SOCO Electricity Demand and Generation Mix
SOCO demand was 23,945 MW in the hour starting 12 Nov 2026, 06:00 CST (UTC-06:00). Gas was the largest source in the hour starting 11 Nov 2026, 22:00 CST (UTC-06:00), at 50% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- SOCO is a balancing authority in the United States, part of the EIA Southeast region.
- In the hour starting 12 Nov 2026, 06:00 CST (UTC-06:00), demand in SOCO was 23,945 MW, against a day-ahead forecast of 23,945 MW.
- Gas supplied 50.0% of SOCO's generation in the hour starting 11 Nov 2026, 22:00 CST (UTC-06:00).
- Demand in SOCO totalled 239 TWh in 2025.
- Gas supplied 49.8% of SOCO's generation in 2025.
- The highest daily demand in SOCO from 2019 onward was 991 GWh, on 2025-01-21 (21 January 2025).
- The highest hourly demand in SOCO since 2026-06-16 (16 June 2026) was 47,656 MW, in the hour starting 17 Aug 2026, 15:00 CDT (UTC-05:00).
- Solar's highest share of SOCO's daily generation from 2019 onward was 10.9%, on 2026-05-03 (3 May 2026).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 12 Nov 2026, 06:00 CST (UTC-06:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12T12:00:00Z.
Generation by Source
Latest hour with generation by source: 11 Nov 2026, 22:00 CST (UTC-06:00)| Source | Output | Share |
|---|---|---|
| Gas | 11,943 MW | 50.0% |
| Nuclear | 7,325 MW | 30.7% |
| Coal | 4,452 MW | 18.6% |
| Hydro | 155 MW | 0.6% |
| Solar | 2 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Other | 0 MW | 0.0% |
| Wind | 0 MW | 0.0% |
| Storage | -310 MW | charging |
| Total from these sources | 23,877 MW | |
| Net interchange | 1,923 MW | net exports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when SOCO exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12T04:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-13T14:00Z | 22,773 MW |
| 2026-10-13T15:00Z | 24,236 MW |
| 2026-10-13T16:00Z | 26,175 MW |
| 2026-10-13T17:00Z | 28,156 MW |
| 2026-10-13T18:00Z | 29,903 MW |
| 2026-10-13T19:00Z | 31,287 MW |
| 2026-10-13T20:00Z | 32,173 MW |
| 2026-10-13T21:00Z | 32,114 MW |
| 2026-10-13T22:00Z | 31,885 MW |
| 2026-10-13T23:00Z | 31,639 MW |
| 2026-10-14T00:00Z | 30,377 MW |
| 2026-10-14T01:00Z | 28,661 MW |
| 2026-10-14T02:00Z | 26,577 MW |
| 2026-10-14T03:00Z | 24,576 MW |
| 2026-10-14T04:00Z | 22,866 MW |
| 2026-10-14T05:00Z | 21,703 MW |
| 2026-10-14T06:00Z | 20,798 MW |
| 2026-10-14T07:00Z | 20,276 MW |
| 2026-10-14T08:00Z | 20,261 MW |
| 2026-10-14T09:00Z | 20,756 MW |
| 2026-10-14T10:00Z | 21,878 MW |
| 2026-10-14T11:00Z | 22,940 MW |
| 2026-10-14T12:00Z | 22,655 MW |
| 2026-10-14T13:00Z | 22,206 MW |
| 2026-10-14T14:00Z | 23,138 MW |
| 2026-10-14T15:00Z | 24,867 MW |
| 2026-10-14T16:00Z | 26,266 MW |
| 2026-10-14T17:00Z | 28,821 MW |
| 2026-10-14T18:00Z | 30,194 MW |
| 2026-10-14T19:00Z | 31,595 MW |
| 2026-10-14T20:00Z | 22,651 MW |
| 2026-10-14T21:00Z | 33,724 MW |
| 2026-10-14T22:00Z | 33,207 MW |
| 2026-10-14T23:00Z | 31,689 MW |
| 2026-10-15T00:00Z | 30,412 MW |
| 2026-10-15T01:00Z | 29,784 MW |
| 2026-10-15T02:00Z | 26,957 MW |
| 2026-10-15T03:00Z | 25,710 MW |
| 2026-10-15T04:00Z | 23,610 MW |
| 2026-10-15T05:00Z | 21,944 MW |
| 2026-10-15T06:00Z | 20,967 MW |
| 2026-10-15T07:00Z | 21,155 MW |
| 2026-10-15T08:00Z | 19,935 MW |
| 2026-10-15T09:00Z | 21,577 MW |
| 2026-10-15T10:00Z | 21,815 MW |
| 2026-10-15T11:00Z | 23,762 MW |
| 2026-10-15T12:00Z | 23,384 MW |
| 2026-10-15T13:00Z | 22,247 MW |
| 2026-10-15T14:00Z | 24,296 MW |
| 2026-10-15T15:00Z | 25,879 MW |
| 2026-10-15T16:00Z | 28,003 MW |
| 2026-10-15T17:00Z | 30,267 MW |
| 2026-10-15T18:00Z | 31,306 MW |
| 2026-10-15T19:00Z | 32,650 MW |
| 2026-10-15T20:00Z | 33,454 MW |
| 2026-10-15T21:00Z | 33,660 MW |
| 2026-10-15T22:00Z | 33,011 MW |
| 2026-10-15T23:00Z | 32,088 MW |
| 2026-10-16T00:00Z | 30,609 MW |
| 2026-10-16T01:00Z | 29,058 MW |
| 2026-10-16T02:00Z | 27,122 MW |
| 2026-10-16T03:00Z | 25,250 MW |
| 2026-10-16T04:00Z | 23,484 MW |
| 2026-10-16T05:00Z | 22,779 MW |
| 2026-10-16T06:00Z | 21,840 MW |
| 2026-10-16T07:00Z | 21,307 MW |
| 2026-10-16T08:00Z | 21,143 MW |
| 2026-10-16T09:00Z | 21,585 MW |
| 2026-10-16T10:00Z | 22,288 MW |
| 2026-10-16T11:00Z | 23,821 MW |
| 2026-10-16T12:00Z | 24,031 MW |
| 2026-10-16T13:00Z | 23,131 MW |
| 2026-10-16T14:00Z | 24,444 MW |
| 2026-10-16T15:00Z | 25,618 MW |
| 2026-10-16T16:00Z | 27,818 MW |
| 2026-10-16T17:00Z | 29,577 MW |
| 2026-10-16T18:00Z | 30,593 MW |
| 2026-10-16T19:00Z | 31,116 MW |
| 2026-10-16T20:00Z | 31,494 MW |
| 2026-10-16T21:00Z | 31,497 MW |
| 2026-10-16T22:00Z | 30,908 MW |
| 2026-10-16T23:00Z | 30,015 MW |
| 2026-10-17T00:00Z | 28,662 MW |
| 2026-10-17T01:00Z | 27,048 MW |
| 2026-10-17T02:00Z | 25,186 MW |
| 2026-10-17T03:00Z | 23,516 MW |
| 2026-10-17T04:00Z | 21,934 MW |
| 2026-10-17T05:00Z | 20,641 MW |
| 2026-10-17T06:00Z | 19,719 MW |
| 2026-10-17T07:00Z | 19,205 MW |
| 2026-10-17T08:00Z | 18,863 MW |
| 2026-10-17T09:00Z | 18,834 MW |
| 2026-10-17T10:00Z | 18,985 MW |
| 2026-10-17T11:00Z | 19,544 MW |
| 2026-10-17T12:00Z | 19,861 MW |
| 2026-10-17T13:00Z | 18,940 MW |
| 2026-10-17T14:00Z | 19,001 MW |
| 2026-10-17T15:00Z | 18,973 MW |
| 2026-10-17T16:00Z | 18,972 MW |
| 2026-10-17T17:00Z | 18,923 MW |
| 2026-10-17T18:00Z | 19,136 MW |
| 2026-10-17T19:00Z | 19,259 MW |
| 2026-10-17T20:00Z | 19,583 MW |
| 2026-10-17T21:00Z | 20,405 MW |
| 2026-10-17T22:00Z | 21,735 MW |
| 2026-10-17T23:00Z | 22,138 MW |
| 2026-10-18T00:00Z | 21,981 MW |
| 2026-10-18T01:00Z | 21,270 MW |
| 2026-10-18T02:00Z | 20,576 MW |
| 2026-10-18T03:00Z | 19,799 MW |
| 2026-10-18T04:00Z | 18,909 MW |
| 2026-10-18T05:00Z | 18,836 MW |
| 2026-10-18T06:00Z | 18,365 MW |
| 2026-10-18T07:00Z | 18,226 MW |
| 2026-10-18T08:00Z | 18,079 MW |
| 2026-10-18T09:00Z | 18,299 MW |
| 2026-10-18T10:00Z | 18,902 MW |
| 2026-10-18T11:00Z | 19,698 MW |
| 2026-10-18T12:00Z | 19,869 MW |
| 2026-10-18T13:00Z | 19,060 MW |
| 2026-10-18T14:00Z | 18,845 MW |
| 2026-10-18T15:00Z | 18,607 MW |
| 2026-10-18T16:00Z | 18,533 MW |
| 2026-10-18T17:00Z | 18,649 MW |
| 2026-10-18T18:00Z | 18,771 MW |
| 2026-10-18T19:00Z | 18,879 MW |
| 2026-10-18T20:00Z | 19,431 MW |
| 2026-10-18T21:00Z | 20,824 MW |
| 2026-10-18T22:00Z | 22,717 MW |
| 2026-10-18T23:00Z | 23,639 MW |
| 2026-10-19T00:00Z | 23,760 MW |
| 2026-10-19T01:00Z | 23,125 MW |
| 2026-10-19T02:00Z | 21,895 MW |
| 2026-10-19T03:00Z | 20,866 MW |
| 2026-10-19T04:00Z | 20,000 MW |
| 2026-10-19T05:00Z | 19,294 MW |
| 2026-10-19T06:00Z | 19,045 MW |
| 2026-10-19T07:00Z | 19,015 MW |
| 2026-10-19T08:00Z | 19,601 MW |
| 2026-10-19T09:00Z | 20,763 MW |
| 2026-10-19T10:00Z | 22,643 MW |
| 2026-10-19T11:00Z | 24,386 MW |
| 2026-10-19T12:00Z | 23,982 MW |
| 2026-10-19T13:00Z | 22,572 MW |
| 2026-10-19T14:00Z | 21,721 MW |
| 2026-10-19T15:00Z | 21,466 MW |
| 2026-10-19T16:00Z | 21,217 MW |
| 2026-10-19T17:00Z | 21,410 MW |
| 2026-10-19T18:00Z | 21,408 MW |
| 2026-10-19T19:00Z | 11,486 MW |
| 2026-10-19T20:00Z | 21,935 MW |
| 2026-10-19T21:00Z | 22,980 MW |
| 2026-10-19T22:00Z | 24,442 MW |
| 2026-10-19T23:00Z | 25,325 MW |
| 2026-10-20T00:00Z | 25,219 MW |
| 2026-10-20T01:00Z | 24,329 MW |
| 2026-10-20T02:00Z | 23,033 MW |
| 2026-10-20T03:00Z | 21,747 MW |
| 2026-10-20T04:00Z | 20,766 MW |
| 2026-10-20T05:00Z | 20,068 MW |
| 2026-10-20T06:00Z | 19,771 MW |
| 2026-10-20T07:00Z | 19,749 MW |
| 2026-10-20T08:00Z | 20,104 MW |
| 2026-10-20T09:00Z | 21,220 MW |
| 2026-10-20T10:00Z | 23,267 MW |
| 2026-10-20T11:00Z | 24,830 MW |
| 2026-10-20T12:00Z | 24,453 MW |
| 2026-10-20T13:00Z | 22,853 MW |
| 2026-10-20T14:00Z | 21,989 MW |
| 2026-10-20T15:00Z | 21,549 MW |
| 2026-10-20T16:00Z | 21,599 MW |
| 2026-10-20T17:00Z | 21,627 MW |
| 2026-10-20T18:00Z | 21,824 MW |
| 2026-10-20T19:00Z | 22,033 MW |
| 2026-10-20T20:00Z | 22,483 MW |
| 2026-10-20T21:00Z | 23,511 MW |
| 2026-10-20T22:00Z | 24,907 MW |
| 2026-10-20T23:00Z | 25,565 MW |
| 2026-10-21T00:00Z | 24,977 MW |
| 2026-10-21T01:00Z | 24,022 MW |
| 2026-10-21T02:00Z | 22,517 MW |
| 2026-10-21T03:00Z | 21,516 MW |
| 2026-10-21T04:00Z | 20,372 MW |
| 2026-10-21T05:00Z | 19,688 MW |
| 2026-10-21T06:00Z | 19,281 MW |
| 2026-10-21T07:00Z | 19,059 MW |
| 2026-10-21T08:00Z | 19,832 MW |
| 2026-10-21T09:00Z | 20,909 MW |
| 2026-10-21T10:00Z | 23,082 MW |
| 2026-10-21T11:00Z | 24,321 MW |
| 2026-10-21T12:00Z | 23,979 MW |
| 2026-10-21T13:00Z | 22,331 MW |
| 2026-10-21T14:00Z | 21,604 MW |
| 2026-10-21T15:00Z | 21,516 MW |
| 2026-10-21T16:00Z | 21,559 MW |
| 2026-10-21T17:00Z | 21,846 MW |
| 2026-10-21T18:00Z | 44,723 MW |
| 2026-10-21T19:00Z | 22,345 MW |
| 2026-10-21T20:00Z | 22,836 MW |
| 2026-10-21T21:00Z | 23,708 MW |
| 2026-10-21T22:00Z | 25,185 MW |
| 2026-10-21T23:00Z | 25,645 MW |
| 2026-10-22T00:00Z | 25,306 MW |
| 2026-10-22T01:00Z | 24,391 MW |
| 2026-10-22T02:00Z | 23,041 MW |
| 2026-10-22T03:00Z | 21,581 MW |
| 2026-10-22T04:00Z | 20,668 MW |
| 2026-10-22T05:00Z | 20,021 MW |
| 2026-10-22T06:00Z | 19,544 MW |
| 2026-10-22T07:00Z | 19,536 MW |
| 2026-10-22T08:00Z | 19,891 MW |
| 2026-10-22T09:00Z | 20,868 MW |
| 2026-10-22T10:00Z | 22,624 MW |
| 2026-10-22T11:00Z | 24,192 MW |
| 2026-10-22T12:00Z | 23,867 MW |
| 2026-10-22T13:00Z | 22,338 MW |
| 2026-10-22T14:00Z | 21,576 MW |
| 2026-10-22T15:00Z | 21,483 MW |
| 2026-10-22T16:00Z | 21,609 MW |
| 2026-10-22T17:00Z | 22,053 MW |
| 2026-10-22T18:00Z | 22,265 MW |
| 2026-10-22T19:00Z | 22,720 MW |
| 2026-10-22T20:00Z | 23,290 MW |
| 2026-10-22T21:00Z | 24,286 MW |
| 2026-10-22T22:00Z | 25,299 MW |
| 2026-10-22T23:00Z | 25,648 MW |
| 2026-10-23T00:00Z | 25,287 MW |
| 2026-10-23T01:00Z | 24,375 MW |
| 2026-10-23T02:00Z | 23,052 MW |
| 2026-10-23T03:00Z | 21,684 MW |
| 2026-10-23T04:00Z | 20,205 MW |
| 2026-10-23T05:00Z | 19,865 MW |
| 2026-10-23T06:00Z | 19,410 MW |
| 2026-10-23T07:00Z | 19,170 MW |
| 2026-10-23T08:00Z | 19,353 MW |
| 2026-10-23T09:00Z | 20,393 MW |
| 2026-10-23T10:00Z | 22,114 MW |
| 2026-10-23T11:00Z | 23,602 MW |
| 2026-10-23T12:00Z | 23,379 MW |
| 2026-10-23T13:00Z | 21,904 MW |
| 2026-10-23T14:00Z | 21,274 MW |
| 2026-10-23T15:00Z | 21,276 MW |
| 2026-10-23T16:00Z | 21,208 MW |
| 2026-10-23T17:00Z | 21,520 MW |
| 2026-10-23T18:00Z | 21,651 MW |
| 2026-10-23T19:00Z | 21,958 MW |
| 2026-10-23T20:00Z | 22,414 MW |
| 2026-10-23T21:00Z | 23,394 MW |
| 2026-10-23T22:00Z | 24,311 MW |
| 2026-10-23T23:00Z | 24,449 MW |
| 2026-10-24T00:00Z | 23,838 MW |
| 2026-10-24T01:00Z | 23,154 MW |
| 2026-10-24T02:00Z | 22,341 MW |
| 2026-10-24T03:00Z | 21,421 MW |
| 2026-10-24T04:00Z | 20,358 MW |
| 2026-10-24T05:00Z | 19,658 MW |
| 2026-10-24T06:00Z | 19,330 MW |
| 2026-10-24T07:00Z | 18,965 MW |
| 2026-10-24T08:00Z | 19,093 MW |
| 2026-10-24T09:00Z | 19,494 MW |
| 2026-10-24T10:00Z | 20,241 MW |
| 2026-10-24T11:00Z | 21,083 MW |
| 2026-10-24T12:00Z | 21,338 MW |
| 2026-10-24T13:00Z | 20,405 MW |
| 2026-10-24T14:00Z | 19,917 MW |
| 2026-10-24T15:00Z | 19,860 MW |
| 2026-10-24T16:00Z | 19,761 MW |
| 2026-10-24T17:00Z | 19,851 MW |
| 2026-10-24T18:00Z | 19,953 MW |
| 2026-10-24T19:00Z | 20,079 MW |
| 2026-10-24T20:00Z | 20,411 MW |
| 2026-10-24T21:00Z | 21,718 MW |
| 2026-10-24T22:00Z | 22,800 MW |
| 2026-10-24T23:00Z | 23,224 MW |
| 2026-10-25T00:00Z | 22,986 MW |
| 2026-10-25T01:00Z | 22,387 MW |
| 2026-10-25T02:00Z | 21,692 MW |
