Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss, 15 October to 12 November 2026
The day-ahead demand forecast for Italy South was off by 10.2% on average (mean absolute percentage error) over 686 hours from 15 October to 12 November 2026, and 30% of hours landed within 5% of the reading. Its bias was +1.4%: it ran high on average, an over forecast. The largest miss was 872 MW (27.8%) too low at 29 Oct 2026, 08:00 CET (UTC+01:00). Dates and times are local (Europe/Rome).
Key Facts
- The day-ahead demand forecast for Italy South was off by 10.2% on average (mean absolute percentage error) over 686 hours from 15 October to 12 November 2026, and 30% of hours landed within 5% of the reading. Its bias was +1.4%: it ran high on average, an over forecast. The largest miss was 872 MW (27.8%) too low at 29 Oct 2026, 08:00 CET (UTC+01:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Italy South came 42 (1 is the smallest error).
- On average the forecast differed from reported demand by 213 MW, against average demand of 2,156 MW.
- The forecast was above reported demand in 53% of compared hours.
Forecast Error at a Glance
686 hours from 15 October to 12 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (-0 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 872 MW (27.8%) too low at 29 Oct 2026, 08:00 CET (UTC+01:00): forecast 2,260 MW, reported 3,131 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 12 Nov 2026, 13:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 5 Nov, 14:00 | 2,111 MW | 2,338 MW |
| 5 Nov, 15:00 | 2,221 MW | 2,316 MW |
| 5 Nov, 16:00 | 2,398 MW | 2,422 MW |
| 5 Nov, 17:00 | 2,568 MW | 2,647 MW |
| 5 Nov, 18:00 | 2,552 MW | 2,734 MW |
| 5 Nov, 19:00 | 2,669 MW | 2,818 MW |
| 5 Nov, 20:00 | 2,658 MW | 2,804 MW |
| 5 Nov, 21:00 | 2,472 MW | 2,513 MW |
| 5 Nov, 22:00 | 2,057 MW | 2,301 MW |
| 5 Nov, 23:00 | 1,800 MW | 2,075 MW |
| 6 Nov, 00:00 | 1,637 MW | 1,891 MW |
| 6 Nov, 01:00 | 1,547 MW | 1,805 MW |
| 6 Nov, 02:00 | 1,468 MW | 1,738 MW |
| 6 Nov, 03:00 | 1,475 MW | 1,735 MW |
| 6 Nov, 04:00 | 1,557 MW | 1,742 MW |
| 6 Nov, 05:00 | 1,603 MW | 1,823 MW |
| 6 Nov, 06:00 | 1,782 MW | 1,987 MW |
| 6 Nov, 07:00 | 2,052 MW | 2,220 MW |
| 6 Nov, 08:00 | 2,100 MW | 2,266 MW |
| 6 Nov, 09:00 | 2,153 MW | 2,248 MW |
| 6 Nov, 10:00 | 2,036 MW | 2,225 MW |
| 6 Nov, 11:00 | 2,117 MW | 2,230 MW |
| 6 Nov, 12:00 | 2,332 MW | 2,330 MW |
| 6 Nov, 13:00 | 2,262 MW | 2,300 MW |
| 6 Nov, 14:00 | 2,228 MW | 2,268 MW |
| 6 Nov, 15:00 | 2,291 MW | 2,397 MW |
| 6 Nov, 16:00 | 2,307 MW | 2,458 MW |
| 6 Nov, 17:00 | 2,383 MW | 2,658 MW |
| 6 Nov, 18:00 | 2,396 MW | 2,656 MW |
| 6 Nov, 19:00 | 2,400 MW | 2,655 MW |
| 6 Nov, 20:00 | 2,388 MW | 2,617 MW |
| 6 Nov, 21:00 | 2,151 MW | 2,396 MW |
| 6 Nov, 22:00 | 1,902 MW | 2,233 MW |
| 6 Nov, 23:00 | 1,678 MW | 2,080 MW |
| 7 Nov, 00:00 | 1,591 MW | 1,834 MW |
