Austria Demand Forecast Accuracy: Error, Bias and Worst Miss, 15 October to 12 November 2026
The day-ahead demand forecast for Austria was off by 2.4% on average (mean absolute percentage error) over 686 hours from 15 October to 12 November 2026, and 89% of hours landed within 5% of the reading. Its bias was -1.8%: it ran low on average, an under forecast. The largest miss was 871 MW (11.4%) too low at 21 Oct 2026, 13:00 CEST (UTC+02:00). Dates and times are local (Europe/Vienna).
Key Facts
- The day-ahead demand forecast for Austria was off by 2.4% on average (mean absolute percentage error) over 686 hours from 15 October to 12 November 2026, and 89% of hours landed within 5% of the reading. Its bias was -1.8%: it ran low on average, an under forecast. The largest miss was 871 MW (11.4%) too low at 21 Oct 2026, 13:00 CEST (UTC+02:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Austria came 12 (1 is the smallest error).
- On average the forecast differed from reported demand by 164 MW, against average demand of 6,804 MW.
- The forecast was above reported demand in 23% of compared hours.
Forecast Error at a Glance
686 hours from 15 October to 12 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-119 MW per hour on average): the forecast ran low on average, an under forecast. The worst miss was 871 MW (11.4%) too low at 21 Oct 2026, 13:00 CEST (UTC+02:00): forecast 6,780 MW, reported 7,651 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 12 Nov 2026, 13:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 5 Nov, 14:00 | 7,844 MW | 7,962 MW |
| 5 Nov, 15:00 | 7,962 MW | 8,168 MW |
| 5 Nov, 16:00 | 8,294 MW | 8,379 MW |
| 5 Nov, 17:00 | 8,542 MW | 8,391 MW |
| 5 Nov, 18:00 | 8,657 MW | 8,372 MW |
| 5 Nov, 19:00 | 8,444 MW | 8,074 MW |
| 5 Nov, 20:00 | 7,992 MW | 7,613 MW |
| 5 Nov, 21:00 | 7,451 MW | 7,092 MW |
| 5 Nov, 22:00 | 7,115 MW | 6,788 MW |
| 5 Nov, 23:00 | 6,666 MW | 6,337 MW |
| 6 Nov, 00:00 | 6,296 MW | 6,090 MW |
| 6 Nov, 01:00 | 6,040 MW | 5,842 MW |
| 6 Nov, 02:00 | 5,975 MW | 5,775 MW |
| 6 Nov, 03:00 | 5,964 MW | 5,738 MW |
| 6 Nov, 04:00 | 6,149 MW | 5,974 MW |
| 6 Nov, 05:00 | 6,846 MW | 6,598 MW |
| 6 Nov, 06:00 | 7,966 MW | 7,623 MW |
| 6 Nov, 07:00 | 8,608 MW | 8,311 MW |
| 6 Nov, 08:00 | 8,648 MW | 8,329 MW |
| 6 Nov, 09:00 | 8,432 MW | 8,081 MW |
| 6 Nov, 10:00 | 8,313 MW | 7,854 MW |
| 6 Nov, 11:00 | 8,212 MW | 7,683 MW |
| 6 Nov, 12:00 | 7,909 MW | 7,366 MW |
| 6 Nov, 13:00 | 7,775 MW | 7,349 MW |
| 6 Nov, 14:00 | 7,808 MW | 7,126 MW |
| 6 Nov, 15:00 | 8,002 MW | 7,275 MW |
| 6 Nov, 16:00 | 8,191 MW | 7,627 MW |
| 6 Nov, 17:00 | 8,488 MW | 7,862 MW |
| 6 Nov, 18:00 | 8,512 MW | 7,970 MW |
| 6 Nov, 19:00 | 8,256 MW | 7,819 MW |
| 6 Nov, 20:00 | 7,726 MW | 7,394 MW |
| 6 Nov, 21:00 | 7,184 MW | 6,853 MW |
| 6 Nov, 22:00 | 6,911 MW | 6,596 MW |
| 6 Nov, 23:00 | 6,451 MW | 6,148 MW |
| 7 Nov, 00:00 | 5,946 MW | 5,817 MW |