| 2026-10-25T03:00Z | 20,798 MW |
| 2026-10-25T04:00Z | 39,918 MW |
| 2026-10-25T05:00Z | 19,181 MW |
| 2026-10-25T06:00Z | 18,776 MW |
| 2026-10-25T07:00Z | 18,413 MW |
| 2026-10-25T08:00Z | 18,360 MW |
| 2026-10-25T09:00Z | 18,672 MW |
| 2026-10-25T10:00Z | 19,154 MW |
| 2026-10-25T11:00Z | 19,805 MW |
| 2026-10-25T12:00Z | 20,054 MW |
| 2026-10-25T13:00Z | 19,431 MW |
| 2026-10-25T14:00Z | 19,080 MW |
| 2026-10-25T15:00Z | 19,111 MW |
| 2026-10-25T16:00Z | 19,411 MW |
| 2026-10-25T17:00Z | 19,824 MW |
| 2026-10-25T18:00Z | 20,135 MW |
| 2026-10-25T19:00Z | 20,444 MW |
| 2026-10-25T20:00Z | 21,195 MW |
| 2026-10-25T21:00Z | 22,376 MW |
| 2026-10-25T22:00Z | 23,806 MW |
| 2026-10-25T23:00Z | 24,504 MW |
| 2026-10-26T00:00Z | 24,309 MW |
| 2026-10-26T01:00Z | 23,447 MW |
| 2026-10-26T02:00Z | 22,107 MW |
| 2026-10-26T03:00Z | 20,905 MW |
| 2026-10-26T04:00Z | 19,748 MW |
| 2026-10-26T05:00Z | 18,996 MW |
| 2026-10-26T06:00Z | 18,680 MW |
| 2026-10-26T07:00Z | 18,685 MW |
| 2026-10-26T08:00Z | 19,113 MW |
| 2026-10-26T09:00Z | 20,145 MW |
| 2026-10-26T10:00Z | 21,966 MW |
| 2026-10-26T11:00Z | 23,521 MW |
| 2026-10-26T12:00Z | 23,341 MW |
| 2026-10-26T13:00Z | 21,994 MW |
| 2026-10-26T14:00Z | 21,639 MW |
| 2026-10-26T15:00Z | 21,449 MW |
| 2026-10-26T16:00Z | 22,064 MW |
| 2026-10-26T17:00Z | 22,064 MW |
| 2026-10-26T18:00Z | 22,276 MW |
| 2026-10-26T19:00Z | 22,664 MW |
| 2026-10-26T20:00Z | 23,401 MW |
| 2026-10-26T21:00Z | 25,742 MW |
| 2026-10-26T22:00Z | 25,261 MW |
| 2026-10-26T23:00Z | 26,082 MW |
| 2026-10-27T00:00Z | 25,590 MW |
| 2026-10-27T01:00Z | 24,401 MW |
| 2026-10-27T02:00Z | 22,832 MW |
| 2026-10-27T03:00Z | 21,627 MW |
| 2026-10-27T04:00Z | 20,682 MW |
| 2026-10-27T05:00Z | 20,036 MW |
| 2026-10-27T06:00Z | 19,667 MW |
| 2026-10-27T07:00Z | 19,522 MW |
| 2026-10-27T08:00Z | 19,781 MW |
| 2026-10-27T09:00Z | 20,764 MW |
| 2026-10-27T10:00Z | 22,584 MW |
| 2026-10-27T11:00Z | 24,229 MW |
| 2026-10-27T12:00Z | 24,010 MW |
| 2026-10-27T13:00Z | 22,466 MW |
| 2026-10-27T14:00Z | 21,819 MW |
| 2026-10-27T15:00Z | 21,635 MW |
| 2026-10-27T16:00Z | 21,875 MW |
| 2026-10-27T17:00Z | 22,033 MW |
| 2026-10-27T18:00Z | 22,378 MW |
| 2026-10-27T19:00Z | 22,693 MW |
| 2026-10-27T20:00Z | 24,006 MW |
| 2026-10-27T21:00Z | 24,968 MW |
| 2026-10-27T22:00Z | 26,122 MW |
| 2026-10-27T23:00Z | 26,188 MW |
| 2026-10-28T00:00Z | 23,518 MW |
| 2026-10-28T01:00Z | 24,526 MW |
| 2026-10-28T02:00Z | 23,197 MW |
| 2026-10-28T03:00Z | 21,795 MW |
| 2026-10-28T04:00Z | 20,795 MW |
| 2026-10-28T05:00Z | 19,952 MW |
| 2026-10-28T06:00Z | 19,438 MW |
| 2026-10-28T07:00Z | 19,421 MW |
| 2026-10-28T08:00Z | 19,627 MW |
| 2026-10-28T09:00Z | 20,649 MW |
| 2026-10-28T10:00Z | 22,468 MW |
| 2026-10-28T11:00Z | 23,969 MW |
| 2026-10-28T12:00Z | 23,711 MW |
| 2026-10-28T13:00Z | 22,421 MW |
| 2026-10-28T14:00Z | 21,591 MW |
| 2026-10-28T15:00Z | 21,612 MW |
| 2026-10-28T16:00Z | 21,930 MW |
| 2026-10-28T17:00Z | 22,221 MW |
| 2026-10-28T18:00Z | 22,641 MW |
| 2026-10-28T19:00Z | 22,925 MW |
| 2026-10-28T20:00Z | 23,154 MW |
| 2026-10-28T21:00Z | 24,355 MW |
| 2026-10-28T22:00Z | 25,256 MW |
| 2026-10-28T23:00Z | 25,628 MW |
| 2026-10-29T00:00Z | 25,223 MW |
| 2026-10-29T01:00Z | 24,502 MW |
| 2026-10-29T02:00Z | 23,188 MW |
| 2026-10-29T03:00Z | 21,862 MW |
| 2026-10-29T04:00Z | 20,796 MW |
| 2026-10-29T05:00Z | 19,966 MW |
| 2026-10-29T06:00Z | 19,512 MW |
| 2026-10-29T07:00Z | 19,366 MW |
| 2026-10-29T08:00Z | 19,630 MW |
| 2026-10-29T09:00Z | 20,370 MW |
| 2026-10-29T10:00Z | 22,240 MW |
| 2026-10-29T11:00Z | 23,643 MW |
| 2026-10-29T12:00Z | 23,488 MW |
| 2026-10-29T13:00Z | 22,486 MW |
| 2026-10-29T14:00Z | 22,020 MW |
| 2026-10-29T15:00Z | 22,163 MW |
| 2026-10-29T16:00Z | 22,659 MW |
| 2026-10-29T17:00Z | 23,327 MW |
| 2026-10-29T18:00Z | 23,947 MW |
| 2026-10-29T19:00Z | 24,349 MW |
| 2026-10-29T20:00Z | 24,997 MW |
| 2026-10-29T21:00Z | 25,706 MW |
| 2026-10-29T22:00Z | 26,065 MW |
| 2026-10-29T23:00Z | 26,345 MW |
| 2026-10-30T00:00Z | 25,900 MW |
| 2026-10-30T01:00Z | 24,971 MW |
| 2026-10-30T02:00Z | 23,585 MW |
| 2026-10-30T03:00Z | 22,059 MW |
| 2026-10-30T04:00Z | 20,727 MW |
| 2026-10-30T05:00Z | 19,982 MW |
| 2026-10-30T06:00Z | 19,353 MW |
| 2026-10-30T07:00Z | 19,074 MW |
| 2026-10-30T08:00Z | 19,257 MW |
| 2026-10-30T09:00Z | 20,127 MW |
| 2026-10-30T10:00Z | 21,699 MW |
| 2026-10-30T11:00Z | 23,021 MW |
| 2026-10-30T12:00Z | 22,955 MW |
| 2026-10-30T13:00Z | 21,943 MW |
| 2026-10-30T14:00Z | 21,674 MW |
| 2026-10-30T15:00Z | 21,772 MW |
| 2026-10-30T16:00Z | 22,471 MW |
| 2026-10-30T17:00Z | 23,087 MW |
| 2026-10-30T18:00Z | 23,568 MW |
| 2026-10-30T19:00Z | 24,082 MW |
| 2026-10-30T20:00Z | 27,011 MW |
| 2026-10-30T21:00Z | 25,461 MW |
| 2026-10-30T22:00Z | 25,511 MW |
| 2026-10-30T23:00Z | 25,411 MW |
| 2026-10-31T00:00Z | 24,610 MW |
| 2026-10-31T01:00Z | 23,826 MW |
| 2026-10-31T02:00Z | 22,738 MW |
| 2026-10-31T03:00Z | 21,560 MW |
| 2026-10-31T04:00Z | 20,691 MW |
| 2026-10-31T05:00Z | 19,861 MW |
| 2026-10-31T06:00Z | 19,152 MW |
| 2026-10-31T07:00Z | 18,805 MW |
| 2026-10-31T08:00Z | 18,735 MW |
| 2026-10-31T09:00Z | 18,840 MW |
| 2026-10-31T10:00Z | 19,236 MW |
| 2026-10-31T11:00Z | 20,060 MW |
| 2026-10-31T12:00Z | 20,473 MW |
| 2026-10-31T13:00Z | 20,779 MW |
| 2026-10-31T14:00Z | 20,929 MW |
| 2026-10-31T15:00Z | 21,110 MW |
| 2026-10-31T16:00Z | 21,396 MW |
| 2026-10-31T17:00Z | 21,842 MW |
| 2026-10-31T18:00Z | 22,172 MW |
| 2026-10-31T19:00Z | 22,748 MW |
| 2026-10-31T20:00Z | 23,142 MW |
| 2026-10-31T21:00Z | 23,237 MW |
| 2026-10-31T22:00Z | 23,036 MW |
| 2026-10-31T23:00Z | 22,974 MW |
| 2026-11-01T00:00Z | 22,644 MW |
| 2026-11-01T01:00Z | 22,377 MW |
| 2026-11-01T02:00Z | 21,678 MW |
| 2026-11-01T03:00Z | 20,874 MW |
| 2026-11-01T04:00Z | 19,681 MW |
| 2026-11-01T05:00Z | 18,092 MW |
| 2026-11-01T06:00Z | 18,475 MW |
| 2026-11-01T07:00Z | 18,109 MW |
| 2026-11-01T08:00Z | 18,022 MW |
| 2026-11-01T09:00Z | 18,207 MW |
| 2026-11-01T10:00Z | 18,699 MW |
| 2026-11-01T11:00Z | 19,474 MW |
| 2026-11-01T12:00Z | 20,469 MW |
| 2026-11-01T13:00Z | 21,148 MW |
| 2026-11-01T14:00Z | 21,374 MW |
| 2026-11-01T15:00Z | 21,431 MW |
| 2026-11-01T16:00Z | 21,775 MW |
| 2026-11-01T17:00Z | 21,980 MW |
| 2026-11-01T18:00Z | 22,229 MW |
| 2026-11-01T19:00Z | 22,443 MW |
| 2026-11-01T20:00Z | 22,738 MW |
| 2026-11-01T21:00Z | 23,330 MW |
| 2026-11-01T22:00Z | 24,406 MW |
| 2026-11-01T23:00Z | 24,042 MW |
| 2026-11-02T00:00Z | 23,615 MW |
| 2026-11-02T01:00Z | 22,657 MW |
| 2026-11-02T02:00Z | 21,470 MW |
| 2026-11-02T03:00Z | 20,323 MW |
| 2026-11-02T04:00Z | 19,430 MW |
| 2026-11-02T05:00Z | 18,823 MW |
| 2026-11-02T06:00Z | 18,893 MW |
| 2026-11-02T07:00Z | 18,491 MW |
| 2026-11-02T08:00Z | 18,471 MW |
| 2026-11-02T09:00Z | 18,873 MW |
| 2026-11-02T10:00Z | 19,818 MW |
| 2026-11-02T11:00Z | 21,683 MW |
| 2026-11-02T12:00Z | 22,558 MW |
| 2026-11-02T13:00Z | 22,282 MW |
| 2026-11-02T14:00Z | 21,935 MW |
| 2026-11-02T15:00Z | 22,239 MW |
| 2026-11-02T16:00Z | 22,512 MW |
| 2026-11-02T17:00Z | 23,225 MW |
| 2026-11-02T18:00Z | 23,867 MW |
| 2026-11-02T19:00Z | 24,203 MW |
| 2026-11-02T20:00Z | 24,560 MW |
| 2026-11-02T21:00Z | 25,230 MW |
| 2026-11-02T22:00Z | 25,763 MW |
| 2026-11-02T23:00Z | 26,483 MW |
| 2026-11-03T00:00Z | 26,106 MW |
| 2026-11-03T01:00Z | 25,331 MW |
| 2026-11-03T02:00Z | 24,304 MW |
| 2026-11-03T03:00Z | 23,037 MW |
| 2026-11-03T04:00Z | 21,601 MW |
| 2026-11-03T05:00Z | 20,550 MW |
| 2026-11-03T06:00Z | 19,800 MW |
| 2026-11-03T07:00Z | 19,372 MW |
| 2026-11-03T08:00Z | 19,224 MW |
| 2026-11-03T09:00Z | 19,439 MW |
| 2026-11-03T10:00Z | 20,248 MW |
| 2026-11-03T11:00Z | 21,819 MW |
| 2026-11-03T12:00Z | 22,793 MW |
| 2026-11-03T13:00Z | 23,242 MW |
| 2026-11-03T14:00Z | 23,439 MW |
| 2026-11-03T15:00Z | 23,548 MW |
| 2026-11-03T16:00Z | 23,601 MW |
| 2026-11-03T17:00Z | 23,981 MW |
| 2026-11-03T18:00Z | 24,573 MW |
| 2026-11-03T19:00Z | 24,812 MW |
| 2026-11-03T20:00Z | 25,040 MW |
| 2026-11-03T21:00Z | 25,561 MW |
| 2026-11-03T22:00Z | 26,071 MW |
| 2026-11-03T23:00Z | 26,924 MW |
| 2026-11-04T00:00Z | 26,752 MW |
| 2026-11-04T01:00Z | 26,203 MW |
| 2026-11-04T02:00Z | 25,213 MW |
| 2026-11-04T03:00Z | 24,024 MW |
| 2026-11-04T04:00Z | 22,670 MW |
| 2026-11-04T05:00Z | 21,562 MW |
| 2026-11-04T06:00Z | 20,773 MW |
| 2026-11-04T07:00Z | 20,313 MW |
| 2026-11-04T08:00Z | 20,025 MW |
| 2026-11-04T09:00Z | 20,205 MW |
| 2026-11-04T10:00Z | 20,913 MW |
| 2026-11-04T11:00Z | 22,552 MW |
| 2026-11-04T12:00Z | 23,746 MW |
| 2026-11-04T13:00Z | 24,260 MW |
| 2026-11-04T14:00Z | 24,730 MW |
| 2026-11-04T15:00Z | 25,254 MW |
| 2026-11-04T16:00Z | 25,604 MW |
| 2026-11-04T17:00Z | 25,971 MW |
| 2026-11-04T18:00Z | 26,204 MW |
| 2026-11-04T19:00Z | 26,245 MW |
| 2026-11-04T20:00Z | 26,444 MW |
| 2026-11-04T21:00Z | 26,588 MW |
| 2026-11-04T22:00Z | 27,256 MW |
| 2026-11-04T23:00Z | 27,864 MW |
| 2026-11-05T00:00Z | 27,439 MW |
| 2026-11-05T01:00Z | 26,854 MW |
| 2026-11-05T02:00Z | 25,918 MW |
| 2026-11-05T03:00Z | 24,495 MW |
| 2026-11-05T04:00Z | 23,184 MW |
| 2026-11-05T05:00Z | 22,058 MW |
| 2026-11-05T06:00Z | 21,251 MW |
| 2026-11-05T07:00Z | 20,648 MW |
| 2026-11-05T08:00Z | 20,139 MW |
| 2026-11-05T09:00Z | 20,013 MW |
| 2026-11-05T10:00Z | 21,141 MW |
| 2026-11-05T11:00Z | 22,705 MW |
| 2026-11-05T12:00Z | 23,687 MW |
| 2026-11-05T13:00Z | 24,136 MW |
| 2026-11-05T14:00Z | 24,238 MW |
| 2026-11-05T15:00Z | 24,350 MW |
| 2026-11-05T16:00Z | 25,285 MW |
| 2026-11-05T17:00Z | 26,089 MW |
| 2026-11-05T18:00Z | 26,867 MW |
| 2026-11-05T19:00Z | 27,353 MW |
| 2026-11-05T20:00Z | 27,823 MW |
| 2026-11-05T21:00Z | 28,306 MW |
| 2026-11-05T22:00Z | 28,391 MW |
| 2026-11-05T23:00Z | 28,302 MW |
| 2026-11-06T00:00Z | 27,509 MW |
| 2026-11-06T01:00Z | 26,837 MW |
| 2026-11-06T02:00Z | 25,705 MW |
| 2026-11-06T03:00Z | 24,329 MW |
| 2026-11-06T04:00Z | 22,708 MW |
| 2026-11-06T05:00Z | 20,930 MW |
| 2026-11-06T06:00Z | 20,589 MW |
| 2026-11-06T07:00Z | 19,994 MW |
| 2026-11-06T08:00Z | 19,638 MW |
| 2026-11-06T09:00Z | 19,661 MW |
| 2026-11-06T10:00Z | 20,324 MW |
| 2026-11-06T11:00Z | 21,817 MW |
| 2026-11-06T12:00Z | 22,674 MW |
| 2026-11-06T13:00Z | 22,894 MW |
| 2026-11-06T14:00Z | 22,844 MW |
| 2026-11-06T15:00Z | 23,108 MW |
| 2026-11-06T16:00Z | 23,639 MW |
| 2026-11-06T17:00Z | 24,171 MW |
| 2026-11-06T18:00Z | 24,710 MW |
| 2026-11-06T19:00Z | 24,740 MW |
| 2026-11-06T20:00Z | 24,795 MW |
| 2026-11-06T21:00Z | 25,373 MW |
| 2026-11-06T22:00Z | 25,665 MW |
| 2026-11-06T23:00Z | 25,589 MW |
| 2026-11-07T00:00Z | 24,814 MW |
| 2026-11-07T01:00Z | 23,935 MW |
| 2026-11-07T02:00Z | 23,105 MW |
| 2026-11-07T03:00Z | 22,086 MW |
| 2026-11-07T04:00Z | 21,147 MW |
| 2026-11-07T05:00Z | 20,190 MW |
| 2026-11-07T06:00Z | 19,267 MW |
| 2026-11-07T07:00Z | 18,850 MW |
| 2026-11-07T08:00Z | 18,460 MW |
| 2026-11-07T09:00Z | 18,472 MW |
| 2026-11-07T10:00Z | 18,951 MW |
| 2026-11-07T11:00Z | 19,589 MW |
| 2026-11-07T12:00Z | 20,001 MW |
| 2026-11-07T13:00Z | 19,527 MW |
| 2026-11-07T14:00Z | 9,441 MW |
| 2026-11-07T15:00Z | 19,738 MW |
| 2026-11-07T16:00Z | 20,010 MW |
| 2026-11-07T17:00Z | 19,941 MW |
| 2026-11-07T18:00Z | 20,020 MW |
| 2026-11-07T19:00Z | 20,395 MW |
| 2026-11-07T20:00Z | 20,775 MW |
| 2026-11-07T21:00Z | 21,914 MW |
