 2026-03-01 | 131 GWh |
| 2026-03-02 | 164 GWh |
| 2026-03-03 | 159 GWh |
| 2026-03-04 | 157 GWh |
| 2026-03-05 | 169 GWh |
| 2026-03-06 | 171 GWh |
| 2026-03-07 | 143 GWh |
| 2026-03-08 | 135 GWh |
| 2026-03-09 | 167 GWh |
| 2026-03-10 | 167 GWh |
| 2026-03-11 | 162 GWh |
| 2026-03-12 | 162 GWh |
| 2026-03-13 | 166 GWh |
| 2026-03-14 | 153 GWh |
| 2026-03-15 | 131 GWh |
| 2026-03-16 | 149 GWh |
| 2026-03-17 | 152 GWh |
| 2026-03-18 | 158 GWh |
| 2026-03-19 | 160 GWh |
| 2026-03-20 | 162 GWh |
| 2026-03-21 | 138 GWh |
| 2026-03-22 | 125 GWh |
| 2026-03-23 | 145 GWh |
| 2026-03-24 | 146 GWh |
| 2026-03-25 | 147 GWh |
| 2026-03-26 | 146 GWh |
| 2026-03-27 | 144 GWh |
| 2026-03-28 | 127 GWh |
| 2026-03-29 | 113 GWh |
| 2026-03-30 | 142 GWh |
| 2026-03-31 | 143 GWh |
| 2026-04-01 | 141 GWh |
| 2026-04-02 | 139 GWh |
| 2026-04-03 | 123 GWh |
| 2026-04-04 | 116 GWh |
| 2026-04-05 | 104 GWh |
| 2026-04-06 | 127 GWh |
| 2026-04-07 | 150 GWh |
| 2026-04-08 | 150 GWh |
| 2026-04-09 | 145 GWh |
| 2026-04-10 | 144 GWh |
| 2026-04-11 | 127 GWh |
| 2026-04-12 | 120 GWh |
| 2026-04-13 | 149 GWh |
| 2026-04-14 | 152 GWh |
| 2026-04-15 | 149 GWh |
| 2026-04-16 | 144 GWh |
| 2026-04-17 | 142 GWh |
| 2026-04-18 | 124 GWh |
| 2026-04-19 | 116 GWh |
| 2026-04-20 | 138 GWh |
| 2026-04-21 | 147 GWh |
| 2026-04-22 | 141 GWh |
| 2026-04-23 | 142 GWh |
| 2026-04-24 | 141 GWh |
| 2026-04-25 | 121 GWh |
| 2026-04-26 | 115 GWh |
| 2026-04-27 | 139 GWh |
| 2026-04-28 | 145 GWh |
| 2026-04-29 | 149 GWh |
| 2026-04-30 | 146 GWh |
| 2026-05-01 | 121 GWh |
| 2026-05-02 | 120 GWh |
| 2026-05-03 | 116 GWh |
| 2026-05-04 | 136 GWh |
| 2026-05-05 | 144 GWh |
| 2026-05-06 | 142 GWh |
| 2026-05-07 | 142 GWh |
| 2026-05-08 | 145 GWh |
| 2026-05-09 | 130 GWh |
| 2026-05-10 | 120 GWh |
| 2026-05-11 | 143 GWh |
| 2026-05-12 | 145 GWh |
| 2026-05-13 | 143 GWh |
| 2026-05-14 | 139 GWh |
| 2026-05-15 | 141 GWh |
| 2026-05-16 | 122 GWh |
| 2026-05-17 | 116 GWh |
| 2026-05-18 | 137 GWh |
| 2026-05-19 | 147 GWh |
| 2026-05-20 | 143 GWh |
| 2026-05-21 | 145 GWh |
| 2026-05-22 | 147 GWh |
| 2026-05-23 | 132 GWh |
| 2026-05-24 | 120 GWh |
| 2026-05-25 | 143 GWh |
| 2026-05-26 | 149 GWh |
| 2026-05-27 | 152 GWh |
| 2026-05-28 | 149 GWh |
| 2026-05-29 | 149 GWh |
| 2026-05-30 | 132 GWh |
| 2026-05-31 | 121 GWh |
| 2026-06-01 | 143 GWh |
| 2026-06-02 | 146 GWh |
| 2026-06-03 | 143 GWh |
| 2026-06-04 | 125 GWh |
| 2026-06-05 | 132 GWh |
| 2026-06-06 | 124 GWh |
| 2026-06-07 | 116 GWh |
| 2026-06-08 | 138 GWh |
| 2026-06-09 | 141 GWh |
| 2026-06-10 | 125 GWh |
| 2026-06-11 | 147 GWh |
| 2026-06-12 | 154 GWh |
| 2026-06-13 | 137 GWh |
| 2026-06-14 | 126 GWh |
| 2026-06-15 | 150 GWh |
| 2026-06-16 | 148 GWh |
| 2026-06-17 | 152 GWh |
| 2026-06-18 | 152 GWh |
| 2026-06-19 | 152 GWh |
| 2026-06-20 | 135 GWh |
| 2026-06-21 | 129 GWh |
| 2026-06-22 | 156 GWh |
| 2026-06-23 | 159 GWh |
| 2026-06-24 | 149 GWh |
| 2026-06-25 | 153 GWh |
| 2026-06-26 | 152 GWh |
| 2026-06-27 | 130 GWh |
| 2026-06-28 | 122 GWh |
| 2026-06-29 | 147 GWh |
| 2026-06-30 | 155 GWh |
