TVA Electricity Demand and Generation Mix
TVA demand was 15,362 MW in the hour starting 12 Nov 2026, 06:00 CST (UTC-06:00). Nuclear was the largest source in the hour starting 11 Nov 2026, 22:00 CST (UTC-06:00), at 51% of generation. Operator data is hourly and provisional, and may be revised.
Key Facts
- TVA is a balancing authority in the United States, part of the EIA Tennessee region.
- In the hour starting 12 Nov 2026, 06:00 CST (UTC-06:00), demand in TVA was 15,362 MW, against a day-ahead forecast of 17,744 MW.
- Nuclear supplied 50.8% of TVA's generation in the hour starting 11 Nov 2026, 22:00 CST (UTC-06:00).
- Demand in TVA totalled 171 TWh in 2025.
- Nuclear supplied 36.3% of TVA's generation in 2025.
- The highest daily demand in TVA from 2019 onward was 736 GWh, on 2022-12-23 (23 December 2022).
- The highest hourly demand in TVA since 2026-06-16 (16 June 2026) was 44,377 MW, in the hour starting 20 Oct 2026, 17:00 CDT (UTC-05:00).
- Solar's highest share of TVA's daily generation from 2019 onward was 9.4%, on 2026-09-17 (17 September 2026).
Latest Demand
Hourly operator dataLatest hour known when this page was built: 12 Nov 2026, 06:00 CST (UTC-06:00).
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12T12:00:00Z.
Generation by Source
Latest hour with generation by source: 11 Nov 2026, 22:00 CST (UTC-06:00)| Source | Output | Share |
|---|---|---|
| Nuclear | 7,308 MW | 50.8% |
| Gas | 3,614 MW | 25.1% |
| Coal | 2,237 MW | 15.5% |
| Hydro | 873 MW | 6.1% |
| Storage | 340 MW | 2.4% |
| Other | 20 MW | 0.1% |
| Geothermal | 0 MW | 0.0% |
| Oil | 0 MW | 0.0% |
| Wind | 0 MW | 0.0% |
| Solar | -5 MW | own use |
| Total from these sources | 14,392 MW | |
| Net interchange | -1,229 MW | net imports |
EIA publishes generation by source 10 or more hours after demand, so this hour can be earlier than the latest demand hour. Net interchange is positive when TVA exports.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12T04:00:00Z.
Last 30 Days, Hourly
Times in UTCShow the data table (720 rows)
| Hour starting (UTC) | Demand |
|---|---|
| 2026-10-13T14:00Z | 18,347 MW |
| 2026-10-13T15:00Z | 19,491 MW |
| 2026-10-13T16:00Z | 20,958 MW |
| 2026-10-13T17:00Z | 22,544 MW |
| 2026-10-13T18:00Z | 23,691 MW |
| 2026-10-13T19:00Z | 24,630 MW |
| 2026-10-13T20:00Z | 25,129 MW |
| 2026-10-13T21:00Z | 25,125 MW |
| 2026-10-13T22:00Z | 24,492 MW |
| 2026-10-13T23:00Z | 23,390 MW |
| 2026-10-14T00:00Z | 22,629 MW |
| 2026-10-14T01:00Z | 21,764 MW |
| 2026-10-14T02:00Z | 20,559 MW |
| 2026-10-14T03:00Z | 19,150 MW |
| 2026-10-14T04:00Z | 17,918 MW |
| 2026-10-14T05:00Z | 17,049 MW |
| 2026-10-14T06:00Z | 16,308 MW |
| 2026-10-14T07:00Z | 15,858 MW |
| 2026-10-14T08:00Z | 15,555 MW |
| 2026-10-14T09:00Z | 15,778 MW |
| 2026-10-14T10:00Z | 16,501 MW |
| 2026-10-14T11:00Z | 17,363 MW |
| 2026-10-14T12:00Z | 17,684 MW |
| 2026-10-14T13:00Z | 18,439 MW |
| 2026-10-14T14:00Z | 19,512 MW |
| 2026-10-14T15:00Z | 20,704 MW |
| 2026-10-14T16:00Z | 22,026 MW |
| 2026-10-14T17:00Z | 23,851 MW |
| 2026-10-14T18:00Z | 25,025 MW |
| 2026-10-14T19:00Z | 25,779 MW |
| 2026-10-14T20:00Z | 26,178 MW |
| 2026-10-14T21:00Z | 26,057 MW |
| 2026-10-14T22:00Z | 25,331 MW |
| 2026-10-14T23:00Z | 24,203 MW |
| 2026-10-15T00:00Z | 23,446 MW |
| 2026-10-15T01:00Z | 22,689 MW |
| 2026-10-15T02:00Z | 21,446 MW |
| 2026-10-15T03:00Z | 19,941 MW |
| 2026-10-15T04:00Z | 18,683 MW |
| 2026-10-15T05:00Z | 17,881 MW |
| 2026-10-15T06:00Z | 16,945 MW |
| 2026-10-15T07:00Z | 16,302 MW |
| 2026-10-15T08:00Z | 15,928 MW |
| 2026-10-15T09:00Z | 16,191 MW |
| 2026-10-15T10:00Z | 16,983 MW |
| 2026-10-15T11:00Z | 17,867 MW |
| 2026-10-15T12:00Z | 18,201 MW |
| 2026-10-15T13:00Z | 19,109 MW |
| 2026-10-15T14:00Z | 19,989 MW |
| 2026-10-15T15:00Z | 21,386 MW |
| 2026-10-15T16:00Z | 22,966 MW |
| 2026-10-15T17:00Z | 24,391 MW |
| 2026-10-15T18:00Z | 25,334 MW |
| 2026-10-15T19:00Z | 26,083 MW |
| 2026-10-15T20:00Z | 26,444 MW |
| 2026-10-15T21:00Z | 26,269 MW |
| 2026-10-15T22:00Z | 25,320 MW |
| 2026-10-15T23:00Z | 24,122 MW |
| 2026-10-16T00:00Z | 23,250 MW |
| 2026-10-16T01:00Z | 21,993 MW |
| 2026-10-16T02:00Z | 20,573 MW |
| 2026-10-16T03:00Z | 19,176 MW |
| 2026-10-16T04:00Z | 18,007 MW |
| 2026-10-16T05:00Z | 16,887 MW |
| 2026-10-16T06:00Z | 16,136 MW |
| 2026-10-16T07:00Z | 15,839 MW |
| 2026-10-16T08:00Z | 15,490 MW |
| 2026-10-16T09:00Z | 15,559 MW |
| 2026-10-16T10:00Z | 16,201 MW |
| 2026-10-16T11:00Z | 16,919 MW |
| 2026-10-16T12:00Z | 17,270 MW |
| 2026-10-16T13:00Z | 17,764 MW |
| 2026-10-16T14:00Z | 18,280 MW |
| 2026-10-16T15:00Z | 18,759 MW |
| 2026-10-16T16:00Z | 19,028 MW |
| 2026-10-16T17:00Z | 19,171 MW |
| 2026-10-16T18:00Z | 18,841 MW |
| 2026-10-16T19:00Z | 18,411 MW |
| 2026-10-16T20:00Z | 17,943 MW |
| 2026-10-16T21:00Z | 17,462 MW |
| 2026-10-16T22:00Z | 17,048 MW |
| 2026-10-16T23:00Z | 17,043 MW |
| 2026-10-17T00:00Z | 16,955 MW |
| 2026-10-17T01:00Z | 16,543 MW |
| 2026-10-17T02:00Z | 15,923 MW |
| 2026-10-17T03:00Z | 15,147 MW |
| 2026-10-17T04:00Z | 14,454 MW |
| 2026-10-17T05:00Z | 13,942 MW |
| 2026-10-17T06:00Z | 13,565 MW |
| 2026-10-17T07:00Z | 13,379 MW |
| 2026-10-17T08:00Z | 13,366 MW |
| 2026-10-17T09:00Z | 13,406 MW |
| 2026-10-17T10:00Z | 13,673 MW |
| 2026-10-17T11:00Z | 14,276 MW |
| 2026-10-17T12:00Z | 14,823 MW |
| 2026-10-17T13:00Z | 15,475 MW |
| 2026-10-17T14:00Z | 15,691 MW |
| 2026-10-17T15:00Z | 15,890 MW |
| 2026-10-17T16:00Z | 15,743 MW |
| 2026-10-17T17:00Z | 15,648 MW |
| 2026-10-17T18:00Z | 15,564 MW |
| 2026-10-17T19:00Z | 15,589 MW |
| 2026-10-17T20:00Z | 15,540 MW |
| 2026-10-17T21:00Z | 15,691 MW |
| 2026-10-17T22:00Z | 15,763 MW |
| 2026-10-17T23:00Z | 16,130 MW |
| 2026-10-18T00:00Z | 16,176 MW |
| 2026-10-18T01:00Z | 15,967 MW |
| 2026-10-18T02:00Z | 15,506 MW |
| 2026-10-18T03:00Z | 14,995 MW |
| 2026-10-18T04:00Z | 14,483 MW |
| 2026-10-18T05:00Z | 13,981 MW |
| 2026-10-18T06:00Z | 13,663 MW |
| 2026-10-18T07:00Z | 13,644 MW |
| 2026-10-18T08:00Z | 13,782 MW |
| 2026-10-18T09:00Z | 13,945 MW |
| 2026-10-18T10:00Z | 14,363 MW |
| 2026-10-18T11:00Z | 15,058 MW |
| 2026-10-18T12:00Z | 15,747 MW |
| 2026-10-18T13:00Z | 16,042 MW |
| 2026-10-18T14:00Z | 15,958 MW |
| 2026-10-18T15:00Z | 15,694 MW |
| 2026-10-18T16:00Z | 15,542 MW |
| 2026-10-18T17:00Z | 15,639 MW |
| 2026-10-18T18:00Z | 15,569 MW |
| 2026-10-18T19:00Z | 15,557 MW |
| 2026-10-18T20:00Z | 15,751 MW |
| 2026-10-18T21:00Z | 16,216 MW |
| 2026-10-18T22:00Z | 16,520 MW |
| 2026-10-18T23:00Z | 16,963 MW |
| 2026-10-19T00:00Z | 16,927 MW |
| 2026-10-19T01:00Z | 16,369 MW |
| 2026-10-19T02:00Z | 15,739 MW |
| 2026-10-19T03:00Z | 14,994 MW |
| 2026-10-19T04:00Z | 14,412 MW |
| 2026-10-19T05:00Z | 14,032 MW |
| 2026-10-19T06:00Z | 13,850 MW |
| 2026-10-19T07:00Z | 13,898 MW |
| 2026-10-19T08:00Z | 14,165 MW |
| 2026-10-19T09:00Z | 14,754 MW |
| 2026-10-19T10:00Z | 16,055 MW |
| 2026-10-19T11:00Z | 17,480 MW |
| 2026-10-19T12:00Z | 18,009 MW |
| 2026-10-19T13:00Z | 17,905 MW |
| 2026-10-19T14:00Z | 17,753 MW |
| 2026-10-19T15:00Z | 17,512 MW |
| 2026-10-19T16:00Z | 17,379 MW |
| 2026-10-19T17:00Z | 17,146 MW |
| 2026-10-19T18:00Z | 16,891 MW |
| 2026-10-19T19:00Z | 16,792 MW |
| 2026-10-19T20:00Z | 16,927 MW |
| 2026-10-19T21:00Z | 17,115 MW |
| 2026-10-19T22:00Z | 17,305 MW |
| 2026-10-19T23:00Z | 17,540 MW |
| 2026-10-20T00:00Z | 17,746 MW |
| 2026-10-20T01:00Z | 17,359 MW |
| 2026-10-20T02:00Z | 16,667 MW |
| 2026-10-20T03:00Z | 15,490 MW |
| 2026-10-20T04:00Z | 14,915 MW |
| 2026-10-20T05:00Z | 14,493 MW |
| 2026-10-20T06:00Z | 14,329 MW |
| 2026-10-20T07:00Z | 14,399 MW |
| 2026-10-20T08:00Z | 14,441 MW |
| 2026-10-20T09:00Z | 15,070 MW |
| 2026-10-20T10:00Z | 16,223 MW |
| 2026-10-20T11:00Z | 17,332 MW |
| 2026-10-20T12:00Z | 17,871 MW |
| 2026-10-20T13:00Z | 17,633 MW |
| 2026-10-20T14:00Z | 17,405 MW |
| 2026-10-20T15:00Z | 17,237 MW |
| 2026-10-20T16:00Z | 17,342 MW |
| 2026-10-20T17:00Z | 17,302 MW |
| 2026-10-20T18:00Z | 17,031 MW |
| 2026-10-20T19:00Z | 17,159 MW |
| 2026-10-20T20:00Z | 17,477 MW |
| 2026-10-20T21:00Z | 17,594 MW |
| 2026-10-20T22:00Z | 44,377 MW |
| 2026-10-20T23:00Z | 17,804 MW |
| 2026-10-21T00:00Z | 17,848 MW |
| 2026-10-21T01:00Z | 17,391 MW |
| 2026-10-21T02:00Z | 16,491 MW |
| 2026-10-21T03:00Z | 15,711 MW |
| 2026-10-21T04:00Z | 14,986 MW |
| 2026-10-21T05:00Z | 14,254 MW |
| 2026-10-21T06:00Z | 14,216 MW |
| 2026-10-21T07:00Z | 14,275 MW |
| 2026-10-21T08:00Z | 14,135 MW |
| 2026-10-21T09:00Z | 14,946 MW |
| 2026-10-21T10:00Z | 16,024 MW |
| 2026-10-21T11:00Z | 17,191 MW |
| 2026-10-21T12:00Z | 17,432 MW |
| 2026-10-21T13:00Z | 18,570 MW |
| 2026-10-21T14:00Z | 17,099 MW |
| 2026-10-21T15:00Z | 16,889 MW |
| 2026-10-21T16:00Z | 16,969 MW |
| 2026-10-21T17:00Z | 17,026 MW |
| 2026-10-21T18:00Z | 17,067 MW |
| 2026-10-21T19:00Z | 17,248 MW |
| 2026-10-21T20:00Z | 17,579 MW |
| 2026-10-21T21:00Z | 17,813 MW |
| 2026-10-21T22:00Z | 17,872 MW |
| 2026-10-21T23:00Z | 17,784 MW |
| 2026-10-22T00:00Z | 17,817 MW |
| 2026-10-22T01:00Z | 17,099 MW |
| 2026-10-22T02:00Z | 16,592 MW |
| 2026-10-22T03:00Z | 15,341 MW |
| 2026-10-22T04:00Z | 14,832 MW |
| 2026-10-22T05:00Z | 14,302 MW |
| 2026-10-22T06:00Z | 14,068 MW |
| 2026-10-22T07:00Z | 14,069 MW |
| 2026-10-22T08:00Z | 14,192 MW |
| 2026-10-22T09:00Z | 14,765 MW |
| 2026-10-22T10:00Z | 15,896 MW |
| 2026-10-22T11:00Z | 17,126 MW |
| 2026-10-22T12:00Z | 17,541 MW |
| 2026-10-22T13:00Z | 17,442 MW |
| 2026-10-22T14:00Z | 17,150 MW |
| 2026-10-22T15:00Z | 17,050 MW |
| 2026-10-22T16:00Z | 17,094 MW |
| 2026-10-22T17:00Z | 17,247 MW |
| 2026-10-22T18:00Z | 16,942 MW |
| 2026-10-22T19:00Z | 17,253 MW |
| 2026-10-22T20:00Z | 17,406 MW |
| 2026-10-22T21:00Z | 17,777 MW |
| 2026-10-22T22:00Z | 17,681 MW |
| 2026-10-22T23:00Z | 17,869 MW |
| 2026-10-23T00:00Z | 18,021 MW |
| 2026-10-23T01:00Z | 17,631 MW |
| 2026-10-23T02:00Z | 16,777 MW |
| 2026-10-23T03:00Z | 15,852 MW |
| 2026-10-23T04:00Z | 15,047 MW |
| 2026-10-23T05:00Z | 14,546 MW |
| 2026-10-23T06:00Z | 14,280 MW |
| 2026-10-23T07:00Z | 14,147 MW |
| 2026-10-23T08:00Z | 14,257 MW |
| 2026-10-23T09:00Z | 14,849 MW |
| 2026-10-23T10:00Z | 15,909 MW |
| 2026-10-23T11:00Z | 17,037 MW |
| 2026-10-23T12:00Z | 17,484 MW |
| 2026-10-23T13:00Z | 17,393 MW |
| 2026-10-23T14:00Z | 17,109 MW |
| 2026-10-23T15:00Z | 17,041 MW |
| 2026-10-23T16:00Z | 16,963 MW |
| 2026-10-23T17:00Z | 16,886 MW |
| 2026-10-23T18:00Z | 16,714 MW |
| 2026-10-23T19:00Z | 17,120 MW |
| 2026-10-23T20:00Z | 17,431 MW |
| 2026-10-23T21:00Z | 17,560 MW |
| 2026-10-23T22:00Z | 17,225 MW |
| 2026-10-23T23:00Z | 17,317 MW |
| 2026-10-24T00:00Z | 17,221 MW |
| 2026-10-24T01:00Z | 16,753 MW |
| 2026-10-24T02:00Z | 16,266 MW |
| 2026-10-24T03:00Z | 15,548 MW |
| 2026-10-24T04:00Z | 14,869 MW |
| 2026-10-24T05:00Z | 14,350 MW |
| 2026-10-24T06:00Z | 13,976 MW |
| 2026-10-24T07:00Z | 13,736 MW |
| 2026-10-24T08:00Z | 13,888 MW |
| 2026-10-24T09:00Z | 14,028 MW |
| 2026-10-24T10:00Z | 14,467 MW |
| 2026-10-24T11:00Z | 15,078 MW |
| 2026-10-24T12:00Z | 15,742 MW |
| 2026-10-24T13:00Z | 16,127 MW |
| 2026-10-24T14:00Z | 16,252 MW |
| 2026-10-24T15:00Z | 16,218 MW |
| 2026-10-24T16:00Z | 16,243 MW |
| 2026-10-24T17:00Z | 16,383 MW |
| 2026-10-24T18:00Z | 16,611 MW |
| 2026-10-24T19:00Z | 16,870 MW |
| 2026-10-24T20:00Z | 17,087 MW |
| 2026-10-24T21:00Z | 17,312 MW |
| 2026-10-24T22:00Z | 17,100 MW |
| 2026-10-24T23:00Z | 17,020 MW |
| 2026-10-25T00:00Z | 16,669 MW |
