PACE Demand Forecast Accuracy: Error, Bias and Worst Miss, 13 October to 12 November 2026
The day-ahead demand forecast for PACE was off by 8.3% on average (mean absolute percentage error) over 719 hours from 13 October to 12 November 2026, and 40% of hours landed within 5% of the reading. Its bias was +6.0%: it ran high on average, an over forecast. The largest miss was 1,629 MW (33.7%) too high at 3 Nov 2026, 18:00 MST (UTC-07:00). Dates and times are local (America/Denver).
Key Facts
- The day-ahead demand forecast for PACE was off by 8.3% on average (mean absolute percentage error) over 719 hours from 13 October to 12 November 2026, and 40% of hours landed within 5% of the reading. Its bias was +6.0%: it ran high on average, an over forecast. The largest miss was 1,629 MW (33.7%) too high at 3 Nov 2026, 18:00 MST (UTC-07:00).
- Across 53 US grids ranked by average error over their own latest 30 day windows, PACE came 40 (1 is the smallest error).
- On average the forecast differed from reported demand by 439 MW, against average demand of 5,468 MW.
- The forecast was above reported demand in 74% of compared hours.
Forecast Error at a Glance
719 hours from 13 October to 12 November 2026Average error is the mean absolute percentage gap between the forecast and reported demand. Bias is the signed mean (+296 MW per hour on average): the forecast ran high on average, an over forecast. The worst miss was 1,629 MW (33.7%) too high at 3 Nov 2026, 18:00 MST (UTC-07:00): forecast 6,466 MW, reported 4,837 MW.
Source: U.S. Energy Information Administration (EIA). (US Government work, public domain) Data as of 2026-11-12. Accuracy is computed by World Power Monitor from the operator's hourly forecast and reported demand.
Forecast and Reported Demand, Last 7 Days
Local time, to 12 Nov 2026, 05:00 MST (UTC-07:00)Show the data table (168 rows)
| Local hour | Reported demand | Day-ahead forecast |
|---|---|---|
| 5 Nov, 06:00 | 5,259 MW | 5,864 MW |
| 5 Nov, 07:00 | 5,444 MW | 6,150 MW |
| 5 Nov, 08:00 | 5,795 MW | 6,212 MW |
| 5 Nov, 09:00 | 5,845 MW | 6,248 MW |
| 5 Nov, 10:00 | 6,307 MW | 6,244 MW |
| 5 Nov, 11:00 | 6,190 MW | 6,205 MW |
| 5 Nov, 12:00 | 6,106 MW | 6,160 MW |
| 5 Nov, 13:00 | 6,179 MW | 6,129 MW |
| 5 Nov, 14:00 | 6,331 MW | 6,097 MW |
| 5 Nov, 15:00 | 6,116 MW | 6,082 MW |
| 5 Nov, 16:00 | 5,649 MW | 6,119 MW |
| 5 Nov, 17:00 | 5,031 MW | 6,292 MW |
| 5 Nov, 18:00 | 4,990 MW | 6,336 MW |
| 5 Nov, 19:00 | 4,937 MW | 6,282 MW |
| 5 Nov, 20:00 | 5,154 MW | 6,187 MW |