| 7 Nov, 01:00 | 5,678 MW | 5,544 MW |
| 7 Nov, 02:00 | 5,586 MW | 5,414 MW |
| 7 Nov, 03:00 | 5,522 MW | 5,314 MW |
| 7 Nov, 04:00 | 5,585 MW | 5,340 MW |
| 7 Nov, 05:00 | 5,836 MW | 5,630 MW |
| 7 Nov, 06:00 | 6,264 MW | 6,038 MW |
| 7 Nov, 07:00 | 6,601 MW | 6,425 MW |
| 7 Nov, 08:00 | 6,805 MW | 6,695 MW |
| 7 Nov, 09:00 | 6,837 MW | 6,718 MW |
| 7 Nov, 10:00 | 6,818 MW | 6,641 MW |
| 7 Nov, 11:00 | 6,731 MW | 6,506 MW |
| 7 Nov, 12:00 | 6,510 MW | 6,299 MW |
| 7 Nov, 13:00 | 6,494 MW | 6,236 MW |
| 7 Nov, 14:00 | 6,431 MW | 6,196 MW |
| 7 Nov, 15:00 | 6,551 MW | 6,388 MW |
| 7 Nov, 16:00 | 6,842 MW | 6,684 MW |
| 7 Nov, 17:00 | 7,147 MW | 6,965 MW |
| 7 Nov, 18:00 | 7,174 MW | 7,022 MW |
| 7 Nov, 19:00 | 6,984 MW | 6,861 MW |
| 7 Nov, 20:00 | 6,699 MW | 6,528 MW |
| 7 Nov, 21:00 | 6,361 MW | 6,160 MW |
| 7 Nov, 22:00 | 6,231 MW | 6,045 MW |
| 7 Nov, 23:00 | 5,867 MW | 5,724 MW |
| 8 Nov, 00:00 | 5,556 MW | 5,497 MW |
| 8 Nov, 01:00 | 5,299 MW | 5,208 MW |
| 8 Nov, 02:00 | 5,206 MW | 5,098 MW |
| 8 Nov, 03:00 | 5,172 MW | 5,026 MW |
| 8 Nov, 04:00 | 5,197 MW | 5,045 MW |
| 8 Nov, 05:00 | 5,309 MW | 5,193 MW |
| 8 Nov, 06:00 | 5,579 MW | 5,461 MW |
| 8 Nov, 07:00 | 5,864 MW | 5,803 MW |
| 8 Nov, 08:00 | 6,010 MW | 6,029 MW |
| 8 Nov, 09:00 | 6,081 MW | 6,132 MW |
| 8 Nov, 10:00 | 6,122 MW | 6,175 MW |
| 8 Nov, 11:00 | 6,168 MW | 6,189 MW |
| 8 Nov, 12:00 | 6,023 MW | 6,125 MW |
| 8 Nov, 13:00 | 5,940 MW | 6,086 MW |
| 8 Nov, 14:00 | 5,929 MW | 5,999 MW |
| 8 Nov, 15:00 | 6,068 MW | 6,045 MW |
| 8 Nov, 16:00 | 6,393 MW | 6,331 MW |
| 8 Nov, 17:00 | 6,763 MW | 6,644 MW |
| 8 Nov, 18:00 | 6,967 MW | 6,840 MW |
| 8 Nov, 19:00 | 6,852 MW | 6,762 MW |
| 8 Nov, 20:00 | 6,593 MW | 6,502 MW |
| 8 Nov, 21:00 | 6,281 MW | 6,178 MW |
| 8 Nov, 22:00 | 6,162 MW | 6,063 MW |
| 8 Nov, 23:00 | 5,867 MW | 5,824 MW |
| 9 Nov, 00:00 | 5,988 MW | 6,028 MW |
| 9 Nov, 01:00 | 5,749 MW | 5,794 MW |
| 9 Nov, 02:00 | 5,662 MW | 5,726 MW |
| 9 Nov, 03:00 | 5,644 MW | 5,704 MW |
| 9 Nov, 04:00 | 5,887 MW | 5,914 MW |
| 9 Nov, 05:00 | 6,614 MW | 6,611 MW |
| 9 Nov, 06:00 | 7,748 MW | 7,765 MW |
| 9 Nov, 07:00 | 8,483 MW | 8,469 MW |
| 9 Nov, 08:00 | 8,725 MW | 8,587 MW |
| 9 Nov, 09:00 | 8,655 MW | 8,392 MW |
| 9 Nov, 10:00 | 8,621 MW | 8,286 MW |
| 9 Nov, 11:00 | 8,503 MW | 8,143 MW |
| 9 Nov, 12:00 | 8,406 MW | 7,955 MW |
| 9 Nov, 13:00 | 8,384 MW | 7,926 MW |
| 9 Nov, 14:00 | 8,329 MW | 7,947 MW |
| 9 Nov, 15:00 | 8,414 MW | 8,134 MW |
| 9 Nov, 16:00 | 8,587 MW | 8,399 MW |
| 9 Nov, 17:00 | 8,758 MW | 8,554 MW |
| 9 Nov, 18:00 | 8,723 MW | 8,551 MW |
| 9 Nov, 19:00 | 8,431 MW | 8,269 MW |
| 9 Nov, 20:00 | 7,989 MW | 7,810 MW |
| 9 Nov, 21:00 | 7,458 MW | 7,272 MW |
| 9 Nov, 22:00 | 7,135 MW | 6,956 MW |
| 9 Nov, 23:00 | 6,657 MW | 6,499 MW |
| 10 Nov, 00:00 | 6,253 MW | 6,032 MW |
| 10 Nov, 01:00 | 5,975 MW | 5,797 MW |
| 10 Nov, 02:00 | 5,887 MW | 5,730 MW |