| 2026-10-25T01:00Z | 16,311 MW |
| 2026-10-25T02:00Z | 15,663 MW |
| 2026-10-25T03:00Z | 15,035 MW |
| 2026-10-25T04:00Z | 14,440 MW |
| 2026-10-25T05:00Z | 13,856 MW |
| 2026-10-25T06:00Z | 13,527 MW |
| 2026-10-25T07:00Z | 13,451 MW |
| 2026-10-25T08:00Z | 13,365 MW |
| 2026-10-25T09:00Z | 13,546 MW |
| 2026-10-25T10:00Z | 13,970 MW |
| 2026-10-25T11:00Z | 14,555 MW |
| 2026-10-25T12:00Z | 15,176 MW |
| 2026-10-25T13:00Z | 15,761 MW |
| 2026-10-25T14:00Z | 15,543 MW |
| 2026-10-25T15:00Z | 15,671 MW |
| 2026-10-25T16:00Z | 15,820 MW |
| 2026-10-25T17:00Z | 16,165 MW |
| 2026-10-25T18:00Z | 16,436 MW |
| 2026-10-25T19:00Z | 16,818 MW |
| 2026-10-25T20:00Z | 17,090 MW |
| 2026-10-25T21:00Z | 17,343 MW |
| 2026-10-25T22:00Z | 17,367 MW |
| 2026-10-25T23:00Z | 17,582 MW |
| 2026-10-26T00:00Z | 17,329 MW |
| 2026-10-26T01:00Z | 16,719 MW |
| 2026-10-26T02:00Z | 16,063 MW |
| 2026-10-26T03:00Z | 15,129 MW |
| 2026-10-26T04:00Z | 14,414 MW |
| 2026-10-26T05:00Z | 13,914 MW |
| 2026-10-26T06:00Z | 13,662 MW |
| 2026-10-26T07:00Z | 13,520 MW |
| 2026-10-26T08:00Z | 13,727 MW |
| 2026-10-26T09:00Z | 14,565 MW |
| 2026-10-26T10:00Z | 15,733 MW |
| 2026-10-26T11:00Z | 17,018 MW |
| 2026-10-26T12:00Z | 17,441 MW |
| 2026-10-26T13:00Z | 17,396 MW |
| 2026-10-26T14:00Z | 17,340 MW |
| 2026-10-26T15:00Z | 17,346 MW |
| 2026-10-26T16:00Z | 17,340 MW |
| 2026-10-26T17:00Z | 17,237 MW |
| 2026-10-26T18:00Z | 17,354 MW |
| 2026-10-26T19:00Z | 17,165 MW |
| 2026-10-26T20:00Z | 17,360 MW |
| 2026-10-26T21:00Z | 17,480 MW |
| 2026-10-26T22:00Z | 17,605 MW |
| 2026-10-26T23:00Z | 18,226 MW |
| 2026-10-27T00:00Z | 18,251 MW |
| 2026-10-27T01:00Z | 17,808 MW |
| 2026-10-27T02:00Z | 17,008 MW |
| 2026-10-27T03:00Z | 15,908 MW |
| 2026-10-27T04:00Z | 14,848 MW |
| 2026-10-27T05:00Z | 14,246 MW |
| 2026-10-27T06:00Z | 14,153 MW |
| 2026-10-27T07:00Z | 14,106 MW |
| 2026-10-27T08:00Z | 14,227 MW |
| 2026-10-27T09:00Z | 14,922 MW |
| 2026-10-27T10:00Z | 16,093 MW |
| 2026-10-27T11:00Z | 17,331 MW |
| 2026-10-27T12:00Z | 17,670 MW |
| 2026-10-27T13:00Z | 17,627 MW |
| 2026-10-27T14:00Z | 17,467 MW |
| 2026-10-27T15:00Z | 17,389 MW |
| 2026-10-27T16:00Z | 17,535 MW |
| 2026-10-27T17:00Z | 17,532 MW |
| 2026-10-27T18:00Z | 17,438 MW |
| 2026-10-27T19:00Z | 17,574 MW |
| 2026-10-27T20:00Z | 17,664 MW |
| 2026-10-27T21:00Z | 17,842 MW |
| 2026-10-27T22:00Z | 17,921 MW |
| 2026-10-27T23:00Z | 18,121 MW |
| 2026-10-28T00:00Z | 18,163 MW |
| 2026-10-28T01:00Z | 17,639 MW |
| 2026-10-28T02:00Z | 16,792 MW |
| 2026-10-28T03:00Z | 15,775 MW |
| 2026-10-28T04:00Z | 14,933 MW |
| 2026-10-28T05:00Z | 14,380 MW |
| 2026-10-28T06:00Z | 14,150 MW |
| 2026-10-28T07:00Z | 13,994 MW |
| 2026-10-28T08:00Z | 14,122 MW |
| 2026-10-28T09:00Z | 14,441 MW |
| 2026-10-28T10:00Z | 15,569 MW |
| 2026-10-28T11:00Z | 16,808 MW |
| 2026-10-28T12:00Z | 17,163 MW |
| 2026-10-28T13:00Z | 17,169 MW |
| 2026-10-28T14:00Z | 17,184 MW |
| 2026-10-28T15:00Z | 17,314 MW |
| 2026-10-28T16:00Z | 17,460 MW |
| 2026-10-28T17:00Z | 17,532 MW |
| 2026-10-28T18:00Z | 17,519 MW |
| 2026-10-28T19:00Z | 17,559 MW |
| 2026-10-28T20:00Z | 17,837 MW |
| 2026-10-28T21:00Z | 18,094 MW |
| 2026-10-28T22:00Z | 17,867 MW |
| 2026-10-28T23:00Z | 17,974 MW |
| 2026-10-29T00:00Z | 18,031 MW |
| 2026-10-29T01:00Z | 17,729 MW |
| 2026-10-29T02:00Z | 16,733 MW |
| 2026-10-29T03:00Z | 15,760 MW |
| 2026-10-29T04:00Z | 15,052 MW |
| 2026-10-29T05:00Z | 14,481 MW |
| 2026-10-29T06:00Z | 14,158 MW |
| 2026-10-29T07:00Z | 14,002 MW |
| 2026-10-29T08:00Z | 14,164 MW |
| 2026-10-29T09:00Z | 14,756 MW |
| 2026-10-29T10:00Z | 15,864 MW |
| 2026-10-29T11:00Z | 17,125 MW |
| 2026-10-29T12:00Z | 17,470 MW |
| 2026-10-29T13:00Z | 17,447 MW |
| 2026-10-29T14:00Z | 17,256 MW |
| 2026-10-29T15:00Z | 17,236 MW |
| 2026-10-29T16:00Z | 17,499 MW |
| 2026-10-29T17:00Z | 17,540 MW |
| 2026-10-29T18:00Z | 17,586 MW |
| 2026-10-29T19:00Z | 17,795 MW |
| 2026-10-29T20:00Z | 18,141 MW |
| 2026-10-29T21:00Z | 18,280 MW |
| 2026-10-29T22:00Z | 18,101 MW |
| 2026-10-29T23:00Z | 18,195 MW |
| 2026-10-30T00:00Z | 18,177 MW |
| 2026-10-30T01:00Z | 17,691 MW |
| 2026-10-30T02:00Z | 16,837 MW |
| 2026-10-30T03:00Z | 15,809 MW |
| 2026-10-30T04:00Z | 14,977 MW |
| 2026-10-30T05:00Z | 14,343 MW |
| 2026-10-30T06:00Z | 13,925 MW |
| 2026-10-30T07:00Z | 13,788 MW |
| 2026-10-30T08:00Z | 13,892 MW |
| 2026-10-30T09:00Z | 14,449 MW |
| 2026-10-30T10:00Z | 15,508 MW |
| 2026-10-30T11:00Z | 16,727 MW |
| 2026-10-30T12:00Z | 17,077 MW |
| 2026-10-30T13:00Z | 17,097 MW |
| 2026-10-30T14:00Z | 17,059 MW |
| 2026-10-30T15:00Z | 17,103 MW |
| 2026-10-30T16:00Z | 17,162 MW |
| 2026-10-30T17:00Z | 17,629 MW |
| 2026-10-30T18:00Z | 17,722 MW |
| 2026-10-30T19:00Z | 17,947 MW |
| 2026-10-30T20:00Z | 18,156 MW |
| 2026-10-30T21:00Z | 18,162 MW |
| 2026-10-30T22:00Z | 17,736 MW |
| 2026-10-30T23:00Z | 17,736 MW |
| 2026-10-31T00:00Z | 17,487 MW |
| 2026-10-31T01:00Z | 17,042 MW |
| 2026-10-31T02:00Z | 16,346 MW |
| 2026-10-31T03:00Z | 15,579 MW |
| 2026-10-31T04:00Z | 14,831 MW |
| 2026-10-31T05:00Z | 14,216 MW |
| 2026-10-31T06:00Z | 13,719 MW |
| 2026-10-31T07:00Z | 13,472 MW |
| 2026-10-31T08:00Z | 13,307 MW |
| 2026-10-31T09:00Z | 13,463 MW |
| 2026-10-31T10:00Z | 13,820 MW |
| 2026-10-31T11:00Z | 14,275 MW |
| 2026-10-31T12:00Z | 14,692 MW |
| 2026-10-31T13:00Z | 15,364 MW |
| 2026-10-31T14:00Z | 15,842 MW |
| 2026-10-31T15:00Z | 16,165 MW |
| 2026-10-31T16:00Z | 16,444 MW |
| 2026-10-31T17:00Z | 16,643 MW |
| 2026-10-31T18:00Z | 16,835 MW |
| 2026-10-31T19:00Z | 16,942 MW |
| 2026-10-31T20:00Z | 17,004 MW |
| 2026-10-31T21:00Z | 16,872 MW |
| 2026-10-31T22:00Z | 16,587 MW |
| 2026-10-31T23:00Z | 16,472 MW |
| 2026-11-01T00:00Z | 16,209 MW |
| 2026-11-01T01:00Z | 16,026 MW |
| 2026-11-01T02:00Z | 15,577 MW |
| 2026-11-01T03:00Z | 14,979 MW |
| 2026-11-01T04:00Z | 14,286 MW |
| 2026-11-01T05:00Z | 13,698 MW |
| 2026-11-01T06:00Z | 13,329 MW |
| 2026-11-01T07:00Z | 12,982 MW |
| 2026-11-01T08:00Z | 12,958 MW |
| 2026-11-01T09:00Z | 12,971 MW |
| 2026-11-01T10:00Z | 13,079 MW |
| 2026-11-01T11:00Z | 13,372 MW |
| 2026-11-01T12:00Z | 13,894 MW |
| 2026-11-01T13:00Z | 14,663 MW |
| 2026-11-01T14:00Z | 15,424 MW |
| 2026-11-01T15:00Z | 15,674 MW |
| 2026-11-01T16:00Z | 16,033 MW |
| 2026-11-01T17:00Z | 15,968 MW |
| 2026-11-01T18:00Z | 16,115 MW |
| 2026-11-01T19:00Z | 16,180 MW |
| 2026-11-01T20:00Z | 16,184 MW |
| 2026-11-01T21:00Z | 16,373 MW |
| 2026-11-01T22:00Z | 16,832 MW |
| 2026-11-01T23:00Z | 17,328 MW |
| 2026-11-02T00:00Z | 17,137 MW |
| 2026-11-02T01:00Z | 16,803 MW |
| 2026-11-02T02:00Z | 16,351 MW |
| 2026-11-02T03:00Z | 15,636 MW |
| 2026-11-02T04:00Z | 14,837 MW |
| 2026-11-02T05:00Z | 14,197 MW |
| 2026-11-02T06:00Z | 13,878 MW |
| 2026-11-02T07:00Z | 13,669 MW |
| 2026-11-02T08:00Z | 13,610 MW |
| 2026-11-02T09:00Z | 13,617 MW |
| 2026-11-02T10:00Z | 13,892 MW |
| 2026-11-02T11:00Z | 15,108 MW |
| 2026-11-02T12:00Z | 16,103 MW |
| 2026-11-02T13:00Z | 16,569 MW |
| 2026-11-02T14:00Z | 16,752 MW |
| 2026-11-02T15:00Z | 16,888 MW |
| 2026-11-02T16:00Z | 17,439 MW |
| 2026-11-02T17:00Z | 17,787 MW |
| 2026-11-02T18:00Z | 17,999 MW |
| 2026-11-02T19:00Z | 18,207 MW |
| 2026-11-02T20:00Z | 18,265 MW |
| 2026-11-02T21:00Z | 18,561 MW |
| 2026-11-02T22:00Z | 18,635 MW |
| 2026-11-02T23:00Z | 19,075 MW |
| 2026-11-03T00:00Z | 18,814 MW |
| 2026-11-03T01:00Z | 18,124 MW |
| 2026-11-03T02:00Z | 17,497 MW |
| 2026-11-03T03:00Z | 16,599 MW |
| 2026-11-03T04:00Z | 15,749 MW |
| 2026-11-03T05:00Z | 15,749 MW |
| 2026-11-03T06:00Z | 14,246 MW |
| 2026-11-03T07:00Z | 13,932 MW |
| 2026-11-03T08:00Z | 13,791 MW |
| 2026-11-03T09:00Z | 13,683 MW |
| 2026-11-03T10:00Z | 13,765 MW |
| 2026-11-03T11:00Z | 14,763 MW |
| 2026-11-03T12:00Z | 15,821 MW |
| 2026-11-03T13:00Z | 16,192 MW |
| 2026-11-03T14:00Z | 16,466 MW |
| 2026-11-03T15:00Z | 16,845 MW |
| 2026-11-03T16:00Z | 17,646 MW |
| 2026-11-03T17:00Z | 18,214 MW |
| 2026-11-03T18:00Z | 18,462 MW |
| 2026-11-03T19:00Z | 18,469 MW |
| 2026-11-03T20:00Z | 18,563 MW |
| 2026-11-03T21:00Z | 18,406 MW |
| 2026-11-03T22:00Z | 18,571 MW |
| 2026-11-03T23:00Z | 18,982 MW |
| 2026-11-04T00:00Z | 18,837 MW |
| 2026-11-04T01:00Z | 18,467 MW |
| 2026-11-04T02:00Z | 17,962 MW |
| 2026-11-04T03:00Z | 17,154 MW |
| 2026-11-04T04:00Z | 16,272 MW |
| 2026-11-04T05:00Z | 15,421 MW |
| 2026-11-04T06:00Z | 14,704 MW |
| 2026-11-04T07:00Z | 14,348 MW |
| 2026-11-04T08:00Z | 14,079 MW |
| 2026-11-04T09:00Z | 14,028 MW |
| 2026-11-04T10:00Z | 14,090 MW |
| 2026-11-04T11:00Z | 15,110 MW |
| 2026-11-04T12:00Z | 16,116 MW |
| 2026-11-04T13:00Z | 16,531 MW |
| 2026-11-04T14:00Z | 16,837 MW |
| 2026-11-04T15:00Z | 17,089 MW |
| 2026-11-04T16:00Z | 17,528 MW |
| 2026-11-04T17:00Z | 17,773 MW |
| 2026-11-04T18:00Z | 17,720 MW |
| 2026-11-04T19:00Z | 17,831 MW |
| 2026-11-04T20:00Z | 17,833 MW |
| 2026-11-04T21:00Z | 17,967 MW |
| 2026-11-04T22:00Z | 18,204 MW |
| 2026-11-04T23:00Z | 18,414 MW |
| 2026-11-05T00:00Z | 17,840 MW |
| 2026-11-05T01:00Z | 17,455 MW |
| 2026-11-05T02:00Z | 16,980 MW |
| 2026-11-05T03:00Z | 16,144 MW |
| 2026-11-05T04:00Z | 15,122 MW |
| 2026-11-05T05:00Z | 14,235 MW |
| 2026-11-05T06:00Z | 14,038 MW |
| 2026-11-05T07:00Z | 13,858 MW |
| 2026-11-05T08:00Z | 13,709 MW |
| 2026-11-05T09:00Z | 13,630 MW |
| 2026-11-05T10:00Z | 13,802 MW |
| 2026-11-05T11:00Z | 14,862 MW |
| 2026-11-05T12:00Z | 15,963 MW |
| 2026-11-05T13:00Z | 16,260 MW |
| 2026-11-05T14:00Z | 16,534 MW |
| 2026-11-05T15:00Z | 16,715 MW |
| 2026-11-05T16:00Z | 17,364 MW |
| 2026-11-05T17:00Z | 17,733 MW |
| 2026-11-05T18:00Z | 17,879 MW |
| 2026-11-05T19:00Z | 18,228 MW |
| 2026-11-05T20:00Z | 18,399 MW |
| 2026-11-05T21:00Z | 18,307 MW |
| 2026-11-05T22:00Z | 18,135 MW |
| 2026-11-05T23:00Z | 18,446 MW |
| 2026-11-06T00:00Z | 18,153 MW |
| 2026-11-06T01:00Z | 17,709 MW |
| 2026-11-06T02:00Z | 17,161 MW |
| 2026-11-06T03:00Z | 16,277 MW |
| 2026-11-06T04:00Z | 15,488 MW |
| 2026-11-06T05:00Z | 14,719 MW |
| 2026-11-06T06:00Z | 14,234 MW |
| 2026-11-06T07:00Z | 13,937 MW |
| 2026-11-06T08:00Z | 13,796 MW |
| 2026-11-06T09:00Z | 13,751 MW |
| 2026-11-06T10:00Z | 13,511 MW |
| 2026-11-06T11:00Z | 14,971 MW |
| 2026-11-06T12:00Z | 15,904 MW |
| 2026-11-06T13:00Z | 16,288 MW |
| 2026-11-06T14:00Z | 16,506 MW |
| 2026-11-06T15:00Z | 16,575 MW |
| 2026-11-06T16:00Z | 16,877 MW |
| 2026-11-06T17:00Z | 16,849 MW |
| 2026-11-06T18:00Z | 17,157 MW |
| 2026-11-06T19:00Z | 16,906 MW |
| 2026-11-06T20:00Z | 17,069 MW |
| 2026-11-06T21:00Z | 17,176 MW |
| 2026-11-06T22:00Z | 17,014 MW |
| 2026-11-06T23:00Z | 17,509 MW |
| 2026-11-07T00:00Z | 17,296 MW |
| 2026-11-07T01:00Z | 16,943 MW |
| 2026-11-07T02:00Z | 16,543 MW |
| 2026-11-07T03:00Z | 16,152 MW |
| 2026-11-07T04:00Z | 15,527 MW |
| 2026-11-07T05:00Z | 14,870 MW |
| 2026-11-07T06:00Z | 14,449 MW |
| 2026-11-07T07:00Z | 14,125 MW |
| 2026-11-07T08:00Z | 14,078 MW |
| 2026-11-07T09:00Z | 14,182 MW |
| 2026-11-07T10:00Z | 14,458 MW |
| 2026-11-07T11:00Z | 14,997 MW |
| 2026-11-07T12:00Z | 15,685 MW |
| 2026-11-07T13:00Z | 16,259 MW |
| 2026-11-07T14:00Z | 16,748 MW |
| 2026-11-07T15:00Z | 16,420 MW |
| 2026-11-07T16:00Z | 16,235 MW |
| 2026-11-07T17:00Z | 16,039 MW |
| 2026-11-07T18:00Z | 15,850 MW |
| 2026-11-07T19:00Z | 15,594 MW |
| 2026-11-07T20:00Z | 15,635 MW |
| 2026-11-07T21:00Z | 15,876 MW |
| 2026-11-07T22:00Z | 16,470 MW |
| 2026-11-07T23:00Z | 16,789 MW |
| 2026-11-08T00:00Z | 16,936 MW |
| 2026-11-08T01:00Z | 16,858 MW |