| 5 Nov, 21:00 | 5,347 MW | 6,037 MW |
| 5 Nov, 22:00 | 4,993 MW | 5,828 MW |
| 5 Nov, 23:00 | 4,959 MW | 5,625 MW |
| 6 Nov, 00:00 | 4,982 MW | 5,533 MW |
| 6 Nov, 01:00 | 5,274 MW | 5,317 MW |
| 6 Nov, 02:00 | 5,151 MW | 5,228 MW |
| 6 Nov, 03:00 | 5,133 MW | 5,209 MW |
| 6 Nov, 04:00 | 5,149 MW | 5,257 MW |
| 6 Nov, 05:00 | 4,966 MW | 5,436 MW |
| 6 Nov, 06:00 | 5,097 MW | 5,737 MW |
| 6 Nov, 07:00 | 5,425 MW | 5,962 MW |
| 6 Nov, 08:00 | 6,159 MW | 6,065 MW |
| 6 Nov, 09:00 | 6,042 MW | 6,079 MW |
| 6 Nov, 10:00 | 6,022 MW | 6,082 MW |
| 6 Nov, 11:00 | 6,172 MW | 6,062 MW |
| 6 Nov, 12:00 | 5,814 MW | 6,043 MW |
| 6 Nov, 13:00 | 5,980 MW | 5,979 MW |
| 6 Nov, 14:00 | 5,848 MW | 5,916 MW |
| 6 Nov, 15:00 | 5,819 MW | 5,927 MW |
| 6 Nov, 16:00 | 5,359 MW | 5,981 MW |
| 6 Nov, 17:00 | 4,760 MW | 6,134 MW |
| 6 Nov, 18:00 | 4,729 MW | 6,178 MW |
| 6 Nov, 19:00 | 5,303 MW | 6,154 MW |
| 6 Nov, 20:00 | 5,539 MW | 6,049 MW |
| 6 Nov, 21:00 | 5,197 MW | 5,925 MW |
| 6 Nov, 22:00 | 5,479 MW | 5,783 MW |
| 6 Nov, 23:00 | 5,380 MW | 5,617 MW |
| 7 Nov, 00:00 | 5,173 MW | 5,486 MW |
| 7 Nov, 01:00 | 5,411 MW | 5,405 MW |
| 7 Nov, 02:00 | 5,267 MW | 5,340 MW |
| 7 Nov, 03:00 | 5,166 MW | 5,319 MW |
| 7 Nov, 04:00 | 5,044 MW | 5,346 MW |
| 7 Nov, 05:00 | 5,004 MW | 5,432 MW |
| 7 Nov, 06:00 | 5,144 MW | 5,550 MW |
| 7 Nov, 07:00 | 5,218 MW | 5,673 MW |
| 7 Nov, 08:00 | 5,581 MW | 5,745 MW |
| 7 Nov, 09:00 | 5,961 MW | 5,765 MW |
| 7 Nov, 10:00 | 5,958 MW | 5,747 MW |
| 7 Nov, 11:00 | 5,890 MW | 5,704 MW |
| 7 Nov, 12:00 | 5,727 MW | 5,637 MW |
| 7 Nov, 13:00 | 5,818 MW | 5,565 MW |
| 7 Nov, 14:00 | 5,717 MW | 5,513 MW |
| 7 Nov, 15:00 | 5,568 MW | 5,533 MW |
| 7 Nov, 16:00 | 5,515 MW | 5,695 MW |
| 7 Nov, 17:00 | 4,845 MW | 5,888 MW |
| 7 Nov, 18:00 | 4,856 MW | 5,983 MW |
| 7 Nov, 19:00 | 4,873 MW | 5,958 MW |
| 7 Nov, 20:00 | 4,781 MW | 5,917 MW |
| 7 Nov, 21:00 | 5,454 MW | 5,838 MW |
| 7 Nov, 22:00 | 5,379 MW | 5,708 MW |
| 7 Nov, 23:00 | 5,282 MW | 5,561 MW |
| 8 Nov, 00:00 | 5,163 MW | 5,411 MW |
| 8 Nov, 01:00 | 5,219 MW | 5,297 MW |
| 8 Nov, 02:00 | 5,026 MW | 5,220 MW |
| 8 Nov, 03:00 | 5,092 MW | 5,203 MW |
| 8 Nov, 04:00 | 5,105 MW | 5,221 MW |
| 8 Nov, 05:00 | 5,031 MW | 5,294 MW |
| 8 Nov, 06:00 | 4,956 MW | 5,401 MW |
| 8 Nov, 07:00 | 5,473 MW | 5,504 MW |
| 8 Nov, 08:00 | 5,583 MW | 5,561 MW |
| 8 Nov, 09:00 | 5,666 MW | 5,582 MW |
| 8 Nov, 10:00 | 6,018 MW | 5,591 MW |
| 8 Nov, 11:00 | 6,359 MW | 5,596 MW |
| 8 Nov, 12:00 | 6,416 MW | 5,589 MW |
