Montenegro Demand Forecast Accuracy: Error, Bias and Worst Miss, 15 October to 12 November 2026
The day-ahead demand forecast for Montenegro was off by 6.4% on average (mean absolute percentage error) over 669 hours from 15 October to 12 November 2026, and 65% of hours landed within 5% of the reading. Its bias was +1.7%: it ran high on average, an over forecast. The largest miss was 599 MW (58.0%) too low at 12 Nov 2026, 09:00 CET (UTC+01:00). Dates and times are local (Europe/Podgorica).
Key Facts
- The day-ahead demand forecast for Montenegro was off by 6.4% on average (mean absolute percentage error) over 669 hours from 15 October to 12 November 2026, and 65% of hours landed within 5% of the reading. Its bias was +1.7%: it ran high on average, an over forecast. The largest miss was 599 MW (58.0%) too low at 12 Nov 2026, 09:00 CET (UTC+01:00).
- Across 47 European bidding zones ranked by average error over their own latest 30 day windows, Montenegro came 36 (1 is the smallest error).
- On average the forecast differed from reported demand by 24 MW, against average demand of 351 MW.
- The forecast was above reported demand in 60% of compared hours.
Forecast Error at a Glance
669 hours from 15 October to 12 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (+2 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 599 MW (58.0%) too low at 12 Nov 2026, 09:00 CET (UTC+01:00): forecast 434 MW, reported 1,033 MW.
Source: ENTSO-E Transparency Platform (transparency.entsoe.eu), CC BY 4.0. Aggregated and converted by World Power Monitor; ENTSO-E does not endorse this site. (ENTSO-E Terms of Use plus CC BY 4.0 for listed data items) Data as of 2026-11-12. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 12 Nov 2026, 10:00 CET (UTC+01:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 5 Nov, 11:00 | 317 MW | 359 MW |
| 5 Nov, 12:00 | 318 MW | 354 MW |
| 5 Nov, 13:00 | 326 MW | 355 MW |
| 5 Nov, 14:00 | 343 MW | 365 MW |
| 5 Nov, 15:00 | 374 MW | 389 MW |
| 5 Nov, 16:00 | 422 MW | 425 MW |
| 5 Nov, 17:00 | 463 MW | 459 MW |
| 5 Nov, 18:00 | 468 MW | 466 MW |
| 5 Nov, 19:00 | 465 MW | 465 MW |
| 5 Nov, 20:00 | 460 MW | 455 MW |
| 5 Nov, 21:00 | 443 MW | 438 MW |
| 5 Nov, 22:00 | 412 MW | 417 MW |
| 5 Nov, 23:00 | 373 MW | 374 MW |
| 6 Nov, 00:00 | 326 MW | 331 MW |
| 6 Nov, 01:00 | 285 MW | 291 MW |
| 6 Nov, 02:00 | 262 MW | 267 MW |
| 6 Nov, 03:00 | 249 MW | 260 MW |
| 6 Nov, 04:00 | 249 MW | 260 MW |
| 6 Nov, 05:00 | 271 MW | 278 MW |
| 6 Nov, 06:00 | 324 MW | 328 MW |
| 6 Nov, 07:00 | 368 MW | 376 MW |
| 6 Nov, 08:00 | 327 MW | 386 MW |
| 6 Nov, 09:00 | 268 MW | 379 MW |
| 6 Nov, 10:00 | 322 MW | 363 MW |
| 6 Nov, 11:00 | 311 MW | 355 MW |
| 6 Nov, 12:00 | 308 MW | 350 MW |
| 6 Nov, 13:00 | 319 MW | 357 MW |
| 6 Nov, 14:00 | 259 MW | 366 MW |
| 6 Nov, 15:00 | 305 MW | 390 MW |
| 6 Nov, 16:00 | 399 MW | 431 MW |