| 2026-11-08T02:00Z | 16,753 MW |
| 2026-11-08T03:00Z | 16,476 MW |
| 2026-11-08T04:00Z | 16,088 MW |
| 2026-11-08T05:00Z | 15,582 MW |
| 2026-11-08T06:00Z | 15,349 MW |
| 2026-11-08T07:00Z | 15,236 MW |
| 2026-11-08T08:00Z | 15,189 MW |
| 2026-11-08T09:00Z | 15,577 MW |
| 2026-11-08T10:00Z | 15,906 MW |
| 2026-11-08T11:00Z | 16,419 MW |
| 2026-11-08T12:00Z | 17,197 MW |
| 2026-11-08T13:00Z | 17,681 MW |
| 2026-11-08T14:00Z | 17,226 MW |
| 2026-11-08T15:00Z | 16,560 MW |
| 2026-11-08T16:00Z | 16,062 MW |
| 2026-11-08T17:00Z | 15,789 MW |
| 2026-11-08T18:00Z | 15,661 MW |
| 2026-11-08T19:00Z | 15,694 MW |
| 2026-11-08T20:00Z | 15,762 MW |
| 2026-11-08T21:00Z | 15,829 MW |
| 2026-11-08T22:00Z | 16,409 MW |
| 2026-11-08T23:00Z | 17,256 MW |
| 2026-11-09T00:00Z | 17,351 MW |
| 2026-11-09T01:00Z | 17,291 MW |
| 2026-11-09T02:00Z | 17,035 MW |
| 2026-11-09T03:00Z | 16,523 MW |
| 2026-11-09T04:00Z | 15,891 MW |
| 2026-11-09T05:00Z | 15,531 MW |
| 2026-11-09T06:00Z | 15,401 MW |
| 2026-11-09T07:00Z | 15,262 MW |
| 2026-11-09T08:00Z | 15,461 MW |
| 2026-11-09T09:00Z | 15,688 MW |
| 2026-11-09T10:00Z | 16,290 MW |
| 2026-11-09T11:00Z | 17,763 MW |
| 2026-11-09T12:00Z | 19,273 MW |
| 2026-11-09T13:00Z | 18,976 MW |
| 2026-11-09T14:00Z | 18,119 MW |
| 2026-11-09T15:00Z | 17,501 MW |
| 2026-11-09T16:00Z | 17,261 MW |
| 2026-11-09T17:00Z | 17,231 MW |
| 2026-11-09T18:00Z | 17,121 MW |
| 2026-11-09T19:00Z | 17,106 MW |
| 2026-11-09T20:00Z | 17,026 MW |
| 2026-11-09T21:00Z | 17,163 MW |
| 2026-11-09T22:00Z | 17,457 MW |
| 2026-11-09T23:00Z | 18,137 MW |
| 2026-11-10T00:00Z | 18,109 MW |
| 2026-11-10T01:00Z | 17,782 MW |
| 2026-11-10T02:00Z | 17,438 MW |
| 2026-11-10T03:00Z | 16,966 MW |
| 2026-11-10T04:00Z | 16,098 MW |
| 2026-11-10T05:00Z | 15,436 MW |
| 2026-11-10T06:00Z | 15,251 MW |
| 2026-11-10T07:00Z | 15,381 MW |
| 2026-11-10T08:00Z | 15,227 MW |
| 2026-11-10T09:00Z | 15,416 MW |
| 2026-11-10T10:00Z | 15,798 MW |
| 2026-11-10T11:00Z | 17,218 MW |
| 2026-11-10T12:00Z | 18,599 MW |
| 2026-11-10T13:00Z | 18,526 MW |
| 2026-11-10T14:00Z | 17,772 MW |
| 2026-11-10T15:00Z | 17,106 MW |
| 2026-11-10T16:00Z | 16,998 MW |
| 2026-11-10T17:00Z | 17,045 MW |
| 2026-11-10T18:00Z | 16,961 MW |
| 2026-11-10T19:00Z | 16,936 MW |
| 2026-11-10T20:00Z | 16,913 MW |
| 2026-11-10T21:00Z | 17,020 MW |
| 2026-11-10T22:00Z | 17,293 MW |
| 2026-11-10T23:00Z | 17,861 MW |
| 2026-11-11T00:00Z | 17,814 MW |
| 2026-11-11T01:00Z | 17,596 MW |
| 2026-11-11T02:00Z | 17,238 MW |
| 2026-11-11T03:00Z | 16,652 MW |
| 2026-11-11T04:00Z | 16,091 MW |
| 2026-11-11T05:00Z | 15,355 MW |
| 2026-11-11T06:00Z | 15,146 MW |
| 2026-11-11T07:00Z | 15,063 MW |
| 2026-11-11T08:00Z | 15,104 MW |
| 2026-11-11T09:00Z | 15,221 MW |
| 2026-11-11T10:00Z | 15,647 MW |
| 2026-11-11T11:00Z | 16,846 MW |
| 2026-11-11T12:00Z | 17,883 MW |
| 2026-11-11T13:00Z | 18,027 MW |
| 2026-11-11T14:00Z | 17,558 MW |
| 2026-11-11T15:00Z | 17,262 MW |
| 2026-11-11T16:00Z | 17,207 MW |
| 2026-11-11T17:00Z | 17,096 MW |
| 2026-11-11T18:00Z | 16,966 MW |
| 2026-11-11T19:00Z | 16,952 MW |
| 2026-11-11T20:00Z | 16,904 MW |
| 2026-11-11T21:00Z | 16,971 MW |
| 2026-11-11T22:00Z | 17,304 MW |
| 2026-11-11T23:00Z | 17,931 MW |
| 2026-11-12T00:00Z | 17,970 MW |
| 2026-11-12T01:00Z | 17,644 MW |
| 2026-11-12T02:00Z | 17,181 MW |
| 2026-11-12T03:00Z | 16,385 MW |
| 2026-11-12T04:00Z | 15,619 MW |
| 2026-11-12T05:00Z | 14,788 MW |
| 2026-11-12T06:00Z | 14,329 MW |
| 2026-11-12T07:00Z | 14,076 MW |
| 2026-11-12T08:00Z | 13,921 MW |
| 2026-11-12T09:00Z | 13,837 MW |
| 2026-11-12T10:00Z | 14,428 MW |
| 2026-11-12T11:00Z | 15,362 MW |
| 2026-11-12T12:00Z | 15,362 MW |
| 2026-11-12T13:00Z | n/a |
Show the data table (720 rows)
| Hour starting (UTC) | Nuclear | Gas | Coal | Hydro | Solar |
|---|---|---|---|---|---|
| 2026-10-13T14:00Z | 7,224 MW | 4,539 MW | 2,931 MW | 1,755 MW | 1,404 MW |
| 2026-10-13T15:00Z | 7,209 MW | 5,138 MW | 3,166 MW | 2,004 MW | 1,407 MW |
| 2026-10-13T16:00Z | 7,179 MW | 5,541 MW | 3,231 MW | 2,187 MW | 1,461 MW |
| 2026-10-13T17:00Z | 7,155 MW | 6,526 MW | 3,238 MW | 2,587 MW | 1,436 MW |
| 2026-10-13T18:00Z | 7,130 MW | 7,035 MW | 3,235 MW | 2,725 MW | 1,367 MW |
| 2026-10-13T19:00Z | 7,115 MW | 7,000 MW | 3,236 MW | 2,810 MW | 1,374 MW |
| 2026-10-13T20:00Z | 7,095 MW | 7,192 MW | 3,229 MW | 2,912 MW | 1,409 MW |
| 2026-10-13T21:00Z | 7,081 MW | 6,965 MW | 3,245 MW | 2,992 MW | 1,202 MW |
| 2026-10-13T22:00Z | 7,067 MW | 7,042 MW | 3,243 MW | 3,067 MW | 444 MW |
| 2026-10-13T23:00Z | 7,059 MW | 6,861 MW | 3,240 MW | 2,963 MW | -2 MW |
| 2026-10-14T00:00Z | 7,054 MW | 6,889 MW | 3,243 MW | 2,832 MW | 9 MW |
| 2026-10-14T01:00Z | 7,065 MW | 6,785 MW | 3,252 MW | 2,650 MW | 19 MW |
| 2026-10-14T02:00Z | 7,067 MW | 6,338 MW | 3,142 MW | 2,458 MW | -7 MW |
| 2026-10-14T03:00Z | 7,070 MW | 6,150 MW | 2,899 MW | 2,037 MW | -6 MW |
| 2026-10-14T04:00Z | 7,066 MW | 5,395 MW | 2,789 MW | 1,552 MW | -5 MW |
| 2026-10-14T05:00Z | 7,074 MW | 5,327 MW | 2,697 MW | 881 MW | -22 MW |
| 2026-10-14T06:00Z | 7,069 MW | 5,228 MW | 2,665 MW | 809 MW | -36 MW |
| 2026-10-14T07:00Z | 7,068 MW | 5,065 MW | 2,688 MW | 829 MW | -60 MW |
| 2026-10-14T08:00Z | 7,072 MW | 5,157 MW | 2,672 MW | 859 MW | -51 MW |
| 2026-10-14T09:00Z | 7,066 MW | 5,509 MW | 2,677 MW | 849 MW | -64 MW |
| 2026-10-14T10:00Z | 6,795 MW | 5,781 MW | 2,675 MW | 915 MW | -21 MW |
| 2026-10-14T11:00Z | 6,890 MW | 5,457 MW | 2,744 MW | 1,152 MW | -73 MW |
| 2026-10-14T12:00Z | 7,062 MW | 4,981 MW | 2,854 MW | 1,171 MW | 45 MW |
| 2026-10-14T13:00Z | 7,109 MW | 4,611 MW | 2,872 MW | 1,360 MW | 646 MW |
| 2026-10-14T14:00Z | 7,152 MW | 4,985 MW | 2,892 MW | 1,711 MW | 965 MW |
| 2026-10-14T15:00Z | 7,187 MW | 5,484 MW | 3,148 MW | 1,953 MW | 1,057 MW |
| 2026-10-14T16:00Z | 7,196 MW | 6,174 MW | 3,254 MW | 2,321 MW | 1,137 MW |
| 2026-10-14T17:00Z | 7,203 MW | 6,864 MW | 3,257 MW | 2,618 MW | 1,133 MW |
| 2026-10-14T18:00Z | 7,189 MW | 7,109 MW | 3,264 MW | 2,944 MW | 1,185 MW |
| 2026-10-14T19:00Z | 7,182 MW | 7,137 MW | 3,256 MW | 3,207 MW | 1,192 MW |
| 2026-10-14T20:00Z | 7,181 MW | 7,247 MW | 3,252 MW | 3,383 MW | 1,120 MW |
| 2026-10-14T21:00Z | 7,184 MW | 7,220 MW | 3,258 MW | 3,512 MW | 870 MW |
| 2026-10-14T22:00Z | 7,175 MW | 7,233 MW | 3,251 MW | 3,567 MW | 306 MW |
| 2026-10-14T23:00Z | 7,173 MW | 7,063 MW | 3,257 MW | 3,425 MW | 39 MW |
| 2026-10-15T00:00Z | 7,182 MW | 7,137 MW | 3,222 MW | 3,260 MW | 73 MW |
| 2026-10-15T01:00Z | 7,178 MW | 6,782 MW | 3,256 MW | 2,904 MW | 51 MW |
| 2026-10-15T02:00Z | 7,187 MW | 6,462 MW | 3,267 MW | 2,508 MW | -6 MW |
| 2026-10-15T03:00Z | 7,188 MW | 6,251 MW | 3,200 MW | 1,959 MW | -9 MW |
| 2026-10-15T04:00Z | 7,198 MW | 6,393 MW | 3,019 MW | 1,407 MW | -4 MW |
| 2026-10-15T05:00Z | 7,198 MW | 6,273 MW | 2,965 MW | 871 MW | -21 MW |
| 2026-10-15T06:00Z | 7,200 MW | 6,087 MW | 2,926 MW | 828 MW | -34 MW |
| 2026-10-15T07:00Z | 7,201 MW | 5,550 MW | 2,877 MW | 828 MW | -50 MW |
| 2026-10-15T08:00Z | 7,201 MW | 5,220 MW | 2,881 MW | 827 MW | -61 MW |
| 2026-10-15T09:00Z | 7,202 MW | 5,585 MW | 2,873 MW | 816 MW | -66 MW |
| 2026-10-15T10:00Z | 7,212 MW | 6,214 MW | 2,881 MW | 1,072 MW | -25 MW |
| 2026-10-15T11:00Z | 7,205 MW | 6,345 MW | 2,879 MW | 1,083 MW | -10 MW |
| 2026-10-15T12:00Z | 7,209 MW | 6,260 MW | 2,854 MW | 1,176 MW | 91 MW |
| 2026-10-15T13:00Z | 7,205 MW | 6,002 MW | 2,875 MW | 1,387 MW | 797 MW |
| 2026-10-15T14:00Z | 7,191 MW | 6,140 MW | 2,990 MW | 1,587 MW | 1,159 MW |
| 2026-10-15T15:00Z | 7,186 MW | 6,356 MW | 3,169 MW | 2,099 MW | 1,207 MW |
| 2026-10-15T16:00Z | 7,179 MW | 6,645 MW | 3,212 MW | 2,510 MW | 1,297 MW |
| 2026-10-15T17:00Z | 7,177 MW | 6,887 MW | 3,216 MW | 2,830 MW | 1,371 MW |
| 2026-10-15T18:00Z | 7,167 MW | 6,807 MW | 3,062 MW | 3,033 MW | 1,373 MW |
| 2026-10-15T19:00Z | 7,163 MW | 7,035 MW | 3,067 MW | 3,186 MW | 1,328 MW |
| 2026-10-15T20:00Z | 7,170 MW | 7,427 MW | 3,065 MW | 3,349 MW | 1,366 MW |
| 2026-10-15T21:00Z | 7,165 MW | 7,265 MW | 3,055 MW | 3,514 MW | 1,115 MW |
| 2026-10-15T22:00Z | 7,166 MW | 7,282 MW | 3,070 MW | 3,543 MW | 344 MW |
| 2026-10-15T23:00Z | 7,169 MW | 7,376 MW | 3,069 MW | 3,537 MW | 5 MW |
| 2026-10-16T00:00Z | 7,177 MW | 7,409 MW | 3,069 MW | 3,216 MW | 31 MW |
| 2026-10-16T01:00Z | 7,171 MW | 7,001 MW | 3,074 MW | 2,893 MW | 16 MW |
| 2026-10-16T02:00Z | 7,183 MW | 6,263 MW | 3,067 MW | 2,471 MW | 4 MW |
| 2026-10-16T03:00Z | 7,186 MW | 6,011 MW | 3,067 MW | 1,955 MW | 0 MW |
| 2026-10-16T04:00Z | 7,196 MW | 5,970 MW | 3,079 MW | 1,253 MW | 3 MW |
| 2026-10-16T05:00Z | 7,195 MW | 5,892 MW | 3,068 MW | 902 MW | -14 MW |
| 2026-10-16T06:00Z | 7,192 MW | 5,445 MW | 2,998 MW | 839 MW | -61 MW |
| 2026-10-16T07:00Z | 7,199 MW | 5,374 MW | 2,913 MW | 795 MW | 115 MW |
| 2026-10-16T08:00Z | 7,209 MW | 5,145 MW | 2,882 MW | 851 MW | -24 MW |
| 2026-10-16T09:00Z | 7,232 MW | 5,205 MW | 2,880 MW | 860 MW | -22 MW |
| 2026-10-16T10:00Z | 7,242 MW | 5,269 MW | 2,861 MW | 973 MW | -10 MW |
| 2026-10-16T11:00Z | 7,236 MW | 5,186 MW | 2,874 MW | 1,425 MW | -61 MW |
| 2026-10-16T12:00Z | 7,243 MW | 4,710 MW | 2,851 MW | 1,834 MW | 123 MW |
| 2026-10-16T13:00Z | 7,238 MW | 4,212 MW | 2,835 MW | 2,129 MW | 588 MW |
| 2026-10-16T14:00Z | 7,238 MW | 4,086 MW | 2,788 MW | 2,644 MW | 250 MW |
| 2026-10-16T15:00Z | 7,229 MW | 4,238 MW | 2,777 MW | 2,815 MW | 959 MW |
| 2026-10-16T16:00Z | 7,218 MW | 4,461 MW | 2,755 MW | 2,939 MW | 532 MW |
| 2026-10-16T17:00Z | 7,208 MW | 4,636 MW | 2,734 MW | 2,994 MW | 526 MW |
| 2026-10-16T18:00Z | 7,222 MW | 4,602 MW | 2,685 MW | 3,023 MW | 367 MW |
| 2026-10-16T19:00Z | 7,222 MW | 4,446 MW | 2,620 MW | 2,956 MW | 311 MW |
| 2026-10-16T20:00Z | 7,249 MW | 4,230 MW | 2,482 MW | 2,836 MW | 304 MW |
| 2026-10-16T21:00Z | 7,263 MW | 3,987 MW | 2,388 MW | 2,761 MW | 599 MW |
| 2026-10-16T22:00Z | 7,278 MW | 3,917 MW | 2,323 MW | 2,794 MW | 79 MW |
| 2026-10-16T23:00Z | 7,289 MW | 4,304 MW | 2,172 MW | 2,479 MW | 13 MW |
| 2026-10-17T00:00Z | 7,291 MW | 4,601 MW | 2,125 MW | 2,135 MW | 0 MW |
| 2026-10-17T01:00Z | 7,298 MW | 4,526 MW | 2,085 MW | 1,685 MW | -5 MW |
| 2026-10-17T02:00Z | 7,307 MW | 4,493 MW | 2,046 MW | 1,203 MW | -6 MW |
| 2026-10-17T03:00Z | 7,312 MW | 4,401 MW | 1,980 MW | 951 MW | -1 MW |
| 2026-10-17T04:00Z | 7,310 MW | 4,095 MW | 1,965 MW | 750 MW | -4 MW |
| 2026-10-17T05:00Z | 7,320 MW | 4,008 MW | 1,935 MW | 610 MW | -41 MW |
| 2026-10-17T06:00Z | 7,313 MW | 4,309 MW | 1,937 MW | 658 MW | -55 MW |
| 2026-10-17T07:00Z | 7,321 MW | 4,389 MW | 1,922 MW | 594 MW | -58 MW |
| 2026-10-17T08:00Z | 7,320 MW | 4,454 MW | 1,909 MW | 578 MW | -53 MW |
| 2026-10-17T09:00Z | 7,323 MW | 4,440 MW | 1,910 MW | 594 MW | -76 MW |
| 2026-10-17T10:00Z | 7,319 MW | 4,098 MW | 1,902 MW | 809 MW | -75 MW |
| 2026-10-17T11:00Z | 7,322 MW | 4,026 MW | 1,914 MW | 974 MW | -35 MW |
| 2026-10-17T12:00Z | 7,328 MW | 3,838 MW | 1,924 MW | 1,454 MW | 179 MW |
| 2026-10-17T13:00Z | 7,323 MW | 3,502 MW | 1,833 MW | 1,943 MW | 1,015 MW |
| 2026-10-17T14:00Z | 7,323 MW | 3,347 MW | 1,670 MW | 2,157 MW | 1,317 MW |
| 2026-10-17T15:00Z | 7,323 MW | 3,276 MW | 1,665 MW | 2,302 MW | 1,446 MW |
| 2026-10-17T16:00Z | 7,324 MW | 3,281 MW | 1,682 MW | 2,177 MW | 1,488 MW |
| 2026-10-17T17:00Z | 7,321 MW | 3,628 MW | 1,648 MW | 1,927 MW | 1,500 MW |
| 2026-10-17T18:00Z | 7,321 MW | 3,728 MW | 1,633 MW | 1,715 MW | 1,542 MW |
| 2026-10-17T19:00Z | 7,329 MW | 3,759 MW | 1,650 MW | 1,649 MW | 1,571 MW |
| 2026-10-17T20:00Z | 7,324 MW | 3,424 MW | 1,678 MW | 1,776 MW | 1,588 MW |