| 8 Nov, 13:00 | 6,298 MW | 5,573 MW |
| 8 Nov, 14:00 | 6,232 MW | 5,563 MW |
| 8 Nov, 15:00 | 5,974 MW | 5,611 MW |
| 8 Nov, 16:00 | 5,589 MW | 5,771 MW |
| 8 Nov, 17:00 | 4,845 MW | 5,943 MW |
| 8 Nov, 18:00 | 5,058 MW | 6,021 MW |
| 8 Nov, 19:00 | 5,033 MW | 5,986 MW |
| 8 Nov, 20:00 | 4,741 MW | 5,918 MW |
| 8 Nov, 21:00 | 5,131 MW | 5,782 MW |
| 8 Nov, 22:00 | 5,113 MW | 5,588 MW |
| 8 Nov, 23:00 | 4,996 MW | 5,401 MW |
| 9 Nov, 00:00 | 4,746 MW | 5,268 MW |
| 9 Nov, 01:00 | 5,095 MW | 5,184 MW |
| 9 Nov, 02:00 | 4,958 MW | 5,145 MW |
| 9 Nov, 03:00 | 5,272 MW | 5,166 MW |
| 9 Nov, 04:00 | 5,440 MW | 5,275 MW |
| 9 Nov, 05:00 | 5,298 MW | 5,525 MW |
| 9 Nov, 06:00 | 5,331 MW | 5,868 MW |
| 9 Nov, 07:00 | 5,872 MW | 6,121 MW |
| 9 Nov, 08:00 | 6,040 MW | 6,182 MW |
| 9 Nov, 09:00 | 6,504 MW | 6,147 MW |
| 9 Nov, 10:00 | 5,993 MW | 6,111 MW |
| 9 Nov, 11:00 | 5,639 MW | 6,077 MW |
| 9 Nov, 12:00 | 5,712 MW | 6,026 MW |
| 9 Nov, 13:00 | 5,613 MW | 5,971 MW |
| 9 Nov, 14:00 | 5,538 MW | 5,928 MW |
| 9 Nov, 15:00 | 5,680 MW | 5,939 MW |
| 9 Nov, 16:00 | 5,316 MW | 6,069 MW |
| 9 Nov, 17:00 | 5,044 MW | 6,224 MW |
| 9 Nov, 18:00 | 5,158 MW | 6,286 MW |
| 9 Nov, 19:00 | 5,227 MW | 6,232 MW |
| 9 Nov, 20:00 | 5,616 MW | 6,146 MW |
| 9 Nov, 21:00 | 5,441 MW | 6,000 MW |
| 9 Nov, 22:00 | 5,271 MW | 5,779 MW |
| 9 Nov, 23:00 | 5,088 MW | 5,565 MW |
| 10 Nov, 00:00 | 4,974 MW | 5,404 MW |
| 10 Nov, 01:00 | 5,181 MW | 5,312 MW |
| 10 Nov, 02:00 | 5,306 MW | 5,231 MW |
| 10 Nov, 03:00 | 5,260 MW | 5,236 MW |
| 10 Nov, 04:00 | 4,883 MW | 5,327 MW |
| 10 Nov, 05:00 | 4,946 MW | 5,555 MW |
| 10 Nov, 06:00 | 5,474 MW | 5,869 MW |
| 10 Nov, 07:00 | 5,531 MW | 6,102 MW |
| 10 Nov, 08:00 | 6,104 MW | 6,156 MW |
| 10 Nov, 09:00 | 6,233 MW | 6,103 MW |
| 10 Nov, 10:00 | 6,257 MW | 6,052 MW |
| 10 Nov, 11:00 | 6,232 MW | 6,003 MW |
| 10 Nov, 12:00 | 6,125 MW | 5,959 MW |
| 10 Nov, 13:00 | 6,740 MW | 5,913 MW |
| 10 Nov, 14:00 | 6,744 MW | 5,885 MW |
| 10 Nov, 15:00 | 6,702 MW | 5,903 MW |
| 10 Nov, 16:00 | 5,870 MW | 6,035 MW |
| 10 Nov, 17:00 | 5,588 MW | 6,186 MW |
| 10 Nov, 18:00 | 5,171 MW | 6,248 MW |
| 10 Nov, 19:00 | 5,376 MW | 6,191 MW |
| 10 Nov, 20:00 | 5,590 MW | 6,097 MW |
| 10 Nov, 21:00 | 5,631 MW | 5,947 MW |
| 10 Nov, 22:00 | 5,566 MW | 5,742 MW |
| 10 Nov, 23:00 | 5,346 MW | 5,542 MW |
| 11 Nov, 00:00 | 5,164 MW | 5,402 MW |
| 11 Nov, 01:00 | 5,323 MW | 5,364 MW |
| 11 Nov, 02:00 | 5,371 MW | 5,299 MW |
| 11 Nov, 03:00 | 5,292 MW | 5,309 MW |