| 2026-07-01 | 160 GWh |
| 2026-07-02 | 166 GWh |
| 2026-07-03 | 171 GWh |
| 2026-07-04 | 152 GWh |
| 2026-07-05 | 144 GWh |
| 2026-07-06 | 164 GWh |
| 2026-07-07 | 160 GWh |
| 2026-07-08 | 158 GWh |
| 2026-07-09 | 155 GWh |
| 2026-07-10 | 150 GWh |
| 2026-07-11 | 130 GWh |
| 2026-07-12 | 121 GWh |
| 2026-07-13 | 146 GWh |
| 2026-07-14 | 148 GWh |
| 2026-07-15 | 149 GWh |
| 2026-07-16 | 151 GWh |
| 2026-07-17 | 149 GWh |
| 2026-07-18 | 133 GWh |
| 2026-07-19 | 124 GWh |
| 2026-07-20 | 149 GWh |
| 2026-07-21 | 152 GWh |
| 2026-07-22 | 153 GWh |
| 2026-07-23 | 153 GWh |
| 2026-07-24 | 152 GWh |
| 2026-07-25 | 132 GWh |
| 2026-07-26 | 122 GWh |
| 2026-07-27 | 153 GWh |
| 2026-07-28 | 158 GWh |
| 2026-07-29 | 156 GWh |
| 2026-07-30 | 153 GWh |
| 2026-07-31 | 152 GWh |
| 2026-08-01 | 136 GWh |
| 2026-08-02 | 128 GWh |
| 2026-08-03 | 147 GWh |
| 2026-08-04 | 151 GWh |
| 2026-08-05 | 149 GWh |
| 2026-08-06 | 150 GWh |
| 2026-08-07 | 150 GWh |
| 2026-08-08 | 136 GWh |
| 2026-08-09 | 127 GWh |
| 2026-08-10 | 142 GWh |
| 2026-08-11 | 146 GWh |
| 2026-08-12 | 147 GWh |
| 2026-08-13 | 149 GWh |
| 2026-08-14 | 148 GWh |
| 2026-08-15 | 131 GWh |
| 2026-08-16 | 127 GWh |
| 2026-08-17 | 146 GWh |
| 2026-08-18 | 150 GWh |
| 2026-08-19 | 148 GWh |
| 2026-08-20 | 145 GWh |
| 2026-08-21 | 136 GWh |
| 2026-08-22 | 123 GWh |
| 2026-08-23 | 122 GWh |
| 2026-08-24 | 138 GWh |
| 2026-08-25 | 139 GWh |
| 2026-08-26 | 140 GWh |
| 2026-08-27 | 135 GWh |
| 2026-08-28 | 136 GWh |
| 2026-08-29 | 122 GWh |
| 2026-08-30 | 118 GWh |
| 2026-08-31 | 136 GWh |
| 2026-09-01 | 141 GWh |
| 2026-09-02 | 145 GWh |
| 2026-09-03 | 153 GWh |
| 2026-09-04 | 160 GWh |
| 2026-09-05 | 138 GWh |
| 2026-09-06 | 128 GWh |
| 2026-09-07 | 150 GWh |
| 2026-09-08 | 156 GWh |
| 2026-09-09 | 152 GWh |
| 2026-09-10 | 150 GWh |
| 2026-09-11 | 151 GWh |
| 2026-09-12 | 137 GWh |
| 2026-09-13 | 131 GWh |
| 2026-09-14 | 156 GWh |
| 2026-09-15 | 157 GWh |
| 2026-09-16 | 154 GWh |
| 2026-09-17 | 153 GWh |
| 2026-09-18 | 152 GWh |
| 2026-09-19 | 136 GWh |
| 2026-09-20 | 130 GWh |
| 2026-09-21 | 156 GWh |
| 2026-09-22 | 160 GWh |
| 2026-09-23 | 159 GWh |
| 2026-09-24 | 157 GWh |
| 2026-09-25 | 154 GWh |
| 2026-09-26 | 138 GWh |
| 2026-09-27 | 130 GWh |
| 2026-09-28 | 150 GWh |
| 2026-09-29 | 161 GWh |
| 2026-09-30 | 154 GWh |
| 2026-10-01 | 147 GWh |
| 2026-10-02 | 148 GWh |
| 2026-10-03 | 130 GWh |
| 2026-10-04 | 120 GWh |
| 2026-10-05 | 122 GWh |
| 2026-10-06 | 145 GWh |
| 2026-10-07 | 148 GWh |
| 2026-10-08 | 146 GWh |
| 2026-10-09 | 148 GWh |
| 2026-10-10 | 127 GWh |
| 2026-10-11 | 123 GWh |
| 2026-10-12 | 142 GWh |
| 2026-10-13 | 146 GWh |
| 2026-10-14 | 146 GWh |
| 2026-10-15 | 147 GWh |
| 2026-10-16 | 147 GWh |
| 2026-10-17 | 131 GWh |
| 2026-10-18 | 121 GWh |
| 2026-10-19 | 140 GWh |
| 2026-10-20 | 146 GWh |
| 2026-10-21 | 148 GWh |
| 2026-10-22 | 150 GWh |
| 2026-10-23 | 150 GWh |
| 2026-10-24 | 131 GWh |
| 2026-10-25 | 130 GWh |
| 2026-10-26 | 145 GWh |
| 2026-10-27 | 155 GWh |
| 2026-10-28 | 154 GWh |
| 2026-10-29 | 152 GWh |
| 2026-10-30 | 152 GWh |