| 2026-11-07T22:00Z | 22,940 MW |
| 2026-11-07T23:00Z | 23,438 MW |
| 2026-11-08T00:00Z | 23,133 MW |
| 2026-11-08T01:00Z | 22,556 MW |
| 2026-11-08T02:00Z | 22,108 MW |
| 2026-11-08T03:00Z | 21,362 MW |
| 2026-11-08T04:00Z | 20,679 MW |
| 2026-11-08T05:00Z | 19,965 MW |
| 2026-11-08T06:00Z | 19,405 MW |
| 2026-11-08T07:00Z | 19,021 MW |
| 2026-11-08T08:00Z | 18,895 MW |
| 2026-11-08T09:00Z | 19,088 MW |
| 2026-11-08T10:00Z | 19,341 MW |
| 2026-11-08T11:00Z | 19,992 MW |
| 2026-11-08T12:00Z | 20,365 MW |
| 2026-11-08T13:00Z | 20,130 MW |
| 2026-11-08T14:00Z | 19,864 MW |
| 2026-11-08T15:00Z | 15,588 MW |
| 2026-11-08T16:00Z | 19,677 MW |
| 2026-11-08T17:00Z | 19,687 MW |
| 2026-11-08T18:00Z | 19,955 MW |
| 2026-11-08T19:00Z | 19,966 MW |
| 2026-11-08T20:00Z | 20,378 MW |
| 2026-11-08T21:00Z | 22,006 MW |
| 2026-11-08T22:00Z | 23,353 MW |
| 2026-11-08T23:00Z | 24,358 MW |
| 2026-11-09T00:00Z | 24,242 MW |
| 2026-11-09T01:00Z | 23,728 MW |
| 2026-11-09T02:00Z | 22,927 MW |
| 2026-11-09T03:00Z | 21,869 MW |
| 2026-11-09T04:00Z | 20,883 MW |
| 2026-11-09T05:00Z | 20,258 MW |
| 2026-11-09T06:00Z | 19,709 MW |
| 2026-11-09T07:00Z | 19,590 MW |
| 2026-11-09T08:00Z | 19,704 MW |
| 2026-11-09T09:00Z | 20,225 MW |
| 2026-11-09T10:00Z | 21,574 MW |
| 2026-11-09T11:00Z | 23,799 MW |
| 2026-11-09T12:00Z | 24,977 MW |
| 2026-11-09T13:00Z | 23,611 MW |
| 2026-11-09T14:00Z | 22,609 MW |
| 2026-11-09T15:00Z | 22,367 MW |
| 2026-11-09T16:00Z | 22,089 MW |
| 2026-11-09T17:00Z | 21,951 MW |
| 2026-11-09T18:00Z | 21,978 MW |
| 2026-11-09T19:00Z | 21,964 MW |
| 2026-11-09T20:00Z | 22,222 MW |
| 2026-11-09T21:00Z | 23,529 MW |
| 2026-11-09T22:00Z | 24,807 MW |
| 2026-11-09T23:00Z | 25,667 MW |
| 2026-11-10T00:00Z | 25,449 MW |
| 2026-11-10T01:00Z | 24,908 MW |
| 2026-11-10T02:00Z | 24,076 MW |
| 2026-11-10T03:00Z | 22,995 MW |
| 2026-11-10T04:00Z | 21,875 MW |
| 2026-11-10T05:00Z | 20,922 MW |
| 2026-11-10T06:00Z | 20,489 MW |
| 2026-11-10T07:00Z | 20,312 MW |
| 2026-11-10T08:00Z | 20,404 MW |
| 2026-11-10T09:00Z | 20,817 MW |
| 2026-11-10T10:00Z | 21,983 MW |
| 2026-11-10T11:00Z | 24,167 MW |
| 2026-11-10T12:00Z | 25,136 MW |
| 2026-11-10T13:00Z | 23,803 MW |
| 2026-11-10T14:00Z | 22,799 MW |
| 2026-11-10T15:00Z | 22,229 MW |
| 2026-11-10T16:00Z | 22,018 MW |
| 2026-11-10T17:00Z | 22,051 MW |
| 2026-11-10T18:00Z | 22,283 MW |
| 2026-11-10T19:00Z | 22,388 MW |
| 2026-11-10T20:00Z | 22,665 MW |
| 2026-11-10T21:00Z | 23,806 MW |
| 2026-11-10T22:00Z | 24,969 MW |
| 2026-11-10T23:00Z | 25,645 MW |
| 2026-11-11T00:00Z | 25,308 MW |
| 2026-11-11T01:00Z | 24,820 MW |
| 2026-11-11T02:00Z | 24,046 MW |
| 2026-11-11T03:00Z | 22,803 MW |
| 2026-11-11T04:00Z | 21,726 MW |
| 2026-11-11T05:00Z | 20,646 MW |
| 2026-11-11T06:00Z | 20,266 MW |
| 2026-11-11T07:00Z | 20,007 MW |
| 2026-11-11T08:00Z | 19,950 MW |
| 2026-11-11T09:00Z | 20,365 MW |
| 2026-11-11T10:00Z | 21,354 MW |
| 2026-11-11T11:00Z | 23,076 MW |
| 2026-11-11T12:00Z | 23,982 MW |
| 2026-11-11T13:00Z | 23,327 MW |
| 2026-11-11T14:00Z | 22,850 MW |
| 2026-11-11T15:00Z | 22,686 MW |
| 2026-11-11T16:00Z | 22,414 MW |
| 2026-11-11T17:00Z | 22,981 MW |
| 2026-11-11T18:00Z | 23,419 MW |
| 2026-11-11T19:00Z | 23,757 MW |
| 2026-11-11T20:00Z | 23,866 MW |
| 2026-11-11T21:00Z | 24,015 MW |
| 2026-11-11T22:00Z | 24,792 MW |
| 2026-11-11T23:00Z | 25,461 MW |
| 2026-11-12T00:00Z | 25,298 MW |
| 2026-11-12T01:00Z | 24,822 MW |
| 2026-11-12T02:00Z | 24,171 MW |
| 2026-11-12T03:00Z | 22,813 MW |
| 2026-11-12T04:00Z | 21,644 MW |
| 2026-11-12T05:00Z | 20,699 MW |
| 2026-11-12T06:00Z | 20,505 MW |
| 2026-11-12T07:00Z | 20,088 MW |
| 2026-11-12T08:00Z | 19,913 MW |
| 2026-11-12T09:00Z | 20,164 MW |
| 2026-11-12T10:00Z | 21,169 MW |
| 2026-11-12T11:00Z | 22,998 MW |
| 2026-11-12T12:00Z | 23,945 MW |
| 2026-11-12T13:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Gas | Nuclear | Coal | Solar | Hydro |
|---|---|---|---|---|---|
| 2026-10-13T14:00Z | 12,944 MW | 6,052 MW | 5,173 MW | 2,277 MW | 67 MW |
| 2026-10-13T15:00Z | 13,526 MW | 6,036 MW | 5,576 MW | 2,410 MW | 92 MW |
| 2026-10-13T16:00Z | 14,214 MW | 6,023 MW | 6,242 MW | 2,600 MW | 236 MW |
| 2026-10-13T17:00Z | 15,050 MW | 6,024 MW | 7,241 MW | 2,619 MW | 369 MW |
| 2026-10-13T18:00Z | 16,310 MW | 6,016 MW | 7,642 MW | 2,632 MW | 436 MW |
| 2026-10-13T19:00Z | 17,649 MW | 6,026 MW | 8,111 MW | 2,621 MW | 462 MW |
| 2026-10-13T20:00Z | 18,341 MW | 6,029 MW | 8,439 MW | 2,526 MW | 559 MW |
| 2026-10-13T21:00Z | 18,867 MW | 6,033 MW | 8,440 MW | 1,965 MW | 632 MW |
| 2026-10-13T22:00Z | 19,577 MW | 6,035 MW | 8,492 MW | 601 MW | 760 MW |
| 2026-10-13T23:00Z | 19,602 MW | 6,039 MW | 8,629 MW | 2 MW | 897 MW |
| 2026-10-14T00:00Z | 18,967 MW | 6,032 MW | 8,210 MW | 0 MW | 721 MW |
| 2026-10-14T01:00Z | 17,411 MW | 6,044 MW | 8,053 MW | 0 MW | 626 MW |
| 2026-10-14T02:00Z | 15,764 MW | 6,054 MW | 7,555 MW | -1 MW | 436 MW |
| 2026-10-14T03:00Z | 13,891 MW | 6,055 MW | 6,431 MW | -1 MW | 387 MW |
| 2026-10-14T04:00Z | 12,875 MW | 6,061 MW | 5,996 MW | 0 MW | 354 MW |
| 2026-10-14T05:00Z | 12,830 MW | 6,062 MW | 5,620 MW | 0 MW | 162 MW |
| 2026-10-14T06:00Z | 12,302 MW | 6,074 MW | 5,537 MW | -1 MW | 144 MW |
| 2026-10-14T07:00Z | 12,143 MW | 6,072 MW | 5,258 MW | -3 MW | 156 MW |
| 2026-10-14T08:00Z | 12,080 MW | 6,072 MW | 5,253 MW | -1 MW | 148 MW |
| 2026-10-14T09:00Z | 12,071 MW | 6,074 MW | 5,368 MW | 0 MW | 145 MW |
| 2026-10-14T10:00Z | 12,571 MW | 6,082 MW | 5,962 MW | 0 MW | 150 MW |
| 2026-10-14T11:00Z | 13,347 MW | 6,075 MW | 7,147 MW | 12 MW | 184 MW |
| 2026-10-14T12:00Z | 13,687 MW | 6,078 MW | 6,428 MW | 685 MW | 90 MW |
| 2026-10-14T13:00Z | 13,284 MW | 6,064 MW | 5,557 MW | 1,872 MW | 108 MW |
| 2026-10-14T14:00Z | 13,139 MW | 6,049 MW | 5,719 MW | 2,227 MW | 108 MW |
| 2026-10-14T15:00Z | 13,890 MW | 6,027 MW | 6,690 MW | 2,308 MW | 125 MW |
| 2026-10-14T16:00Z | 14,448 MW | 6,096 MW | 7,170 MW | 2,135 MW | 70 MW |
| 2026-10-14T17:00Z | 15,830 MW | 6,133 MW | 7,815 MW | 2,435 MW | 164 MW |
| 2026-10-14T18:00Z | 16,536 MW | 6,168 MW | 8,208 MW | 2,482 MW | 203 MW |
| 2026-10-14T19:00Z | 17,222 MW | 6,237 MW | 8,189 MW | 2,481 MW | 313 MW |
| 2026-10-14T20:00Z | 17,933 MW | 6,238 MW | 8,188 MW | 2,526 MW | 647 MW |
| 2026-10-14T21:00Z | 19,433 MW | 6,260 MW | 8,317 MW | 1,814 MW | 759 MW |
| 2026-10-14T22:00Z | 20,177 MW | 6,283 MW | 8,372 MW | 566 MW | 794 MW |
| 2026-10-14T23:00Z | 19,552 MW | 6,315 MW | 8,162 MW | 4 MW | 767 MW |
| 2026-10-15T00:00Z | 18,701 MW | 6,324 MW | 7,707 MW | 0 MW | 744 MW |
| 2026-10-15T01:00Z | 18,381 MW | 6,393 MW | 7,584 MW | 1 MW | 570 MW |
| 2026-10-15T02:00Z | 16,032 MW | 6,446 MW | 7,539 MW | 0 MW | 311 MW |
| 2026-10-15T03:00Z | 14,668 MW | 6,466 MW | 6,487 MW | 0 MW | 312 MW |
| 2026-10-15T04:00Z | 12,590 MW | 6,477 MW | 6,079 MW | 0 MW | 302 MW |
| 2026-10-15T05:00Z | 11,920 MW | 6,476 MW | 5,864 MW | -2 MW | 100 MW |
| 2026-10-15T06:00Z | 11,649 MW | 6,532 MW | 5,571 MW | -1 MW | 83 MW |
| 2026-10-15T07:00Z | 12,049 MW | 6,567 MW | 5,609 MW | 0 MW | 78 MW |
| 2026-10-15T08:00Z | 11,053 MW | 6,601 MW | 5,506 MW | 0 MW | 101 MW |
| 2026-10-15T09:00Z | 12,340 MW | 6,656 MW | 5,575 MW | -1 MW | 79 MW |
| 2026-10-15T10:00Z | 11,592 MW | 6,647 MW | 6,897 MW | -2 MW | 52 MW |
| 2026-10-15T11:00Z | 12,650 MW | 6,642 MW | 8,046 MW | 11 MW | 128 MW |
| 2026-10-15T12:00Z | 12,862 MW | 6,633 MW | 7,353 MW | 644 MW | 68 MW |
| 2026-10-15T13:00Z | 11,726 MW | 6,616 MW | 5,906 MW | 1,851 MW | 71 MW |
| 2026-10-15T14:00Z | 12,445 MW | 6,590 MW | 6,423 MW | 2,298 MW | 70 MW |
| 2026-10-15T15:00Z | 12,748 MW | 6,572 MW | 7,568 MW | 2,512 MW | 88 MW |
| 2026-10-15T16:00Z | 14,044 MW | 6,562 MW | 8,178 MW | 2,581 MW | 96 MW |
| 2026-10-15T17:00Z | 16,018 MW | 6,547 MW | 8,189 MW | 2,495 MW | 92 MW |
| 2026-10-15T18:00Z | 16,579 MW | 6,550 MW | 8,400 MW | 2,474 MW | 70 MW |
| 2026-10-15T19:00Z | 17,804 MW | 6,538 MW | 8,363 MW | 2,432 MW | 297 MW |
| 2026-10-15T20:00Z | 18,535 MW | 6,544 MW | 7,668 MW | 2,344 MW | 557 MW |
| 2026-10-15T21:00Z | 19,215 MW | 6,526 MW | 7,603 MW | 1,753 MW | 574 MW |
| 2026-10-15T22:00Z | 19,065 MW | 6,535 MW | 7,725 MW | 419 MW | 719 MW |
| 2026-10-15T23:00Z | 18,973 MW | 6,527 MW | 7,470 MW | 3 MW | 836 MW |
| 2026-10-16T00:00Z | 17,913 MW | 6,608 MW | 7,538 MW | -3 MW | 744 MW |
| 2026-10-16T01:00Z | 16,501 MW | 6,630 MW | 7,792 MW | -1 MW | 569 MW |
| 2026-10-16T02:00Z | 14,879 MW | 6,675 MW | 8,194 MW | 1 MW | 177 MW |
| 2026-10-16T03:00Z | 12,429 MW | 6,759 MW | 7,816 MW | -1 MW | 123 MW |
| 2026-10-16T04:00Z | 11,424 MW | 6,795 MW | 7,064 MW | 0 MW | 119 MW |
| 2026-10-16T05:00Z | 11,314 MW | 6,852 MW | 6,010 MW | -2 MW | 192 MW |
| 2026-10-16T06:00Z | 11,257 MW | 6,879 MW | 5,459 MW | 1 MW | 182 MW |
| 2026-10-16T07:00Z | 11,141 MW | 6,897 MW | 5,111 MW | 0 MW | 194 MW |
| 2026-10-16T08:00Z | 11,006 MW | 6,909 MW | 5,101 MW | -1 MW | 195 MW |
| 2026-10-16T09:00Z | 11,108 MW | 6,921 MW | 5,402 MW | 0 MW | 65 MW |
| 2026-10-16T10:00Z | 10,743 MW | 6,927 MW | 5,812 MW | -1 MW | 37 MW |
| 2026-10-16T11:00Z | 11,683 MW | 6,929 MW | 7,352 MW | 10 MW | 107 MW |
| 2026-10-16T12:00Z | 12,600 MW | 6,915 MW | 6,319 MW | 575 MW | 72 MW |
| 2026-10-16T13:00Z | 11,316 MW | 6,904 MW | 5,609 MW | 1,705 MW | 97 MW |
| 2026-10-16T14:00Z | 11,681 MW | 6,882 MW | 6,191 MW | 2,324 MW | 73 MW |
| 2026-10-16T15:00Z | 11,683 MW | 6,874 MW | 7,153 MW | 2,364 MW | 64 MW |
| 2026-10-16T16:00Z | 12,490 MW | 6,858 MW | 7,825 MW | 2,338 MW | 69 MW |
| 2026-10-16T17:00Z | 13,547 MW | 6,847 MW | 8,326 MW | 2,249 MW | 137 MW |
| 2026-10-16T18:00Z | 14,260 MW | 6,842 MW | 8,377 MW | 2,152 MW | 212 MW |
| 2026-10-16T19:00Z | 14,572 MW | 6,828 MW | 8,273 MW | 2,120 MW | 283 MW |
| 2026-10-16T20:00Z | 15,394 MW | 6,827 MW | 8,510 MW | 1,685 MW | 375 MW |
| 2026-10-16T21:00Z | 16,014 MW | 6,813 MW | 8,467 MW | 1,230 MW | 343 MW |
| 2026-10-16T22:00Z | 16,689 MW | 6,812 MW | 8,496 MW | 259 MW | 464 MW |
| 2026-10-16T23:00Z | 15,863 MW | 6,815 MW | 8,448 MW | -1 MW | 580 MW |
| 2026-10-17T00:00Z | 14,943 MW | 6,821 MW | 8,009 MW | -4 MW | 614 MW |
| 2026-10-17T01:00Z | 13,780 MW | 6,735 MW | 7,724 MW | 0 MW | 403 MW |
| 2026-10-17T02:00Z | 13,072 MW | 6,744 MW | 7,131 MW | -1 MW | 227 MW |
| 2026-10-17T03:00Z | 11,092 MW | 6,757 MW | 6,407 MW | -1 MW | 171 MW |
| 2026-10-17T04:00Z | 9,743 MW | 6,764 MW | 6,512 MW | 0 MW | 129 MW |
| 2026-10-17T05:00Z | 8,490 MW | 6,825 MW | 6,544 MW | -2 MW | 140 MW |
| 2026-10-17T06:00Z | 8,069 MW | 6,876 MW | 6,053 MW | 0 MW | 149 MW |
| 2026-10-17T07:00Z | 8,045 MW | 6,898 MW | 5,591 MW | -1 MW | 144 MW |
| 2026-10-17T08:00Z | 8,080 MW | 6,940 MW | 5,382 MW | 0 MW | 128 MW |
| 2026-10-17T09:00Z | 7,987 MW | 6,958 MW | 5,677 MW | -1 MW | 148 MW |
| 2026-10-17T10:00Z | 7,911 MW | 6,976 MW | 6,234 MW | -2 MW | 109 MW |
| 2026-10-17T11:00Z | 7,945 MW | 6,984 MW | 6,710 MW | 3 MW | 134 MW |
| 2026-10-17T12:00Z | 8,093 MW | 6,993 MW | 6,256 MW | 514 MW | 70 MW |
| 2026-10-17T13:00Z | 6,554 MW | 6,985 MW | 4,952 MW | 1,827 MW | 65 MW |
| 2026-10-17T14:00Z | 6,437 MW | 6,986 MW | 4,096 MW | 2,507 MW | 86 MW |
| 2026-10-17T15:00Z | 6,942 MW | 6,980 MW | 3,692 MW | 2,511 MW | 79 MW |
| 2026-10-17T16:00Z | 6,938 MW | 6,980 MW | 3,651 MW | 2,591 MW | 184 MW |