| 2026-10-17T21:00Z | 7,324 MW | 3,163 MW | 1,691 MW | 2,211 MW | 1,358 MW |
| 2026-10-17T22:00Z | 7,325 MW | 3,843 MW | 1,771 MW | 2,616 MW | 431 MW |
| 2026-10-17T23:00Z | 7,325 MW | 3,732 MW | 1,950 MW | 2,660 MW | 3 MW |
| 2026-10-18T00:00Z | 7,324 MW | 3,402 MW | 1,917 MW | 2,553 MW | -7 MW |
| 2026-10-18T01:00Z | 7,333 MW | 3,606 MW | 1,860 MW | 2,179 MW | -4 MW |
| 2026-10-18T02:00Z | 7,328 MW | 3,493 MW | 1,868 MW | 1,895 MW | -7 MW |
| 2026-10-18T03:00Z | 7,339 MW | 3,872 MW | 1,870 MW | 1,468 MW | -2 MW |
| 2026-10-18T04:00Z | 7,336 MW | 3,840 MW | 1,865 MW | 975 MW | -5 MW |
| 2026-10-18T05:00Z | 7,335 MW | 3,617 MW | 1,864 MW | 667 MW | -6 MW |
| 2026-10-18T06:00Z | 7,339 MW | 3,280 MW | 1,861 MW | 651 MW | -3 MW |
| 2026-10-18T07:00Z | 7,346 MW | 3,316 MW | 1,866 MW | 591 MW | -8 MW |
| 2026-10-18T08:00Z | 7,344 MW | 3,324 MW | 1,885 MW | 638 MW | -8 MW |
| 2026-10-18T09:00Z | 7,344 MW | 3,433 MW | 1,872 MW | 686 MW | -7 MW |
| 2026-10-18T10:00Z | 7,345 MW | 3,582 MW | 1,871 MW | 948 MW | -8 MW |
| 2026-10-18T11:00Z | 7,349 MW | 3,845 MW | 1,879 MW | 1,408 MW | -3 MW |
| 2026-10-18T12:00Z | 7,349 MW | 3,898 MW | 1,871 MW | 1,812 MW | 224 MW |
| 2026-10-18T13:00Z | 7,349 MW | 3,155 MW | 1,866 MW | 2,036 MW | 1,160 MW |
| 2026-10-18T14:00Z | 7,356 MW | 2,985 MW | 1,873 MW | 2,276 MW | 1,558 MW |
| 2026-10-18T15:00Z | 7,351 MW | 2,982 MW | 1,864 MW | 2,233 MW | 1,551 MW |
| 2026-10-18T16:00Z | 7,348 MW | 3,429 MW | 1,875 MW | 1,955 MW | 1,500 MW |
| 2026-10-18T17:00Z | 7,334 MW | 3,698 MW | 1,929 MW | 1,730 MW | 1,477 MW |
| 2026-10-18T18:00Z | 7,339 MW | 3,904 MW | 1,982 MW | 1,444 MW | 1,505 MW |
| 2026-10-18T19:00Z | 7,334 MW | 3,872 MW | 1,934 MW | 1,472 MW | 1,551 MW |
| 2026-10-18T20:00Z | 7,325 MW | 4,219 MW | 2,006 MW | 1,465 MW | 1,588 MW |
| 2026-10-18T21:00Z | 7,328 MW | 4,305 MW | 2,073 MW | 1,718 MW | 1,395 MW |
| 2026-10-18T22:00Z | 7,326 MW | 4,358 MW | 2,059 MW | 2,153 MW | 535 MW |
| 2026-10-18T23:00Z | 7,329 MW | 4,525 MW | 2,045 MW | 2,495 MW | 126 MW |
| 2026-10-19T00:00Z | 7,332 MW | 4,414 MW | 2,016 MW | 2,478 MW | 105 MW |
| 2026-10-19T01:00Z | 7,334 MW | 4,032 MW | 1,926 MW | 2,401 MW | 55 MW |
| 2026-10-19T02:00Z | 7,338 MW | 4,005 MW | 1,932 MW | 1,940 MW | -6 MW |
| 2026-10-19T03:00Z | 7,346 MW | 3,885 MW | 1,936 MW | 1,509 MW | -10 MW |
| 2026-10-19T04:00Z | 7,339 MW | 3,803 MW | 1,944 MW | 1,103 MW | -3 MW |
| 2026-10-19T05:00Z | 7,346 MW | 3,337 MW | 1,947 MW | 1,106 MW | -60 MW |
| 2026-10-19T06:00Z | 7,345 MW | 3,333 MW | 1,951 MW | 1,092 MW | -139 MW |
| 2026-10-19T07:00Z | 7,349 MW | 3,504 MW | 1,944 MW | 1,252 MW | -106 MW |
| 2026-10-19T08:00Z | 7,356 MW | 3,805 MW | 1,955 MW | 1,433 MW | -75 MW |
| 2026-10-19T09:00Z | 7,362 MW | 4,258 MW | 1,974 MW | 1,720 MW | -50 MW |
| 2026-10-19T10:00Z | 7,353 MW | 4,469 MW | 2,451 MW | 2,115 MW | -3 MW |
| 2026-10-19T11:00Z | 7,358 MW | 5,238 MW | 2,716 MW | 2,346 MW | -5 MW |
| 2026-10-19T12:00Z | 7,353 MW | 5,525 MW | 2,738 MW | 2,247 MW | 207 MW |
| 2026-10-19T13:00Z | 7,358 MW | 4,666 MW | 2,692 MW | 2,164 MW | 1,114 MW |
| 2026-10-19T14:00Z | 7,352 MW | 4,223 MW | 2,445 MW | 2,043 MW | 1,471 MW |
| 2026-10-19T15:00Z | 7,355 MW | 4,371 MW | 2,057 MW | 1,897 MW | 1,510 MW |
| 2026-10-19T16:00Z | 7,353 MW | 4,579 MW | 1,958 MW | 1,673 MW | 1,516 MW |
| 2026-10-19T17:00Z | 7,335 MW | 4,678 MW | 1,961 MW | 1,431 MW | 1,493 MW |
| 2026-10-19T18:00Z | 7,335 MW | 4,408 MW | 1,985 MW | 1,384 MW | 1,510 MW |
| 2026-10-19T19:00Z | 7,331 MW | 4,178 MW | 2,083 MW | 1,449 MW | 1,544 MW |
| 2026-10-19T20:00Z | 7,319 MW | 4,312 MW | 2,088 MW | 1,576 MW | 1,558 MW |
| 2026-10-19T21:00Z | 7,321 MW | 4,632 MW | 2,109 MW | 1,922 MW | 1,331 MW |
| 2026-10-19T22:00Z | 7,327 MW | 4,629 MW | 2,289 MW | 2,472 MW | 524 MW |
| 2026-10-19T23:00Z | 7,319 MW | 4,607 MW | 2,369 MW | 2,706 MW | 111 MW |
| 2026-10-20T00:00Z | 7,326 MW | 4,797 MW | 2,415 MW | 2,812 MW | 59 MW |
| 2026-10-20T01:00Z | 7,329 MW | 4,473 MW | 2,360 MW | 2,730 MW | 34 MW |
| 2026-10-20T02:00Z | 7,333 MW | 4,593 MW | 2,349 MW | 2,280 MW | -6 MW |
| 2026-10-20T03:00Z | 7,335 MW | 4,176 MW | 2,350 MW | 1,842 MW | -5 MW |
| 2026-10-20T04:00Z | 7,343 MW | 3,753 MW | 2,291 MW | 1,572 MW | -1 MW |
| 2026-10-20T05:00Z | 7,337 MW | 4,245 MW | 2,134 MW | 937 MW | -50 MW |
| 2026-10-20T06:00Z | 7,342 MW | 4,313 MW | 2,088 MW | 813 MW | -62 MW |
| 2026-10-20T07:00Z | 7,338 MW | 4,503 MW | 2,098 MW | 645 MW | -52 MW |
| 2026-10-20T08:00Z | 7,341 MW | 4,488 MW | 2,087 MW | 812 MW | -65 MW |
| 2026-10-20T09:00Z | 7,339 MW | 4,843 MW | 2,108 MW | 1,237 MW | -109 MW |
| 2026-10-20T10:00Z | 7,348 MW | 5,149 MW | 2,322 MW | 1,836 MW | -41 MW |
| 2026-10-20T11:00Z | 7,347 MW | 5,322 MW | 2,593 MW | 2,110 MW | -3 MW |
| 2026-10-20T12:00Z | 7,348 MW | 5,469 MW | 2,660 MW | 2,098 MW | 176 MW |
| 2026-10-20T13:00Z | 7,351 MW | 4,496 MW | 2,748 MW | 1,942 MW | 802 MW |
| 2026-10-20T14:00Z | 7,329 MW | 4,685 MW | 2,500 MW | 1,592 MW | 1,218 MW |
| 2026-10-20T15:00Z | 7,338 MW | 4,858 MW | 2,270 MW | 1,280 MW | 1,454 MW |
| 2026-10-20T16:00Z | 7,332 MW | 5,128 MW | 2,296 MW | 1,065 MW | 1,419 MW |
| 2026-10-20T17:00Z | 7,331 MW | 5,079 MW | 2,398 MW | 1,036 MW | 1,414 MW |
| 2026-10-20T18:00Z | 7,320 MW | 4,799 MW | 2,455 MW | 1,043 MW | 1,382 MW |
| 2026-10-20T19:00Z | 7,305 MW | 4,777 MW | 2,452 MW | 1,155 MW | 1,428 MW |
| 2026-10-20T20:00Z | 7,309 MW | 4,950 MW | 2,474 MW | 1,331 MW | 1,504 MW |
| 2026-10-20T21:00Z | 7,305 MW | 5,162 MW | 2,483 MW | 1,647 MW | 1,266 MW |
| 2026-10-20T22:00Z | 7,305 MW | 32,006 MW | 2,476 MW | 2,279 MW | 484 MW |
| 2026-10-20T23:00Z | 7,310 MW | 5,435 MW | 2,487 MW | 2,432 MW | 69 MW |
| 2026-10-21T00:00Z | 7,313 MW | 5,415 MW | 2,481 MW | 2,436 MW | 78 MW |
| 2026-10-21T01:00Z | 7,318 MW | 5,009 MW | 2,483 MW | 2,291 MW | 19 MW |
| 2026-10-21T02:00Z | 7,326 MW | 4,879 MW | 2,478 MW | 2,038 MW | -8 MW |
| 2026-10-21T03:00Z | 7,328 MW | 4,334 MW | 2,483 MW | 1,685 MW | -2 MW |
| 2026-10-21T04:00Z | 7,327 MW | 4,192 MW | 2,485 MW | 1,342 MW | -6 MW |
| 2026-10-21T05:00Z | 7,331 MW | 4,362 MW | 2,477 MW | 733 MW | -20 MW |
| 2026-10-21T06:00Z | 7,338 MW | 4,640 MW | 2,491 MW | 735 MW | -53 MW |
| 2026-10-21T07:00Z | 7,329 MW | 4,658 MW | 2,484 MW | 660 MW | -45 MW |
| 2026-10-21T08:00Z | 7,335 MW | 4,490 MW | 2,480 MW | 742 MW | -59 MW |
| 2026-10-21T09:00Z | 7,340 MW | 4,534 MW | 2,489 MW | 1,031 MW | -16 MW |
| 2026-10-21T10:00Z | 7,336 MW | 4,570 MW | 2,662 MW | 1,529 MW | -3 MW |
| 2026-10-21T11:00Z | 7,333 MW | 4,925 MW | 2,675 MW | 1,789 MW | 22 MW |
| 2026-10-21T12:00Z | 7,338 MW | 4,806 MW | 2,681 MW | 1,845 MW | 153 MW |
| 2026-10-21T13:00Z | 8,488 MW | 3,894 MW | 2,674 MW | 1,690 MW | 913 MW |
| 2026-10-21T14:00Z | 7,338 MW | 4,198 MW | 2,601 MW | 1,261 MW | 1,427 MW |
| 2026-10-21T15:00Z | 7,326 MW | 4,457 MW | 2,372 MW | 1,013 MW | 1,427 MW |
| 2026-10-21T16:00Z | 7,331 MW | 4,784 MW | 2,260 MW | 876 MW | 1,458 MW |
| 2026-10-21T17:00Z | 7,315 MW | 4,936 MW | 2,268 MW | 876 MW | 1,431 MW |
| 2026-10-21T18:00Z | 7,310 MW | 4,827 MW | 2,329 MW | 880 MW | 1,478 MW |
| 2026-10-21T19:00Z | 7,292 MW | 4,852 MW | 2,374 MW | 965 MW | 1,487 MW |
| 2026-10-21T20:00Z | 7,299 MW | 4,665 MW | 2,380 MW | 1,303 MW | 1,447 MW |
| 2026-10-21T21:00Z | 7,298 MW | 5,037 MW | 2,424 MW | 1,693 MW | 1,068 MW |
| 2026-10-21T22:00Z | 7,305 MW | 5,247 MW | 2,484 MW | 2,125 MW | 426 MW |
| 2026-10-21T23:00Z | 7,297 MW | 5,234 MW | 2,502 MW | 2,330 MW | 105 MW |
| 2026-10-22T00:00Z | 7,299 MW | 5,260 MW | 2,503 MW | 2,341 MW | 88 MW |
| 2026-10-22T01:00Z | 7,307 MW | 4,655 MW | 2,501 MW | 2,225 MW | -2 MW |
| 2026-10-22T02:00Z | 7,310 MW | 4,602 MW | 2,506 MW | 1,743 MW | -7 MW |
| 2026-10-22T03:00Z | 7,315 MW | 3,989 MW | 2,483 MW | 1,317 MW | -6 MW |
| 2026-10-22T04:00Z | 7,317 MW | 4,307 MW | 2,468 MW | 876 MW | -4 MW |
| 2026-10-22T05:00Z | 7,324 MW | 4,098 MW | 2,467 MW | 694 MW | -24 MW |
| 2026-10-22T06:00Z | 7,323 MW | 4,231 MW | 2,476 MW | 696 MW | -33 MW |
| 2026-10-22T07:00Z | 7,323 MW | 4,283 MW | 2,473 MW | 668 MW | -27 MW |
| 2026-10-22T08:00Z | 7,327 MW | 4,467 MW | 2,470 MW | 625 MW | -29 MW |
| 2026-10-22T09:00Z | 7,329 MW | 4,944 MW | 2,491 MW | 738 MW | -39 MW |
| 2026-10-22T10:00Z | 7,326 MW | 4,734 MW | 2,725 MW | 1,092 MW | -62 MW |
| 2026-10-22T11:00Z | 7,334 MW | 5,386 MW | 2,748 MW | 1,616 MW | 6 MW |
| 2026-10-22T12:00Z | 7,334 MW | 5,347 MW | 2,724 MW | 1,828 MW | 172 MW |
| 2026-10-22T13:00Z | 7,331 MW | 4,556 MW | 2,724 MW | 1,696 MW | 920 MW |
| 2026-10-22T14:00Z | 7,326 MW | 4,438 MW | 2,449 MW | 1,294 MW | 1,416 MW |
| 2026-10-22T15:00Z | 7,319 MW | 4,740 MW | 2,284 MW | 1,089 MW | 1,417 MW |
| 2026-10-22T16:00Z | 7,315 MW | 4,954 MW | 2,267 MW | 907 MW | 1,437 MW |
| 2026-10-22T17:00Z | 7,314 MW | 4,854 MW | 2,271 MW | 869 MW | 1,425 MW |
| 2026-10-22T18:00Z | 7,303 MW | 4,422 MW | 2,272 MW | 895 MW | 1,449 MW |
| 2026-10-22T19:00Z | 7,304 MW | 4,617 MW | 2,267 MW | 920 MW | 1,485 MW |
| 2026-10-22T20:00Z | 7,303 MW | 4,536 MW | 2,270 MW | 1,237 MW | 1,485 MW |
| 2026-10-22T21:00Z | 7,293 MW | 4,498 MW | 2,274 MW | 1,673 MW | 1,197 MW |
| 2026-10-22T22:00Z | 7,304 MW | 4,620 MW | 2,274 MW | 2,209 MW | 314 MW |
| 2026-10-22T23:00Z | 7,300 MW | 4,706 MW | 2,276 MW | 2,375 MW | -9 MW |
| 2026-10-23T00:00Z | 7,309 MW | 4,739 MW | 2,273 MW | 2,385 MW | -2 MW |
| 2026-10-23T01:00Z | 7,308 MW | 4,405 MW | 2,272 MW | 2,192 MW | -4 MW |
| 2026-10-23T02:00Z | 7,311 MW | 4,535 MW | 2,270 MW | 1,815 MW | -5 MW |
| 2026-10-23T03:00Z | 7,319 MW | 4,397 MW | 2,274 MW | 1,240 MW | -7 MW |
| 2026-10-23T04:00Z | 7,319 MW | 3,976 MW | 2,260 MW | 877 MW | -7 MW |
| 2026-10-23T05:00Z | 7,319 MW | 3,829 MW | 2,274 MW | 666 MW | -11 MW |
| 2026-10-23T06:00Z | 7,319 MW | 4,208 MW | 2,270 MW | 531 MW | -41 MW |
| 2026-10-23T07:00Z | 7,322 MW | 4,119 MW | 2,270 MW | 518 MW | -30 MW |
| 2026-10-23T08:00Z | 7,323 MW | 4,045 MW | 2,273 MW | 634 MW | -27 MW |
| 2026-10-23T09:00Z | 7,323 MW | 4,484 MW | 2,458 MW | 840 MW | -19 MW |
| 2026-10-23T10:00Z | 7,329 MW | 4,676 MW | 2,566 MW | 1,320 MW | -36 MW |
| 2026-10-23T11:00Z | 7,329 MW | 5,064 MW | 2,575 MW | 1,927 MW | -13 MW |
| 2026-10-23T12:00Z | 7,330 MW | 5,176 MW | 2,574 MW | 1,991 MW | 166 MW |
| 2026-10-23T13:00Z | 7,319 MW | 4,687 MW | 2,570 MW | 1,721 MW | 1,070 MW |
| 2026-10-23T14:00Z | 7,328 MW | 4,038 MW | 2,558 MW | 1,376 MW | 1,517 MW |
| 2026-10-23T15:00Z | 7,327 MW | 4,545 MW | 2,570 MW | 1,073 MW | 1,500 MW |
| 2026-10-23T16:00Z | 7,319 MW | 4,640 MW | 2,563 MW | 920 MW | 1,461 MW |
| 2026-10-23T17:00Z | 7,315 MW | 4,214 MW | 2,563 MW | 1,056 MW | 1,429 MW |
| 2026-10-23T18:00Z | 7,308 MW | 3,952 MW | 2,561 MW | 1,070 MW | 1,451 MW |
| 2026-10-23T19:00Z | 7,308 MW | 3,824 MW | 2,537 MW | 1,371 MW | 1,493 MW |
| 2026-10-23T20:00Z | 7,298 MW | 3,936 MW | 2,444 MW | 1,742 MW | 1,510 MW |
| 2026-10-23T21:00Z | 7,294 MW | 4,230 MW | 2,462 MW | 2,145 MW | 1,205 MW |
| 2026-10-23T22:00Z | 7,294 MW | 4,781 MW | 2,459 MW | 2,593 MW | 310 MW |
| 2026-10-23T23:00Z | 7,312 MW | 5,096 MW | 2,475 MW | 2,615 MW | 52 MW |
| 2026-10-24T00:00Z | 7,295 MW | 4,853 MW | 2,476 MW | 2,575 MW | -6 MW |
| 2026-10-24T01:00Z | 7,316 MW | 4,788 MW | 2,477 MW | 2,180 MW | -9 MW |
| 2026-10-24T02:00Z | 7,272 MW | 4,708 MW | 2,468 MW | 1,616 MW | -4 MW |
| 2026-10-24T03:00Z | 7,212 MW | 4,544 MW | 2,472 MW | 1,116 MW | -5 MW |
| 2026-10-24T04:00Z | 7,278 MW | 4,045 MW | 2,467 MW | 695 MW | -6 MW |
| 2026-10-24T05:00Z | 7,326 MW | 3,875 MW | 2,466 MW | 470 MW | -51 MW |