| 10 Nov, 03:00 | 5,869 MW | 5,708 MW |
| 10 Nov, 04:00 | 6,082 MW | 5,919 MW |
| 10 Nov, 05:00 | 6,765 MW | 6,618 MW |
| 10 Nov, 06:00 | 7,911 MW | 7,779 MW |
| 10 Nov, 07:00 | 8,715 MW | 8,483 MW |
| 10 Nov, 08:00 | 9,023 MW | 8,598 MW |
| 10 Nov, 09:00 | 8,962 MW | 8,399 MW |
| 10 Nov, 10:00 | 9,005 MW | 8,290 MW |
| 10 Nov, 11:00 | 8,960 MW | 8,149 MW |
| 10 Nov, 12:00 | 8,818 MW | 7,959 MW |
| 10 Nov, 13:00 | 8,766 MW | 7,927 MW |
| 10 Nov, 14:00 | 8,692 MW | 7,948 MW |
| 10 Nov, 15:00 | 8,704 MW | 8,142 MW |
| 10 Nov, 16:00 | 8,781 MW | 8,413 MW |
| 10 Nov, 17:00 | 8,918 MW | 8,570 MW |
| 10 Nov, 18:00 | 8,867 MW | 8,568 MW |
| 10 Nov, 19:00 | 8,563 MW | 8,287 MW |
| 10 Nov, 20:00 | 8,087 MW | 7,823 MW |
| 10 Nov, 21:00 | 7,546 MW | 7,278 MW |
| 10 Nov, 22:00 | 7,198 MW | 6,961 MW |
| 10 Nov, 23:00 | 6,709 MW | 6,501 MW |
| 11 Nov, 00:00 | 6,325 MW | 6,012 MW |
| 11 Nov, 01:00 | 6,062 MW | 5,770 MW |
| 11 Nov, 02:00 | 6,002 MW | 5,684 MW |
| 11 Nov, 03:00 | 5,983 MW | 5,663 MW |
| 11 Nov, 04:00 | 6,172 MW | 5,906 MW |
| 11 Nov, 05:00 | 6,823 MW | 6,656 MW |
| 11 Nov, 06:00 | 7,928 MW | 7,830 MW |
| 11 Nov, 07:00 | 8,627 MW | 8,581 MW |
| 11 Nov, 08:00 | 8,817 MW | 8,818 MW |
| 11 Nov, 09:00 | 8,812 MW | 8,737 MW |
| 11 Nov, 10:00 | 8,753 MW | 8,699 MW |
| 11 Nov, 11:00 | 8,598 MW | 8,576 MW |
| 11 Nov, 12:00 | 8,481 MW | 8,471 MW |
| 11 Nov, 13:00 | 8,471 MW | 8,441 MW |
| 11 Nov, 14:00 | 8,421 MW | 8,388 MW |
| 11 Nov, 15:00 | 8,486 MW | 8,499 MW |
| 11 Nov, 16:00 | 8,609 MW | 8,691 MW |
| 11 Nov, 17:00 | 8,752 MW | 8,861 MW |
| 11 Nov, 18:00 | 8,659 MW | 8,825 MW |
| 11 Nov, 19:00 | 8,358 MW | 8,525 MW |
| 11 Nov, 20:00 | 7,891 MW | 8,064 MW |
| 11 Nov, 21:00 | 7,334 MW | 7,518 MW |
| 11 Nov, 22:00 | 7,034 MW | 7,185 MW |
| 11 Nov, 23:00 | 6,556 MW | 6,696 MW |
| 12 Nov, 00:00 | 6,227 MW | 6,289 MW |
| 12 Nov, 01:00 | 5,962 MW | 6,012 MW |
| 12 Nov, 02:00 | 5,959 MW | 5,924 MW |
| 12 Nov, 03:00 | 5,920 MW | 5,903 MW |
| 12 Nov, 04:00 | 6,101 MW | 6,116 MW |
| 12 Nov, 05:00 | 6,716 MW | 6,817 MW |
| 12 Nov, 06:00 | 7,845 MW | 7,999 MW |
| 12 Nov, 07:00 | 8,529 MW | 8,755 MW |
| 12 Nov, 08:00 | 8,719 MW | 9,068 MW |
| 12 Nov, 09:00 | 8,649 MW | 9,074 MW |
| 12 Nov, 10:00 | 8,601 MW | 9,108 MW |
| 12 Nov, 11:00 | 8,480 MW | 9,055 MW |
| 12 Nov, 12:00 | 8,301 MW | 8,907 MW |
| 12 Nov, 13:00 | 8,297 MW | 8,842 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (686 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Austria Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/at/
World Power Monitor. Austria Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-12. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/at/
@misc{wpm_forecast_accuracy_at_2026,
title = {{Austria Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/at/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/at/
The Copy buttons add today's date as the access date.