| 2026-10-17T17:00Z | 7,179 MW | 6,964 MW | 3,642 MW | 2,587 MW | 207 MW |
| 2026-10-17T18:00Z | 7,581 MW | 6,971 MW | 3,494 MW | 2,613 MW | 204 MW |
| 2026-10-17T19:00Z | 7,172 MW | 6,945 MW | 3,578 MW | 2,712 MW | 209 MW |
| 2026-10-17T20:00Z | 7,382 MW | 6,961 MW | 3,579 MW | 2,641 MW | 315 MW |
| 2026-10-17T21:00Z | 8,051 MW | 6,960 MW | 4,428 MW | 2,002 MW | 375 MW |
| 2026-10-17T22:00Z | 8,883 MW | 6,978 MW | 5,790 MW | 647 MW | 399 MW |
| 2026-10-17T23:00Z | 9,071 MW | 6,977 MW | 6,489 MW | 175 MW | 419 MW |
| 2026-10-18T00:00Z | 9,053 MW | 6,978 MW | 6,134 MW | 135 MW | 420 MW |
| 2026-10-18T01:00Z | 8,991 MW | 6,912 MW | 5,613 MW | 2 MW | 361 MW |
| 2026-10-18T02:00Z | 8,659 MW | 6,899 MW | 5,276 MW | 1 MW | 238 MW |
| 2026-10-18T03:00Z | 8,055 MW | 6,916 MW | 5,119 MW | 1 MW | 237 MW |
| 2026-10-18T04:00Z | 7,662 MW | 6,924 MW | 4,956 MW | 0 MW | 233 MW |
| 2026-10-18T05:00Z | 7,989 MW | 6,942 MW | 4,906 MW | 0 MW | 210 MW |
| 2026-10-18T06:00Z | 7,813 MW | 6,901 MW | 4,740 MW | -1 MW | 208 MW |
| 2026-10-18T07:00Z | 7,896 MW | 6,794 MW | 4,461 MW | 1 MW | 208 MW |
| 2026-10-18T08:00Z | 7,967 MW | 6,698 MW | 4,208 MW | 0 MW | 224 MW |
| 2026-10-18T09:00Z | 8,094 MW | 6,583 MW | 4,744 MW | -2 MW | 262 MW |
| 2026-10-18T10:00Z | 8,088 MW | 6,480 MW | 5,321 MW | -2 MW | 111 MW |
| 2026-10-18T11:00Z | 8,285 MW | 6,366 MW | 5,405 MW | 95 MW | 70 MW |
| 2026-10-18T12:00Z | 8,267 MW | 6,279 MW | 4,974 MW | 803 MW | 133 MW |
| 2026-10-18T13:00Z | 7,739 MW | 6,141 MW | 3,724 MW | 2,198 MW | 113 MW |
| 2026-10-18T14:00Z | 7,441 MW | 6,143 MW | 3,449 MW | 2,608 MW | 114 MW |
| 2026-10-18T15:00Z | 7,080 MW | 6,137 MW | 3,455 MW | 2,651 MW | 91 MW |
| 2026-10-18T16:00Z | 6,979 MW | 6,133 MW | 3,453 MW | 2,630 MW | 122 MW |
| 2026-10-18T17:00Z | 7,078 MW | 6,113 MW | 3,447 MW | 2,726 MW | 102 MW |
| 2026-10-18T18:00Z | 7,232 MW | 6,114 MW | 3,427 MW | 2,784 MW | 88 MW |
| 2026-10-18T19:00Z | 7,503 MW | 6,106 MW | 3,440 MW | 2,739 MW | 186 MW |
| 2026-10-18T20:00Z | 7,997 MW | 6,115 MW | 3,597 MW | 2,530 MW | 292 MW |
| 2026-10-18T21:00Z | 8,917 MW | 6,114 MW | 4,867 MW | 1,972 MW | 311 MW |
| 2026-10-18T22:00Z | 10,697 MW | 6,121 MW | 6,161 MW | 685 MW | 384 MW |
| 2026-10-18T23:00Z | 11,233 MW | 6,126 MW | 6,908 MW | 173 MW | 439 MW |
| 2026-10-19T00:00Z | 10,992 MW | 6,128 MW | 6,436 MW | 92 MW | 457 MW |
| 2026-10-19T01:00Z | 10,846 MW | 6,139 MW | 6,119 MW | 1 MW | 395 MW |
| 2026-10-19T02:00Z | 10,279 MW | 6,154 MW | 5,517 MW | 1 MW | 82 MW |
| 2026-10-19T03:00Z | 9,485 MW | 6,149 MW | 5,133 MW | 1 MW | 69 MW |
| 2026-10-19T04:00Z | 9,175 MW | 6,164 MW | 5,069 MW | -3 MW | 51 MW |
| 2026-10-19T05:00Z | 9,010 MW | 6,165 MW | 5,136 MW | -1 MW | 83 MW |
| 2026-10-19T06:00Z | 9,009 MW | 6,166 MW | 5,163 MW | 0 MW | 57 MW |
| 2026-10-19T07:00Z | 9,124 MW | 6,162 MW | 5,177 MW | 0 MW | 56 MW |
| 2026-10-19T08:00Z | 9,441 MW | 6,164 MW | 5,388 MW | -1 MW | 60 MW |
| 2026-10-19T09:00Z | 10,112 MW | 6,162 MW | 5,304 MW | 1 MW | 87 MW |
| 2026-10-19T10:00Z | 10,880 MW | 6,169 MW | 6,077 MW | 58 MW | 93 MW |
| 2026-10-19T11:00Z | 11,376 MW | 6,174 MW | 6,906 MW | 60 MW | 203 MW |
| 2026-10-19T12:00Z | 11,272 MW | 6,171 MW | 6,319 MW | 733 MW | 135 MW |
| 2026-10-19T13:00Z | 10,326 MW | 6,166 MW | 5,041 MW | 2,004 MW | 145 MW |
| 2026-10-19T14:00Z | 9,546 MW | 6,163 MW | 4,942 MW | 2,531 MW | 101 MW |
| 2026-10-19T15:00Z | 9,398 MW | 6,165 MW | 4,931 MW | 2,534 MW | 95 MW |
| 2026-10-19T16:00Z | 9,358 MW | 6,147 MW | 4,743 MW | 2,499 MW | 115 MW |
| 2026-10-19T17:00Z | 9,276 MW | 6,150 MW | 4,941 MW | 2,477 MW | 121 MW |
| 2026-10-19T18:00Z | 9,344 MW | 6,139 MW | 5,044 MW | 2,545 MW | 71 MW |
| 2026-10-19T19:00Z | 9,517 MW | 6,142 MW | 4,841 MW | 2,689 MW | 175 MW |
| 2026-10-19T20:00Z | 9,728 MW | 6,146 MW | 5,108 MW | 2,445 MW | 266 MW |
| 2026-10-19T21:00Z | 10,592 MW | 6,147 MW | 5,595 MW | 1,880 MW | 377 MW |
| 2026-10-19T22:00Z | 11,690 MW | 6,149 MW | 6,876 MW | 570 MW | 609 MW |
| 2026-10-19T23:00Z | 12,429 MW | 6,147 MW | 7,310 MW | 168 MW | 712 MW |
| 2026-10-20T00:00Z | 12,079 MW | 6,138 MW | 7,008 MW | 55 MW | 745 MW |
| 2026-10-20T01:00Z | 11,646 MW | 6,131 MW | 6,581 MW | 49 MW | 538 MW |
| 2026-10-20T02:00Z | 11,291 MW | 6,135 MW | 6,552 MW | 21 MW | 234 MW |
| 2026-10-20T03:00Z | 10,755 MW | 6,139 MW | 5,567 MW | 1 MW | 161 MW |
| 2026-10-20T04:00Z | 10,356 MW | 6,137 MW | 5,287 MW | 0 MW | 167 MW |
| 2026-10-20T05:00Z | 10,047 MW | 6,142 MW | 5,259 MW | 1 MW | 61 MW |
| 2026-10-20T06:00Z | 9,974 MW | 6,149 MW | 5,053 MW | -1 MW | 40 MW |
| 2026-10-20T07:00Z | 10,012 MW | 6,149 MW | 5,051 MW | 1 MW | 42 MW |
| 2026-10-20T08:00Z | 10,048 MW | 6,156 MW | 5,165 MW | -1 MW | 38 MW |
| 2026-10-20T09:00Z | 10,464 MW | 6,160 MW | 5,378 MW | -1 MW | 63 MW |
| 2026-10-20T10:00Z | 11,458 MW | 6,157 MW | 5,804 MW | 1 MW | 49 MW |
| 2026-10-20T11:00Z | 11,839 MW | 6,166 MW | 6,780 MW | 26 MW | 93 MW |
| 2026-10-20T12:00Z | 11,526 MW | 6,154 MW | 5,917 MW | 718 MW | 101 MW |
| 2026-10-20T13:00Z | 10,245 MW | 6,156 MW | 4,795 MW | 2,018 MW | 87 MW |
| 2026-10-20T14:00Z | 9,917 MW | 6,147 MW | 4,426 MW | 2,404 MW | 70 MW |
| 2026-10-20T15:00Z | 9,886 MW | 6,143 MW | 3,871 MW | 2,451 MW | 83 MW |
| 2026-10-20T16:00Z | 9,767 MW | 6,141 MW | 3,853 MW | 2,452 MW | 177 MW |
| 2026-10-20T17:00Z | 9,700 MW | 6,130 MW | 3,768 MW | 2,554 MW | 204 MW |
| 2026-10-20T18:00Z | 9,702 MW | 6,119 MW | 3,906 MW | 2,546 MW | 207 MW |
| 2026-10-20T19:00Z | 9,761 MW | 6,113 MW | 4,093 MW | 2,533 MW | 181 MW |
| 2026-10-20T20:00Z | 9,749 MW | 6,118 MW | 4,126 MW | 2,425 MW | 285 MW |
| 2026-10-20T21:00Z | 10,195 MW | 6,115 MW | 4,675 MW | 1,755 MW | 423 MW |
| 2026-10-20T22:00Z | 11,258 MW | 6,115 MW | 5,376 MW | 424 MW | 627 MW |
| 2026-10-20T23:00Z | 11,679 MW | 6,115 MW | 5,885 MW | 26 MW | 777 MW |
| 2026-10-21T00:00Z | 11,383 MW | 6,115 MW | 5,612 MW | 7 MW | 752 MW |
| 2026-10-21T01:00Z | 11,032 MW | 6,122 MW | 5,146 MW | 0 MW | 640 MW |
| 2026-10-21T02:00Z | 10,539 MW | 6,126 MW | 5,032 MW | 1 MW | 367 MW |
| 2026-10-21T03:00Z | 10,439 MW | 6,124 MW | 4,981 MW | 3 MW | 208 MW |
| 2026-10-21T04:00Z | 9,850 MW | 6,105 MW | 4,848 MW | -1 MW | 146 MW |
| 2026-10-21T05:00Z | 9,620 MW | 6,007 MW | 4,839 MW | -1 MW | 63 MW |
| 2026-10-21T06:00Z | 9,444 MW | 6,007 MW | 4,806 MW | 1 MW | 63 MW |
| 2026-10-21T07:00Z | 9,258 MW | 6,045 MW | 4,887 MW | 1 MW | 37 MW |
| 2026-10-21T08:00Z | 9,757 MW | 6,072 MW | 5,188 MW | 0 MW | 41 MW |
| 2026-10-21T09:00Z | 10,065 MW | 6,075 MW | 5,342 MW | 0 MW | 39 MW |
| 2026-10-21T10:00Z | 11,399 MW | 6,088 MW | 5,450 MW | 68 MW | 49 MW |
| 2026-10-21T11:00Z | 11,768 MW | 6,088 MW | 5,703 MW | 184 MW | 106 MW |
| 2026-10-21T12:00Z | 11,379 MW | 6,108 MW | 5,532 MW | 769 MW | 125 MW |
| 2026-10-21T13:00Z | 9,708 MW | 6,109 MW | 4,848 MW | 1,980 MW | 62 MW |
| 2026-10-21T14:00Z | 9,279 MW | 6,108 MW | 4,646 MW | 2,335 MW | 98 MW |
| 2026-10-21T15:00Z | 9,212 MW | 6,100 MW | 4,851 MW | 2,392 MW | 166 MW |
| 2026-10-21T16:00Z | 9,132 MW | 6,106 MW | 4,786 MW | 2,462 MW | 84 MW |
| 2026-10-21T17:00Z | 9,173 MW | 6,103 MW | 4,921 MW | 2,540 MW | 97 MW |
| 2026-10-21T18:00Z | 9,341 MW | 6,106 MW | 5,165 MW | 2,557 MW | 95 MW |
| 2026-10-21T19:00Z | 9,482 MW | 6,119 MW | 5,264 MW | 2,534 MW | 180 MW |
| 2026-10-21T20:00Z | 9,843 MW | 6,110 MW | 5,260 MW | 2,392 MW | 294 MW |
| 2026-10-21T21:00Z | 10,915 MW | 6,114 MW | 5,475 MW | 1,803 MW | 596 MW |
| 2026-10-21T22:00Z | 12,376 MW | 6,114 MW | 6,415 MW | 541 MW | 794 MW |
| 2026-10-21T23:00Z | 12,760 MW | 6,116 MW | 6,438 MW | 157 MW | 906 MW |
| 2026-10-22T00:00Z | 12,456 MW | 6,121 MW | 6,133 MW | 21 MW | 892 MW |
| 2026-10-22T01:00Z | 11,903 MW | 6,122 MW | 5,929 MW | 73 MW | 628 MW |
| 2026-10-22T02:00Z | 11,530 MW | 6,122 MW | 5,660 MW | 16 MW | 309 MW |
| 2026-10-22T03:00Z | 10,944 MW | 6,135 MW | 5,153 MW | 1 MW | 205 MW |
| 2026-10-22T04:00Z | 10,209 MW | 6,138 MW | 5,208 MW | 1 MW | 226 MW |
| 2026-10-22T05:00Z | 10,173 MW | 6,145 MW | 5,281 MW | 2 MW | 42 MW |
| 2026-10-22T06:00Z | 10,204 MW | 6,141 MW | 5,074 MW | -1 MW | 56 MW |
| 2026-10-22T07:00Z | 10,211 MW | 6,140 MW | 5,074 MW | 0 MW | 49 MW |
| 2026-10-22T08:00Z | 10,366 MW | 6,150 MW | 5,150 MW | 1 MW | 69 MW |
| 2026-10-22T09:00Z | 11,088 MW | 6,149 MW | 5,336 MW | 0 MW | 45 MW |
| 2026-10-22T10:00Z | 12,322 MW | 6,141 MW | 5,370 MW | -3 MW | 35 MW |
| 2026-10-22T11:00Z | 12,652 MW | 6,152 MW | 6,232 MW | 76 MW | 123 MW |
| 2026-10-22T12:00Z | 12,425 MW | 6,149 MW | 5,949 MW | 662 MW | 116 MW |
| 2026-10-22T13:00Z | 10,480 MW | 6,139 MW | 5,182 MW | 1,958 MW | 68 MW |
| 2026-10-22T14:00Z | 10,098 MW | 6,136 MW | 4,742 MW | 2,377 MW | 67 MW |
| 2026-10-22T15:00Z | 10,017 MW | 6,123 MW | 5,246 MW | 2,442 MW | 70 MW |
| 2026-10-22T16:00Z | 9,788 MW | 6,114 MW | 5,264 MW | 2,370 MW | 87 MW |
| 2026-10-22T17:00Z | 9,996 MW | 6,116 MW | 5,393 MW | 2,499 MW | 91 MW |
| 2026-10-22T18:00Z | 10,034 MW | 6,097 MW | 5,386 MW | 2,548 MW | 89 MW |
| 2026-10-22T19:00Z | 10,164 MW | 5,954 MW | 5,567 MW | 2,597 MW | 185 MW |
| 2026-10-22T20:00Z | 10,193 MW | 5,972 MW | 5,436 MW | 2,472 MW | 283 MW |
| 2026-10-22T21:00Z | 11,106 MW | 6,028 MW | 5,951 MW | 1,837 MW | 522 MW |
| 2026-10-22T22:00Z | 12,025 MW | 6,044 MW | 7,043 MW | 478 MW | 799 MW |
| 2026-10-22T23:00Z | 12,473 MW | 6,050 MW | 6,907 MW | 173 MW | 813 MW |
| 2026-10-23T00:00Z | 12,208 MW | 6,065 MW | 6,968 MW | 145 MW | 772 MW |
| 2026-10-23T01:00Z | 11,729 MW | 6,074 MW | 6,796 MW | 3 MW | 686 MW |
| 2026-10-23T02:00Z | 11,441 MW | 6,080 MW | 6,219 MW | 1 MW | 287 MW |
| 2026-10-23T03:00Z | 10,742 MW | 6,090 MW | 5,742 MW | -2 MW | 187 MW |
| 2026-10-23T04:00Z | 9,962 MW | 6,117 MW | 5,439 MW | 1 MW | 168 MW |
| 2026-10-23T05:00Z | 10,298 MW | 6,121 MW | 5,601 MW | 1 MW | 63 MW |
| 2026-10-23T06:00Z | 10,050 MW | 6,124 MW | 5,389 MW | 0 MW | 73 MW |
| 2026-10-23T07:00Z | 9,783 MW | 6,134 MW | 5,359 MW | 0 MW | 53 MW |
| 2026-10-23T08:00Z | 9,749 MW | 6,142 MW | 5,423 MW | 0 MW | 41 MW |
| 2026-10-23T09:00Z | 10,123 MW | 6,142 MW | 5,461 MW | 1 MW | 36 MW |
| 2026-10-23T10:00Z | 11,175 MW | 6,149 MW | 5,738 MW | -1 MW | 77 MW |
| 2026-10-23T11:00Z | 11,474 MW | 6,147 MW | 6,596 MW | 16 MW | 223 MW |
| 2026-10-23T12:00Z | 11,272 MW | 6,146 MW | 6,287 MW | 668 MW | 83 MW |
| 2026-10-23T13:00Z | 9,790 MW | 6,142 MW | 5,275 MW | 2,009 MW | 114 MW |
| 2026-10-23T14:00Z | 9,483 MW | 6,140 MW | 4,639 MW | 2,465 MW | 91 MW |
| 2026-10-23T15:00Z | 9,397 MW | 6,136 MW | 4,546 MW | 2,519 MW | 76 MW |
| 2026-10-23T16:00Z | 9,454 MW | 6,130 MW | 4,654 MW | 2,499 MW | 74 MW |
| 2026-10-23T17:00Z | 9,451 MW | 6,132 MW | 4,676 MW | 2,566 MW | 124 MW |
| 2026-10-23T18:00Z | 9,482 MW | 6,114 MW | 4,774 MW | 2,648 MW | 123 MW |
| 2026-10-23T19:00Z | 9,563 MW | 6,125 MW | 4,984 MW | 2,654 MW | 199 MW |
| 2026-10-23T20:00Z | 9,788 MW | 6,125 MW | 5,308 MW | 2,519 MW | 250 MW |
| 2026-10-23T21:00Z | 10,368 MW | 6,120 MW | 5,647 MW | 1,830 MW | 544 MW |
| 2026-10-23T22:00Z | 11,003 MW | 6,122 MW | 6,174 MW | 521 MW | 734 MW |
| 2026-10-23T23:00Z | 11,100 MW | 6,123 MW | 6,279 MW | 172 MW | 912 MW |
| 2026-10-24T00:00Z | 11,004 MW | 6,171 MW | 6,029 MW | 151 MW | 788 MW |
| 2026-10-24T01:00Z | 11,009 MW | 6,229 MW | 6,162 MW | 5 MW | 473 MW |
| 2026-10-24T02:00Z | 10,977 MW | 6,241 MW | 5,803 MW | 24 MW | 275 MW |