| 2026-10-24T06:00Z | 7,329 MW | 3,823 MW | 2,462 MW | 475 MW | -37 MW |
| 2026-10-24T07:00Z | 7,333 MW | 3,886 MW | 2,472 MW | 444 MW | -10 MW |
| 2026-10-24T08:00Z | 7,326 MW | 4,009 MW | 2,471 MW | 440 MW | -9 MW |
| 2026-10-24T09:00Z | 7,338 MW | 4,300 MW | 2,465 MW | 469 MW | -2 MW |
| 2026-10-24T10:00Z | 7,323 MW | 4,647 MW | 2,470 MW | 682 MW | -12 MW |
| 2026-10-24T11:00Z | 7,326 MW | 5,077 MW | 2,466 MW | 760 MW | -3 MW |
| 2026-10-24T12:00Z | 7,341 MW | 4,969 MW | 2,474 MW | 713 MW | 154 MW |
| 2026-10-24T13:00Z | 7,319 MW | 4,183 MW | 2,463 MW | 649 MW | 1,003 MW |
| 2026-10-24T14:00Z | 7,327 MW | 3,806 MW | 2,324 MW | 753 MW | 1,464 MW |
| 2026-10-24T15:00Z | 7,325 MW | 3,813 MW | 2,260 MW | 827 MW | 1,475 MW |
| 2026-10-24T16:00Z | 7,312 MW | 3,910 MW | 2,269 MW | 861 MW | 1,430 MW |
| 2026-10-24T17:00Z | 7,318 MW | 3,865 MW | 2,254 MW | 1,010 MW | 1,400 MW |
| 2026-10-24T18:00Z | 7,305 MW | 4,016 MW | 2,257 MW | 1,022 MW | 1,414 MW |
| 2026-10-24T19:00Z | 7,295 MW | 3,997 MW | 2,252 MW | 1,348 MW | 1,430 MW |
| 2026-10-24T20:00Z | 7,304 MW | 4,007 MW | 2,262 MW | 1,691 MW | 1,412 MW |
| 2026-10-24T21:00Z | 7,293 MW | 4,397 MW | 2,260 MW | 1,996 MW | 1,078 MW |
| 2026-10-24T22:00Z | 7,294 MW | 4,559 MW | 2,268 MW | 2,322 MW | 308 MW |
| 2026-10-24T23:00Z | 7,298 MW | 4,680 MW | 2,263 MW | 2,439 MW | 13 MW |
| 2026-10-25T00:00Z | 7,298 MW | 4,166 MW | 2,263 MW | 2,449 MW | -7 MW |
| 2026-10-25T01:00Z | 7,315 MW | 4,014 MW | 2,252 MW | 2,160 MW | -9 MW |
| 2026-10-25T02:00Z | 7,301 MW | 4,019 MW | 2,254 MW | 1,678 MW | -5 MW |
| 2026-10-25T03:00Z | 7,321 MW | 4,031 MW | 2,246 MW | 1,116 MW | -4 MW |
| 2026-10-25T04:00Z | 7,315 MW | 3,920 MW | 2,267 MW | 666 MW | -7 MW |
| 2026-10-25T05:00Z | 7,322 MW | 3,765 MW | 2,255 MW | 408 MW | -11 MW |
| 2026-10-25T06:00Z | 7,317 MW | 3,791 MW | 2,261 MW | 408 MW | -15 MW |
| 2026-10-25T07:00Z | 7,327 MW | 3,824 MW | 2,261 MW | 383 MW | -39 MW |
| 2026-10-25T08:00Z | 7,326 MW | 3,798 MW | 2,268 MW | 395 MW | -38 MW |
| 2026-10-25T09:00Z | 7,339 MW | 4,016 MW | 2,263 MW | 406 MW | -14 MW |
| 2026-10-25T10:00Z | 7,329 MW | 4,426 MW | 2,258 MW | 521 MW | -5 MW |
| 2026-10-25T11:00Z | 7,327 MW | 4,716 MW | 2,271 MW | 587 MW | -6 MW |
| 2026-10-25T12:00Z | 7,327 MW | 4,819 MW | 2,264 MW | 647 MW | 130 MW |
| 2026-10-25T13:00Z | 7,327 MW | 4,374 MW | 2,259 MW | 558 MW | 980 MW |
| 2026-10-25T14:00Z | 7,322 MW | 3,456 MW | 2,266 MW | 619 MW | 1,437 MW |
| 2026-10-25T15:00Z | 7,323 MW | 3,784 MW | 2,268 MW | 683 MW | 1,453 MW |
| 2026-10-25T16:00Z | 7,316 MW | 3,972 MW | 2,262 MW | 740 MW | 1,416 MW |
| 2026-10-25T17:00Z | 7,311 MW | 4,224 MW | 2,267 MW | 859 MW | 1,391 MW |
| 2026-10-25T18:00Z | 7,305 MW | 4,349 MW | 2,264 MW | 1,022 MW | 1,388 MW |
| 2026-10-25T19:00Z | 7,301 MW | 3,981 MW | 2,257 MW | 1,401 MW | 1,402 MW |
| 2026-10-25T20:00Z | 7,296 MW | 4,108 MW | 2,256 MW | 1,768 MW | 1,247 MW |
| 2026-10-25T21:00Z | 7,296 MW | 4,364 MW | 2,261 MW | 2,015 MW | 1,014 MW |
| 2026-10-25T22:00Z | 7,303 MW | 4,711 MW | 2,261 MW | 2,351 MW | 210 MW |
| 2026-10-25T23:00Z | 7,299 MW | 4,833 MW | 2,267 MW | 2,448 MW | 38 MW |
| 2026-10-26T00:00Z | 7,303 MW | 4,558 MW | 2,260 MW | 2,415 MW | -4 MW |
| 2026-10-26T01:00Z | 7,309 MW | 4,157 MW | 2,261 MW | 2,199 MW | -11 MW |
| 2026-10-26T02:00Z | 7,303 MW | 4,144 MW | 2,260 MW | 1,697 MW | -2 MW |
| 2026-10-26T03:00Z | 7,310 MW | 4,176 MW | 2,260 MW | 1,120 MW | -4 MW |
| 2026-10-26T04:00Z | 7,320 MW | 3,950 MW | 2,260 MW | 666 MW | -7 MW |
| 2026-10-26T05:00Z | 7,318 MW | 3,746 MW | 2,263 MW | 487 MW | -23 MW |
| 2026-10-26T06:00Z | 7,313 MW | 3,750 MW | 2,258 MW | 523 MW | -24 MW |
| 2026-10-26T07:00Z | 7,318 MW | 3,758 MW | 2,258 MW | 484 MW | -9 MW |
| 2026-10-26T08:00Z | 7,318 MW | 4,169 MW | 2,267 MW | 478 MW | -1 MW |
| 2026-10-26T09:00Z | 7,317 MW | 4,728 MW | 2,256 MW | 561 MW | -4 MW |
| 2026-10-26T10:00Z | 7,320 MW | 5,313 MW | 2,271 MW | 783 MW | -9 MW |
| 2026-10-26T11:00Z | 7,316 MW | 5,877 MW | 2,283 MW | 1,066 MW | 31 MW |
| 2026-10-26T12:00Z | 7,320 MW | 5,930 MW | 2,399 MW | 1,167 MW | 180 MW |
| 2026-10-26T13:00Z | 7,316 MW | 5,592 MW | 2,459 MW | 1,040 MW | 572 MW |
| 2026-10-26T14:00Z | 7,314 MW | 5,252 MW | 2,468 MW | 1,053 MW | 904 MW |
| 2026-10-26T15:00Z | 7,310 MW | 5,007 MW | 2,453 MW | 1,167 MW | 1,034 MW |
| 2026-10-26T16:00Z | 7,294 MW | 4,784 MW | 2,454 MW | 1,311 MW | 1,099 MW |
| 2026-10-26T17:00Z | 7,302 MW | 4,299 MW | 2,455 MW | 1,634 MW | 949 MW |
| 2026-10-26T18:00Z | 7,277 MW | 4,284 MW | 2,452 MW | 1,850 MW | 940 MW |
| 2026-10-26T19:00Z | 7,290 MW | 3,881 MW | 2,448 MW | 2,076 MW | 947 MW |
| 2026-10-26T20:00Z | 7,281 MW | 3,937 MW | 2,440 MW | 2,387 MW | 880 MW |
| 2026-10-26T21:00Z | 7,290 MW | 4,197 MW | 2,444 MW | 2,666 MW | 718 MW |
| 2026-10-26T22:00Z | 7,281 MW | 4,677 MW | 2,472 MW | 2,778 MW | 276 MW |
| 2026-10-26T23:00Z | 7,291 MW | 5,037 MW | 2,468 MW | 2,809 MW | 134 MW |
| 2026-10-27T00:00Z | 7,286 MW | 5,119 MW | 2,455 MW | 2,760 MW | 91 MW |
| 2026-10-27T01:00Z | 7,288 MW | 4,869 MW | 2,453 MW | 2,406 MW | 68 MW |
| 2026-10-27T02:00Z | 7,296 MW | 4,756 MW | 2,453 MW | 1,744 MW | -4 MW |
| 2026-10-27T03:00Z | 7,306 MW | 4,315 MW | 2,443 MW | 1,334 MW | 2 MW |
| 2026-10-27T04:00Z | 7,293 MW | 4,244 MW | 2,393 MW | 900 MW | -2 MW |
| 2026-10-27T05:00Z | 7,303 MW | 4,400 MW | 2,266 MW | 439 MW | -5 MW |
| 2026-10-27T06:00Z | 7,313 MW | 4,407 MW | 2,239 MW | 412 MW | -5 MW |
| 2026-10-27T07:00Z | 7,309 MW | 4,414 MW | 2,233 MW | 420 MW | 2 MW |
| 2026-10-27T08:00Z | 7,304 MW | 4,611 MW | 2,229 MW | 462 MW | -1 MW |
| 2026-10-27T09:00Z | 7,310 MW | 4,821 MW | 2,222 MW | 566 MW | 1 MW |
| 2026-10-27T10:00Z | 7,317 MW | 5,560 MW | 2,238 MW | 744 MW | -10 MW |
| 2026-10-27T11:00Z | 7,305 MW | 6,059 MW | 2,259 MW | 1,017 MW | -14 MW |
| 2026-10-27T12:00Z | 7,315 MW | 6,190 MW | 2,220 MW | 1,094 MW | 110 MW |
| 2026-10-27T13:00Z | 7,309 MW | 5,909 MW | 2,218 MW | 1,162 MW | 836 MW |
| 2026-10-27T14:00Z | 7,308 MW | 4,727 MW | 2,157 MW | 1,087 MW | 1,283 MW |
| 2026-10-27T15:00Z | 7,295 MW | 4,438 MW | 2,162 MW | 1,278 MW | 1,284 MW |
| 2026-10-27T16:00Z | 7,300 MW | 4,548 MW | 2,161 MW | 1,308 MW | 1,251 MW |
| 2026-10-27T17:00Z | 7,284 MW | 4,436 MW | 2,158 MW | 1,590 MW | 1,190 MW |
| 2026-10-27T18:00Z | 7,287 MW | 4,112 MW | 2,164 MW | 1,734 MW | 1,166 MW |
| 2026-10-27T19:00Z | 7,271 MW | 4,231 MW | 2,159 MW | 1,896 MW | 1,099 MW |
| 2026-10-27T20:00Z | 7,271 MW | 4,072 MW | 2,158 MW | 2,129 MW | 1,144 MW |
| 2026-10-27T21:00Z | 7,266 MW | 4,732 MW | 2,173 MW | 2,517 MW | 533 MW |
| 2026-10-27T22:00Z | 7,270 MW | 5,172 MW | 2,232 MW | 2,683 MW | 116 MW |
| 2026-10-27T23:00Z | 7,267 MW | 5,157 MW | 2,250 MW | 2,761 MW | -41 MW |
| 2026-10-28T00:00Z | 7,269 MW | 5,201 MW | 2,236 MW | 2,721 MW | -49 MW |
| 2026-10-28T01:00Z | 7,286 MW | 4,738 MW | 2,225 MW | 2,363 MW | -32 MW |
| 2026-10-28T02:00Z | 7,278 MW | 4,540 MW | 2,172 MW | 1,689 MW | -54 MW |
| 2026-10-28T03:00Z | 7,291 MW | 4,110 MW | 2,159 MW | 1,194 MW | -45 MW |
| 2026-10-28T04:00Z | 7,290 MW | 3,866 MW | 2,150 MW | 780 MW | -26 MW |
| 2026-10-28T05:00Z | 7,287 MW | 4,152 MW | 2,083 MW | 492 MW | -41 MW |
| 2026-10-28T06:00Z | 7,296 MW | 4,514 MW | 2,120 MW | 494 MW | -53 MW |
| 2026-10-28T07:00Z | 7,308 MW | 4,426 MW | 2,066 MW | 500 MW | -63 MW |
| 2026-10-28T08:00Z | 7,299 MW | 4,464 MW | 2,074 MW | 561 MW | -22 MW |
| 2026-10-28T09:00Z | 7,294 MW | 4,695 MW | 2,124 MW | 639 MW | 13 MW |
| 2026-10-28T10:00Z | 7,303 MW | 4,932 MW | 2,176 MW | 923 MW | 9 MW |
| 2026-10-28T11:00Z | 7,300 MW | 5,452 MW | 2,191 MW | 1,260 MW | 52 MW |
| 2026-10-28T12:00Z | 7,304 MW | 5,477 MW | 2,168 MW | 1,349 MW | 130 MW |
| 2026-10-28T13:00Z | 7,299 MW | 4,994 MW | 2,131 MW | 1,178 MW | 623 MW |
| 2026-10-28T14:00Z | 7,287 MW | 4,238 MW | 2,084 MW | 1,284 MW | 1,120 MW |
| 2026-10-28T15:00Z | 7,291 MW | 3,992 MW | 2,081 MW | 1,495 MW | 1,227 MW |
| 2026-10-28T16:00Z | 7,285 MW | 3,882 MW | 2,071 MW | 1,746 MW | 1,230 MW |
| 2026-10-28T17:00Z | 7,279 MW | 3,942 MW | 2,078 MW | 1,915 MW | 1,217 MW |
| 2026-10-28T18:00Z | 7,278 MW | 3,635 MW | 2,088 MW | 2,129 MW | 1,240 MW |
| 2026-10-28T19:00Z | 7,276 MW | 3,540 MW | 2,086 MW | 2,227 MW | 1,283 MW |
| 2026-10-28T20:00Z | 7,268 MW | 3,831 MW | 2,107 MW | 2,424 MW | 1,271 MW |
| 2026-10-28T21:00Z | 7,281 MW | 3,849 MW | 2,101 MW | 2,802 MW | 983 MW |
| 2026-10-28T22:00Z | 7,258 MW | 4,386 MW | 2,169 MW | 2,856 MW | 283 MW |
| 2026-10-28T23:00Z | 7,270 MW | 4,262 MW | 2,146 MW | 2,777 MW | 76 MW |
| 2026-10-29T00:00Z | 7,277 MW | 4,112 MW | 2,142 MW | 2,693 MW | 62 MW |
| 2026-10-29T01:00Z | 7,275 MW | 3,834 MW | 2,140 MW | 2,177 MW | 45 MW |
| 2026-10-29T02:00Z | 7,279 MW | 3,543 MW | 2,070 MW | 1,706 MW | -5 MW |
| 2026-10-29T03:00Z | 7,274 MW | 3,292 MW | 2,043 MW | 1,198 MW | -19 MW |
| 2026-10-29T04:00Z | 7,289 MW | 3,394 MW | 2,105 MW | 815 MW | -6 MW |
| 2026-10-29T05:00Z | 7,286 MW | 3,079 MW | 2,130 MW | 526 MW | -8 MW |
| 2026-10-29T06:00Z | 7,292 MW | 3,161 MW | 2,131 MW | 441 MW | -10 MW |
| 2026-10-29T07:00Z | 7,302 MW | 3,125 MW | 2,136 MW | 449 MW | -9 MW |
| 2026-10-29T08:00Z | 7,288 MW | 3,588 MW | 2,167 MW | 442 MW | -12 MW |
| 2026-10-29T09:00Z | 7,304 MW | 3,722 MW | 2,171 MW | 477 MW | -36 MW |
| 2026-10-29T10:00Z | 7,288 MW | 4,273 MW | 2,172 MW | 688 MW | -57 MW |
| 2026-10-29T11:00Z | 7,302 MW | 5,023 MW | 2,230 MW | 1,104 MW | -21 MW |
| 2026-10-29T12:00Z | 7,296 MW | 5,210 MW | 2,260 MW | 1,138 MW | 103 MW |
| 2026-10-29T13:00Z | 7,296 MW | 4,637 MW | 2,221 MW | 1,080 MW | 794 MW |
| 2026-10-29T14:00Z | 7,292 MW | 4,443 MW | 2,190 MW | 1,301 MW | 1,237 MW |
| 2026-10-29T15:00Z | 7,279 MW | 4,373 MW | 2,224 MW | 1,470 MW | 1,228 MW |
| 2026-10-29T16:00Z | 7,277 MW | 4,378 MW | 2,220 MW | 1,910 MW | 1,177 MW |
| 2026-10-29T17:00Z | 7,273 MW | 4,290 MW | 2,235 MW | 2,070 MW | 1,200 MW |
| 2026-10-29T18:00Z | 7,263 MW | 4,490 MW | 2,249 MW | 1,966 MW | 1,223 MW |
| 2026-10-29T19:00Z | 7,258 MW | 4,369 MW | 2,247 MW | 2,234 MW | 1,166 MW |
| 2026-10-29T20:00Z | 7,254 MW | 4,525 MW | 2,259 MW | 2,459 MW | 1,124 MW |
| 2026-10-29T21:00Z | 7,263 MW | 4,518 MW | 2,274 MW | 2,705 MW | 634 MW |
| 2026-10-29T22:00Z | 7,255 MW | 4,496 MW | 2,253 MW | 2,850 MW | 97 MW |
| 2026-10-29T23:00Z | 7,246 MW | 4,573 MW | 2,280 MW | 2,856 MW | -6 MW |
| 2026-10-30T00:00Z | 7,242 MW | 4,406 MW | 2,256 MW | 2,733 MW | -3 MW |
| 2026-10-30T01:00Z | 7,253 MW | 4,063 MW | 2,234 MW | 2,200 MW | 7 MW |
| 2026-10-30T02:00Z | 7,260 MW | 3,781 MW | 2,190 MW | 1,672 MW | -6 MW |
| 2026-10-30T03:00Z | 7,254 MW | 3,774 MW | 2,220 MW | 1,160 MW | -30 MW |
| 2026-10-30T04:00Z | 7,260 MW | 3,424 MW | 2,181 MW | 770 MW | -56 MW |
| 2026-10-30T05:00Z | 7,277 MW | 3,164 MW | 2,167 MW | 462 MW | -69 MW |
| 2026-10-30T06:00Z | 7,268 MW | 2,875 MW | 2,159 MW | 433 MW | -70 MW |
| 2026-10-30T07:00Z | 7,280 MW | 3,058 MW | 2,157 MW | 407 MW | -64 MW |
| 2026-10-30T08:00Z | 7,274 MW | 3,270 MW | 2,161 MW | 457 MW | -50 MW |
| 2026-10-30T09:00Z | 7,284 MW | 3,789 MW | 2,205 MW | 490 MW | -23 MW |
| 2026-10-30T10:00Z | 7,279 MW | 4,293 MW | 2,361 MW | 743 MW | -2 MW |
| 2026-10-30T11:00Z | 7,273 MW | 4,735 MW | 2,437 MW | 1,106 MW | 12 MW |
| 2026-10-30T12:00Z | 7,289 MW | 4,660 MW | 2,451 MW | 1,280 MW | 88 MW |
| 2026-10-30T13:00Z | 7,274 MW | 3,994 MW | 2,578 MW | 1,183 MW | 699 MW |
| 2026-10-30T14:00Z | 7,269 MW | 3,729 MW | 2,643 MW | 1,126 MW | 1,085 MW |
| 2026-10-30T15:00Z | 7,258 MW | 3,551 MW | 2,619 MW | 1,326 MW | 1,118 MW |