| 6 Nov, 17:00 | 400 MW | 466 MW |
| 6 Nov, 18:00 | 404 MW | 473 MW |
| 6 Nov, 19:00 | 412 MW | 473 MW |
| 6 Nov, 20:00 | 405 MW | 462 MW |
| 6 Nov, 21:00 | 449 MW | 446 MW |
| 6 Nov, 22:00 | 417 MW | 418 MW |
| 6 Nov, 23:00 | 383 MW | 379 MW |
| 7 Nov, 00:00 | 334 MW | 328 MW |
| 7 Nov, 01:00 | 294 MW | 290 MW |
| 7 Nov, 02:00 | 268 MW | 266 MW |
| 7 Nov, 03:00 | 256 MW | 256 MW |
| 7 Nov, 04:00 | 253 MW | 255 MW |
| 7 Nov, 05:00 | 267 MW | 271 MW |
| 7 Nov, 06:00 | 295 MW | 305 MW |
| 7 Nov, 07:00 | 344 MW | 351 MW |
| 7 Nov, 08:00 | 378 MW | 383 MW |
| 7 Nov, 09:00 | 360 MW | 378 MW |
| 7 Nov, 10:00 | 351 MW | 364 MW |
| 7 Nov, 11:00 | 347 MW | 356 MW |
| 7 Nov, 12:00 | 339 MW | 352 MW |
| 7 Nov, 13:00 | 339 MW | 355 MW |
| 7 Nov, 14:00 | 354 MW | 366 MW |
| 7 Nov, 15:00 | 328 MW | 390 MW |
| 7 Nov, 16:00 | 381 MW | 428 MW |
| 7 Nov, 17:00 | 421 MW | 465 MW |
| 7 Nov, 18:00 | 427 MW | 473 MW |
| 7 Nov, 19:00 | 476 MW | 474 MW |
| 7 Nov, 20:00 | 470 MW | 465 MW |
| 7 Nov, 21:00 | 451 MW | 448 MW |
| 7 Nov, 22:00 | 425 MW | 417 MW |
| 7 Nov, 23:00 | 392 MW | 379 MW |
| 8 Nov, 00:00 | 342 MW | 335 MW |
| 8 Nov, 01:00 | 302 MW | 296 MW |
| 8 Nov, 02:00 | 276 MW | 270 MW |
| 8 Nov, 03:00 | 263 MW | 259 MW |
| 8 Nov, 04:00 | 258 MW | 255 MW |
| 8 Nov, 05:00 | 267 MW | 266 MW |
| 8 Nov, 06:00 | 284 MW | 296 MW |
| 8 Nov, 07:00 | 325 MW | 341 MW |
| 8 Nov, 08:00 | 368 MW | 380 MW |
| 8 Nov, 09:00 | 400 MW | 393 MW |
| 8 Nov, 10:00 | 413 MW | 384 MW |
| 8 Nov, 11:00 | 417 MW | 382 MW |
| 8 Nov, 12:00 | 437 MW | 376 MW |
| 8 Nov, 13:00 | 499 MW | 379 MW |
| 8 Nov, 14:00 | 496 MW | 389 MW |
| 8 Nov, 15:00 | 507 MW | 401 MW |
| 8 Nov, 16:00 | 475 MW | 445 MW |
| 8 Nov, 17:00 | 489 MW | 479 MW |
| 8 Nov, 18:00 | 489 MW | 486 MW |
| 8 Nov, 19:00 | 489 MW | 489 MW |
| 8 Nov, 20:00 | 486 MW | 478 MW |
| 8 Nov, 21:00 | 470 MW | 463 MW |
| 8 Nov, 22:00 | 434 MW | 437 MW |
| 8 Nov, 23:00 | 380 MW | 407 MW |
| 9 Nov, 00:00 | 328 MW | 330 MW |
| 9 Nov, 01:00 | 287 MW | 295 MW |
| 9 Nov, 02:00 | 264 MW | 274 MW |
| 9 Nov, 03:00 | 254 MW | 264 MW |
| 9 Nov, 04:00 | 253 MW | 263 MW |
| 9 Nov, 05:00 | 271 MW | 279 MW |
| 9 Nov, 06:00 | 323 MW | 325 MW |
| 9 Nov, 07:00 | 383 MW | 378 MW |
| 9 Nov, 08:00 | 414 MW | 406 MW |
| 9 Nov, 09:00 | 410 MW | 416 MW |
| 9 Nov, 10:00 | 384 MW | 412 MW |
| 9 Nov, 11:00 | 409 MW | 405 MW |
| 9 Nov, 12:00 | 409 MW | 398 MW |
| 9 Nov, 13:00 | 403 MW | 394 MW |
| 9 Nov, 14:00 | 402 MW | 394 MW |
| 9 Nov, 15:00 | 419 MW | 406 MW |
| 9 Nov, 16:00 | 453 MW | 443 MW |
| 9 Nov, 17:00 | 486 MW | 486 MW |
| 9 Nov, 18:00 | 489 MW | 491 MW |
| 9 Nov, 19:00 | 485 MW | 491 MW |
| 9 Nov, 20:00 | 480 MW | 482 MW |
| 9 Nov, 21:00 | 464 MW | 466 MW |
| 9 Nov, 22:00 | 435 MW | 436 MW |
| 9 Nov, 23:00 | 394 MW | 398 MW |
| 10 Nov, 00:00 | 342 MW | 336 MW |
| 10 Nov, 01:00 | 299 MW | 297 MW |