| 2026-10-24T03:00Z | 10,431 MW | 6,242 MW | 5,806 MW | -1 MW | 200 MW |
| 2026-10-24T04:00Z | 9,649 MW | 6,261 MW | 5,618 MW | -2 MW | 225 MW |
| 2026-10-24T05:00Z | 9,207 MW | 6,358 MW | 5,346 MW | -1 MW | 311 MW |
| 2026-10-24T06:00Z | 8,902 MW | 6,467 MW | 5,171 MW | 0 MW | 307 MW |
| 2026-10-24T07:00Z | 8,806 MW | 6,550 MW | 5,141 MW | -1 MW | 240 MW |
| 2026-10-24T08:00Z | 8,666 MW | 6,571 MW | 5,121 MW | -1 MW | 217 MW |
| 2026-10-24T09:00Z | 8,813 MW | 6,576 MW | 5,233 MW | 0 MW | 224 MW |
| 2026-10-24T10:00Z | 9,093 MW | 6,570 MW | 5,455 MW | -3 MW | 281 MW |
| 2026-10-24T11:00Z | 9,197 MW | 6,560 MW | 5,651 MW | 4 MW | 359 MW |
| 2026-10-24T12:00Z | 9,074 MW | 6,558 MW | 5,578 MW | 628 MW | 368 MW |
| 2026-10-24T13:00Z | 8,427 MW | 6,563 MW | 4,143 MW | 1,970 MW | 380 MW |
| 2026-10-24T14:00Z | 8,386 MW | 6,559 MW | 3,698 MW | 2,402 MW | 347 MW |
| 2026-10-24T15:00Z | 8,496 MW | 6,525 MW | 3,549 MW | 2,459 MW | 224 MW |
| 2026-10-24T16:00Z | 8,664 MW | 6,508 MW | 3,411 MW | 2,478 MW | 214 MW |
| 2026-10-24T17:00Z | 8,873 MW | 6,528 MW | 3,512 MW | 2,426 MW | 289 MW |
| 2026-10-24T18:00Z | 9,024 MW | 6,534 MW | 3,623 MW | 2,510 MW | 251 MW |
| 2026-10-24T19:00Z | 9,116 MW | 6,528 MW | 3,409 MW | 2,567 MW | 213 MW |
| 2026-10-24T20:00Z | 9,356 MW | 6,533 MW | 3,566 MW | 2,447 MW | 234 MW |
| 2026-10-24T21:00Z | 10,103 MW | 6,530 MW | 4,538 MW | 1,735 MW | 234 MW |
| 2026-10-24T22:00Z | 10,761 MW | 6,537 MW | 5,601 MW | 492 MW | 303 MW |
| 2026-10-24T23:00Z | 10,795 MW | 6,547 MW | 5,927 MW | 174 MW | 444 MW |
| 2026-10-25T00:00Z | 10,735 MW | 6,541 MW | 5,843 MW | 119 MW | 336 MW |
| 2026-10-25T01:00Z | 10,714 MW | 6,556 MW | 5,506 MW | 52 MW | 225 MW |
| 2026-10-25T02:00Z | 10,558 MW | 6,600 MW | 5,140 MW | 0 MW | 53 MW |
| 2026-10-25T03:00Z | 10,123 MW | 6,687 MW | 4,652 MW | -1 MW | 64 MW |
| 2026-10-25T04:00Z | 9,377 MW | 6,796 MW | 4,481 MW | -1 MW | 55 MW |
| 2026-10-25T05:00Z | 8,164 MW | 6,906 MW | 4,833 MW | 1 MW | 322 MW |
| 2026-10-25T06:00Z | 8,166 MW | 7,033 MW | 4,958 MW | -2 MW | 318 MW |
| 2026-10-25T07:00Z | 8,048 MW | 7,115 MW | 4,953 MW | 1 MW | 310 MW |
| 2026-10-25T08:00Z | 7,995 MW | 7,128 MW | 4,992 MW | 0 MW | 284 MW |
| 2026-10-25T09:00Z | 8,104 MW | 7,171 MW | 5,001 MW | -1 MW | 312 MW |
| 2026-10-25T10:00Z | 8,228 MW | 7,196 MW | 5,003 MW | 0 MW | 263 MW |
| 2026-10-25T11:00Z | 8,303 MW | 7,240 MW | 4,945 MW | 2 MW | 321 MW |
| 2026-10-25T12:00Z | 7,990 MW | 7,278 MW | 4,765 MW | 603 MW | 295 MW |
| 2026-10-25T13:00Z | 7,489 MW | 7,295 MW | 3,881 MW | 1,936 MW | 292 MW |
| 2026-10-25T14:00Z | 7,545 MW | 7,310 MW | 3,673 MW | 2,421 MW | 208 MW |
| 2026-10-25T15:00Z | 7,574 MW | 7,296 MW | 3,647 MW | 2,432 MW | 148 MW |
| 2026-10-25T16:00Z | 7,767 MW | 7,292 MW | 3,736 MW | 2,403 MW | 145 MW |
| 2026-10-25T17:00Z | 8,086 MW | 7,292 MW | 3,701 MW | 2,489 MW | 260 MW |
| 2026-10-25T18:00Z | 8,306 MW | 7,292 MW | 3,761 MW | 2,502 MW | 260 MW |
| 2026-10-25T19:00Z | 8,479 MW | 7,293 MW | 3,853 MW | 2,397 MW | 214 MW |
| 2026-10-25T20:00Z | 9,313 MW | 7,295 MW | 3,976 MW | 2,205 MW | 286 MW |
| 2026-10-25T21:00Z | 10,232 MW | 7,295 MW | 4,731 MW | 1,408 MW | 350 MW |
| 2026-10-25T22:00Z | 10,802 MW | 7,306 MW | 6,004 MW | 421 MW | 352 MW |
| 2026-10-25T23:00Z | 11,010 MW | 7,305 MW | 6,361 MW | 173 MW | 457 MW |
| 2026-10-26T00:00Z | 11,054 MW | 7,314 MW | 6,095 MW | 163 MW | 269 MW |
| 2026-10-26T01:00Z | 10,997 MW | 7,318 MW | 5,707 MW | 41 MW | 245 MW |
| 2026-10-26T02:00Z | 10,421 MW | 7,315 MW | 5,147 MW | 1 MW | 114 MW |
| 2026-10-26T03:00Z | 9,485 MW | 7,327 MW | 4,921 MW | 0 MW | 126 MW |
| 2026-10-26T04:00Z | 9,509 MW | 7,330 MW | 4,017 MW | 0 MW | 94 MW |
| 2026-10-26T05:00Z | 9,608 MW | 7,334 MW | 3,868 MW | -1 MW | 107 MW |
| 2026-10-26T06:00Z | 9,622 MW | 7,342 MW | 3,829 MW | 0 MW | 106 MW |
| 2026-10-26T07:00Z | 9,667 MW | 7,349 MW | 3,886 MW | 0 MW | 96 MW |
| 2026-10-26T08:00Z | 9,741 MW | 7,343 MW | 4,019 MW | -1 MW | 63 MW |
| 2026-10-26T09:00Z | 10,030 MW | 7,351 MW | 4,227 MW | 0 MW | 60 MW |
| 2026-10-26T10:00Z | 10,800 MW | 7,346 MW | 4,977 MW | -1 MW | 109 MW |
| 2026-10-26T11:00Z | 11,090 MW | 7,356 MW | 5,119 MW | 1 MW | 498 MW |
| 2026-10-26T12:00Z | 10,850 MW | 7,353 MW | 5,110 MW | 566 MW | 375 MW |
| 2026-10-26T13:00Z | 9,994 MW | 7,337 MW | 4,071 MW | 1,820 MW | 280 MW |
| 2026-10-26T14:00Z | 9,709 MW | 7,316 MW | 3,829 MW | 2,280 MW | 117 MW |
| 2026-10-26T15:00Z | 9,502 MW | 7,308 MW | 3,978 MW | 2,295 MW | 110 MW |
| 2026-10-26T16:00Z | 9,680 MW | 7,307 MW | 3,789 MW | 2,331 MW | 106 MW |
| 2026-10-26T17:00Z | 9,992 MW | 7,304 MW | 3,782 MW | 2,307 MW | 132 MW |
| 2026-10-26T18:00Z | 10,131 MW | 7,298 MW | 4,009 MW | 2,267 MW | 190 MW |
| 2026-10-26T19:00Z | 10,376 MW | 7,304 MW | 4,196 MW | 2,296 MW | 297 MW |
| 2026-10-26T20:00Z | 10,909 MW | 7,307 MW | 4,101 MW | 2,047 MW | 342 MW |
| 2026-10-26T21:00Z | 11,560 MW | 7,310 MW | 5,221 MW | 1,118 MW | 354 MW |
| 2026-10-26T22:00Z | 12,081 MW | 7,315 MW | 5,773 MW | 219 MW | 590 MW |
| 2026-10-26T23:00Z | 12,263 MW | 7,322 MW | 5,668 MW | 55 MW | 651 MW |
| 2026-10-27T00:00Z | 12,213 MW | 7,327 MW | 5,738 MW | 8 MW | 510 MW |
| 2026-10-27T01:00Z | 11,452 MW | 7,331 MW | 5,607 MW | -1 MW | 328 MW |
| 2026-10-27T02:00Z | 11,057 MW | 7,345 MW | 4,802 MW | 1 MW | 187 MW |
| 2026-10-27T03:00Z | 10,402 MW | 7,351 MW | 4,383 MW | 0 MW | 187 MW |
| 2026-10-27T04:00Z | 9,789 MW | 7,368 MW | 4,656 MW | 0 MW | 138 MW |
| 2026-10-27T05:00Z | 9,570 MW | 7,363 MW | 4,992 MW | 1 MW | 138 MW |
| 2026-10-27T06:00Z | 9,621 MW | 7,375 MW | 4,767 MW | 0 MW | 157 MW |
| 2026-10-27T07:00Z | 9,644 MW | 7,376 MW | 4,772 MW | 0 MW | 147 MW |
| 2026-10-27T08:00Z | 9,628 MW | 7,371 MW | 4,859 MW | 0 MW | 142 MW |
| 2026-10-27T09:00Z | 10,146 MW | 7,376 MW | 5,074 MW | -1 MW | 131 MW |
| 2026-10-27T10:00Z | 10,770 MW | 7,389 MW | 5,537 MW | 28 MW | 142 MW |
| 2026-10-27T11:00Z | 11,255 MW | 7,385 MW | 5,880 MW | 175 MW | 410 MW |
| 2026-10-27T12:00Z | 10,962 MW | 7,379 MW | 5,796 MW | 693 MW | 298 MW |
| 2026-10-27T13:00Z | 9,598 MW | 7,381 MW | 4,760 MW | 1,916 MW | 180 MW |
| 2026-10-27T14:00Z | 9,174 MW | 7,370 MW | 4,813 MW | 2,350 MW | 174 MW |
| 2026-10-27T15:00Z | 8,984 MW | 7,363 MW | 5,014 MW | 2,350 MW | 75 MW |
| 2026-10-27T16:00Z | 8,685 MW | 7,352 MW | 5,145 MW | 2,460 MW | 190 MW |
| 2026-10-27T17:00Z | 8,718 MW | 7,343 MW | 5,315 MW | 2,476 MW | 232 MW |
| 2026-10-27T18:00Z | 8,881 MW | 7,333 MW | 5,383 MW | 2,567 MW | 215 MW |
| 2026-10-27T19:00Z | 9,019 MW | 7,334 MW | 5,602 MW | 2,538 MW | 184 MW |
| 2026-10-27T20:00Z | 9,109 MW | 7,333 MW | 5,745 MW | 2,431 MW | 231 MW |
| 2026-10-27T21:00Z | 9,810 MW | 7,330 MW | 6,293 MW | 1,681 MW | 384 MW |
| 2026-10-27T22:00Z | 11,273 MW | 7,340 MW | 6,494 MW | 363 MW | 530 MW |
| 2026-10-27T23:00Z | 11,739 MW | 7,338 MW | 6,416 MW | 151 MW | 647 MW |
| 2026-10-28T00:00Z | 11,526 MW | 7,340 MW | 6,694 MW | 33 MW | 517 MW |
| 2026-10-28T01:00Z | 11,145 MW | 7,356 MW | 6,590 MW | 9 MW | 418 MW |
| 2026-10-28T02:00Z | 10,736 MW | 7,359 MW | 6,358 MW | 13 MW | 151 MW |
| 2026-10-28T03:00Z | 9,987 MW | 7,359 MW | 5,820 MW | 1 MW | 110 MW |
| 2026-10-28T04:00Z | 9,502 MW | 7,357 MW | 5,612 MW | 0 MW | 78 MW |
| 2026-10-28T05:00Z | 9,413 MW | 7,366 MW | 5,181 MW | 0 MW | 165 MW |
| 2026-10-28T06:00Z | 9,364 MW | 7,364 MW | 4,648 MW | -1 MW | 151 MW |
| 2026-10-28T07:00Z | 9,364 MW | 7,378 MW | 4,581 MW | 2 MW | 134 MW |
| 2026-10-28T08:00Z | 9,417 MW | 7,373 MW | 4,627 MW | -1 MW | 134 MW |
| 2026-10-28T09:00Z | 9,478 MW | 7,382 MW | 4,997 MW | 0 MW | 159 MW |
| 2026-10-28T10:00Z | 10,214 MW | 7,374 MW | 6,031 MW | -1 MW | 125 MW |
| 2026-10-28T11:00Z | 10,917 MW | 7,381 MW | 6,056 MW | 8 MW | 306 MW |
| 2026-10-28T12:00Z | 10,631 MW | 7,379 MW | 5,725 MW | 491 MW | 250 MW |
| 2026-10-28T13:00Z | 9,745 MW | 7,373 MW | 5,227 MW | 1,620 MW | 69 MW |
| 2026-10-28T14:00Z | 9,352 MW | 7,364 MW | 4,476 MW | 2,294 MW | 39 MW |
| 2026-10-28T15:00Z | 8,999 MW | 7,343 MW | 4,759 MW | 2,348 MW | 51 MW |
| 2026-10-28T16:00Z | 8,820 MW | 7,329 MW | 5,379 MW | 2,348 MW | 124 MW |
| 2026-10-28T17:00Z | 8,844 MW | 7,308 MW | 5,520 MW | 2,332 MW | 193 MW |
| 2026-10-28T18:00Z | 8,947 MW | 7,302 MW | 5,818 MW | 2,403 MW | 156 MW |
| 2026-10-28T19:00Z | 9,067 MW | 7,299 MW | 5,958 MW | 2,352 MW | 213 MW |
| 2026-10-28T20:00Z | 9,366 MW | 7,297 MW | 5,705 MW | 2,162 MW | 211 MW |
| 2026-10-28T21:00Z | 10,100 MW | 7,296 MW | 6,355 MW | 1,538 MW | 313 MW |
| 2026-10-28T22:00Z | 10,959 MW | 7,310 MW | 7,191 MW | 439 MW | 408 MW |
| 2026-10-28T23:00Z | 11,413 MW | 7,309 MW | 7,091 MW | 164 MW | 811 MW |
| 2026-10-29T00:00Z | 11,063 MW | 7,313 MW | 6,800 MW | 43 MW | 842 MW |
| 2026-10-29T01:00Z | 10,816 MW | 7,318 MW | 6,564 MW | 38 MW | 643 MW |
| 2026-10-29T02:00Z | 10,450 MW | 7,325 MW | 6,393 MW | 25 MW | 300 MW |
| 2026-10-29T03:00Z | 9,819 MW | 7,333 MW | 6,041 MW | 29 MW | 144 MW |
| 2026-10-29T04:00Z | 9,576 MW | 7,329 MW | 5,720 MW | 28 MW | 128 MW |
| 2026-10-29T05:00Z | 9,452 MW | 7,337 MW | 5,644 MW | 28 MW | 106 MW |
| 2026-10-29T06:00Z | 9,369 MW | 7,336 MW | 5,528 MW | 26 MW | 60 MW |
| 2026-10-29T07:00Z | 9,287 MW | 7,338 MW | 5,446 MW | 29 MW | 85 MW |
| 2026-10-29T08:00Z | 9,388 MW | 7,339 MW | 5,367 MW | 28 MW | 122 MW |
| 2026-10-29T09:00Z | 9,415 MW | 7,340 MW | 5,384 MW | 29 MW | 61 MW |
| 2026-10-29T10:00Z | 10,238 MW | 7,339 MW | 5,643 MW | 28 MW | 72 MW |
| 2026-10-29T11:00Z | 10,795 MW | 7,342 MW | 6,301 MW | 27 MW | 327 MW |
| 2026-10-29T12:00Z | 10,709 MW | 7,350 MW | 6,069 MW | 419 MW | 334 MW |
| 2026-10-29T13:00Z | 9,965 MW | 7,335 MW | 5,524 MW | 1,502 MW | 194 MW |
| 2026-10-29T14:00Z | 9,724 MW | 7,323 MW | 5,291 MW | 2,162 MW | 94 MW |
| 2026-10-29T15:00Z | 9,393 MW | 7,310 MW | 5,219 MW | 2,313 MW | 125 MW |
| 2026-10-29T16:00Z | 9,395 MW | 7,299 MW | 5,609 MW | 2,235 MW | 178 MW |
| 2026-10-29T17:00Z | 9,688 MW | 7,287 MW | 5,521 MW | 2,151 MW | 237 MW |
| 2026-10-29T18:00Z | 9,949 MW | 7,284 MW | 6,046 MW | 2,002 MW | 245 MW |
| 2026-10-29T19:00Z | 10,088 MW | 7,288 MW | 6,462 MW | 1,882 MW | 253 MW |
| 2026-10-29T20:00Z | 10,666 MW | 7,286 MW | 6,477 MW | 1,895 MW | 331 MW |
| 2026-10-29T21:00Z | 11,606 MW | 7,286 MW | 6,843 MW | 1,192 MW | 440 MW |
| 2026-10-29T22:00Z | 12,120 MW | 7,289 MW | 7,030 MW | 266 MW | 495 MW |
| 2026-10-29T23:00Z | 12,750 MW | 7,302 MW | 7,048 MW | 28 MW | 846 MW |
| 2026-10-30T00:00Z | 12,557 MW | 7,307 MW | 6,622 MW | 2 MW | 839 MW |
| 2026-10-30T01:00Z | 11,868 MW | 7,305 MW | 6,311 MW | 16 MW | 685 MW |
| 2026-10-30T02:00Z | 11,091 MW | 7,320 MW | 5,878 MW | 0 MW | 512 MW |
| 2026-10-30T03:00Z | 10,768 MW | 7,318 MW | 5,419 MW | 0 MW | 123 MW |
| 2026-10-30T04:00Z | 9,947 MW | 7,279 MW | 5,085 MW | 0 MW | 61 MW |
| 2026-10-30T05:00Z | 9,747 MW | 7,234 MW | 4,984 MW | 1 MW | 96 MW |
| 2026-10-30T06:00Z | 9,789 MW | 7,230 MW | 4,615 MW | 0 MW | 76 MW |
| 2026-10-30T07:00Z | 9,816 MW | 7,243 MW | 4,534 MW | 0 MW | 62 MW |
| 2026-10-30T08:00Z | 9,882 MW | 7,255 MW | 4,475 MW | -2 MW | 127 MW |
| 2026-10-30T09:00Z | 10,043 MW | 7,270 MW | 4,683 MW | 0 MW | 73 MW |
| 2026-10-30T10:00Z | 10,286 MW | 7,283 MW | 5,499 MW | -1 MW | 66 MW |
| 2026-10-30T11:00Z | 10,877 MW | 7,299 MW | 6,285 MW | 22 MW | 178 MW |
| 2026-10-30T12:00Z | 10,938 MW | 7,305 MW | 5,888 MW | 456 MW | 221 MW |