| 2026-10-30T16:00Z | 7,256 MW | 3,310 MW | 2,617 MW | 1,651 MW | 1,147 MW |
| 2026-10-30T17:00Z | 7,246 MW | 3,588 MW | 2,625 MW | 1,855 MW | 1,095 MW |
| 2026-10-30T18:00Z | 7,241 MW | 3,470 MW | 2,624 MW | 1,974 MW | 1,180 MW |
| 2026-10-30T19:00Z | 7,246 MW | 3,672 MW | 2,622 MW | 2,229 MW | 1,105 MW |
| 2026-10-30T20:00Z | 7,229 MW | 3,978 MW | 2,657 MW | 2,475 MW | 795 MW |
| 2026-10-30T21:00Z | 7,231 MW | 4,218 MW | 2,643 MW | 2,754 MW | 459 MW |
| 2026-10-30T22:00Z | 7,227 MW | 4,227 MW | 2,463 MW | 2,912 MW | 81 MW |
| 2026-10-30T23:00Z | 7,237 MW | 4,054 MW | 2,407 MW | 2,916 MW | -10 MW |
| 2026-10-31T00:00Z | 7,240 MW | 3,880 MW | 2,372 MW | 2,884 MW | -4 MW |
| 2026-10-31T01:00Z | 7,239 MW | 3,745 MW | 2,332 MW | 2,446 MW | 8 MW |
| 2026-10-31T02:00Z | 7,235 MW | 3,706 MW | 2,329 MW | 1,779 MW | -9 MW |
| 2026-10-31T03:00Z | 7,242 MW | 3,771 MW | 2,343 MW | 1,169 MW | -25 MW |
| 2026-10-31T04:00Z | 7,237 MW | 3,501 MW | 2,322 MW | 823 MW | -11 MW |
| 2026-10-31T05:00Z | 7,237 MW | 3,365 MW | 2,274 MW | 497 MW | -4 MW |
| 2026-10-31T06:00Z | 7,249 MW | 3,241 MW | 2,239 MW | 417 MW | -7 MW |
| 2026-10-31T07:00Z | 7,239 MW | 3,181 MW | 2,238 MW | 388 MW | -8 MW |
| 2026-10-31T08:00Z | 7,255 MW | 3,173 MW | 2,245 MW | 385 MW | -7 MW |
| 2026-10-31T09:00Z | 7,241 MW | 3,308 MW | 2,242 MW | 381 MW | -3 MW |
| 2026-10-31T10:00Z | 7,248 MW | 3,729 MW | 2,246 MW | 519 MW | -6 MW |
| 2026-10-31T11:00Z | 7,242 MW | 3,998 MW | 2,256 MW | 632 MW | -7 MW |
| 2026-10-31T12:00Z | 7,248 MW | 3,900 MW | 2,251 MW | 671 MW | 18 MW |
| 2026-10-31T13:00Z | 7,260 MW | 4,043 MW | 2,279 MW | 736 MW | 125 MW |
| 2026-10-31T14:00Z | 7,245 MW | 4,190 MW | 2,308 MW | 815 MW | 248 MW |
| 2026-10-31T15:00Z | 7,248 MW | 4,237 MW | 2,342 MW | 906 MW | 403 MW |
| 2026-10-31T16:00Z | 7,238 MW | 4,269 MW | 2,436 MW | 1,009 MW | 510 MW |
| 2026-10-31T17:00Z | 7,233 MW | 4,315 MW | 2,345 MW | 1,202 MW | 616 MW |
| 2026-10-31T18:00Z | 7,233 MW | 4,376 MW | 2,295 MW | 1,472 MW | 540 MW |
| 2026-10-31T19:00Z | 7,170 MW | 4,382 MW | 2,288 MW | 1,918 MW | 370 MW |
| 2026-10-31T20:00Z | 7,013 MW | 4,386 MW | 2,301 MW | 2,209 MW | 231 MW |
| 2026-10-31T21:00Z | 6,995 MW | 4,132 MW | 2,347 MW | 2,527 MW | 88 MW |
| 2026-10-31T22:00Z | 6,997 MW | 3,958 MW | 2,339 MW | 2,692 MW | 2 MW |
| 2026-10-31T23:00Z | 7,076 MW | 3,906 MW | 2,307 MW | 2,647 MW | -10 MW |
| 2026-11-01T00:00Z | 7,085 MW | 3,673 MW | 2,292 MW | 2,474 MW | -6 MW |
| 2026-11-01T01:00Z | 7,091 MW | 3,968 MW | 2,326 MW | 1,826 MW | -2 MW |
| 2026-11-01T02:00Z | 7,103 MW | 3,941 MW | 2,314 MW | 1,358 MW | -7 MW |
| 2026-11-01T03:00Z | 7,099 MW | 3,840 MW | 2,320 MW | 840 MW | -5 MW |
| 2026-11-01T04:00Z | 7,103 MW | 3,186 MW | 2,292 MW | 689 MW | -13 MW |
| 2026-11-01T05:00Z | 7,110 MW | 2,752 MW | 2,295 MW | 672 MW | 0 MW |
| 2026-11-01T06:00Z | 7,005 MW | 2,570 MW | 2,293 MW | 595 MW | -9 MW |
| 2026-11-01T07:00Z | 7,013 MW | 2,298 MW | 2,292 MW | 589 MW | -4 MW |
| 2026-11-01T08:00Z | 7,226 MW | 2,559 MW | 2,295 MW | 573 MW | -12 MW |
| 2026-11-01T09:00Z | 7,249 MW | 2,729 MW | 2,292 MW | 388 MW | -8 MW |
| 2026-11-01T10:00Z | 7,238 MW | 2,825 MW | 2,313 MW | 418 MW | -5 MW |
| 2026-11-01T11:00Z | 7,228 MW | 2,988 MW | 2,326 MW | 534 MW | -8 MW |
| 2026-11-01T12:00Z | 7,244 MW | 3,281 MW | 2,392 MW | 586 MW | 60 MW |
| 2026-11-01T13:00Z | 7,231 MW | 3,497 MW | 2,441 MW | 589 MW | 171 MW |
| 2026-11-01T14:00Z | 7,240 MW | 3,767 MW | 2,395 MW | 676 MW | 134 MW |
| 2026-11-01T15:00Z | 7,248 MW | 3,940 MW | 2,414 MW | 793 MW | 286 MW |
| 2026-11-01T16:00Z | 7,237 MW | 3,886 MW | 2,353 MW | 918 MW | 308 MW |
| 2026-11-01T17:00Z | 7,242 MW | 3,871 MW | 2,337 MW | 1,047 MW | 388 MW |
| 2026-11-01T18:00Z | 7,227 MW | 3,869 MW | 2,352 MW | 1,209 MW | 361 MW |
| 2026-11-01T19:00Z | 7,228 MW | 3,861 MW | 2,352 MW | 1,368 MW | 313 MW |
| 2026-11-01T20:00Z | 7,238 MW | 3,791 MW | 2,321 MW | 1,784 MW | 309 MW |
| 2026-11-01T21:00Z | 7,228 MW | 4,077 MW | 2,373 MW | 2,050 MW | 203 MW |
| 2026-11-01T22:00Z | 7,251 MW | 4,281 MW | 2,401 MW | 2,402 MW | 36 MW |
| 2026-11-01T23:00Z | 7,238 MW | 4,177 MW | 2,399 MW | 2,583 MW | -4 MW |
| 2026-11-02T00:00Z | 7,245 MW | 4,136 MW | 2,387 MW | 2,492 MW | -5 MW |
| 2026-11-02T01:00Z | 7,249 MW | 3,825 MW | 2,330 MW | 2,334 MW | -9 MW |
| 2026-11-02T02:00Z | 7,252 MW | 3,499 MW | 2,362 MW | 2,010 MW | -5 MW |
| 2026-11-02T03:00Z | 7,255 MW | 3,005 MW | 2,397 MW | 1,605 MW | -7 MW |
| 2026-11-02T04:00Z | 7,257 MW | 3,040 MW | 2,398 MW | 1,112 MW | -33 MW |
| 2026-11-02T05:00Z | 7,260 MW | 2,576 MW | 2,293 MW | 979 MW | -41 MW |
| 2026-11-02T06:00Z | 7,260 MW | 2,576 MW | 2,293 MW | 979 MW | -41 MW |
| 2026-11-02T07:00Z | 7,013 MW | 2,298 MW | 2,292 MW | 589 MW | -4 MW |
| 2026-11-02T08:00Z | 7,226 MW | 2,559 MW | 2,295 MW | 573 MW | -12 MW |
| 2026-11-02T09:00Z | 7,249 MW | 2,729 MW | 2,292 MW | 388 MW | -8 MW |
| 2026-11-02T10:00Z | 7,238 MW | 2,825 MW | 2,313 MW | 418 MW | -5 MW |
| 2026-11-02T11:00Z | 7,228 MW | 2,988 MW | 2,326 MW | 534 MW | -8 MW |
| 2026-11-02T12:00Z | 7,244 MW | 3,281 MW | 2,392 MW | 586 MW | 60 MW |
| 2026-11-02T13:00Z | 7,231 MW | 3,497 MW | 2,441 MW | 589 MW | 171 MW |
| 2026-11-02T14:00Z | 7,240 MW | 3,767 MW | 2,395 MW | 676 MW | 134 MW |
| 2026-11-02T15:00Z | 7,248 MW | 3,940 MW | 2,414 MW | 793 MW | 286 MW |
| 2026-11-02T16:00Z | 7,237 MW | 3,886 MW | 2,353 MW | 918 MW | 308 MW |
| 2026-11-02T17:00Z | 7,242 MW | 3,871 MW | 2,337 MW | 1,047 MW | 388 MW |
| 2026-11-02T18:00Z | 7,227 MW | 3,869 MW | 2,352 MW | 1,209 MW | 361 MW |
| 2026-11-02T19:00Z | 7,228 MW | 3,861 MW | 2,352 MW | 1,368 MW | 313 MW |
| 2026-11-02T20:00Z | 7,238 MW | 3,791 MW | 2,321 MW | 1,784 MW | 309 MW |
| 2026-11-02T21:00Z | 7,228 MW | 4,077 MW | 2,373 MW | 2,050 MW | 203 MW |
| 2026-11-02T22:00Z | 7,251 MW | 4,281 MW | 2,401 MW | 2,402 MW | 36 MW |
| 2026-11-02T23:00Z | 7,238 MW | 4,177 MW | 2,399 MW | 2,583 MW | -4 MW |
| 2026-11-03T00:00Z | 7,245 MW | 4,136 MW | 2,387 MW | 2,492 MW | -5 MW |
| 2026-11-03T01:00Z | 7,249 MW | 3,825 MW | 2,330 MW | 2,334 MW | -9 MW |
| 2026-11-03T02:00Z | 7,252 MW | 3,499 MW | 2,362 MW | 2,010 MW | -5 MW |
| 2026-11-03T03:00Z | 7,255 MW | 3,005 MW | 2,397 MW | 1,605 MW | -7 MW |
| 2026-11-03T04:00Z | 7,257 MW | 3,040 MW | 2,398 MW | 1,112 MW | -33 MW |
| 2026-11-03T05:00Z | 7,260 MW | 2,576 MW | 2,293 MW | 979 MW | -41 MW |
| 2026-11-03T06:00Z | 7,225 MW | 3,738 MW | 2,276 MW | 755 MW | -28 MW |
| 2026-11-03T07:00Z | 7,236 MW | 3,434 MW | 2,276 MW | 720 MW | -52 MW |
| 2026-11-03T08:00Z | 7,230 MW | 3,534 MW | 2,302 MW | 708 MW | -35 MW |
| 2026-11-03T09:00Z | 7,231 MW | 3,711 MW | 2,306 MW | 758 MW | -44 MW |
| 2026-11-03T10:00Z | 7,214 MW | 3,884 MW | 2,328 MW | 888 MW | -35 MW |
| 2026-11-03T11:00Z | 7,201 MW | 4,319 MW | 2,378 MW | 957 MW | 48 MW |
| 2026-11-03T12:00Z | 7,208 MW | 4,410 MW | 2,423 MW | 963 MW | 112 MW |
| 2026-11-03T13:00Z | 7,216 MW | 4,064 MW | 2,481 MW | 951 MW | 473 MW |
| 2026-11-03T14:00Z | 7,207 MW | 3,907 MW | 2,499 MW | 952 MW | 723 MW |
| 2026-11-03T15:00Z | 7,203 MW | 4,173 MW | 2,518 MW | 1,048 MW | 714 MW |
| 2026-11-03T16:00Z | 7,208 MW | 4,730 MW | 2,542 MW | 1,135 MW | 636 MW |
| 2026-11-03T17:00Z | 7,192 MW | 4,747 MW | 2,576 MW | 1,279 MW | 635 MW |
| 2026-11-03T18:00Z | 7,198 MW | 4,744 MW | 2,639 MW | 1,398 MW | 648 MW |
| 2026-11-03T19:00Z | 7,183 MW | 4,824 MW | 2,649 MW | 1,618 MW | 420 MW |
| 2026-11-03T20:00Z | 7,225 MW | 4,855 MW | 2,638 MW | 1,916 MW | 210 MW |
| 2026-11-03T21:00Z | 7,260 MW | 4,669 MW | 2,639 MW | 2,225 MW | 75 MW |
| 2026-11-03T22:00Z | 7,342 MW | 4,485 MW | 2,642 MW | 2,686 MW | 2 MW |
| 2026-11-03T23:00Z | 7,411 MW | 5,007 MW | 2,636 MW | 2,702 MW | -6 MW |
| 2026-11-04T00:00Z | 7,487 MW | 4,752 MW | 2,637 MW | 2,708 MW | -4 MW |
| 2026-11-04T01:00Z | 7,508 MW | 4,734 MW | 2,376 MW | 2,507 MW | -6 MW |
| 2026-11-04T02:00Z | 7,516 MW | 4,868 MW | 2,126 MW | 2,066 MW | -3 MW |
| 2026-11-04T03:00Z | 7,527 MW | 4,270 MW | 2,074 MW | 1,617 MW | -7 MW |
| 2026-11-04T04:00Z | 7,517 MW | 3,921 MW | 2,100 MW | 1,037 MW | -19 MW |
| 2026-11-04T05:00Z | 7,517 MW | 3,692 MW | 2,099 MW | 871 MW | -28 MW |
| 2026-11-04T06:00Z | 7,515 MW | 3,670 MW | 2,092 MW | 713 MW | -41 MW |
| 2026-11-04T07:00Z | 7,517 MW | 3,531 MW | 2,101 MW | 619 MW | -47 MW |
| 2026-11-04T08:00Z | 7,494 MW | 3,846 MW | 2,100 MW | 553 MW | -34 MW |
| 2026-11-04T09:00Z | 7,497 MW | 3,923 MW | 2,120 MW | 587 MW | -53 MW |
| 2026-11-04T10:00Z | 7,491 MW | 3,823 MW | 2,345 MW | 694 MW | -67 MW |
| 2026-11-04T11:00Z | 7,494 MW | 4,390 MW | 2,392 MW | 754 MW | -19 MW |
| 2026-11-04T12:00Z | 7,499 MW | 4,555 MW | 2,389 MW | 881 MW | 13 MW |
| 2026-11-04T13:00Z | 7,501 MW | 4,209 MW | 2,409 MW | 1,150 MW | 81 MW |
| 2026-11-04T14:00Z | 7,489 MW | 4,322 MW | 2,413 MW | 1,199 MW | 309 MW |
| 2026-11-04T15:00Z | 7,510 MW | 4,595 MW | 2,450 MW | 1,217 MW | 466 MW |
| 2026-11-04T16:00Z | 7,557 MW | 4,635 MW | 2,479 MW | 1,335 MW | 481 MW |
| 2026-11-04T17:00Z | 7,641 MW | 5,270 MW | 2,495 MW | 1,559 MW | 539 MW |
| 2026-11-04T18:00Z | 7,694 MW | 4,984 MW | 2,520 MW | 1,577 MW | 964 MW |
| 2026-11-04T19:00Z | 7,737 MW | 4,953 MW | 2,524 MW | 1,614 MW | 1,080 MW |
| 2026-11-04T20:00Z | 7,782 MW | 5,363 MW | 2,523 MW | 1,612 MW | 1,101 MW |
| 2026-11-04T21:00Z | 7,840 MW | 5,432 MW | 2,529 MW | 2,036 MW | 797 MW |
| 2026-11-04T22:00Z | 7,882 MW | 5,879 MW | 2,521 MW | 2,289 MW | 157 MW |
| 2026-11-04T23:00Z | 7,892 MW | 5,810 MW | 2,608 MW | 2,440 MW | -7 MW |
| 2026-11-05T00:00Z | 7,916 MW | 5,175 MW | 2,729 MW | 2,632 MW | -3 MW |
| 2026-11-05T01:00Z | 7,917 MW | 4,824 MW | 2,801 MW | 2,516 MW | -9 MW |
| 2026-11-05T02:00Z | 7,912 MW | 4,566 MW | 2,831 MW | 2,211 MW | 13 MW |
| 2026-11-05T03:00Z | 7,920 MW | 4,469 MW | 2,857 MW | 1,718 MW | -4 MW |
| 2026-11-05T04:00Z | 7,924 MW | 4,532 MW | 2,777 MW | 1,112 MW | -14 MW |
| 2026-11-05T05:00Z | 7,929 MW | 4,557 MW | 2,650 MW | 779 MW | -49 MW |
| 2026-11-05T06:00Z | 8,297 MW | 4,462 MW | 2,460 MW | 597 MW | -46 MW |
| 2026-11-05T07:00Z | 8,307 MW | 4,389 MW | 2,222 MW | 591 MW | -66 MW |
| 2026-11-05T08:00Z | 8,320 MW | 4,383 MW | 2,226 MW | 539 MW | -66 MW |
| 2026-11-05T09:00Z | 8,338 MW | 3,972 MW | 2,223 MW | 558 MW | -77 MW |
| 2026-11-05T10:00Z | 8,357 MW | 4,192 MW | 2,224 MW | 649 MW | -7 MW |
| 2026-11-05T11:00Z | 8,336 MW | 4,785 MW | 2,228 MW | 713 MW | 21 MW |
| 2026-11-05T12:00Z | 8,344 MW | 4,608 MW | 2,376 MW | 767 MW | 87 MW |
| 2026-11-05T13:00Z | 8,343 MW | 3,858 MW | 2,543 MW | 776 MW | 689 MW |
| 2026-11-05T14:00Z | 8,350 MW | 3,457 MW | 2,624 MW | 751 MW | 1,306 MW |
| 2026-11-05T15:00Z | 8,344 MW | 3,642 MW | 2,733 MW | 782 MW | 1,403 MW |
| 2026-11-05T16:00Z | 8,338 MW | 3,944 MW | 2,880 MW | 900 MW | 1,393 MW |
| 2026-11-05T17:00Z | 8,342 MW | 3,953 MW | 2,945 MW | 1,120 MW | 1,380 MW |
| 2026-11-05T18:00Z | 8,336 MW | 3,592 MW | 2,792 MW | 1,402 MW | 1,377 MW |
| 2026-11-05T19:00Z | 8,324 MW | 3,814 MW | 2,704 MW | 1,491 MW | 1,447 MW |
| 2026-11-05T20:00Z | 8,329 MW | 3,751 MW | 2,713 MW | 1,599 MW | 1,445 MW |
| 2026-11-05T21:00Z | 8,331 MW | 3,594 MW | 2,827 MW | 1,941 MW | 988 MW |
| 2026-11-05T22:00Z | 8,326 MW | 3,517 MW | 2,902 MW | 2,429 MW | 193 MW |
| 2026-11-05T23:00Z | 8,345 MW | 3,737 MW | 2,908 MW | 2,654 MW | 12 MW |
| 2026-11-06T00:00Z | 8,343 MW | 3,465 MW | 2,904 MW | 2,675 MW | -4 MW |
| 2026-11-06T01:00Z | 8,349 MW | 3,388 MW | 2,851 MW | 2,603 MW | -1 MW |
| 2026-11-06T02:00Z | 8,358 MW | 3,413 MW | 2,764 MW | 2,312 MW | 8 MW |