| 2026-10-31 | 132 GWh |
| 2026-11-01 | 123 GWh |
| 2026-11-02 | 147 GWh |
| 2026-11-03 | 151 GWh |
| 2026-11-04 | 151 GWh |
| 2026-11-05 | 154 GWh |
| 2026-11-06 | 162 GWh |
| 2026-11-07 | 140 GWh |
| 2026-11-08 | 135 GWh |
| 2026-11-09 | 156 GWh |
| 2026-11-10 | 163 GWh |
| 2026-11-11 | 155 GWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11. Daily totals are summed by World Power Monitor from complete Europe/Lisbon local days.
Year by Year
Summed from ENTSO-E daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 46.5 TWh | 35.2 TWh | Wind 30.2% | 315 |
| 2025 | 53.0 TWh | 43.7 TWh | Wind 30.8% | 365 |
| 2024 | 51.4 TWh | 40.9 TWh | Wind 34.6% | 366 |
| 2023 | 50.7 TWh | 40.5 TWh | Wind 32.0% | 365 |
| 2022 | 50.3 TWh | 41.0 TWh | Gas 40.0% | 365 |
| 2021 | 49.5 TWh | 44.7 TWh | Gas 32.4% | 365 |
| 2020 | 48.8 TWh | 46.7 TWh | Gas 35.5% | 366 |
| 2019 | 50.3 TWh | 46.9 TWh | Gas 34.3% | 365 |
| 2018 | 50.9 TWh | 53.5 TWh | Gas 27.0% | 365 |
| 2017 | 49.6 TWh | 52.3 TWh | Gas 33.7% | 365 |
| 2016 | 49.3 TWh | 54.3 TWh | Hydro 24.4% | 366 |
| 2015 | 49.0 TWh | 46.7 TWh | Coal 29.3% | 365 |
A year is partial when ENTSO-E has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys. Demand and net generation are summed over the days each was reported, so in a year with gaps the two columns can cover different days.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Power Flows With Neighbours
Net totals, 2026-10-13 (13 October 2026) to 2026-11-11 (11 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| Spain | Portugal imports | 1.53 TWh |
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-11.
Latest Grid Alerts
Newest alert 1 November 2026- Net imports Portugal imported a net 74.1 GWh on 1 November 2026, the highest daily net imports in 389 days of loaded history and 60% of its demand that day. All alerts that day
- Net imports Net imports into Portugal reached 67.5 GWh on 23 October 2026 (45% of demand), the 3rd highest daily net imports in 380 days of loaded history. All alerts that day
- Net imports Net imports into Portugal reached 70.9 GWh on 16 October 2026 (48% of demand), the 2nd highest daily net imports in 373 days of loaded history. All alerts that day
Follow this grid: RSS feed of Portugal alerts. Source: ENTSO-E operator data, provisional. Alerts by zone.
Share and Embed
Figures as of 2026-11-12 (12 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for Portugal, credited to ENTSO-E. The image is rebuilt with the page.
Related
Cite this page
World Power Monitor. (2026). Portugal Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/pt/
World Power Monitor. Portugal Electricity Demand and Generation Mix. Data as of 2026-11-12 13:00 UTC. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/zones/pt/
@misc{wpm_zones_pt_2026,
title = {{Portugal Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12 13:00 UTC. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/zones/pt/}
} Permalink: https://worldpowermonitor.com/zones/pt/
The Copy buttons add today's date as the access date.