| 2026-10-30T13:00Z | 10,332 MW | 7,310 MW | 4,885 MW | 1,677 MW | 146 MW |
| 2026-10-30T14:00Z | 10,012 MW | 7,304 MW | 4,620 MW | 2,173 MW | 86 MW |
| 2026-10-30T15:00Z | 10,113 MW | 7,286 MW | 4,537 MW | 2,167 MW | 58 MW |
| 2026-10-30T16:00Z | 10,331 MW | 7,286 MW | 4,799 MW | 2,223 MW | 147 MW |
| 2026-10-30T17:00Z | 10,382 MW | 7,286 MW | 5,350 MW | 2,115 MW | 326 MW |
| 2026-10-30T18:00Z | 10,488 MW | 7,295 MW | 5,509 MW | 2,129 MW | 301 MW |
| 2026-10-30T19:00Z | 10,879 MW | 7,301 MW | 5,745 MW | 1,990 MW | 314 MW |
| 2026-10-30T20:00Z | 11,331 MW | 7,300 MW | 6,126 MW | 1,600 MW | 554 MW |
| 2026-10-30T21:00Z | 11,639 MW | 7,295 MW | 6,733 MW | 789 MW | 737 MW |
| 2026-10-30T22:00Z | 12,583 MW | 7,302 MW | 6,281 MW | 239 MW | 839 MW |
| 2026-10-30T23:00Z | 12,792 MW | 7,304 MW | 5,784 MW | 35 MW | 949 MW |
| 2026-10-31T00:00Z | 12,431 MW | 7,309 MW | 5,155 MW | 1 MW | 917 MW |
| 2026-10-31T01:00Z | 12,381 MW | 7,324 MW | 4,854 MW | 0 MW | 555 MW |
| 2026-10-31T02:00Z | 12,081 MW | 7,325 MW | 4,573 MW | 1 MW | 219 MW |
| 2026-10-31T03:00Z | 11,944 MW | 7,325 MW | 4,115 MW | -2 MW | 168 MW |
| 2026-10-31T04:00Z | 11,165 MW | 7,338 MW | 3,771 MW | 1 MW | 161 MW |
| 2026-10-31T05:00Z | 10,798 MW | 7,333 MW | 3,679 MW | 1 MW | 357 MW |
| 2026-10-31T06:00Z | 10,676 MW | 7,343 MW | 3,543 MW | 0 MW | 331 MW |
| 2026-10-31T07:00Z | 10,706 MW | 7,344 MW | 3,510 MW | -1 MW | 228 MW |
| 2026-10-31T08:00Z | 10,641 MW | 7,349 MW | 3,555 MW | 0 MW | 303 MW |
| 2026-10-31T09:00Z | 10,421 MW | 7,345 MW | 3,593 MW | 0 MW | 226 MW |
| 2026-10-31T10:00Z | 10,373 MW | 7,348 MW | 3,679 MW | 1 MW | 200 MW |
| 2026-10-31T11:00Z | 10,695 MW | 7,353 MW | 3,900 MW | -2 MW | 255 MW |
| 2026-10-31T12:00Z | 10,833 MW | 7,355 MW | 3,866 MW | 212 MW | 215 MW |
| 2026-10-31T13:00Z | 10,311 MW | 7,355 MW | 3,895 MW | 909 MW | 160 MW |
| 2026-10-31T14:00Z | 10,158 MW | 7,354 MW | 3,869 MW | 1,240 MW | 167 MW |
| 2026-10-31T15:00Z | 10,381 MW | 7,340 MW | 3,734 MW | 1,385 MW | 178 MW |
| 2026-10-31T16:00Z | 10,553 MW | 7,337 MW | 3,773 MW | 1,553 MW | 217 MW |
| 2026-10-31T17:00Z | 10,915 MW | 7,325 MW | 3,929 MW | 1,389 MW | 325 MW |
| 2026-10-31T18:00Z | 11,105 MW | 7,316 MW | 4,241 MW | 1,134 MW | 345 MW |
| 2026-10-31T19:00Z | 11,344 MW | 7,315 MW | 5,039 MW | 772 MW | 312 MW |
| 2026-10-31T20:00Z | 11,653 MW | 7,314 MW | 5,131 MW | 471 MW | 487 MW |
| 2026-10-31T21:00Z | 11,866 MW | 7,318 MW | 5,460 MW | 208 MW | 538 MW |
| 2026-10-31T22:00Z | 11,910 MW | 7,329 MW | 5,269 MW | 24 MW | 456 MW |
| 2026-10-31T23:00Z | 11,892 MW | 7,326 MW | 4,865 MW | 1 MW | 581 MW |
| 2026-11-01T00:00Z | 11,875 MW | 7,329 MW | 4,273 MW | 0 MW | 467 MW |
| 2026-11-01T01:00Z | 11,832 MW | 7,336 MW | 3,969 MW | -1 MW | 407 MW |
| 2026-11-01T02:00Z | 11,817 MW | 7,344 MW | 4,235 MW | 0 MW | 75 MW |
| 2026-11-01T03:00Z | 11,639 MW | 7,341 MW | 3,900 MW | 1 MW | 78 MW |
| 2026-11-01T04:00Z | 10,617 MW | 7,353 MW | 3,750 MW | 0 MW | 67 MW |
| 2026-11-01T05:00Z | 9,657 MW | 7,356 MW | 3,792 MW | -1 MW | 82 MW |
| 2026-11-01T06:00Z | 9,411 MW | 7,366 MW | 3,777 MW | 1 MW | 38 MW |
| 2026-11-01T07:00Z | 9,484 MW | 7,391 MW | 3,755 MW | -2 MW | 105 MW |
| 2026-11-01T08:00Z | 9,510 MW | 7,362 MW | 3,732 MW | 88 MW | 62 MW |
| 2026-11-01T09:00Z | 9,391 MW | 7,369 MW | 3,735 MW | -1 MW | 63 MW |
| 2026-11-01T10:00Z | 9,758 MW | 7,367 MW | 3,748 MW | 0 MW | 39 MW |
| 2026-11-01T11:00Z | 10,416 MW | 7,370 MW | 3,832 MW | 16 MW | 99 MW |
| 2026-11-01T12:00Z | 10,933 MW | 7,364 MW | 4,051 MW | 130 MW | 109 MW |
| 2026-11-01T13:00Z | 11,178 MW | 7,368 MW | 4,007 MW | 325 MW | 79 MW |
| 2026-11-01T14:00Z | 11,252 MW | 7,357 MW | 3,903 MW | 483 MW | 116 MW |
| 2026-11-01T15:00Z | 11,168 MW | 7,351 MW | 3,886 MW | 744 MW | 221 MW |
| 2026-11-01T16:00Z | 11,055 MW | 7,343 MW | 3,884 MW | 894 MW | 311 MW |
| 2026-11-01T17:00Z | 11,181 MW | 7,319 MW | 4,013 MW | 752 MW | 316 MW |
| 2026-11-01T18:00Z | 11,561 MW | 7,325 MW | 4,026 MW | 605 MW | 372 MW |
| 2026-11-01T19:00Z | 11,876 MW | 7,318 MW | 4,080 MW | 421 MW | 477 MW |
| 2026-11-01T20:00Z | 11,988 MW | 7,321 MW | 4,635 MW | 183 MW | 608 MW |
| 2026-11-01T21:00Z | 12,103 MW | 7,332 MW | 5,225 MW | 41 MW | 660 MW |
| 2026-11-01T22:00Z | 12,197 MW | 7,331 MW | 5,758 MW | 100 MW | 851 MW |
| 2026-11-01T23:00Z | 12,190 MW | 7,335 MW | 5,369 MW | 0 MW | 972 MW |
| 2026-11-02T00:00Z | 12,201 MW | 7,348 MW | 4,581 MW | 0 MW | 845 MW |
| 2026-11-02T01:00Z | 12,030 MW | 7,356 MW | 4,110 MW | 1 MW | 580 MW |
| 2026-11-02T02:00Z | 11,649 MW | 7,357 MW | 3,871 MW | 0 MW | 285 MW |
| 2026-11-02T03:00Z | 11,057 MW | 7,362 MW | 4,002 MW | 0 MW | 130 MW |
| 2026-11-02T04:00Z | 10,399 MW | 7,363 MW | 3,849 MW | 1 MW | 67 MW |
| 2026-11-02T05:00Z | 10,256 MW | 7,362 MW | 3,789 MW | 0 MW | 85 MW |
| 2026-11-02T06:00Z | 10,256 MW | 7,362 MW | 3,789 MW | 0 MW | 94 MW |
| 2026-11-02T07:00Z | 10,320 MW | 7,361 MW | 3,705 MW | -1 MW | 65 MW |
| 2026-11-02T08:00Z | 10,252 MW | 7,357 MW | 3,694 MW | 0 MW | 66 MW |
| 2026-11-02T09:00Z | 10,408 MW | 7,367 MW | 3,722 MW | -1 MW | 145 MW |
| 2026-11-02T10:00Z | 10,589 MW | 7,361 MW | 4,322 MW | -1 MW | 68 MW |
| 2026-11-02T11:00Z | 10,638 MW | 7,365 MW | 5,440 MW | 2 MW | 65 MW |
| 2026-11-02T12:00Z | 10,771 MW | 7,354 MW | 5,489 MW | 235 MW | 249 MW |
| 2026-11-02T13:00Z | 10,731 MW | 7,360 MW | 4,919 MW | 1,201 MW | 227 MW |
| 2026-11-02T14:00Z | 10,560 MW | 7,354 MW | 4,562 MW | 1,753 MW | 140 MW |
| 2026-11-02T15:00Z | 10,852 MW | 7,347 MW | 4,209 MW | 1,959 MW | 115 MW |
| 2026-11-02T16:00Z | 11,401 MW | 7,321 MW | 3,899 MW | 1,951 MW | 159 MW |
| 2026-11-02T17:00Z | 11,589 MW | 7,306 MW | 4,437 MW | 1,863 MW | 236 MW |
| 2026-11-02T18:00Z | 11,651 MW | 7,299 MW | 5,335 MW | 1,543 MW | 249 MW |
| 2026-11-02T19:00Z | 12,173 MW | 7,242 MW | 5,607 MW | 1,136 MW | 298 MW |
| 2026-11-02T20:00Z | 13,075 MW | 7,133 MW | 5,450 MW | 845 MW | 330 MW |
| 2026-11-02T21:00Z | 13,198 MW | 7,002 MW | 6,014 MW | 641 MW | 393 MW |
| 2026-11-02T22:00Z | 13,043 MW | 6,894 MW | 6,387 MW | 224 MW | 612 MW |
| 2026-11-02T23:00Z | 13,118 MW | 6,763 MW | 6,553 MW | 135 MW | 890 MW |
| 2026-11-03T00:00Z | 13,065 MW | 6,629 MW | 6,265 MW | 4 MW | 1,071 MW |
| 2026-11-03T01:00Z | 12,955 MW | 6,496 MW | 5,815 MW | 0 MW | 909 MW |
| 2026-11-03T02:00Z | 12,662 MW | 6,347 MW | 5,675 MW | -1 MW | 485 MW |
| 2026-11-03T03:00Z | 12,404 MW | 6,084 MW | 5,427 MW | 1 MW | 191 MW |
| 2026-11-03T04:00Z | 11,704 MW | 6,086 MW | 5,093 MW | -1 MW | 94 MW |
| 2026-11-03T05:00Z | 11,469 MW | 6,095 MW | 5,061 MW | 0 MW | 77 MW |
| 2026-11-03T06:00Z | 11,453 MW | 6,098 MW | 4,654 MW | 0 MW | 79 MW |
| 2026-11-03T07:00Z | 11,446 MW | 6,107 MW | 4,489 MW | 0 MW | 71 MW |
| 2026-11-03T08:00Z | 11,467 MW | 6,101 MW | 4,429 MW | 1 MW | 62 MW |
| 2026-11-03T09:00Z | 11,465 MW | 6,094 MW | 4,413 MW | 0 MW | 115 MW |
| 2026-11-03T10:00Z | 11,463 MW | 6,108 MW | 4,971 MW | 0 MW | 49 MW |
| 2026-11-03T11:00Z | 11,689 MW | 6,105 MW | 5,486 MW | 0 MW | 63 MW |
| 2026-11-03T12:00Z | 11,712 MW | 6,097 MW | 5,655 MW | 47 MW | 312 MW |
| 2026-11-03T13:00Z | 11,813 MW | 6,098 MW | 5,751 MW | 227 MW | 210 MW |
| 2026-11-03T14:00Z | 11,841 MW | 6,087 MW | 5,978 MW | 490 MW | 153 MW |
| 2026-11-03T15:00Z | 11,968 MW | 6,072 MW | 5,914 MW | 844 MW | 90 MW |
| 2026-11-03T16:00Z | 12,267 MW | 6,061 MW | 5,574 MW | 970 MW | 70 MW |
| 2026-11-03T17:00Z | 12,387 MW | 6,051 MW | 5,846 MW | 964 MW | 166 MW |
| 2026-11-03T18:00Z | 12,513 MW | 6,047 MW | 6,447 MW | 864 MW | 220 MW |
| 2026-11-03T19:00Z | 12,726 MW | 6,047 MW | 6,963 MW | 757 MW | 309 MW |
| 2026-11-03T20:00Z | 13,240 MW | 6,050 MW | 6,715 MW | 527 MW | 456 MW |
| 2026-11-03T21:00Z | 13,532 MW | 6,049 MW | 6,800 MW | 252 MW | 369 MW |
| 2026-11-03T22:00Z | 13,906 MW | 6,048 MW | 6,950 MW | 24 MW | 449 MW |
| 2026-11-03T23:00Z | 14,039 MW | 6,048 MW | 7,270 MW | 18 MW | 594 MW |
| 2026-11-04T00:00Z | 13,670 MW | 6,054 MW | 7,048 MW | 0 MW | 909 MW |
| 2026-11-04T01:00Z | 13,279 MW | 6,053 MW | 6,468 MW | -2 MW | 810 MW |
| 2026-11-04T02:00Z | 12,985 MW | 6,062 MW | 5,910 MW | -1 MW | 555 MW |
| 2026-11-04T03:00Z | 12,209 MW | 6,066 MW | 5,698 MW | 0 MW | 308 MW |
| 2026-11-04T04:00Z | 11,760 MW | 6,074 MW | 5,687 MW | 5 MW | 192 MW |
| 2026-11-04T05:00Z | 11,505 MW | 6,077 MW | 5,678 MW | 2 MW | 105 MW |
| 2026-11-04T06:00Z | 11,239 MW | 6,084 MW | 5,512 MW | 0 MW | 84 MW |
| 2026-11-04T07:00Z | 11,266 MW | 6,086 MW | 5,376 MW | 0 MW | 50 MW |
| 2026-11-04T08:00Z | 11,266 MW | 6,084 MW | 5,304 MW | 0 MW | 48 MW |
| 2026-11-04T09:00Z | 11,363 MW | 6,078 MW | 5,454 MW | -1 MW | 99 MW |
| 2026-11-04T10:00Z | 11,736 MW | 6,078 MW | 5,579 MW | 2 MW | 51 MW |
| 2026-11-04T11:00Z | 12,521 MW | 6,078 MW | 5,781 MW | 0 MW | 39 MW |
| 2026-11-04T12:00Z | 12,802 MW | 6,073 MW | 5,596 MW | 45 MW | 197 MW |
| 2026-11-04T13:00Z | 12,796 MW | 6,072 MW | 6,130 MW | 243 MW | 296 MW |
| 2026-11-04T14:00Z | 12,837 MW | 6,075 MW | 6,437 MW | 451 MW | 201 MW |
| 2026-11-04T15:00Z | 12,996 MW | 6,057 MW | 6,181 MW | 780 MW | 125 MW |
| 2026-11-04T16:00Z | 13,297 MW | 6,052 MW | 6,027 MW | 870 MW | 195 MW |
| 2026-11-04T17:00Z | 13,241 MW | 6,033 MW | 6,096 MW | 968 MW | 225 MW |
| 2026-11-04T18:00Z | 13,360 MW | 6,025 MW | 6,482 MW | 966 MW | 341 MW |
| 2026-11-04T19:00Z | 13,836 MW | 6,028 MW | 6,401 MW | 748 MW | 437 MW |
| 2026-11-04T20:00Z | 13,915 MW | 6,032 MW | 6,519 MW | 642 MW | 486 MW |
| 2026-11-04T21:00Z | 14,022 MW | 6,037 MW | 6,722 MW | 538 MW | 414 MW |
| 2026-11-04T22:00Z | 14,711 MW | 6,029 MW | 7,088 MW | 107 MW | 517 MW |
| 2026-11-04T23:00Z | 15,144 MW | 6,037 MW | 6,984 MW | -1 MW | 586 MW |
| 2026-11-05T00:00Z | 14,540 MW | 6,042 MW | 6,555 MW | -1 MW | 873 MW |
| 2026-11-05T01:00Z | 13,711 MW | 6,044 MW | 6,850 MW | 0 MW | 827 MW |
| 2026-11-05T02:00Z | 13,023 MW | 6,051 MW | 6,411 MW | 0 MW | 888 MW |
| 2026-11-05T03:00Z | 12,101 MW | 6,046 MW | 6,338 MW | 1 MW | 602 MW |
| 2026-11-05T04:00Z | 11,710 MW | 6,056 MW | 6,000 MW | 1 MW | 287 MW |
| 2026-11-05T05:00Z | 11,254 MW | 6,047 MW | 5,539 MW | 2 MW | 215 MW |
| 2026-11-05T06:00Z | 10,783 MW | 6,056 MW | 5,509 MW | -1 MW | 201 MW |
| 2026-11-05T07:00Z | 10,573 MW | 6,056 MW | 5,411 MW | 0 MW | 108 MW |
| 2026-11-05T08:00Z | 10,408 MW | 6,053 MW | 5,301 MW | 0 MW | 96 MW |
| 2026-11-05T09:00Z | 10,701 MW | 6,060 MW | 5,097 MW | 1 MW | 135 MW |
| 2026-11-05T10:00Z | 11,191 MW | 6,053 MW | 5,312 MW | -1 MW | 101 MW |
| 2026-11-05T11:00Z | 11,738 MW | 6,066 MW | 5,803 MW | 0 MW | 87 MW |
| 2026-11-05T12:00Z | 12,300 MW | 6,063 MW | 6,115 MW | 78 MW | 213 MW |
| 2026-11-05T13:00Z | 12,515 MW | 6,056 MW | 6,057 MW | 519 MW | 255 MW |
| 2026-11-05T14:00Z | 12,358 MW | 6,055 MW | 6,152 MW | 948 MW | 271 MW |
| 2026-11-05T15:00Z | 12,203 MW | 6,041 MW | 5,810 MW | 1,239 MW | 239 MW |
| 2026-11-05T16:00Z | 12,508 MW | 6,039 MW | 6,448 MW | 1,384 MW | 363 MW |
| 2026-11-05T17:00Z | 12,871 MW | 6,035 MW | 6,661 MW | 1,610 MW | 379 MW |
| 2026-11-05T18:00Z | 13,472 MW | 6,031 MW | 6,749 MW | 1,579 MW | 429 MW |
| 2026-11-05T19:00Z | 13,984 MW | 5,915 MW | 6,735 MW | 1,462 MW | 453 MW |
| 2026-11-05T20:00Z | 14,647 MW | 5,826 MW | 6,799 MW | 1,331 MW | 519 MW |
| 2026-11-05T21:00Z | 14,981 MW | 5,837 MW | 6,931 MW | 717 MW | 701 MW |