| 2026-11-06T03:00Z | 8,352 MW | 3,443 MW | 2,722 MW | 1,812 MW | -2 MW |
| 2026-11-06T04:00Z | 8,359 MW | 3,257 MW | 2,670 MW | 1,218 MW | -23 MW |
| 2026-11-06T05:00Z | 8,364 MW | 3,253 MW | 2,668 MW | 848 MW | -17 MW |
| 2026-11-06T06:00Z | 8,377 MW | 3,565 MW | 2,667 MW | 655 MW | -21 MW |
| 2026-11-06T07:00Z | 8,369 MW | 3,459 MW | 2,646 MW | 647 MW | -38 MW |
| 2026-11-06T08:00Z | 8,371 MW | 3,671 MW | 2,587 MW | 694 MW | -24 MW |
| 2026-11-06T09:00Z | 8,375 MW | 3,748 MW | 2,485 MW | 739 MW | -60 MW |
| 2026-11-06T10:00Z | 7,986 MW | 3,907 MW | 2,455 MW | 755 MW | -18 MW |
| 2026-11-06T11:00Z | 8,384 MW | 4,507 MW | 2,522 MW | 889 MW | 22 MW |
| 2026-11-06T12:00Z | 8,383 MW | 4,482 MW | 2,559 MW | 1,001 MW | 89 MW |
| 2026-11-06T13:00Z | 8,372 MW | 4,082 MW | 2,470 MW | 971 MW | 659 MW |
| 2026-11-06T14:00Z | 8,375 MW | 3,760 MW | 2,364 MW | 1,148 MW | 1,177 MW |
| 2026-11-06T15:00Z | 8,354 MW | 3,823 MW | 2,308 MW | 1,190 MW | 1,187 MW |
| 2026-11-06T16:00Z | 8,357 MW | 3,972 MW | 2,255 MW | 1,271 MW | 1,136 MW |
| 2026-11-06T17:00Z | 8,352 MW | 3,542 MW | 2,240 MW | 1,540 MW | 1,118 MW |
| 2026-11-06T18:00Z | 8,359 MW | 3,536 MW | 2,242 MW | 1,671 MW | 1,077 MW |
| 2026-11-06T19:00Z | 8,339 MW | 3,607 MW | 2,236 MW | 1,798 MW | 1,019 MW |
| 2026-11-06T20:00Z | 8,352 MW | 3,760 MW | 2,242 MW | 1,885 MW | 972 MW |
| 2026-11-06T21:00Z | 8,358 MW | 4,059 MW | 2,233 MW | 2,113 MW | 614 MW |
| 2026-11-06T22:00Z | 8,281 MW | 4,432 MW | 2,239 MW | 2,494 MW | 115 MW |
| 2026-11-06T23:00Z | 8,094 MW | 4,182 MW | 2,269 MW | 2,772 MW | -5 MW |
| 2026-11-07T00:00Z | 7,925 MW | 4,029 MW | 2,296 MW | 2,767 MW | -8 MW |
| 2026-11-07T01:00Z | 7,750 MW | 4,086 MW | 2,317 MW | 2,470 MW | -10 MW |
| 2026-11-07T02:00Z | 7,249 MW | 4,399 MW | 2,322 MW | 1,958 MW | -3 MW |
| 2026-11-07T03:00Z | 7,254 MW | 4,360 MW | 2,335 MW | 1,580 MW | -6 MW |
| 2026-11-07T04:00Z | 7,264 MW | 3,885 MW | 2,636 MW | 1,180 MW | -52 MW |
| 2026-11-07T05:00Z | 7,260 MW | 3,562 MW | 2,625 MW | 903 MW | -33 MW |
| 2026-11-07T06:00Z | 7,262 MW | 3,552 MW | 2,513 MW | 560 MW | -10 MW |
| 2026-11-07T07:00Z | 7,276 MW | 3,220 MW | 2,378 MW | 524 MW | -62 MW |
| 2026-11-07T08:00Z | 7,250 MW | 3,316 MW | 2,244 MW | 497 MW | -50 MW |
| 2026-11-07T09:00Z | 7,275 MW | 3,535 MW | 2,066 MW | 527 MW | -50 MW |
| 2026-11-07T10:00Z | 7,264 MW | 3,950 MW | 1,922 MW | 553 MW | -27 MW |
| 2026-11-07T11:00Z | 7,269 MW | 4,409 MW | 1,887 MW | 568 MW | 34 MW |
| 2026-11-07T12:00Z | 7,268 MW | 4,791 MW | 1,887 MW | 693 MW | 161 MW |
| 2026-11-07T13:00Z | 7,264 MW | 4,616 MW | 1,893 MW | 839 MW | 713 MW |
| 2026-11-07T14:00Z | 7,272 MW | 4,095 MW | 1,806 MW | 1,075 MW | 1,311 MW |
| 2026-11-07T15:00Z | 7,280 MW | 3,985 MW | 1,759 MW | 1,176 MW | 1,353 MW |
| 2026-11-07T16:00Z | 7,277 MW | 3,775 MW | 1,770 MW | 1,134 MW | 1,279 MW |
| 2026-11-07T17:00Z | 7,281 MW | 3,622 MW | 1,778 MW | 1,127 MW | 1,227 MW |
| 2026-11-07T18:00Z | 7,275 MW | 3,882 MW | 1,823 MW | 959 MW | 1,247 MW |
| 2026-11-07T19:00Z | 7,276 MW | 4,082 MW | 1,821 MW | 904 MW | 1,219 MW |
| 2026-11-07T20:00Z | 7,273 MW | 4,309 MW | 1,845 MW | 1,002 MW | 1,282 MW |
| 2026-11-07T21:00Z | 7,285 MW | 4,778 MW | 1,881 MW | 1,163 MW | 887 MW |
| 2026-11-07T22:00Z | 7,276 MW | 4,935 MW | 1,964 MW | 1,724 MW | 156 MW |
| 2026-11-07T23:00Z | 7,270 MW | 4,720 MW | 1,905 MW | 2,329 MW | -9 MW |
| 2026-11-08T00:00Z | 7,275 MW | 4,621 MW | 1,862 MW | 2,402 MW | -5 MW |
| 2026-11-08T01:00Z | 7,276 MW | 4,505 MW | 1,872 MW | 2,429 MW | -3 MW |
| 2026-11-08T02:00Z | 7,286 MW | 4,558 MW | 1,864 MW | 2,161 MW | 13 MW |
| 2026-11-08T03:00Z | 7,279 MW | 4,653 MW | 1,871 MW | 1,728 MW | -7 MW |
| 2026-11-08T04:00Z | 7,294 MW | 4,506 MW | 1,912 MW | 1,284 MW | -5 MW |
| 2026-11-08T05:00Z | 7,284 MW | 4,403 MW | 1,896 MW | 936 MW | -39 MW |
| 2026-11-08T06:00Z | 7,292 MW | 4,359 MW | 1,872 MW | 526 MW | -44 MW |
| 2026-11-08T07:00Z | 7,284 MW | 4,281 MW | 1,870 MW | 528 MW | -66 MW |
| 2026-11-08T08:00Z | 7,291 MW | 4,206 MW | 1,868 MW | 588 MW | -73 MW |
| 2026-11-08T09:00Z | 7,304 MW | 4,360 MW | 1,879 MW | 770 MW | -71 MW |
| 2026-11-08T10:00Z | 7,290 MW | 4,365 MW | 1,910 MW | 1,070 MW | -52 MW |
| 2026-11-08T11:00Z | 7,296 MW | 4,345 MW | 1,875 MW | 1,575 MW | -26 MW |
| 2026-11-08T12:00Z | 7,286 MW | 4,508 MW | 1,966 MW | 1,937 MW | 151 MW |
| 2026-11-08T13:00Z | 7,296 MW | 4,220 MW | 1,945 MW | 2,023 MW | 819 MW |
| 2026-11-08T14:00Z | 7,290 MW | 3,546 MW | 1,737 MW | 1,940 MW | 1,302 MW |
| 2026-11-08T15:00Z | 7,293 MW | 3,648 MW | 1,603 MW | 1,613 MW | 1,352 MW |
| 2026-11-08T16:00Z | 7,299 MW | 3,705 MW | 1,592 MW | 1,102 MW | 1,302 MW |
| 2026-11-08T17:00Z | 7,301 MW | 3,507 MW | 1,598 MW | 794 MW | 1,214 MW |
| 2026-11-08T18:00Z | 7,293 MW | 3,491 MW | 1,601 MW | 693 MW | 1,209 MW |
| 2026-11-08T19:00Z | 7,294 MW | 3,287 MW | 1,606 MW | 724 MW | 1,323 MW |
| 2026-11-08T20:00Z | 7,293 MW | 3,417 MW | 1,600 MW | 757 MW | 1,349 MW |
| 2026-11-08T21:00Z | 7,291 MW | 3,873 MW | 1,669 MW | 803 MW | 771 MW |
| 2026-11-08T22:00Z | 7,286 MW | 4,251 MW | 1,973 MW | 1,124 MW | 126 MW |
| 2026-11-08T23:00Z | 7,305 MW | 4,482 MW | 1,987 MW | 1,664 MW | -4 MW |
| 2026-11-09T00:00Z | 7,294 MW | 4,283 MW | 1,999 MW | 1,837 MW | -5 MW |
| 2026-11-09T01:00Z | 7,298 MW | 4,153 MW | 1,995 MW | 1,882 MW | -8 MW |
| 2026-11-09T02:00Z | 7,302 MW | 4,014 MW | 1,988 MW | 1,722 MW | 11 MW |
| 2026-11-09T03:00Z | 7,305 MW | 4,145 MW | 2,002 MW | 1,319 MW | -9 MW |
| 2026-11-09T04:00Z | 7,298 MW | 4,186 MW | 2,003 MW | 976 MW | -6 MW |
| 2026-11-09T05:00Z | 7,316 MW | 4,096 MW | 1,995 MW | 837 MW | -4 MW |
| 2026-11-09T06:00Z | 7,301 MW | 4,036 MW | 2,004 MW | 806 MW | -7 MW |
| 2026-11-09T07:00Z | 7,317 MW | 4,232 MW | 2,001 MW | 826 MW | -6 MW |
| 2026-11-09T08:00Z | 7,309 MW | 4,490 MW | 1,996 MW | 840 MW | -5 MW |
| 2026-11-09T09:00Z | 7,305 MW | 4,676 MW | 2,002 MW | 942 MW | -5 MW |
| 2026-11-09T10:00Z | 7,316 MW | 4,323 MW | 2,107 MW | 1,489 MW | -8 MW |
| 2026-11-09T11:00Z | 7,307 MW | 4,824 MW | 2,236 MW | 2,205 MW | -3 MW |
| 2026-11-09T12:00Z | 7,325 MW | 5,012 MW | 2,314 MW | 2,526 MW | 48 MW |
| 2026-11-09T13:00Z | 7,317 MW | 4,552 MW | 2,293 MW | 2,499 MW | 736 MW |
| 2026-11-09T14:00Z | 7,312 MW | 4,188 MW | 1,982 MW | 2,072 MW | 1,389 MW |
| 2026-11-09T15:00Z | 7,304 MW | 4,536 MW | 1,815 MW | 1,948 MW | 1,402 MW |
| 2026-11-09T16:00Z | 7,296 MW | 4,701 MW | 1,834 MW | 1,560 MW | 1,368 MW |
| 2026-11-09T17:00Z | 7,305 MW | 4,823 MW | 1,894 MW | 1,311 MW | 1,368 MW |
| 2026-11-09T18:00Z | 7,291 MW | 4,823 MW | 1,887 MW | 947 MW | 1,346 MW |
| 2026-11-09T19:00Z | 7,305 MW | 4,519 MW | 1,817 MW | 959 MW | 1,366 MW |
| 2026-11-09T20:00Z | 7,283 MW | 4,340 MW | 1,769 MW | 953 MW | 1,343 MW |
| 2026-11-09T21:00Z | 7,288 MW | 4,774 MW | 1,806 MW | 1,076 MW | 908 MW |
| 2026-11-09T22:00Z | 7,296 MW | 4,766 MW | 1,958 MW | 1,630 MW | 144 MW |
| 2026-11-09T23:00Z | 7,287 MW | 4,834 MW | 2,146 MW | 1,928 MW | 22 MW |
| 2026-11-10T00:00Z | 7,293 MW | 4,569 MW | 2,181 MW | 2,004 MW | -1 MW |
| 2026-11-10T01:00Z | 7,288 MW | 4,537 MW | 2,180 MW | 2,063 MW | 1 MW |
| 2026-11-10T02:00Z | 7,315 MW | 4,613 MW | 2,208 MW | 1,876 MW | 16 MW |
| 2026-11-10T03:00Z | 7,294 MW | 4,423 MW | 2,153 MW | 1,595 MW | -6 MW |
| 2026-11-10T04:00Z | 7,312 MW | 4,483 MW | 2,056 MW | 1,098 MW | 1 MW |
| 2026-11-10T05:00Z | 7,301 MW | 4,432 MW | 2,043 MW | 877 MW | -43 MW |
| 2026-11-10T06:00Z | 7,315 MW | 4,682 MW | 2,028 MW | 812 MW | -13 MW |
| 2026-11-10T07:00Z | 7,301 MW | 4,965 MW | 2,041 MW | 699 MW | -6 MW |
| 2026-11-10T08:00Z | 7,319 MW | 4,973 MW | 2,038 MW | 744 MW | -6 MW |
| 2026-11-10T09:00Z | 7,313 MW | 5,009 MW | 2,049 MW | 932 MW | -6 MW |
| 2026-11-10T10:00Z | 7,314 MW | 5,099 MW | 2,051 MW | 1,411 MW | -7 MW |
| 2026-11-10T11:00Z | 7,312 MW | 5,117 MW | 2,005 MW | 2,072 MW | 34 MW |
| 2026-11-10T12:00Z | 7,318 MW | 5,331 MW | 2,030 MW | 2,550 MW | 140 MW |
| 2026-11-10T13:00Z | 7,318 MW | 4,818 MW | 2,017 MW | 2,423 MW | 705 MW |
| 2026-11-10T14:00Z | 7,317 MW | 4,105 MW | 2,054 MW | 2,352 MW | 1,283 MW |
| 2026-11-10T15:00Z | 7,308 MW | 3,978 MW | 2,089 MW | 2,005 MW | 1,265 MW |
| 2026-11-10T16:00Z | 7,298 MW | 4,282 MW | 2,098 MW | 1,589 MW | 1,268 MW |
| 2026-11-10T17:00Z | 7,303 MW | 4,484 MW | 1,932 MW | 1,335 MW | 1,255 MW |
| 2026-11-10T18:00Z | 7,295 MW | 4,435 MW | 1,868 MW | 1,017 MW | 1,301 MW |
| 2026-11-10T19:00Z | 7,295 MW | 4,412 MW | 1,841 MW | 1,062 MW | 1,360 MW |
| 2026-11-10T20:00Z | 7,284 MW | 4,402 MW | 1,832 MW | 1,103 MW | 1,357 MW |
| 2026-11-10T21:00Z | 7,297 MW | 4,618 MW | 1,797 MW | 1,408 MW | 818 MW |
| 2026-11-10T22:00Z | 7,286 MW | 4,867 MW | 1,812 MW | 1,919 MW | 104 MW |
| 2026-11-10T23:00Z | 7,300 MW | 5,092 MW | 1,888 MW | 2,342 MW | 12 MW |
| 2026-11-11T00:00Z | 7,297 MW | 5,044 MW | 1,860 MW | 2,343 MW | -3 MW |
| 2026-11-11T01:00Z | 7,299 MW | 4,809 MW | 1,859 MW | 2,270 MW | 23 MW |
| 2026-11-11T02:00Z | 7,305 MW | 4,351 MW | 1,880 MW | 1,973 MW | 9 MW |
| 2026-11-11T03:00Z | 7,301 MW | 4,133 MW | 1,880 MW | 1,356 MW | -2 MW |
| 2026-11-11T04:00Z | 7,308 MW | 4,137 MW | 1,846 MW | 825 MW | -6 MW |
| 2026-11-11T05:00Z | 7,300 MW | 4,098 MW | 1,824 MW | 765 MW | -28 MW |
| 2026-11-11T06:00Z | 7,303 MW | 4,234 MW | 1,887 MW | 711 MW | -2 MW |
| 2026-11-11T07:00Z | 7,317 MW | 4,240 MW | 1,895 MW | 607 MW | -9 MW |
| 2026-11-11T08:00Z | 7,304 MW | 4,278 MW | 1,894 MW | 613 MW | -7 MW |
| 2026-11-11T09:00Z | 7,321 MW | 4,258 MW | 1,970 MW | 766 MW | -6 MW |
| 2026-11-11T10:00Z | 7,310 MW | 4,258 MW | 2,168 MW | 1,036 MW | -31 MW |
| 2026-11-11T11:00Z | 7,305 MW | 4,519 MW | 2,232 MW | 1,519 MW | 11 MW |
| 2026-11-11T12:00Z | 7,313 MW | 4,663 MW | 2,241 MW | 1,949 MW | 54 MW |
| 2026-11-11T13:00Z | 7,319 MW | 4,330 MW | 2,258 MW | 2,036 MW | 252 MW |
| 2026-11-11T14:00Z | 7,309 MW | 4,196 MW | 2,250 MW | 1,932 MW | 424 MW |
| 2026-11-11T15:00Z | 7,313 MW | 4,185 MW | 2,243 MW | 1,639 MW | 614 MW |
| 2026-11-11T16:00Z | 7,314 MW | 4,457 MW | 2,236 MW | 1,296 MW | 593 MW |
| 2026-11-11T17:00Z | 7,310 MW | 4,728 MW | 2,237 MW | 1,138 MW | 873 MW |
| 2026-11-11T18:00Z | 7,295 MW | 5,095 MW | 2,228 MW | 1,077 MW | 963 MW |
| 2026-11-11T19:00Z | 7,299 MW | 5,341 MW | 2,239 MW | 1,218 MW | 710 MW |
| 2026-11-11T20:00Z | 7,303 MW | 4,673 MW | 2,234 MW | 1,467 MW | 681 MW |
| 2026-11-11T21:00Z | 7,303 MW | 4,064 MW | 2,175 MW | 1,938 MW | 591 MW |
| 2026-11-11T22:00Z | 7,313 MW | 4,297 MW | 2,199 MW | 2,432 MW | 76 MW |
| 2026-11-11T23:00Z | 7,293 MW | 4,529 MW | 2,223 MW | 2,674 MW | -8 MW |
| 2026-11-12T00:00Z | 7,309 MW | 4,380 MW | 2,232 MW | 2,666 MW | -5 MW |
| 2026-11-12T01:00Z | 7,299 MW | 4,216 MW | 2,201 MW | 2,577 MW | -7 MW |
| 2026-11-12T02:00Z | 7,307 MW | 4,244 MW | 2,215 MW | 2,064 MW | 4 MW |
| 2026-11-12T03:00Z | 7,304 MW | 4,017 MW | 2,228 MW | 1,355 MW | -5 MW |
| 2026-11-12T04:00Z | 7,308 MW | 3,614 MW | 2,237 MW | 873 MW | -5 MW |
| 2026-11-12T05:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T06:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T07:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T08:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T09:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T10:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T11:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T12:00Z | n/a | n/a | n/a | n/a | n/a |
| 2026-11-12T13:00Z | n/a | n/a | n/a | n/a | n/a |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12T13:00Z.