| 7 Nov, 01:00 | 1,569 MW | 1,675 MW |
| 7 Nov, 02:00 | 1,487 MW | 1,660 MW |
| 7 Nov, 03:00 | 1,455 MW | 1,667 MW |
| 7 Nov, 04:00 | 1,502 MW | 1,646 MW |
| 7 Nov, 05:00 | 1,579 MW | 1,677 MW |
| 7 Nov, 06:00 | 1,741 MW | 1,869 MW |
| 7 Nov, 07:00 | 1,911 MW | 1,978 MW |
| 7 Nov, 08:00 | 2,059 MW | 2,095 MW |
| 7 Nov, 09:00 | 2,062 MW | 2,091 MW |
| 7 Nov, 10:00 | 2,057 MW | 2,081 MW |
| 7 Nov, 11:00 | 2,076 MW | 2,121 MW |
| 7 Nov, 12:00 | 2,039 MW | 2,140 MW |
| 7 Nov, 13:00 | 1,936 MW | 2,106 MW |
| 7 Nov, 14:00 | 1,815 MW | 2,049 MW |
| 7 Nov, 15:00 | 1,713 MW | 2,078 MW |
| 7 Nov, 16:00 | 1,861 MW | 2,208 MW |
| 7 Nov, 17:00 | 2,096 MW | 2,348 MW |
| 7 Nov, 18:00 | 2,122 MW | 2,393 MW |
| 7 Nov, 19:00 | 2,148 MW | 2,430 MW |
| 7 Nov, 20:00 | 2,089 MW | 2,398 MW |
| 7 Nov, 21:00 | 1,863 MW | 2,238 MW |
| 7 Nov, 22:00 | 1,646 MW | 2,127 MW |
| 7 Nov, 23:00 | 1,565 MW | 2,005 MW |
| 8 Nov, 00:00 | 1,464 MW | 1,772 MW |
| 8 Nov, 01:00 | 1,422 MW | 1,525 MW |
| 8 Nov, 02:00 | 1,314 MW | 1,444 MW |
| 8 Nov, 03:00 | 1,281 MW | 1,399 MW |
| 8 Nov, 04:00 | 1,268 MW | 1,407 MW |
| 8 Nov, 05:00 | 1,338 MW | 1,377 MW |
| 8 Nov, 06:00 | 1,367 MW | 1,456 MW |
| 8 Nov, 07:00 | 1,446 MW | 1,450 MW |
| 8 Nov, 08:00 | 1,616 MW | 1,526 MW |
| 8 Nov, 09:00 | 1,837 MW | 1,635 MW |
| 8 Nov, 10:00 | 1,987 MW | 1,897 MW |
| 8 Nov, 11:00 | 1,930 MW | 1,991 MW |
| 8 Nov, 12:00 | 1,895 MW | 2,020 MW |
| 8 Nov, 13:00 | 1,758 MW | 1,929 MW |
| 8 Nov, 14:00 | 1,539 MW | 1,765 MW |
| 8 Nov, 15:00 | 1,465 MW | 1,790 MW |
| 8 Nov, 16:00 | 1,631 MW | 1,927 MW |
| 8 Nov, 17:00 | 1,799 MW | 2,060 MW |
| 8 Nov, 18:00 | 1,855 MW | 2,130 MW |
| 8 Nov, 19:00 | 1,861 MW | 2,195 MW |
| 8 Nov, 20:00 | 1,937 MW | 2,207 MW |
| 8 Nov, 21:00 | 1,863 MW | 2,062 MW |
| 8 Nov, 22:00 | 1,677 MW | 1,967 MW |
| 8 Nov, 23:00 | 1,462 MW | 1,800 MW |
| 9 Nov, 00:00 | 1,471 MW | 1,516 MW |
| 9 Nov, 01:00 | 1,412 MW | 1,457 MW |
| 9 Nov, 02:00 | 1,362 MW | 1,418 MW |
| 9 Nov, 03:00 | 1,302 MW | 1,385 MW |
| 9 Nov, 04:00 | 1,288 MW | 1,425 MW |
| 9 Nov, 05:00 | 1,353 MW | 1,502 MW |
| 9 Nov, 06:00 | 1,426 MW | 1,683 MW |
| 9 Nov, 07:00 | 1,676 MW | 1,933 MW |
| 9 Nov, 08:00 | 1,897 MW | 2,045 MW |
| 9 Nov, 09:00 | 2,103 MW | 2,122 MW |
| 9 Nov, 10:00 | 2,164 MW | 2,155 MW |
| 9 Nov, 11:00 | 2,133 MW | 2,183 MW |
| 9 Nov, 12:00 | 2,124 MW | 2,207 MW |
| 9 Nov, 13:00 | 2,052 MW | 2,203 MW |
| 9 Nov, 14:00 | 1,987 MW | 2,213 MW |
| 9 Nov, 15:00 | 1,993 MW | 2,263 MW |
| 9 Nov, 16:00 | 2,042 MW | 2,348 MW |
| 9 Nov, 17:00 | 2,255 MW | 2,417 MW |
| 9 Nov, 18:00 | 2,232 MW | 2,457 MW |
| 9 Nov, 19:00 | 2,294 MW | 2,473 MW |
| 9 Nov, 20:00 | 2,261 MW | 2,478 MW |
| 9 Nov, 21:00 | 2,126 MW | 2,318 MW |
| 9 Nov, 22:00 | 1,901 MW | 2,135 MW |
| 9 Nov, 23:00 | 1,646 MW | 1,880 MW |
| 10 Nov, 00:00 | 1,603 MW | 1,768 MW |
| 10 Nov, 01:00 | 1,469 MW | 1,670 MW |