| 2026-11-05T22:00Z | 15,661 MW | 5,872 MW | 6,878 MW | 146 MW | 724 MW |
| 2026-11-05T23:00Z | 16,066 MW | 5,919 MW | 6,269 MW | 33 MW | 837 MW |
| 2026-11-06T00:00Z | 15,337 MW | 5,937 MW | 6,431 MW | 4 MW | 918 MW |
| 2026-11-06T01:00Z | 14,700 MW | 5,949 MW | 6,260 MW | 1 MW | 875 MW |
| 2026-11-06T02:00Z | 13,702 MW | 5,955 MW | 6,186 MW | 0 MW | 819 MW |
| 2026-11-06T03:00Z | 12,581 MW | 5,962 MW | 6,297 MW | -2 MW | 332 MW |
| 2026-11-06T04:00Z | 11,664 MW | 5,980 MW | 5,719 MW | 0 MW | 175 MW |
| 2026-11-06T05:00Z | 10,780 MW | 5,995 MW | 5,329 MW | 0 MW | 132 MW |
| 2026-11-06T06:00Z | 11,189 MW | 6,005 MW | 4,804 MW | 1 MW | 125 MW |
| 2026-11-06T07:00Z | 11,194 MW | 6,016 MW | 4,330 MW | -1 MW | 105 MW |
| 2026-11-06T08:00Z | 11,230 MW | 6,030 MW | 4,058 MW | -1 MW | 129 MW |
| 2026-11-06T09:00Z | 11,243 MW | 6,038 MW | 3,902 MW | 0 MW | 148 MW |
| 2026-11-06T10:00Z | 11,296 MW | 6,048 MW | 4,407 MW | -1 MW | 88 MW |
| 2026-11-06T11:00Z | 11,356 MW | 6,059 MW | 5,263 MW | 0 MW | 102 MW |
| 2026-11-06T12:00Z | 11,515 MW | 6,068 MW | 5,518 MW | 158 MW | 237 MW |
| 2026-11-06T13:00Z | 11,585 MW | 6,064 MW | 5,512 MW | 862 MW | 172 MW |
| 2026-11-06T14:00Z | 11,352 MW | 6,063 MW | 5,240 MW | 1,375 MW | 233 MW |
| 2026-11-06T15:00Z | 11,160 MW | 6,062 MW | 5,387 MW | 1,507 MW | 288 MW |
| 2026-11-06T16:00Z | 11,632 MW | 6,058 MW | 5,535 MW | 1,663 MW | 341 MW |
| 2026-11-06T17:00Z | 11,876 MW | 6,058 MW | 5,469 MW | 1,755 MW | 478 MW |
| 2026-11-06T18:00Z | 11,982 MW | 6,065 MW | 5,925 MW | 1,748 MW | 551 MW |
| 2026-11-06T19:00Z | 12,444 MW | 6,068 MW | 5,755 MW | 1,713 MW | 519 MW |
| 2026-11-06T20:00Z | 12,695 MW | 6,068 MW | 5,579 MW | 1,340 MW | 531 MW |
| 2026-11-06T21:00Z | 13,203 MW | 6,068 MW | 5,850 MW | 752 MW | 568 MW |
| 2026-11-06T22:00Z | 13,593 MW | 6,068 MW | 6,089 MW | 110 MW | 577 MW |
| 2026-11-06T23:00Z | 13,689 MW | 6,078 MW | 5,899 MW | 8 MW | 784 MW |
| 2026-11-07T00:00Z | 13,137 MW | 6,088 MW | 5,642 MW | 0 MW | 936 MW |
| 2026-11-07T01:00Z | 12,577 MW | 6,089 MW | 5,262 MW | 0 MW | 924 MW |
| 2026-11-07T02:00Z | 11,807 MW | 6,101 MW | 5,267 MW | -1 MW | 780 MW |
| 2026-11-07T03:00Z | 11,228 MW | 6,099 MW | 5,399 MW | -1 MW | 359 MW |
| 2026-11-07T04:00Z | 10,522 MW | 6,105 MW | 5,302 MW | -1 MW | 203 MW |
| 2026-11-07T05:00Z | 10,297 MW | 6,121 MW | 4,792 MW | 1 MW | 145 MW |
| 2026-11-07T06:00Z | 10,282 MW | 6,120 MW | 4,418 MW | -1 MW | 188 MW |
| 2026-11-07T07:00Z | 10,264 MW | 6,120 MW | 4,343 MW | -1 MW | 196 MW |
| 2026-11-07T08:00Z | 10,175 MW | 6,130 MW | 4,208 MW | 0 MW | 174 MW |
| 2026-11-07T09:00Z | 10,095 MW | 6,131 MW | 4,207 MW | -1 MW | 237 MW |
| 2026-11-07T10:00Z | 10,287 MW | 6,136 MW | 4,551 MW | 0 MW | 123 MW |
| 2026-11-07T11:00Z | 10,382 MW | 6,133 MW | 4,842 MW | -1 MW | 120 MW |
| 2026-11-07T12:00Z | 10,456 MW | 6,135 MW | 4,967 MW | 350 MW | 150 MW |
| 2026-11-07T13:00Z | 10,097 MW | 6,123 MW | 4,007 MW | 1,598 MW | 128 MW |
| 2026-11-07T14:00Z | 9,834 MW | 6,121 MW | 3,852 MW | 1,330 MW | 157 MW |
| 2026-11-07T15:00Z | 9,848 MW | 6,109 MW | 3,760 MW | 2,148 MW | 207 MW |
| 2026-11-07T16:00Z | 9,958 MW | 6,097 MW | 3,829 MW | 2,163 MW | 216 MW |
| 2026-11-07T17:00Z | 9,820 MW | 6,082 MW | 3,785 MW | 2,144 MW | 422 MW |
| 2026-11-07T18:00Z | 9,837 MW | 6,088 MW | 3,856 MW | 2,224 MW | 444 MW |
| 2026-11-07T19:00Z | 9,907 MW | 6,088 MW | 3,844 MW | 2,288 MW | 503 MW |
| 2026-11-07T20:00Z | 9,952 MW | 6,083 MW | 4,082 MW | 2,051 MW | 499 MW |
| 2026-11-07T21:00Z | 10,703 MW | 6,086 MW | 5,307 MW | 1,249 MW | 488 MW |
| 2026-11-07T22:00Z | 11,676 MW | 6,077 MW | 5,800 MW | 327 MW | 559 MW |
| 2026-11-07T23:00Z | 12,109 MW | 6,087 MW | 5,980 MW | 176 MW | 667 MW |
| 2026-11-08T00:00Z | 12,173 MW | 6,089 MW | 5,663 MW | 98 MW | 650 MW |
| 2026-11-08T01:00Z | 11,784 MW | 6,101 MW | 5,587 MW | 23 MW | 692 MW |
| 2026-11-08T02:00Z | 11,390 MW | 6,102 MW | 5,569 MW | 21 MW | 690 MW |
| 2026-11-08T03:00Z | 10,995 MW | 6,106 MW | 5,559 MW | -1 MW | 534 MW |
| 2026-11-08T04:00Z | 10,856 MW | 6,118 MW | 5,168 MW | 1 MW | 354 MW |
| 2026-11-08T05:00Z | 10,840 MW | 6,117 MW | 4,454 MW | -1 MW | 272 MW |
| 2026-11-08T06:00Z | 10,760 MW | 6,119 MW | 4,078 MW | -1 MW | 108 MW |
| 2026-11-08T07:00Z | 10,795 MW | 6,125 MW | 3,734 MW | 0 MW | 144 MW |
| 2026-11-08T08:00Z | 10,808 MW | 6,120 MW | 3,530 MW | -1 MW | 116 MW |
| 2026-11-08T09:00Z | 10,730 MW | 6,122 MW | 3,632 MW | 0 MW | 165 MW |
| 2026-11-08T10:00Z | 10,876 MW | 6,121 MW | 3,757 MW | -2 MW | 156 MW |
| 2026-11-08T11:00Z | 10,991 MW | 6,120 MW | 4,214 MW | 0 MW | 155 MW |
| 2026-11-08T12:00Z | 11,105 MW | 6,124 MW | 4,393 MW | 274 MW | 197 MW |
| 2026-11-08T13:00Z | 10,729 MW | 6,123 MW | 3,453 MW | 1,461 MW | 179 MW |
| 2026-11-08T14:00Z | 10,001 MW | 6,109 MW | 3,197 MW | 2,133 MW | 274 MW |
| 2026-11-08T15:00Z | 9,889 MW | 6,097 MW | 3,038 MW | 2,156 MW | 290 MW |
| 2026-11-08T16:00Z | 10,036 MW | 6,065 MW | 3,102 MW | 2,243 MW | 330 MW |
| 2026-11-08T17:00Z | 10,120 MW | 6,066 MW | 3,203 MW | 2,115 MW | 543 MW |
| 2026-11-08T18:00Z | 10,255 MW | 6,075 MW | 3,235 MW | 2,179 MW | 556 MW |
| 2026-11-08T19:00Z | 10,208 MW | 6,081 MW | 3,072 MW | 2,280 MW | 527 MW |
| 2026-11-08T20:00Z | 10,557 MW | 6,080 MW | 3,256 MW | 2,102 MW | 530 MW |
| 2026-11-08T21:00Z | 11,689 MW | 6,094 MW | 4,396 MW | 1,105 MW | 543 MW |
| 2026-11-08T22:00Z | 13,085 MW | 6,116 MW | 4,648 MW | 111 MW | 700 MW |
| 2026-11-08T23:00Z | 13,439 MW | 6,226 MW | 4,734 MW | 138 MW | 715 MW |
| 2026-11-09T00:00Z | 13,580 MW | 6,257 MW | 4,777 MW | 178 MW | 751 MW |
| 2026-11-09T01:00Z | 13,464 MW | 6,318 MW | 4,773 MW | 20 MW | 733 MW |
| 2026-11-09T02:00Z | 12,853 MW | 6,403 MW | 4,532 MW | 2 MW | 666 MW |
| 2026-11-09T03:00Z | 12,274 MW | 6,395 MW | 4,473 MW | -1 MW | 423 MW |
| 2026-11-09T04:00Z | 11,778 MW | 6,423 MW | 4,216 MW | 1 MW | 215 MW |
| 2026-11-09T05:00Z | 11,549 MW | 6,444 MW | 3,977 MW | 0 MW | 195 MW |
| 2026-11-09T06:00Z | 11,349 MW | 6,458 MW | 3,575 MW | 0 MW | 113 MW |
| 2026-11-09T07:00Z | 11,555 MW | 6,483 MW | 3,527 MW | 0 MW | 119 MW |
| 2026-11-09T08:00Z | 11,610 MW | 6,570 MW | 3,589 MW | 0 MW | 94 MW |
| 2026-11-09T09:00Z | 11,614 MW | 6,582 MW | 3,716 MW | 1 MW | 130 MW |
| 2026-11-09T10:00Z | 12,241 MW | 6,599 MW | 4,090 MW | 0 MW | 79 MW |
| 2026-11-09T11:00Z | 13,322 MW | 6,602 MW | 4,653 MW | 69 MW | 157 MW |
| 2026-11-09T12:00Z | 13,792 MW | 6,608 MW | 4,927 MW | 428 MW | 347 MW |
| 2026-11-09T13:00Z | 12,797 MW | 6,605 MW | 3,834 MW | 1,582 MW | 148 MW |
| 2026-11-09T14:00Z | 11,774 MW | 6,609 MW | 3,644 MW | 2,189 MW | 148 MW |
| 2026-11-09T15:00Z | 11,721 MW | 6,679 MW | 3,668 MW | 2,272 MW | 140 MW |
| 2026-11-09T16:00Z | 11,818 MW | 6,790 MW | 3,202 MW | 2,136 MW | 160 MW |
| 2026-11-09T17:00Z | 11,669 MW | 6,921 MW | 3,122 MW | 2,310 MW | 235 MW |
| 2026-11-09T18:00Z | 11,671 MW | 7,021 MW | 3,135 MW | 2,361 MW | 281 MW |
| 2026-11-09T19:00Z | 11,757 MW | 7,135 MW | 3,125 MW | 2,333 MW | 286 MW |
| 2026-11-09T20:00Z | 11,841 MW | 7,196 MW | 3,412 MW | 2,219 MW | 383 MW |
| 2026-11-09T21:00Z | 12,379 MW | 7,230 MW | 4,592 MW | 1,376 MW | 411 MW |
| 2026-11-09T22:00Z | 13,634 MW | 7,247 MW | 5,152 MW | 286 MW | 467 MW |
| 2026-11-09T23:00Z | 14,084 MW | 7,247 MW | 5,297 MW | 42 MW | 619 MW |
| 2026-11-10T00:00Z | 14,033 MW | 7,258 MW | 5,038 MW | -1 MW | 826 MW |
| 2026-11-10T01:00Z | 13,688 MW | 7,259 MW | 4,790 MW | -3 MW | 720 MW |
| 2026-11-10T02:00Z | 13,179 MW | 7,270 MW | 4,560 MW | 1 MW | 482 MW |
| 2026-11-10T03:00Z | 12,735 MW | 7,258 MW | 4,565 MW | 0 MW | 179 MW |
| 2026-11-10T04:00Z | 11,953 MW | 7,268 MW | 4,348 MW | 0 MW | 86 MW |
| 2026-11-10T05:00Z | 11,586 MW | 7,296 MW | 3,829 MW | 0 MW | 40 MW |
| 2026-11-10T06:00Z | 11,589 MW | 7,306 MW | 3,862 MW | -1 MW | 41 MW |
| 2026-11-10T07:00Z | 11,721 MW | 7,306 MW | 4,030 MW | 1 MW | 60 MW |
| 2026-11-10T08:00Z | 11,736 MW | 7,309 MW | 3,865 MW | -1 MW | 44 MW |
| 2026-11-10T09:00Z | 11,962 MW | 7,311 MW | 3,982 MW | -2 MW | 110 MW |
| 2026-11-10T10:00Z | 12,689 MW | 7,312 MW | 4,110 MW | 0 MW | 72 MW |
| 2026-11-10T11:00Z | 13,338 MW | 7,321 MW | 4,690 MW | 0 MW | 195 MW |
| 2026-11-10T12:00Z | 13,825 MW | 7,323 MW | 5,120 MW | 252 MW | 383 MW |
| 2026-11-10T13:00Z | 13,004 MW | 7,318 MW | 4,240 MW | 1,095 MW | 105 MW |
| 2026-11-10T14:00Z | 11,653 MW | 7,312 MW | 3,954 MW | 1,989 MW | 52 MW |
| 2026-11-10T15:00Z | 11,067 MW | 7,295 MW | 3,855 MW | 2,218 MW | 104 MW |
| 2026-11-10T16:00Z | 10,816 MW | 7,274 MW | 4,119 MW | 2,189 MW | 71 MW |
| 2026-11-10T17:00Z | 11,073 MW | 7,272 MW | 4,300 MW | 2,094 MW | 153 MW |
| 2026-11-10T18:00Z | 11,136 MW | 7,270 MW | 4,297 MW | 1,982 MW | 276 MW |
| 2026-11-10T19:00Z | 11,192 MW | 7,279 MW | 4,147 MW | 2,032 MW | 291 MW |
| 2026-11-10T20:00Z | 11,219 MW | 7,277 MW | 4,224 MW | 1,847 MW | 319 MW |
| 2026-11-10T21:00Z | 12,543 MW | 7,277 MW | 4,856 MW | 1,088 MW | 366 MW |
| 2026-11-10T22:00Z | 13,402 MW | 7,287 MW | 5,491 MW | 267 MW | 368 MW |
| 2026-11-10T23:00Z | 13,806 MW | 7,304 MW | 5,603 MW | 68 MW | 583 MW |
| 2026-11-11T00:00Z | 13,564 MW | 7,298 MW | 5,365 MW | -1 MW | 842 MW |
| 2026-11-11T01:00Z | 12,839 MW | 7,302 MW | 5,103 MW | 1 MW | 842 MW |
| 2026-11-11T02:00Z | 12,597 MW | 7,314 MW | 5,148 MW | 4 MW | 564 MW |
| 2026-11-11T03:00Z | 12,534 MW | 7,316 MW | 4,875 MW | 4 MW | 279 MW |
| 2026-11-11T04:00Z | 12,150 MW | 7,318 MW | 4,423 MW | 2 MW | 66 MW |
| 2026-11-11T05:00Z | 11,445 MW | 7,331 MW | 4,153 MW | 0 MW | 50 MW |
| 2026-11-11T06:00Z | 11,526 MW | 7,277 MW | 4,656 MW | 2 MW | 51 MW |
| 2026-11-11T07:00Z | 11,423 MW | 7,263 MW | 4,503 MW | -1 MW | 50 MW |
| 2026-11-11T08:00Z | 11,352 MW | 7,280 MW | 4,382 MW | 2 MW | 50 MW |
| 2026-11-11T09:00Z | 11,458 MW | 7,282 MW | 4,583 MW | -2 MW | 87 MW |
| 2026-11-11T10:00Z | 11,698 MW | 7,294 MW | 4,497 MW | 2 MW | 93 MW |
| 2026-11-11T11:00Z | 12,281 MW | 7,293 MW | 4,676 MW | -1 MW | 211 MW |
| 2026-11-11T12:00Z | 12,703 MW | 7,311 MW | 4,811 MW | 181 MW | 275 MW |
| 2026-11-11T13:00Z | 12,353 MW | 7,314 MW | 4,665 MW | 899 MW | 156 MW |
| 2026-11-11T14:00Z | 11,989 MW | 7,316 MW | 4,445 MW | 1,203 MW | 100 MW |
| 2026-11-11T15:00Z | 11,963 MW | 7,318 MW | 4,539 MW | 1,150 MW | 78 MW |
| 2026-11-11T16:00Z | 12,033 MW | 7,304 MW | 4,774 MW | 1,188 MW | 71 MW |
| 2026-11-11T17:00Z | 12,195 MW | 7,299 MW | 4,866 MW | 1,072 MW | 175 MW |
| 2026-11-11T18:00Z | 12,576 MW | 7,291 MW | 5,086 MW | 981 MW | 218 MW |
| 2026-11-11T19:00Z | 13,073 MW | 7,303 MW | 5,336 MW | 876 MW | 290 MW |
| 2026-11-11T20:00Z | 13,401 MW | 7,305 MW | 5,142 MW | 784 MW | 343 MW |
| 2026-11-11T21:00Z | 13,424 MW | 7,303 MW | 4,971 MW | 515 MW | 425 MW |
| 2026-11-11T22:00Z | 13,976 MW | 7,307 MW | 4,921 MW | 92 MW | 700 MW |
| 2026-11-11T23:00Z | 14,114 MW | 7,313 MW | 4,869 MW | -1 MW | 739 MW |
| 2026-11-12T00:00Z | 13,680 MW | 7,310 MW | 4,792 MW | 0 MW | 950 MW |
| 2026-11-12T01:00Z | 13,501 MW | 7,316 MW | 4,727 MW | 43 MW | 824 MW |
| 2026-11-12T02:00Z | 13,239 MW | 7,319 MW | 4,793 MW | 0 MW | 544 MW |
| 2026-11-12T03:00Z | 12,698 MW | 7,324 MW | 4,477 MW | 1 MW | 409 MW |
| 2026-11-12T04:00Z | 11,943 MW | 7,325 MW | 4,452 MW | 2 MW | 155 MW |
| 2026-11-12T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T13:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12T13:00Z.