Day by Day
Daily totals, Central time dates, through 2026-11-11Show the data table (400 rows)
| Date (Central time) | Demand |
|---|---|
| 2025-10-08 | 423 GWh |
| 2025-10-09 | 388 GWh |
| 2025-10-10 | 389 GWh |
| 2025-10-11 | 375 GWh |
| 2025-10-12 | 374 GWh |
| 2025-10-13 | 402 GWh |
| 2025-10-14 | 407 GWh |
| 2025-10-15 | 410 GWh |
| 2025-10-16 | 415 GWh |
| 2025-10-17 | 406 GWh |
| 2025-10-18 | 414 GWh |
| 2025-10-19 | 367 GWh |
| 2025-10-20 | 378 GWh |
| 2025-10-21 | 384 GWh |
| 2025-10-22 | 385 GWh |
| 2025-10-23 | 389 GWh |
| 2025-10-24 | 387 GWh |
| 2025-10-25 | 366 GWh |
| 2025-10-26 | 361 GWh |
| 2025-10-27 | 393 GWh |
| 2025-10-28 | 390 GWh |
| 2025-10-29 | 401 GWh |
| 2025-10-30 | 414 GWh |
| 2025-10-31 | 409 GWh |
| 2025-11-01 | 399 GWh |
| 2025-11-02 | 412 GWh |
| 2025-11-03 | 429 GWh |
| 2025-11-04 | 418 GWh |
| 2025-11-05 | 401 GWh |
| 2025-11-06 | 398 GWh |
| 2025-11-07 | 391 GWh |
| 2025-11-08 | 367 GWh |
| 2025-11-09 | 398 GWh |
| 2025-11-10 | 540 GWh |
| 2025-11-11 | 529 GWh |
| 2025-11-12 | 442 GWh |
| 2025-11-13 | 426 GWh |
| 2025-11-14 | 413 GWh |
| 2025-11-15 | 377 GWh |
| 2025-11-16 | 366 GWh |
| 2025-11-17 | 425 GWh |
| 2025-11-18 | 416 GWh |
| 2025-11-19 | 400 GWh |
| 2025-11-20 | 395 GWh |
| 2025-11-21 | 390 GWh |
| 2025-11-22 | 374 GWh |
| 2025-11-23 | 371 GWh |
| 2025-11-24 | 409 GWh |
| 2025-11-25 | 395 GWh |
| 2025-11-26 | 409 GWh |
| 2025-11-27 | 438 GWh |
| 2025-11-28 | 484 GWh |
| 2025-11-29 | 477 GWh |
| 2025-11-30 | 464 GWh |
| 2025-12-01 | 532 GWh |
| 2025-12-02 | 547 GWh |
| 2025-12-03 | 553 GWh |
| 2025-12-04 | 555 GWh |
| 2025-12-05 | 526 GWh |
| 2025-12-06 | 498 GWh |
| 2025-12-07 | 480 GWh |
| 2025-12-08 | 381 GWh |
| 2025-12-09 | 453 GWh |
| 2025-12-10 | 501 GWh |
| 2025-12-11 | 519 GWh |
| 2025-12-12 | 485 GWh |
| 2025-12-13 | 473 GWh |
| 2025-12-14 | 606 GWh |
| 2025-12-15 | 656 GWh |
| 2025-12-16 | 564 GWh |
| 2025-12-17 | 492 GWh |
| 2025-12-18 | 447 GWh |
| 2025-12-19 | 488 GWh |
| 2025-12-20 | 482 GWh |
| 2025-12-21 | 433 GWh |
| 2025-12-22 | 467 GWh |
| 2025-12-23 | 401 GWh |
| 2025-12-24 | 360 GWh |
| 2025-12-25 | 336 GWh |
| 2025-12-26 | 351 GWh |
| 2025-12-27 | 356 GWh |
| 2025-12-28 | 358 GWh |
| 2025-12-29 | 473 GWh |
| 2025-12-30 | 562 GWh |
| 2025-12-31 | 519 GWh |
| 2026-01-01 | 448 GWh |
| 2026-01-02 | 439 GWh |
| 2026-01-03 | 424 GWh |
| 2026-01-04 | 460 GWh |
| 2026-01-05 | 462 GWh |
| 2026-01-06 | 421 GWh |
| 2026-01-07 | 399 GWh |
| 2026-01-08 | 413 GWh |
| 2026-01-09 | 389 GWh |
| 2026-01-10 | 387 GWh |
| 2026-01-11 | 484 GWh |
| 2026-01-12 | 551 GWh |
| 2026-01-13 | 504 GWh |
| 2026-01-14 | 492 GWh |
| 2026-01-15 | 606 GWh |
| 2026-01-16 | 556 GWh |
| 2026-01-17 | 492 GWh |
| 2026-01-18 | 562 GWh |
| 2026-01-19 | 583 GWh |
| 2026-01-20 | 615 GWh |
| 2026-01-21 | 548 GWh |
| 2026-01-22 | 494 GWh |
| 2026-01-23 | 553 GWh |
| 2026-01-24 | 638 GWh |
| 2026-01-25 | 564 GWh |
| 2026-01-26 | 677 GWh |
| 2026-01-27 | 676 GWh |
| 2026-01-28 | 618 GWh |
| 2026-01-29 | 608 GWh |
| 2026-01-30 | 618 GWh |
| 2026-01-31 | 717 GWh |
| 2026-02-01 | 677 GWh |
| 2026-02-02 | 622 GWh |
| 2026-02-03 | 565 GWh |
| 2026-02-04 | 568 GWh |
| 2026-02-05 | 619 GWh |
| 2026-02-06 | 539 GWh |
| 2026-02-07 | 516 GWh |
| 2026-02-08 | 524 GWh |
| 2026-02-09 | 471 GWh |
| 2026-02-10 | 428 GWh |
| 2026-02-11 | 415 GWh |
| 2026-02-12 | 484 GWh |
| 2026-02-13 | 474 GWh |
| 2026-02-14 | 445 GWh |
| 2026-02-15 | 417 GWh |
| 2026-02-16 | 432 GWh |
| 2026-02-17 | 427 GWh |
| 2026-02-18 | 407 GWh |
| 2026-02-19 | 398 GWh |
| 2026-02-20 | 387 GWh |
| 2026-02-21 | 396 GWh |
| 2026-02-22 | 503 GWh |
| 2026-02-23 | 611 GWh |
| 2026-02-24 | 570 GWh |
| 2026-02-25 | 456 GWh |
| 2026-02-26 | 416 GWh |
| 2026-02-27 | 409 GWh |
| 2026-02-28 | 394 GWh |
| 2026-03-01 | 374 GWh |
| 2026-03-02 | 407 GWh |
| 2026-03-03 | 395 GWh |
| 2026-03-04 | 392 GWh |
| 2026-03-05 | 400 GWh |
| 2026-03-06 | 402 GWh |
| 2026-03-07 | 375 GWh |
| 2026-03-08 | 340 GWh |
| 2026-03-09 | 388 GWh |
| 2026-03-10 | 399 GWh |
| 2026-03-11 | 402 GWh |
| 2026-03-12 | 410 GWh |
| 2026-03-13 | 424 GWh |
| 2026-03-14 | 380 GWh |
| 2026-03-15 | 365 GWh |
| 2026-03-16 | 474 GWh |
| 2026-03-17 | 540 GWh |
| 2026-03-18 | 482 GWh |
| 2026-03-19 | 428 GWh |
| 2026-03-20 | 401 GWh |
| 2026-03-21 | 392 GWh |
| 2026-03-22 | 411 GWh |
| 2026-03-23 | 392 GWh |
| 2026-03-24 | 395 GWh |
| 2026-03-25 | 396 GWh |
| 2026-03-26 | 412 GWh |
| 2026-03-27 | 392 GWh |
| 2026-03-28 | 382 GWh |
| 2026-03-29 | 388 GWh |
| 2026-03-30 | 401 GWh |
| 2026-03-31 | 429 GWh |
| 2026-04-01 | 429 GWh |
| 2026-04-02 | 430 GWh |
| 2026-04-03 | 426 GWh |
| 2026-04-04 | 392 GWh |
| 2026-04-05 | 346 GWh |
| 2026-04-06 | 383 GWh |
| 2026-04-07 | 391 GWh |
| 2026-04-08 | 397 GWh |
| 2026-04-09 | 396 GWh |
| 2026-04-10 | 396 GWh |
| 2026-04-11 | 388 GWh |
| 2026-04-12 | 387 GWh |
| 2026-04-13 | 409 GWh |
| 2026-04-14 | 432 GWh |
| 2026-04-15 | 436 GWh |
| 2026-04-16 | 438 GWh |
| 2026-04-17 | 437 GWh |
| 2026-04-18 | 388 GWh |
| 2026-04-19 | 350 GWh |
| 2026-04-20 | 390 GWh |
| 2026-04-21 | 399 GWh |
| 2026-04-22 | 411 GWh |
| 2026-04-23 | 418 GWh |
| 2026-04-24 | 415 GWh |
| 2026-04-25 | 397 GWh |
| 2026-04-26 | 407 GWh |
| 2026-04-27 | 446 GWh |
| 2026-04-28 | 435 GWh |
| 2026-04-29 | 415 GWh |
| 2026-04-30 | 385 GWh |
| 2026-05-01 | 377 GWh |
| 2026-05-02 | 358 GWh |
| 2026-05-03 | 366 GWh |
| 2026-05-04 | 409 GWh |
| 2026-05-05 | 402 GWh |
| 2026-05-06 | 398 GWh |
| 2026-05-07 | 387 GWh |
| 2026-05-08 | 389 GWh |
| 2026-05-09 | 385 GWh |
| 2026-05-10 | 401 GWh |
| 2026-05-11 | 409 GWh |
| 2026-05-12 | 415 GWh |
| 2026-05-13 | 421 GWh |
| 2026-05-14 | 399 GWh |
| 2026-05-15 | 409 GWh |
| 2026-05-16 | 430 GWh |
| 2026-05-17 | 463 GWh |
| 2026-05-18 | 517 GWh |
| 2026-05-19 | 533 GWh |
| 2026-05-20 | 486 GWh |
| 2026-05-21 | 445 GWh |
| 2026-05-22 | 433 GWh |
| 2026-05-23 | 433 GWh |
| 2026-05-24 | 414 GWh |
| 2026-05-25 | 421 GWh |
| 2026-05-26 | 468 GWh |
| 2026-05-27 | 496 GWh |
| 2026-05-28 | 518 GWh |
| 2026-05-29 | 478 GWh |
| 2026-05-30 | 469 GWh |
| 2026-05-31 | 469 GWh |
| 2026-06-01 | 480 GWh |
| 2026-06-02 | 470 GWh |
| 2026-06-03 | 454 GWh |
| 2026-06-04 | 461 GWh |
| 2026-06-05 | 465 GWh |
| 2026-06-06 | 469 GWh |
| 2026-06-07 | 454 GWh |
| 2026-06-08 | 500 GWh |
| 2026-06-09 | 536 GWh |
| 2026-06-10 | 565 GWh |
| 2026-06-11 | 578 GWh |
| 2026-06-12 | 525 GWh |
| 2026-06-13 | 520 GWh |
| 2026-06-14 | 484 GWh |
| 2026-06-15 | 469 GWh |
| 2026-06-16 | 472 GWh |
| 2026-06-17 | 513 GWh |
| 2026-06-18 | 522 GWh |
| 2026-06-19 | 497 GWh |
| 2026-06-20 | 471 GWh |
| 2026-06-21 | 488 GWh |
| 2026-06-22 | 494 GWh |
| 2026-06-23 | 467 GWh |
| 2026-06-24 | 475 GWh |
| 2026-06-25 | 516 GWh |
| 2026-06-26 | 535 GWh |
| 2026-06-27 | 533 GWh |
| 2026-06-28 | 549 GWh |
| 2026-06-29 | 598 GWh |
| 2026-06-30 | 615 GWh |
| 2026-07-01 | 618 GWh |
| 2026-07-02 | 606 GWh |
| 2026-07-03 | 552 GWh |
| 2026-07-04 | 522 GWh |
| 2026-07-05 | 506 GWh |
| 2026-07-06 | 542 GWh |
| 2026-07-07 | 544 GWh |
| 2026-07-08 | 541 GWh |
| 2026-07-09 | 563 GWh |
| 2026-07-10 | 537 GWh |
| 2026-07-11 | 531 GWh |
| 2026-07-12 | 491 GWh |
| 2026-07-13 | 524 GWh |
| 2026-07-14 | 532 GWh |
| 2026-07-15 | 547 GWh |
| 2026-07-16 | 570 GWh |
| 2026-07-17 | 566 GWh |
| 2026-07-18 | 559 GWh |
| 2026-07-19 | 547 GWh |
| 2026-07-20 | 593 GWh |
| 2026-07-21 | 618 GWh |
| 2026-07-22 | 573 GWh |
| 2026-07-23 | 522 GWh |
| 2026-07-24 | 507 GWh |
| 2026-07-25 | 485 GWh |
| 2026-07-26 | 561 GWh |
| 2026-07-27 | 599 GWh |
| 2026-07-28 | 628 GWh |
| 2026-07-29 | 595 GWh |
| 2026-07-30 | 547 GWh |
| 2026-07-31 | 529 GWh |
| 2026-08-01 | 506 GWh |
| 2026-08-02 | 468 GWh |
| 2026-08-03 | 516 GWh |
| 2026-08-04 | 538 GWh |
| 2026-08-05 | 547 GWh |
| 2026-08-06 | 560 GWh |
| 2026-08-07 | 557 GWh |
| 2026-08-08 | 513 GWh |
| 2026-08-09 | 530 GWh |
| 2026-08-10 | 584 GWh |
| 2026-08-11 | 608 GWh |
| 2026-08-12 | 599 GWh |
| 2026-08-13 | 624 GWh |
| 2026-08-14 | 625 GWh |
| 2026-08-15 | 606 GWh |
| 2026-08-16 | 606 GWh |
| 2026-08-17 | 621 GWh |
| 2026-08-18 | 575 GWh |
| 2026-08-19 | 563 GWh |
| 2026-08-20 | 577 GWh |
| 2026-08-21 | 566 GWh |
| 2026-08-22 | 533 GWh |
| 2026-08-23 | 499 GWh |
| 2026-08-24 | 515 GWh |
| 2026-08-25 | 529 GWh |
| 2026-08-26 | 515 GWh |
| 2026-08-27 | 538 GWh |
| 2026-08-28 | 538 GWh |
| 2026-08-29 | 526 GWh |
| 2026-08-30 | 549 GWh |
| 2026-08-31 | 590 GWh |
| 2026-09-01 | 607 GWh |
| 2026-09-02 | 617 GWh |
| 2026-09-03 | 629 GWh |
| 2026-09-04 | 623 GWh |
| 2026-09-05 | 588 GWh |
| 2026-09-06 | 570 GWh |
| 2026-09-07 | 532 GWh |
| 2026-09-08 | 567 GWh |
| 2026-09-09 | 583 GWh |
| 2026-09-10 | 577 GWh |
| 2026-09-11 | 568 GWh |
| 2026-09-12 | 522 GWh |
| 2026-09-13 | 538 GWh |
| 2026-09-14 | 572 GWh |
| 2026-09-15 | 588 GWh |
| 2026-09-16 | 589 GWh |
| 2026-09-17 | 586 GWh |
| 2026-09-18 | 589 GWh |
| 2026-09-19 | 560 GWh |
| 2026-09-20 | 552 GWh |
| 2026-09-21 | 566 GWh |
| 2026-09-22 | 511 GWh |
| 2026-09-23 | 455 GWh |
| 2026-09-24 | 448 GWh |
| 2026-09-25 | 442 GWh |
| 2026-09-26 | 407 GWh |
| 2026-09-27 | 399 GWh |
| 2026-09-28 | 418 GWh |
| 2026-09-29 | 436 GWh |
| 2026-09-30 | 465 GWh |
| 2026-10-01 | 500 GWh |
| 2026-10-02 | 489 GWh |
| 2026-10-03 | 426 GWh |
| 2026-10-04 | 415 GWh |
| 2026-10-05 | 432 GWh |
| 2026-10-06 | 422 GWh |
| 2026-10-07 | 436 GWh |
| 2026-10-08 | 441 GWh |
| 2026-10-09 | 420 GWh |
| 2026-10-10 | 379 GWh |
| 2026-10-11 | 384 GWh |
| 2026-10-12 | 445 GWh |
| 2026-10-13 | 471 GWh |
| 2026-10-14 | 495 GWh |
| 2026-10-15 | 501 GWh |
| 2026-10-16 | 409 GWh |
| 2026-10-17 | 360 GWh |
| 2026-10-18 | 368 GWh |
| 2026-10-19 | 395 GWh |
| 2026-10-20 | 425 GWh |
| 2026-10-21 | 396 GWh |
| 2026-10-22 | 396 GWh |
| 2026-10-23 | 392 GWh |
| 2026-10-24 | 377 GWh |
| 2026-10-25 | 373 GWh |
| 2026-10-26 | 395 GWh |
| 2026-10-27 | 400 GWh |
| 2026-10-28 | 397 GWh |
| 2026-10-29 | 401 GWh |
| 2026-10-30 | 395 GWh |
| 2026-10-31 | 369 GWh |
| 2026-11-01 | 378 GWh |
| 2026-11-02 | 399 GWh |
| 2026-11-03 | 401 GWh |
| 2026-11-04 | 394 GWh |
| 2026-11-05 | 393 GWh |
| 2026-11-06 | 383 GWh |
| 2026-11-07 | 379 GWh |
| 2026-11-08 | 390 GWh |
| 2026-11-09 | 410 GWh |
| 2026-11-10 | 404 GWh |
| 2026-11-11 | 401 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11. Daily totals are EIA's own daily aggregation in the balancing authority's reporting time zone.
Year by Year
Summed from EIA daily operator data| Year | Demand | Net generation | Largest source | Days reported |
|---|---|---|---|---|
| 2026 (partial) | 151 TWh | 144 TWh | Nuclear 40.4% | 315 |
| 2025 | 171 TWh | 162 TWh | Nuclear 36.3% | 365 |
| 2024 | 165 TWh | 158 TWh | Nuclear 38.8% | 366 |
| 2023 | 158 TWh | 155 TWh | Nuclear 44.2% | 365 |
| 2022 | 166 TWh | 160 TWh | Nuclear 40.9% | 365 |
| 2021 | 160 TWh | 156 TWh | Nuclear 42.8% | 365 |
| 2020 | 153 TWh | 153 TWh | Nuclear 43.1% | 366 |
| 2019 | 159 TWh | 161 TWh | Nuclear 40.8% | 365 |
A year is partial when EIA has not published every day; 2025 is the latest complete year. Operator totals differ slightly from annual statistics, which are compiled later from plant surveys.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11.
Records
From EIA operator data held by World Power Monitor| Record | Value | When |
|---|---|---|
| Highest daily demand, 2019 onward | 736 GWh | 2022-12-23 (23 December 2022) |
| Highest hourly demand since 2026-06-16 (16 June 2026) | 44,377 MW | 20 Oct 2026, 17:00 CDT (UTC-05:00) |
| Highest solar share of a day's generation, 2019 onward | 9.4% | 2026-09-17 (17 September 2026) |
| Highest wind share of a day's generation, 2019 onward | 0.1% | 2022-10-25 (25 October 2022) |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11.
Power Flows With Neighbours
Net totals, 2026-10-13 (13 October 2026) to 2026-11-11 (11 November 2026)| Neighbour | Direction | Net energy |
|---|---|---|
| MISO | TVA imports | 1.47 TWh |
| PJM | TVA exports | 847 GWh |
| LGEE | TVA exports | 169 GWh |
| SOCO | TVA exports | 158 GWh |
| AECI | TVA imports | 139 GWh |
| DUK | TVA exports | 54.4 GWh |
| CPLW | TVA exports | 9.79 GWh |
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-11.
Share and Embed
Figures as of 2026-11-12 (12 November 2026)Download share image (PNG, 1200 x 630 pixels) with the latest demand and largest source for TVA, credited to EIA. The image is rebuilt with the page. More about grid widgets.
Embed this widget
Free to use on your own site. Keep the source line in the frame; it carries the data licence and a link back here.
The frame reports its height to the page with postMessage type wpm-embed-height if you want it to resize.
Related
Cite this page
World Power Monitor. (2026). TVA Electricity Demand and Generation Mix. https://worldpowermonitor.com/zones/tva/
World Power Monitor. TVA Electricity Demand and Generation Mix. Data as of 2026-11-12 12:00 UTC. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/zones/tva/
@misc{wpm_zones_tva_2026,
title = {{TVA Electricity Demand and Generation Mix}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12 12:00 UTC. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/zones/tva/}
} Permalink: https://worldpowermonitor.com/zones/tva/
The Copy buttons add today's date as the access date.