| 10 Nov, 02:00 | 274 MW | 273 MW |
| 10 Nov, 03:00 | 262 MW | 263 MW |
| 10 Nov, 04:00 | 262 MW | 261 MW |
| 10 Nov, 05:00 | 285 MW | 280 MW |
| 10 Nov, 06:00 | 342 MW | 330 MW |
| 10 Nov, 07:00 | 393 MW | 389 MW |
| 10 Nov, 08:00 | 401 MW | 423 MW |
| 10 Nov, 09:00 | 416 MW | 430 MW |
| 10 Nov, 10:00 | 421 MW | 430 MW |
| 10 Nov, 11:00 | 431 MW | 433 MW |
| 10 Nov, 12:00 | 436 MW | 436 MW |
| 10 Nov, 13:00 | 434 MW | 440 MW |
| 10 Nov, 14:00 | 443 MW | 440 MW |
| 10 Nov, 15:00 | 460 MW | 447 MW |
| 10 Nov, 16:00 | 487 MW | 462 MW |
| 10 Nov, 17:00 | 507 MW | 482 MW |
| 10 Nov, 18:00 | 510 MW | 487 MW |
| 10 Nov, 19:00 | 500 MW | 489 MW |
| 10 Nov, 20:00 | 486 MW | 476 MW |
| 10 Nov, 21:00 | 470 MW | 460 MW |
| 10 Nov, 22:00 | 432 MW | 428 MW |
| 10 Nov, 23:00 | 391 MW | 389 MW |
| 11 Nov, 00:00 | 340 MW | 326 MW |
| 11 Nov, 01:00 | 300 MW | 285 MW |
| 11 Nov, 02:00 | 274 MW | 260 MW |
| 11 Nov, 03:00 | 262 MW | 255 MW |
| 11 Nov, 04:00 | 261 MW | 255 MW |
| 11 Nov, 05:00 | 277 MW | 267 MW |
| 11 Nov, 06:00 | 325 MW | 324 MW |
| 11 Nov, 07:00 | 386 MW | 382 MW |
| 11 Nov, 08:00 | 447 MW | 413 MW |
| 11 Nov, 09:00 | 505 MW | 420 MW |
| 11 Nov, 10:00 | 418 MW | 419 MW |
| 11 Nov, 11:00 | 403 MW | 420 MW |
| 11 Nov, 12:00 | 397 MW | 416 MW |
| 11 Nov, 13:00 | 400 MW | 413 MW |
| 11 Nov, 14:00 | 346 MW | 412 MW |
| 11 Nov, 15:00 | 338 MW | 425 MW |
| 11 Nov, 16:00 | 359 MW | 451 MW |
| 11 Nov, 17:00 | 375 MW | 476 MW |
| 11 Nov, 18:00 | 370 MW | 479 MW |
| 11 Nov, 19:00 | 371 MW | 477 MW |
| 11 Nov, 20:00 | 436 MW | 468 MW |
| 11 Nov, 21:00 | 419 MW | 449 MW |
| 11 Nov, 22:00 | 393 MW | 418 MW |
| 11 Nov, 23:00 | 361 MW | 378 MW |
| 12 Nov, 00:00 | 446 MW | 338 MW |
| 12 Nov, 01:00 | 284 MW | 296 MW |
| 12 Nov, 02:00 | 236 MW | 271 MW |
| 12 Nov, 03:00 | 251 MW | 261 MW |
| 12 Nov, 04:00 | 304 MW | 258 MW |
| 12 Nov, 05:00 | 346 MW | 276 MW |
| 12 Nov, 06:00 | 452 MW | 327 MW |
| 12 Nov, 07:00 | 598 MW | 387 MW |
| 12 Nov, 08:00 | 915 MW | 424 MW |
| 12 Nov, 09:00 | 1,033 MW | 434 MW |
| 12 Nov, 10:00 | 1,024 MW | 435 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (669 of 686 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- European figures are for the ENTSO-E bidding zone named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). Montenegro Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/me/
World Power Monitor. Montenegro Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-12. Data from ENTSO-E Transparency Platform. https://worldpowermonitor.com/forecast-accuracy/me/
@misc{wpm_forecast_accuracy_me_2026,
title = {{Montenegro Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12. Data from ENTSO-E Transparency Platform.},
url = {https://worldpowermonitor.com/forecast-accuracy/me/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/me/
The Copy buttons add today's date as the access date.