| 10 Nov, 02:00 | 1,408 MW | 1,672 MW |
| 10 Nov, 03:00 | 1,393 MW | 1,618 MW |
| 10 Nov, 04:00 | 1,444 MW | 1,608 MW |
| 10 Nov, 05:00 | 1,521 MW | 1,640 MW |
| 10 Nov, 06:00 | 1,653 MW | 1,845 MW |
| 10 Nov, 07:00 | 2,071 MW | 2,024 MW |
| 10 Nov, 08:00 | 2,309 MW | 2,155 MW |
| 10 Nov, 09:00 | 2,376 MW | 2,205 MW |
| 10 Nov, 10:00 | 2,384 MW | 2,180 MW |
| 10 Nov, 11:00 | 2,319 MW | 2,165 MW |
| 10 Nov, 12:00 | 2,284 MW | 2,180 MW |
| 10 Nov, 13:00 | 2,227 MW | 2,141 MW |
| 10 Nov, 14:00 | 2,275 MW | 2,095 MW |
| 10 Nov, 15:00 | 2,242 MW | 2,126 MW |
| 10 Nov, 16:00 | 2,414 MW | 2,205 MW |
| 10 Nov, 17:00 | 2,558 MW | 2,338 MW |
| 10 Nov, 18:00 | 2,523 MW | 2,377 MW |
| 10 Nov, 19:00 | 2,468 MW | 2,403 MW |
| 10 Nov, 20:00 | 2,421 MW | 2,388 MW |
| 10 Nov, 21:00 | 2,359 MW | 2,152 MW |
| 10 Nov, 22:00 | 2,216 MW | 1,952 MW |
| 10 Nov, 23:00 | 2,012 MW | 1,808 MW |
| 11 Nov, 00:00 | 1,868 MW | 1,720 MW |
| 11 Nov, 01:00 | 1,744 MW | 1,660 MW |
| 11 Nov, 02:00 | 1,588 MW | 1,575 MW |
| 11 Nov, 03:00 | 1,528 MW | 1,555 MW |
| 11 Nov, 04:00 | 1,488 MW | 1,545 MW |
| 11 Nov, 05:00 | 1,577 MW | 1,604 MW |
| 11 Nov, 06:00 | 1,802 MW | 1,703 MW |
| 11 Nov, 07:00 | 2,123 MW | 1,908 MW |
| 11 Nov, 08:00 | 2,045 MW | 2,048 MW |
| 11 Nov, 09:00 | 2,178 MW | 2,100 MW |
| 11 Nov, 10:00 | 2,228 MW | 2,125 MW |
| 11 Nov, 11:00 | 2,166 MW | 2,125 MW |
| 11 Nov, 12:00 | 2,245 MW | 2,105 MW |
| 11 Nov, 13:00 | 2,242 MW | 2,068 MW |
| 11 Nov, 14:00 | 2,001 MW | 2,040 MW |
| 11 Nov, 15:00 | 2,123 MW | 2,110 MW |
| 11 Nov, 16:00 | 2,371 MW | 2,198 MW |
| 11 Nov, 17:00 | 2,555 MW | 2,382 MW |
| 11 Nov, 18:00 | 2,513 MW | 2,528 MW |
| 11 Nov, 19:00 | 2,511 MW | 2,558 MW |
| 11 Nov, 20:00 | 2,488 MW | 2,505 MW |
| 11 Nov, 21:00 | 2,362 MW | 2,289 MW |
| 11 Nov, 22:00 | 2,178 MW | 2,162 MW |
| 11 Nov, 23:00 | 1,958 MW | 1,953 MW |
| 12 Nov, 00:00 | 1,729 MW | 1,712 MW |
| 12 Nov, 01:00 | 1,909 MW | 1,603 MW |
| 12 Nov, 02:00 | 2,013 MW | 1,564 MW |
| 12 Nov, 03:00 | 1,843 MW | 1,565 MW |
| 12 Nov, 04:00 | 1,881 MW | 1,570 MW |
| 12 Nov, 05:00 | 2,004 MW | 1,620 MW |
| 12 Nov, 06:00 | 2,317 MW | 1,763 MW |
| 12 Nov, 07:00 | 2,220 MW | 2,080 MW |
| 12 Nov, 08:00 | 2,042 MW | 2,180 MW |
| 12 Nov, 09:00 | 1,933 MW | 2,190 MW |
| 12 Nov, 10:00 | 1,656 MW | 2,185 MW |
| 12 Nov, 11:00 | 1,838 MW | 2,211 MW |
| 12 Nov, 12:00 | 2,096 MW | 2,214 MW |
| 12 Nov, 13:00 | 2,026 MW | 2,178 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (686 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/it-sud/
World Power Monitor. Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-12. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/it-sud/
@misc{wpm_forecast_accuracy_it_sud_2026,
title = {{Italy South Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/it-sud/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/it-sud/