Day by Day
Daily totals, Central time dates, through 2026-11-11Show the data table (400 rows)
| Date (Central time) | Demand |
|---|---|
| 2025-10-08 | 684 GWh |
| 2025-10-09 | 608 GWh |
| 2025-10-10 | 551 GWh |
| 2025-10-11 | 507 GWh |
| 2025-10-12 | 523 GWh |
| 2025-10-13 | 577 GWh |
| 2025-10-14 | 595 GWh |
| 2025-10-15 | 606 GWh |
| 2025-10-16 | 607 GWh |
| 2025-10-17 | 596 GWh |
| 2025-10-18 | 571 GWh |
| 2025-10-19 | 543 GWh |
| 2025-10-20 | 544 GWh |
| 2025-10-21 | 562 GWh |
| 2025-10-22 | 555 GWh |
| 2025-10-23 | 516 GWh |
| 2025-10-24 | 518 GWh |
| 2025-10-25 | 490 GWh |
| 2025-10-26 | 495 GWh |
| 2025-10-27 | 555 GWh |
| 2025-10-28 | 574 GWh |
| 2025-10-29 | 576 GWh |
| 2025-10-30 | 594 GWh |
| 2025-10-31 | 583 GWh |
| 2025-11-01 | 530 GWh |
| 2025-11-02 | 543 GWh |
| 2025-11-03 | 570 GWh |
| 2025-11-04 | 568 GWh |
| 2025-11-05 | 559 GWh |
| 2025-11-06 | 567 GWh |
| 2025-11-07 | 555 GWh |
| 2025-11-08 | 534 GWh |
| 2025-11-09 | 524 GWh |
| 2025-11-10 | 687 GWh |
| 2025-11-11 | 745 GWh |
| 2025-11-12 | 658 GWh |
| 2025-11-13 | 591 GWh |
| 2025-11-14 | 577 GWh |
| 2025-11-15 | 544 GWh |
| 2025-11-16 | 520 GWh |
| 2025-11-17 | 570 GWh |
| 2025-11-18 | 594 GWh |
| 2025-11-19 | 572 GWh |
| 2025-11-20 | 571 GWh |
| 2025-11-21 | 559 GWh |
| 2025-11-22 | 546 GWh |
| 2025-11-23 | 521 GWh |
| 2025-11-24 | 559 GWh |
| 2025-11-25 | 564 GWh |
| 2025-11-26 | 557 GWh |
| 2025-11-27 | 571 GWh |
| 2025-11-28 | 638 GWh |
| 2025-11-29 | 641 GWh |
| 2025-11-30 | 596 GWh |
| 2025-12-01 | 636 GWh |
| 2025-12-02 | 662 GWh |
| 2025-12-03 | 704 GWh |
| 2025-12-04 | 720 GWh |
| 2025-12-05 | 663 GWh |
| 2025-12-06 | 634 GWh |
| 2025-12-07 | 654 GWh |
| 2025-12-08 | 680 GWh |
| 2025-12-09 | 729 GWh |
| 2025-12-10 | 724 GWh |
| 2025-12-11 | 679 GWh |
| 2025-12-12 | 696 GWh |
| 2025-12-13 | 600 GWh |
| 2025-12-14 | 665 GWh |
| 2025-12-15 | 868 GWh |
| 2025-12-16 | 811 GWh |
| 2025-12-17 | 706 GWh |
| 2025-12-18 | 620 GWh |
| 2025-12-19 | 630 GWh |
| 2025-12-20 | 666 GWh |
| 2025-12-21 | 592 GWh |
| 2025-12-22 | 598 GWh |
| 2025-12-23 | 571 GWh |
| 2025-12-24 | 522 GWh |
| 2025-12-25 | 486 GWh |
| 2025-12-26 | 503 GWh |
| 2025-12-27 | 505 GWh |
| 2025-12-28 | 504 GWh |
| 2025-12-29 | 593 GWh |
| 2025-12-30 | 779 GWh |
| 2025-12-31 | 746 GWh |
| 2026-01-01 | 639 GWh |
| 2026-01-02 | 609 GWh |
| 2026-01-03 | 553 GWh |
| 2026-01-04 | 571 GWh |
| 2026-01-05 | 621 GWh |
| 2026-01-06 | 600 GWh |
| 2026-01-07 | 571 GWh |
| 2026-01-08 | 579 GWh |
| 2026-01-09 | 565 GWh |
| 2026-01-10 | 536 GWh |
| 2026-01-11 | 578 GWh |
| 2026-01-12 | 761 GWh |
| 2026-01-13 | 745 GWh |
| 2026-01-14 | 692 GWh |
| 2026-01-15 | 789 GWh |
| 2026-01-16 | 788 GWh |
| 2026-01-17 | 633 GWh |
| 2026-01-18 | 740 GWh |
| 2026-01-19 | 789 GWh |
| 2026-01-20 | 813 GWh |
| 2026-01-21 | 775 GWh |
| 2026-01-22 | 667 GWh |
| 2026-01-23 | 648 GWh |
| 2026-01-24 | 667 GWh |
| 2026-01-25 | 717 GWh |
| 2026-01-26 | 866 GWh |
| 2026-01-27 | 914 GWh |
| 2026-01-28 | 821 GWh |
| 2026-01-29 | 781 GWh |
| 2026-01-30 | 760 GWh |
| 2026-01-31 | 924 GWh |
| 2026-02-01 | 939 GWh |
| 2026-02-02 | 827 GWh |
| 2026-02-03 | 743 GWh |
| 2026-02-04 | 677 GWh |
| 2026-02-05 | 796 GWh |
| 2026-02-06 | 738 GWh |
| 2026-02-07 | 661 GWh |
| 2026-02-08 | 683 GWh |
| 2026-02-09 | 640 GWh |
| 2026-02-10 | 609 GWh |
| 2026-02-11 | 585 GWh |
| 2026-02-12 | 628 GWh |
| 2026-02-13 | 638 GWh |
| 2026-02-14 | 605 GWh |
| 2026-02-15 | 557 GWh |
| 2026-02-16 | 582 GWh |
| 2026-02-17 | 603 GWh |
| 2026-02-18 | 581 GWh |
| 2026-02-19 | 574 GWh |
| 2026-02-20 | 573 GWh |
| 2026-02-21 | 541 GWh |
| 2026-02-22 | 594 GWh |
| 2026-02-23 | 793 GWh |
| 2026-02-24 | 783 GWh |
| 2026-02-25 | 660 GWh |
| 2026-02-26 | 583 GWh |
| 2026-02-27 | 562 GWh |
| 2026-02-28 | 541 GWh |
| 2026-03-01 | 541 GWh |
| 2026-03-02 | 567 GWh |
| 2026-03-03 | 577 GWh |
| 2026-03-04 | 578 GWh |
| 2026-03-05 | 579 GWh |
| 2026-03-06 | 584 GWh |
| 2026-03-07 | 562 GWh |
| 2026-03-08 | 509 GWh |
| 2026-03-09 | 584 GWh |
| 2026-03-10 | 610 GWh |
| 2026-03-11 | 625 GWh |
| 2026-03-12 | 561 GWh |
| 2026-03-13 | 587 GWh |
| 2026-03-14 | 539 GWh |
| 2026-03-15 | 531 GWh |
| 2026-03-16 | 612 GWh |
| 2026-03-17 | 726 GWh |
| 2026-03-18 | 694 GWh |
| 2026-03-19 | 635 GWh |
| 2026-03-20 | 584 GWh |
| 2026-03-21 | 553 GWh |
| 2026-03-22 | 569 GWh |
| 2026-03-23 | 602 GWh |
| 2026-03-24 | 561 GWh |
| 2026-03-25 | 567 GWh |
| 2026-03-26 | 592 GWh |
| 2026-03-27 | 604 GWh |
| 2026-03-28 | 522 GWh |
| 2026-03-29 | 524 GWh |
| 2026-03-30 | 571 GWh |
| 2026-03-31 | 604 GWh |
| 2026-04-01 | 616 GWh |
| 2026-04-02 | 619 GWh |
| 2026-04-03 | 605 GWh |
| 2026-04-04 | 596 GWh |
| 2026-04-05 | 533 GWh |
| 2026-04-06 | 541 GWh |
| 2026-04-07 | 565 GWh |
| 2026-04-08 | 555 GWh |
| 2026-04-09 | 563 GWh |
| 2026-04-10 | 568 GWh |
| 2026-04-11 | 557 GWh |
| 2026-04-12 | 565 GWh |
| 2026-04-13 | 608 GWh |
| 2026-04-14 | 621 GWh |
| 2026-04-15 | 639 GWh |
| 2026-04-16 | 646 GWh |
| 2026-04-17 | 660 GWh |
| 2026-04-18 | 617 GWh |
| 2026-04-19 | 522 GWh |
| 2026-04-20 | 568 GWh |
| 2026-04-21 | 581 GWh |
| 2026-04-22 | 597 GWh |
| 2026-04-23 | 614 GWh |
| 2026-04-24 | 617 GWh |
| 2026-04-25 | 574 GWh |
| 2026-04-26 | 596 GWh |
| 2026-04-27 | 617 GWh |
| 2026-04-28 | 593 GWh |
| 2026-04-29 | 643 GWh |
| 2026-04-30 | 605 GWh |
| 2026-05-01 | 549 GWh |
| 2026-05-02 | 515 GWh |
| 2026-05-03 | 519 GWh |
| 2026-05-04 | 577 GWh |
| 2026-05-05 | 600 GWh |
| 2026-05-06 | 634 GWh |
| 2026-05-07 | 606 GWh |
| 2026-05-08 | 559 GWh |
| 2026-05-09 | 529 GWh |
| 2026-05-10 | 581 GWh |
| 2026-05-11 | 632 GWh |
| 2026-05-12 | 588 GWh |
| 2026-05-13 | 612 GWh |
| 2026-05-14 | 603 GWh |
| 2026-05-15 | 583 GWh |
| 2026-05-16 | 603 GWh |
| 2026-05-17 | 662 GWh |
| 2026-05-18 | 719 GWh |
| 2026-05-19 | 738 GWh |
| 2026-05-20 | 741 GWh |
| 2026-05-21 | 727 GWh |
| 2026-05-22 | 688 GWh |
| 2026-05-23 | 636 GWh |
| 2026-05-24 | 618 GWh |
| 2026-05-25 | 623 GWh |
| 2026-05-26 | 686 GWh |
| 2026-05-27 | 713 GWh |
| 2026-05-28 | 733 GWh |
| 2026-05-29 | 704 GWh |
| 2026-05-30 | 692 GWh |
| 2026-05-31 | 636 GWh |
| 2026-06-01 | 692 GWh |
| 2026-06-02 | 685 GWh |
| 2026-06-03 | 636 GWh |
| 2026-06-04 | 645 GWh |
| 2026-06-05 | 669 GWh |
| 2026-06-06 | 666 GWh |
| 2026-06-07 | 665 GWh |
| 2026-06-08 | 716 GWh |
| 2026-06-09 | 750 GWh |
| 2026-06-10 | 793 GWh |
| 2026-06-11 | 831 GWh |
| 2026-06-12 | 833 GWh |
| 2026-06-13 | 810 GWh |
| 2026-06-14 | 774 GWh |
| 2026-06-15 | 738 GWh |
| 2026-06-16 | 658 GWh |
| 2026-06-17 | 732 GWh |
| 2026-06-18 | 740 GWh |
| 2026-06-19 | 734 GWh |
| 2026-06-20 | 677 GWh |
| 2026-06-21 | 695 GWh |
| 2026-06-22 | 781 GWh |
| 2026-06-23 | 725 GWh |
| 2026-06-24 | 723 GWh |
| 2026-06-25 | 730 GWh |
| 2026-06-26 | 780 GWh |
| 2026-06-27 | 775 GWh |
| 2026-06-28 | 809 GWh |
| 2026-06-29 | 863 GWh |
| 2026-06-30 | 879 GWh |
| 2026-07-01 | 870 GWh |
| 2026-07-02 | 870 GWh |
| 2026-07-03 | 811 GWh |
| 2026-07-04 | 789 GWh |
| 2026-07-05 | 780 GWh |
| 2026-07-06 | 806 GWh |
| 2026-07-07 | 836 GWh |
| 2026-07-08 | 855 GWh |
| 2026-07-09 | 837 GWh |
| 2026-07-10 | 820 GWh |
| 2026-07-11 | 754 GWh |
| 2026-07-12 | 766 GWh |
| 2026-07-13 | 747 GWh |
| 2026-07-14 | 741 GWh |
| 2026-07-15 | 778 GWh |
| 2026-07-16 | 812 GWh |
| 2026-07-17 | 824 GWh |
| 2026-07-18 | 805 GWh |
| 2026-07-19 | 780 GWh |
| 2026-07-20 | 843 GWh |
| 2026-07-21 | 843 GWh |
| 2026-07-22 | 837 GWh |
| 2026-07-23 | 841 GWh |
| 2026-07-24 | 786 GWh |
| 2026-07-25 | 771 GWh |
| 2026-07-26 | 797 GWh |
| 2026-07-27 | 855 GWh |
| 2026-07-28 | 847 GWh |
| 2026-07-29 | 864 GWh |
| 2026-07-30 | 832 GWh |
| 2026-07-31 | 805 GWh |
| 2026-08-01 | 778 GWh |
| 2026-08-02 | 769 GWh |
| 2026-08-03 | 768 GWh |
| 2026-08-04 | 780 GWh |
| 2026-08-05 | 789 GWh |
| 2026-08-06 | 788 GWh |
| 2026-08-07 | 787 GWh |
| 2026-08-08 | 784 GWh |
| 2026-08-09 | 779 GWh |
| 2026-08-10 | 794 GWh |
| 2026-08-11 | 844 GWh |
| 2026-08-12 | 845 GWh |
| 2026-08-13 | 877 GWh |
| 2026-08-14 | 861 GWh |
| 2026-08-15 | 817 GWh |
| 2026-08-16 | 815 GWh |
| 2026-08-17 | 905 GWh |
| 2026-08-18 | 880 GWh |
| 2026-08-19 | 865 GWh |
| 2026-08-20 | 879 GWh |
| 2026-08-21 | 842 GWh |
| 2026-08-22 | 799 GWh |
| 2026-08-23 | 798 GWh |
| 2026-08-24 | 807 GWh |
| 2026-08-25 | 803 GWh |
| 2026-08-26 | 802 GWh |
| 2026-08-27 | 758 GWh |
| 2026-08-28 | 782 GWh |
| 2026-08-29 | 754 GWh |
| 2026-08-30 | 769 GWh |
| 2026-08-31 | 832 GWh |
| 2026-09-01 | 854 GWh |
| 2026-09-02 | 872 GWh |
| 2026-09-03 | 878 GWh |
| 2026-09-04 | 853 GWh |
| 2026-09-05 | 810 GWh |
| 2026-09-06 | 792 GWh |
| 2026-09-07 | 747 GWh |
| 2026-09-08 | 791 GWh |
| 2026-09-09 | 758 GWh |
| 2026-09-10 | 809 GWh |
| 2026-09-11 | 772 GWh |
| 2026-09-12 | 731 GWh |
| 2026-09-13 | 726 GWh |
| 2026-09-14 | 820 GWh |
| 2026-09-15 | 824 GWh |
| 2026-09-16 | 802 GWh |
| 2026-09-17 | 778 GWh |
| 2026-09-18 | 800 GWh |
| 2026-09-19 | 770 GWh |
| 2026-09-20 | 733 GWh |
| 2026-09-21 | 788 GWh |
| 2026-09-22 | 762 GWh |
| 2026-09-23 | 731 GWh |
| 2026-09-24 | 642 GWh |
| 2026-09-25 | 619 GWh |
| 2026-09-26 | 595 GWh |
| 2026-09-27 | 589 GWh |
| 2026-09-28 | 621 GWh |
| 2026-09-29 | 645 GWh |
| 2026-09-30 | 680 GWh |
| 2026-10-01 | 715 GWh |
| 2026-10-02 | 724 GWh |
| 2026-10-03 | 688 GWh |
| 2026-10-04 | 629 GWh |
| 2026-10-05 | 652 GWh |
| 2026-10-06 | 640 GWh |
| 2026-10-07 | 631 GWh |
| 2026-10-08 | 630 GWh |
| 2026-10-09 | 571 GWh |
| 2026-10-10 | 535 GWh |
| 2026-10-11 | 547 GWh |
| 2026-10-12 | 623 GWh |
| 2026-10-13 | 653 GWh |
| 2026-10-14 | 669 GWh |
| 2026-10-15 | 684 GWh |
| 2026-10-16 | 653 GWh |
| 2026-10-17 | 519 GWh |
| 2026-10-18 | 515 GWh |
| 2026-10-19 | 567 GWh |
| 2026-10-20 | 576 GWh |
| 2026-10-21 | 574 GWh |
| 2026-10-22 | 576 GWh |
| 2026-10-23 | 562 GWh |
| 2026-10-24 | 531 GWh |
| 2026-10-25 | 528 GWh |
| 2026-10-26 | 568 GWh |
| 2026-10-27 | 577 GWh |
| 2026-10-28 | 574 GWh |
| 2026-10-29 | 581 GWh |
| 2026-10-30 | 573 GWh |
| 2026-10-31 | 531 GWh |
| 2026-11-01 | 542 GWh |
| 2026-11-02 | 570 GWh |
| 2026-11-03 | 582 GWh |
| 2026-11-04 | 604 GWh |
| 2026-11-05 | 589 GWh |
| 2026-11-06 | 548 GWh |
| 2026-11-07 | 482 GWh |
| 2026-11-08 | 495 GWh |
| 2026-11-09 | 543 GWh |
| 2026-11-10 | 547 GWh |
| 2026-11-11 | 548 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 215 TWh | 225 TWh | Gas 49.9% | 315 |
| 2025 | 239 TWh | 249 TWh | Gas 49.8% | 365 |
| 2024 | 239 TWh | 250 TWh | Gas 50.6% | 366 |
| 2023 | 229 TWh | 240 TWh | Gas 54.1% | 365 |
| 2022 | 241 TWh | 245 TWh | Gas 53.4% | 365 |
| 2021 | 233 TWh | 239 TWh | Gas 50.5% | 365 |
| 2020 | 227 TWh | 232 TWh | Gas 54.2% | 366 |
| 2019 | 238 TWh | 245 TWh | Gas 51.1% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 991 GWh | 2025-01-21 (21 January 2025) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 47,656 MW | 17 Aug 2026, 15:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 10.9% | 2026-05-03 (3 May 2026) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11.
Power Flows With Neighbours
Net totals, 2026-10-13 (13 October 2026) to 2026-11-11 (11 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| SCEG | SOCO exports | 920 GWh |
| SC | SOCO exports | 378 GWh |
| FPL | SOCO exports | 302 GWh |
| TVA | SOCO imports | 160 GWh |
| SEPA | SOCO imports | 148 GWh |
| MISO | SOCO imports | 112 GWh |
| DUK | SOCO imports | 66.8 GWh |
| TAL | SOCO exports | 56.4 GWh |
| FPC | SOCO imports | 39.6 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11.
Share and Embed
Figures as of 2026-11-12 (12 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for SOCO, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). SOCO Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/soco/
World Power Monitor. SOCO Electricity Demand and Generation Mix. Data as of 2026-11-12 12:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/soco/
@misc{wpm_zones_soco_2026,
title = {{SOCO Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12 12:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/soco/}
} Permalink: https://worldpowermonitor.com/zones/soco/
The Copy buttons add today's date as the access date.