| 11 Nov, 04:00 | 5,123 MW | 5,431 MW |
| 11 Nov, 05:00 | 5,547 MW | 5,621 MW |
| 11 Nov, 06:00 | 5,635 MW | 5,975 MW |
| 11 Nov, 07:00 | 5,760 MW | 6,193 MW |
| 11 Nov, 08:00 | 5,901 MW | 6,169 MW |
| 11 Nov, 09:00 | 6,077 MW | 6,110 MW |
| 11 Nov, 10:00 | 6,674 MW | 6,101 MW |
| 11 Nov, 11:00 | 6,381 MW | 6,069 MW |
| 11 Nov, 12:00 | 6,314 MW | 6,055 MW |
| 11 Nov, 13:00 | 6,256 MW | 6,013 MW |
| 11 Nov, 14:00 | 6,251 MW | 6,018 MW |
| 11 Nov, 15:00 | 6,077 MW | 6,023 MW |
| 11 Nov, 16:00 | 5,775 MW | 6,069 MW |
| 11 Nov, 17:00 | 5,233 MW | 6,294 MW |
| 11 Nov, 18:00 | 5,334 MW | 6,328 MW |
| 11 Nov, 19:00 | 5,505 MW | 6,231 MW |
| 11 Nov, 20:00 | 5,751 MW | 6,094 MW |
| 11 Nov, 21:00 | 5,630 MW | 5,955 MW |
| 11 Nov, 22:00 | 5,264 MW | 5,759 MW |
| 11 Nov, 23:00 | 5,271 MW | 5,567 MW |
| 12 Nov, 00:00 | 4,824 MW | 5,452 MW |
| 12 Nov, 01:00 | 5,301 MW | 5,377 MW |
| 12 Nov, 02:00 | 5,134 MW | 5,340 MW |
| 12 Nov, 03:00 | 4,983 MW | 5,340 MW |
| 12 Nov, 04:00 | 5,135 MW | 5,429 MW |
| 12 Nov, 05:00 | 5,089 MW | 5,652 MW |
Assumptions
- Only hours with both a forecast and a positive demand reading count (719 of 720 hours in the window). Missing and zero values, and readings under 30% or over 3 times the grid's own median for the window, are treated as reporting faults and left out.
- Error is (forecast minus reported demand) divided by reported demand; average error uses absolute values so high and low misses do not cancel. Bias keeps the sign and does cancel.
- Reported demand is preliminary and may be revised. A 30 day window is a short sample and one heat wave or holiday can move these figures.
- US figures are for the EIA balancing authority or region named on this page. US and European grids are ranked separately.
Related
Cite this page
World Power Monitor. (2026). PACE Demand Forecast Accuracy: Error, Bias and Worst Miss. https://worldpowermonitor.com/forecast-accuracy/pace/
World Power Monitor. PACE Demand Forecast Accuracy: Error, Bias and Worst Miss. Data as of 2026-11-12. Data from U.S. Energy Information Administration. https://worldpowermonitor.com/forecast-accuracy/pace/
@misc{wpm_forecast_accuracy_pace_2026,
title = {{PACE Demand Forecast Accuracy: Error, Bias and Worst Miss}},
author = {{World Power Monitor}},
year = {2026},
note = {Data as of 2026-11-12. Data from U.S. Energy Information Administration.},
url = {https://worldpowermonitor.com/forecast-accuracy/pace/}
} Permalink: https://worldpowermonitor.com/forecast-accuracy/pace/